Loading...
TR-2010-9 APPROP FOR WESTFIELD RIVER 7� .1 __ J 6/, TR-2010-q A RESOLUTION AUTHORIZING THE APPROPIATION OF $151,000.00 FOR CONSTRUCTION OF THE EMERGENCY STREAM BANK PROTECTION ALONG THE WESTFIELD RIVER FROM THE WASTEWATER RETAINED EARNINGS ACCOUNT Whereas, it is necessary for the Town of Agawam to construction emergency erosion protection for a sewer interceptor along the Westfield River; and Whereas, the Town of Agawam has $15 1,000.00 in Wastewater Unreserved Retainq% Earning available for this project; and Whereas, the Town of Agawdm has entered into a contact with the Department of t& Army dated January 4, 2010; and Whereas, th e terms of the contact will provide the placement of approximately 80'Pinear c-n feet of steel sheeting along the Westfield River as erosion control and river bank Ch stabilization by the Department of the Army; and Whereas, payment for the contact is due to the Department of the Army on March 1, 2010; NOW THEREFORE, The Agawam City Council hereby resolves to appropriate $15 1,000 from the Wastewater Retained Earnings Account (22500-315 10) for the construction of the Emergency Stream Bank Protection. DATED THIS DAY OF RA11�4�, 2010 ' 7 1 PER ORDER XFