No preview available
 /
     
8601_AMENDMENT TO RULES AND REGS INSPECTION FEE.pdfPI 8601-AMENDMENT I~o RULES& REGS ID Inspection Fee" I ',' Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 . Tel. 413-786-0400 Fax 4l3.-786-9927 PLANNING BOARD May 8, 2009· Recorder of Land 226 Causeway Street Boston, MA 02 I 14 To Whom It May Concern: Attached please find an amendment to the Agawam Subdivision Rules and Regulations which was approved by the Planning Board on May 7, 2009 . . Sincerely, b~ tO~J-)~ Travis Ward, Chairman AGA W AM PLANNING BOARD TWIDSD:prk cc: HeRD Town Clerk File Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 . Tel. 413-786-0400 Fax 413-786-9927 May 8, 2009 I HEREBY CERTIFY THAT THIS IS A TRUE COPY OF THE APPROVED CHANGES TO THE SUBDIVISION RULES AND REGULATI<)NS OF THE AGAWAM PLANNING . BOARD. APPROVED May 7, 2009 VOTE: 4 YES, 0 NO, 0 ABSTENTIONS . ATTEST: / AGA W AM PLANNING BOARD Amendment To Section lS9-7H(6){b) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". which now reads: The unit rate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board . . Shall now read as follows: The unit rate of inspection fee levied shall be $1.20 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 . Tel. 413-786-0400 Fax 413-786-9927 PLANNING BOARD May 8,2009 Recorder of Land 226 Causeway Street Boston, MA 02114 To Whom It May Concern: Attached please find an amendment to the Agawam Subdivision Rules and Regulations which was approved by the Planning Board on May 7, 2009 . . Sinc.erely, .~~ tO~J)~. Travis Ward, Chairrilan AGA W AM PLANNING BOARD TWIDSD:prk cc: HCRD Town Clerk File Town of Agawam 36 Main Street Agawam. Massachusetts 01001-1837 . Tel. 413-786-0400 Fax 413-786-9927 May 8, 2009 I HEREBY CERTIFY THAT THIS IS A TRUE COpy OF THE APPROVED CHANGES TO THE SUBDIVISION RULES AND REGULATIONS OF THE AGAWAM PLANNING . BOARD. APPROVED May 7,2009 VOTE: 4 YES, 0 NO, 0 ABSTENTIONS . ATTEST: AGA W AM PLANNING BOARD Amendment To Section IS9-7H(6)(b) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". which now reads: The unit tate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board. Shall now read as follows: The unit rate of inspection fee levied shall be $1.20 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board • • Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 " Tel. 413-786-0400 Fax 413-786-9927 PLANNING BOARD May 8,2009" Recorder of Land 226 Causeway Street Boston, MA 02114 To Whom It May Concern:" Attached please find an amendment to the Agawam Subdivision Rules and Regulations which was approved by the Planning Board on May 7, 2009 . . Sinc.erely, .~~ LO~.J~~. Travis Ward, Chairman AGAWAM PLANNING BOARD TWIDSD:prk cc: HCRD Town Clerk File • • Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 . Tel. 413-786-0400 Fax 413.-786-9927 May 8,2009 I HEREBY CERTIFY THAT THIS IS A TRUE COPY OF THE APPROVED CHANGES TO THE SUBDIVISION RULES AND REGULATIONS OF THE AGAWAM PLANNING . BOARD. APPROVED May 7, 2009 VOTE: 4 YES, 0 NO, 0 ABSTENTIONS . ATTEST: .. ' • • . . AGA W AM PLANNING BOARD Amendment To Section lS9-7H(6)(b) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". which now reads: The unit rate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board. Shall now read as follows: The unit rate of inspection fee levied shall be $1.20 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board To: CC: From: Date: Subject: • Planning Board • TOWN OF AGAWAM Department of Public Works 1000 Suffield Street • Agawam, MA 01001 Tel (413) 821 0600 • Fax (413) 821 0631 John P. Stone • Superintendent MEMORANDUM John Stone -DPW Supt.; File Michael Chase -Engineering; John Decker -Engineering May 7, 2009 Subdivision Inspection Fee Increase, Additional Information As requested, we have performed the following comparison between the current and proposed Agawam subdivision inspection fees and to those of several Pioneer Valley communities. We used "Windermere Estates", off of Mill Street, as a typical subdivision to model the rates. Agawam's inspection fee is per linear foot of installed item for: water, sewer, drain, and roadway. Of the other communities in the comparison only South Hadley's rate is based on a similar structure where they impose per linear foot inspection fee for: sewer, storm, road construction, and sidewalks. The other community's fees are based on a linear footage of the roadway itself. Community Length Rate Fee Ditt. Proposed Vs. Cost per LF of Roadway LF LF Agawam-Current 3079.33 $ 0.75 $ 2,309.50 $ 1,385.70 $ 3.24 Agawam-Proposed 3079.33 $ 1.20 $ 3,695.20 $ -$ 5.18 West Sll"ingfield 713.33 $ 5.00 $ 3,566.65 $ 128.55 $ 5.00 Amherst 713.33 $ . 6.00 $4,279.98 $ (584.78) $ 6.00 South Hadley See Table Below $ 6,815.99 $ (3,120.79) $ 9.56 South Hadley Inspection Fees Inspection Item Length Rate Fee LF LF Sewer 775 $ 2.00 $1,550.00 Drainage 820 $ 2.00 $1,640.00 Road 713.33 $ 3.00 $ 2,139.99 Sidewalk 1486 $ 1.00 $1,486.00 Total Fee $6,815.99 Total Feel Roadway Length $ 9.56 The proposed inspection fee increase is an adjustment of the existing fee by the Consumer Price Index (CPI) to bring it up to current level. The CPI is an accepted inflation index, and as code specifies inflation a warrant for increasing the unit inspection fee. Although the change is a 60% increase, this change is appropriate because the fee has not been adjusted for about 18 years. Developers have enjoyed the benefit of paying the fee at the 1991 level, shifting an ever increasing burden to the Town. s:\files\inspection fee increase add info 5 _09.doc / 1 of2 4-15-2009 1913 1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 . 1927 1928 1929 1930 1931 19)2 1933 1934 1935 1936 1937 19)9 1939 1940 1941 1942 1943 1944 1945 1946 1947 1949 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 196) 1964 1965 1966 1967 1968 1969 1970 1971 1972 1913 1974 1975 1976 1977 1978 1979 1980 1981 19B2 198) 1984 19B5 Jan. •. a 10.0 10.1 . 10.4 11.7 14.0 16.5 19.3 19.0 16.9 16. B 11.3 17.3 17.9 17.5 17 .3 17 .1 11.1 15.9 14. ) 12.9 13.2 13.6 13. 14.1 14.2 14.0 13.9 14.1 157 16.9 11.4 11.8 18.2 21. 5 23. "7 24.0 23.5 25.4 26.5 26.6 26.9 26.7 26.8 21.6 28.6 29.0 29.3 29.8 30 0 30.4 30.9 31.2 31. e 32.9 34.1 35.6 37.8 39.8 41.1 42.6 46.6 52.1 55.6 58.5 62.5 68.3 11.8 87.0 " 3 97 a 101. 9 IDS 5 "eb. •. a ••• 10.0 . 10.4 12.0 14.1 16.2 19.5 '18.4 16.9 16. a 17.2 17.2 11.9 11.4 11.1 11.1 11.0 15.1 14 .1 12.1 13.3 13.1 13. 14 .1 14.1 13.9 14.0 14.1 15.8 16.9 11.4 11.8 18.1 21. 5 23.5 23. B 23.5 25.1 26.3 26.5 26.9 26.7 26. B 27.7 28.6 28.9 29.4 29.8 30.1 30' 3 •• 31 2 32.0 32.9 34.2 35.8 38.0 39.9 41. 3 42.9 4i.2 S2.5 55.8 59.1 62.9 69.1 18.9 81.9 94.6 91.9 102.4 106.0 Mar. •. a • •• • •• 10.5 12.0 14.0 16.4 19.7 lB.3 16.7 16.8 11.1 11.3 11.8 17.3 17.1 17.0 16.9 15.6 14.0 12.6 13.3 13 .7 13 14.2 14.1 13.9 14.0 14.2 16.0 11.2 17.4 17.8 18.3 21.9 23.4 23. a 23.6 25.8 26.3 26.6 26.9 26.1 26.8 27.8 28.8 28.9 29.4 29 8 301 30.5 30.9 31.3 32.1 33.0 34.3 36.1 38.2 40.0 41.4 43.3 47.8 52.7 55.9 59.5 63.4 69.8 80.1 88.5 " 5 " . 102.6 106.4 • Apr. •. a •. a 10.0 10.6 . 12.6 14.2 lEi.7 20.3 18.1 16. i 16.9 17.0 17 .2 17 .9 17 .3 Ii .1 16.9 17 .0 15.5 13.9 12.6 13.3 13.8 13.7 14.3 14.2 13 .8 14.0 14.3 16 1 17 .4 17 5 17 a la , 21 • 23 a 23.9 23.6 25.8 26.4 26.6 26.8 26.7 26.9 27.9 28.9 29 0 29"5 29.8 30.2 30 5 309 31.4 32.3 33.1 34.4 36.3 38.5 40.1 41.5 43.6 48.0 52.9 56.1 60.0 63.9 70.6 81.0 "1 94.9 98.6 103.1 106.9 H.y '.7 ••• 10.1 10.7 12.8 14.5 16.9 20.6 17.7 16.7 16.9 17 .0 17.3 17.8 17.4 17.2 17.0 16.9 15.3 13.7 12.6 13.3 13.8 13.7 14.4 14.1 13.8 14.0 14.4 16.3 17.5 11.5 17.9 18.5 21. 9 23.9 23.9 23.7 25.9 26.4 26.7 26.9 26.7 27.0 28.0 28.9 29.0 29.5 29.9 30.2 30.5 30.9 31.4 32.3 33.2 34.5 36.4 38.6 40.3 41.6 43.9 48.6 53.2 56.5 60.3 64.5 71. 5 81.8 89.8 ~5. 9 99.2 103.4 107.3 U.S. Department ot Labor Bureau or Labor Stlthtics Washington, D.C. 20212 Consumer Price Index All Urban Consumer::J -(CPI-O) U.S. city average •. a ••• 10.1 10.8 13.0 14.1 16.9 20.9 17.6 16.7 17.0 17 .0 17 .5 17 .1 17 .6 17 .1 17 .1 16.8 15.1 13.6 12.7 13.4 13.7 13.8 14.4 14 .1 13.8 14.1 14.7 16.3 17.5 '17 .6 18.1 18.7 22.0 24.1 23.9 23.8 25.9 26.5 26.8 26.9 26. ? 27.2 28.1 29.9 29.1 29.6 29.8 30 2 30.6 31. 0 J1. 6 n.4 3J.3 34.7 36.6 38.8 40.6 41. 7 44.2 49.0 53.6 56.8 60.7 65.2 72.3 82.7 90.6 91.0 99.5 103.7 107.6 All iteJU 1982-84-100 July • •• 10.0 10.1 10.8 12.8 15.1 17 .4 20.8 17.7 16.8 17 .2 17 .1 17.7 17 .5 17.3 17 .1 17 .3 16.6 15.1 13.6 13.1 13.4 13.7 13.9 14.5 14 .1 13.8 14.0 14.7 16 , 17.4 17.7 18.1 19.8 22.2 24.4 23.7 24.1 25.9 26.7 26.8 26.9 26.8 27.4 28.3 29.0 29.2 29.6 30.0 30.3 30.7 31. 1 31. 6 .32. 33.4 34.9 36.9 39.0 40.7 41.9 44.3 49.4 54.2 57.1 61. 0 65.7 73.1 82.7 91. 6 97.5 99.9 104.1 107.8 Auq. ••• 10.2 10.1 10.9 13.0 15.4 17.7 20.3 17.7 16.6 17 .1 17.0 17.1 17.4 17 .2 17.1 17.3 16.5 15.1 13.5 13.2 13.4 13.7 14.0 14.5 14.1 13.8 14.0 14.9 16.5 17 .3 17.7 18.1 20.2 22.5 24.5 23.8 24.3 25.9 26.7 26.9 26.9 26.8 " lB. 28.9 29.2 29.6 29.9 30.3 30.1 31. 0 31. 6 32.7 33.5 35.0 37.0 39.0 40.8 42.0 45.1 50.0 54.3 57.4 61. 2 66.0 73.8 83.3 92.3 97.7 100.2 104.5 108.0 sap. 10.0 10.2 10.1 11.1 13.3 15.7 11.8 20.0 17. 5 16.6 17.2 17 .1 17.7 17.5 17.3 17.3 17.3 16.6 15.0 13.4 13.2 13.6 13.7 14 0 14.6 14.1 14 .1 " 0 15. 16.5 17.4 17.7 18.1 20.4 23.0 24.5 23.9 24.4 26.1 26.7 26.9 26. B 26.9 27.4 28.3 28.9 29.3 29.6 30 30.4 30.7 31.1 31. 6 32.7 33.6 35.1 37.1 39.2 40.8 42.1 45.2 50'.6 54.6 57. 61.1; 66.5 74.6 84.0 93.2 97.9 100.7 105.0 108.3 oct. 10.0 10.1 10.2 11. 3 13.5 16.0 18.1 19.9 17.5 16.7 17.3 17.2 17.7 17.6 17.4 1 i. 2 17.3 16.5 14.9 13.3 13.2 13.5 13.7 14.0 14.6 14.0 14.0 14.0 15.3 16.7 11.4 17.7 18.1 20. B 23.0 24.4 23. "7 24.6 26.2 26.7 27 0 26 a 26.9 27.5 28.3 28.9 29.4 29.8 30 30 , 30.8 31.1 3I. 7 32.9 33.7 35.3 37.3 39.4 40.9 42.3 45.6 51.1 54.9 57.9 61.6 67.1 75.2 84.8 93.4 98.2 101.0 105.3 108.7 Nov. 10.1 10.2 10.3 11.5 13.5 16.3 18.5 19. B 17.4 16.8 17.3 11.2 18.0 17.7 17.3 17.2 .... 17.3 16.4 14.7 13.2 13.2 13.5 13.8 14.0 14.5 14.0 14.0 14.0 15.4 16.8 17.4 17.7 18.1 21.3' 23.1 24.2 23.8 24.7 26.4. 26.7 26.9 26.8 26.9 27.5 28.4 29.0 29.4 29. B 30.0 30.4 30.8 31.2 31.1 32.9 33.8 35.4. 37.5 39.6 40.9 42.4 45.9 51. 5 55.3 58.0 61. 9 61. 4 15.9 85.5 93.7 98.0 101.2 105.3 109.0 Dec. 10.0 10.1 10.3 11.6 13.7 16.5 18.9 19.4. 17.3 16.9 17.3 17 .3 17.9 17.7 17 .3 17 .1 17 .2 16.1 14.6 13.1 13.2 13 13 14 0 14.4 14.0 14 .0 14 .1 15 l' • 17 , 17.8 1 e.2 21.5 23.4 24.1 23.6 25.0 26.5 26.7 26.9 26.7 26.8 " 6 28.4 2B 29.4 29.B 30 0 30 , 30 9 31.2 31.9 32.9 33 • 35.5 37.7 39.8 41.1 42.5 46.2 51. 9 55.5 58.2 62.1 67.7 76.1 86.3 94.0 97.6 101.3 105.3 109.3 Bn~all Av • ••• 10.0 10.1 10.9 12.8 15.1 17.3 20.0 17.9 16.8 17.1 17 .1 17.5 17.7 17 .4 17 .1 17 .1 16.7 15.2 13.7 13.0 13.4. 13.7 13.9 14.4 14.1 13.9 l'LO 14.7 16.3 17.3 17.6 18.0 19.5 22.3 24.1 23.8 24.1 26.0 26.5 26.7 26.9 26.8 27.2 28.1 28.9 29.1 29.6 29.9 30.2 30.6 31 .0 31. 5 32.4 33.4 34. B 36.7 38.8 40.5 H.B 44.4 49.3 53.8 56.9 60.6 65.2 72.6 82.4 90.9 96.5 99.6 103.9 107.6 Percent Dec· 0." 1.0 2.0 12.6 18.1 20.4 14.5 2.6 -10.8 -2.3 2.4 0.0 3.5 ·1.1 -2.3 -1. 2 0.5 -6.4 -9.3 -10.3 o. a 1.5 3.0' 1.' 2.' -2.8 0.0 0.7 -9.9 '.0 3.0 2.3 2.2 18.1 a.a 3.0 -2.1 5.9 6.0 o. a 0.7 -D.7 0.4 3.0 2.9 1.8 1.7 1.4 0.7 1.3 1.6 1.0 1.' 3.5 3.0 ,.7 5.2 5.5 3.3 3.4 a.7 12.3 5 .• , . 5.7 '.0 13.3 12.5 a •• 3. a 3 .• 3 .• 3.a change Avg- Av, 1.0 1.0 7 •• 17 .4 18.0 14.6 15.6 -10.5 -6.1 La 0.0 2.3 1.1 -1.7 -1. 7 0.0 -2.3 -9.0 -9.9 -5.1 3.1 2.2 1.5 3. , ·2.1 -1.4 0.7 5.0 10.9 6.1 l.7 2.3 a .3 14.4 a.l -1.2 1.3 7 .• I.' o. a 0.7 -0.4 1.5 3.3 2.a 0.7 1.7 1.0 1.0 1.3 1.3 1.6 2 •• 3.1 '.2 5.5 5.7 ,. , 3.2 5.2 11.0 •. 1 5 a 6 5 7 5 11. 3 U.S 10.3 6.2 3.2 '.3 3.6 4/16/2009 ~·n.?V • Hp." "P'U'.' UW~, ~~~u.'''-',<U~~'~'~' "~, u-:, .. ~ ... 1986 109.6 109.3 10B.8 108.6 10a.9 109.5 109.5 109.7 110.2 110.3 110.4 110.5 109.6 '-I '-, 1987 111. 2 111.6 112.1 112. '1 113.1 113.5 113.8 114.4 115.0 115.3 11 S. II 115.4 113.6 ••• 3. , 1988 115. '1 116.0 116.5 117.1 117.5 H8: 0 118.5 119.0 119.8 120.2 120.3 120.5 118.3 ••• •. 1 1989 121.1 121. 6 122.3 123.1 123.8 124.1 124.4 124.6 125.0 125.6 125.9 126.1 124.0 .. , .. , 1990 127. II 128.0 128.7 128.9 129,2 129.9 130.4 131.6 132. '1 133.5 133.8 133.8 130. '1 '.1 S .• --71991 134.6 134.8 135.0 135.2 135.6 136.0 136.2 136.6 137.2 137. II 137. B 137.9 *H-3.1 '.2 <-1992 138.1 138.6 139. J 139.5 139,7 140.2 140.5 140.9 141. 3 141. 8 142.0 141. 9 14. 2. , '.0 1993 142.6 143.1 143.6 144.0 144.2 144.4 144.4 144.8 145.1 145.7 145.8 145.8 144.5 2. , 3.0 1994 146.2 14 6. 7 147.2 147.4 147.5 148.0 148.4 149.0 149. II 149.S 149.7 149.7 148.2 2. , 2. , 1995 150.3 130.9 151.4 151. 9 152.2 152.5 152.5 152.9 153.2 153.7 153.6 153.5 152.4 2.5 2 .• 1996 154.4 154.9 155.7 156.3 156.6 156.1 157.0 157.3 151.6 156.3 156.6 158.6 156.9 3.3 3.0 1997 159.1 159.6 160.0 160.2 160.1 160.3 160.5 160.6 161. 2 161.6 161. 5 161.3 160.5 l.1 2.3 1996 161.6 161.9 162.2 162.5 162.6 163.0 163.2 163.4 163.6 164.0 164.0 163.9 163.0 '-, 1.6 1999 164.3 164.5 165.0 166.2 166.2 166.2 166.7 161.1 167.9 166.2 166.3 166.3 166.6 2.' 2.2 2000 166. a 169.6 171.2 171. 3 171. 5 172.4 112.6 1'12.6 173.7 174.0 174.1 174.0 112.2 3 •• 3 .• 2001 175.1 175.8 176.2 176.9 177.7 178.0 177.5 177.5 178.3 177.7 177.4 176.7 177.1 '-, 2 •• 2002 177 .1 177.6 176.6 179.6 179.8 179.9 160.1 180.7 1B1. 0 181. 3 181. 3 180.9 179.9 2 .• '-, 2003 161. 7 183.1 164.2 IB3.8 183.5 183.7 183.9 184.6 185.2 185.0 164.5 184.3 184.0 1.9 2.3 2004 185.2 186.2 167.4 188.0· 189.1 189.7 189.4 169.5 189.9 190.9 191. 0 190.3 18a.9 3.3 ", 2005 19.0.7 191. 8 193.3 194.6 194.4 194.5 195.4 196.4. 198. B 199.2 191.6 196.8 195.3 3 .• 3 .• 2006 198. J 196 . ., 199.8 201. 5 202.5 202.9 203.5 203.9 202.9 201.8 201.5 201.8 201. 6 2. S 3.2 2007 202.416 203.499 205.352 206.686 201.949 208.352 208.299 207.917 206.490 208.936 210.177 210.036 207.342 •. 1 2 .• -7 2008 211.080 211. 693 213.528 214.823 216.632 218.815 219.964 219.086 218.783 216.573 212.425 .nO.228 215.303 0.1 3 .• 2009 211.143 212.193 212.709 -j1 ? of2 4116/20094'08 PI- '59-7 :d so I the ,d to : has Iding In a f the , the shall :oard e the the lfded f the e of e an ,f all .1d as ed to or to ,tody, lence til be Indby shall ,II be § 159-7 • SUBDIVISION OF LAND • (3) Extension of time. If the 'time schedule is altered, notice must be given to the Planning Board which, at its discretion, may extend the time of completion, provided that any securities then held by the Town must be reviewed and increased as necessary to cov~r any increased.cosl'of improvements. As part of the increased costs, the cost increment due to inflation of construction costs shall be added to the bond or cash security posted by the applicant. The Engineering News Record Construction Cost or similar index most accurately reflecting Agawam's liability, as determined by the City Engineer, will be used to arrive at the increased construction cost. [Amended 12-5-1996], (4) Upon' request, partial release of securities shall be made upon acceptance by the Board of the work COf"-"ted. (5) Building lot bond. A performance bond will be required of contractors or other pal1ies constructing residences upon vacant lots where curbs, sidewalks, treebelts and other municipal facilities have been placed at' the lot. frontage. The requirements for this bond shall conform to the applicable provisions of Subsection H(2) of these regulations. The bond amount shall be br.sed upon the potential damage of Town facilities plus administrative costs. It shall be' the responsibility of the developer to ensure that ,all permitted but uncompleted residences existing in the subdivision' at the time of suhdivision bond rele",~ have proper building lot honds. (6) Inspection fee. [Added 3-21-1991] (a) There shall be a fee instituted to pay for the costs pf inspection.' The fee shall be based upon the linear footage of roadway, water lines, sewer lines and drainage lines. The footage shall be as measiired on the approved definitive plans. Any substantial increase in constructed footages over the plan footage shall result in a prorated increase in fee. Roadways shall be measured along the center line, from its beginning intersection with an existing street layout line or other beginning point to the final intersection with another street or existing layout line, so as to encompass all proposed rights-of-way. Culs-de-sac shall be measured on the basis of a center line extendi ng straight through the center of the cul-de-sac to the far edge of the layout. Water line connections and building sewers in the right-of-way will not be included in the measurement for fee determination, except where their length exceeds 40 feet. (b) The unit rate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to' be undel1aken, e.g., roadway, sewer, water ,or drain.[When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board] , 159: 15 07·01 • 2008 , wes+ ;) pv-f:e J j '6' Approval Not Required Plan.-Form A Preliminary Subdivision Plan -Form B Definitive Subdivision Plan -Fonn C Amended Subdivision Plan -Form CC More TIlan One Building Plan -Form D _____ ~ Inspection Charges Public hearing notice APPENDlXC ·APPLrCATION FEES $50 + $20 Ilot for plans containing more than 3 lots $100 + $20 110t $250 + $30 Ilot with approval of preliminary plan $500 + $50 I lot without approval of preliminary plan $100 I affected lot $500 + $50 I building $5 per lineal foot of roadway $250 per detention I retention I subsurface leaching basin $65· (check made payable to the West Springfield Record) All checks except that for the Public Hearing Notice are to be made payable to the TO\"n of West Springfield. All fees must be submitted in full at the time of application in order for an application to be deemed complete. • • /" . /" , I / / • Section II.B. (continued) Planning Board are hereby authorized to sign said endorsement. If the Board " determines that the plan does require approval under the Subdivision Control Law, it shall, within twenty-one (21) days of submission of said plan, so inform the Clerk of its detennination. Before the Board makes its decision, a review by the Town Engineer is required. n.c. Basic Requirements No person shall make a subdivision within the meaning of the Subdivision Control Law or any land within the Town or proceed with the.improvement or sale of lots in a subdivision, or the construction of ways, or the installation of municipal services therein, unless and until a Defensive Plan of such subdivision has been submitted to and approved by the Board as hereinafter provided, and subsequently recorded at the Hampshire County Registry of Deeds and. in the " case of registered land, with the recorder of the Land Court. II.D. Zoning Subdivisions shall meet the Rules and Regulations pertaining to lot size and restrictions to water courses under existing zoning laws. No subdivision rules can affect the size, shape, width, frontage or use of lots except that compliance with the requirements of the zoning bylaw will be requ~red. " II.E. Ellgineering The Definitive Plan shall be prepared by a Registered Land Surveyor. Construction details shall be designed by a Registered Professional Engineer. II.F. Fees The following application fees shall be paid at the time of the filing of subdivision applications: I. ANRIForm A 2. Preliminary Subdivision Plan 3. Detinitive Subdivision Plan 4. Definitive Subdivision Plan if no Preliminary Plan has been filed 5. Amendment to a Definitive Subdivision Plan ----/'5" 6. Inspection $50/two lots + $10 extra lot $500 plus $75 per lot $500 plus $100 per lot $1,250 plus $200 per lot $350 plus $75/affected lot $6!linear foot of new road John Decker From: Sent: Richard Harris [planningsh@southhadley.org] Tuesday: April 21, 20099:21 AM To: 'Yem Lip'; John Decker Subject: RE: Subdivision Inspection Fees Good Morning Mr. Decker, Our subdivision inspection fee schedule is as follows: INSPECTION FEES - [ Sewer Mains & Appurtenances Stann Drainage & Appurtenances Road Construction, including curbing & paving Sidewalk . $ $ 2Ilineal foot J 211ineal foot $ 311ineal foot $ Illineal foot • Just for future reference, all of the Planning Board fees (Special Permits, subdivisions, site plan review, etc.) are on the Town's website -on the Planning Board page. If you have any questions, please feel free to contact me. Sincerely, Richard Harris, AICP South Hadley Town Planner From: Yem Lip [mailto:yemdpw@comcast.net] Sent: Tuesday, April 21, 2009 9:00 AM To: 'John Decker'; Richard Harris Subject: RE: Subdivision Inspection Fees John, Richard Harris,is our Town Planner. He can help you out with subdivision inspection fees. Yem From: John Decker [mailto:JDecker@agawam.ma.us] Sent: Friday, April 17, 2009 12:57 PM To: yemdpw@comcast.net Subject: Subdivision Inspection Fees Hello Mr. Lip. I was wondering what your Town subdivision inspections fees for water, sewer, drain and roadway? Thank you, -John John Decker, E.I.T. Assistant Town Engineer Town of Agawam Department of Public Works 1000 Suffield Street Agawam MA 01001 Email: jdecker@agawam.ma.us Phone: (413) 821-0628 Fax: (413) 821-0631 4/2112009 l'age 1 or 1 ., • • . . Town of Agawam ·36 Main Street Agawam, Massachusetts 01001-1837 Tel. 413-786-0400 Fax 413-786-9927 AGAWAM PLANNING BOARD Proposed Amendment To Se.ction 159-7H(6)(b) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". which now reads: The unit raie of inspection fee Je~ied shall be $0.75 per linear foot measured on each ofthe four categories cited above. The total inspection fee shall be equal to the unit rate· times the total footage of each line category of inspection (roadway, water~ sewer and drain lines) as measured by the City Engineer.· The fees described above· must be paid prior to the commencement of . construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or'other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works·and approved by the Planning Board. Shall now read as follows: The unit rate of inspection fee.levi.ed shall be $1.20 per linear foot measured on' each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. . The fees described above must be paid prior to the commencement of : construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other.factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board . • • AGAWAM PLANNING BOARD The Agawam Planning Board will hold a public hearing on Thursday, April 2, 2009 at 7:00 PM at the Agawam Public Library, 750 Cooper Street, Agawam, MA. The purpose of this hearing will be to hear the petition of the Agawam Planning Board on a proposed amendment to Section \ 59-7H(6)(b) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". Per order of: Travis Ward, Chairman AGAWAM PLANNING BOARD To be run 3/\9 & 3/26/09. To: CC: From: Date: Subject: i/. • TOWN OF AGAWAM Department of Public Works Planning Board File John Stone -DPW Supt. February 6,2009 1000 Suffield Street • Agawam, MA 01001 Tel (413) 821 0600 • Fax (413) 821 0631 John P. Stone • Superintendent MEMORANDUM Subdivision Inspection Fee Increase The Department of Public Works proposes that the subdivision inspection fee outlined in Town subdivision code be increased to $1.20 per linear foot from the current $0.75. The fee does not appear to have been adjusted since its inception in 1991. $0.75x CPJ(2008) =$0.75x 215.303 =$0.75xI.581 =$1.19 Sa $1.20. CPJ(l991) 136.2 ' Y Consumer Price Index (CPI) yearly average data from: !'~I'P' //1:1)1 HI S GO\' Ip! IB/SPFCiAI R!:Q! )[";irS/Crltelll"! 'IX'I' If you have any questions please do not hesitate to contact me. Sincerely, ~- ~hnP. Stone . Supenntendent of Pub he Works JPS/jgd s:\files\inspcction fee increase feb 2009.doc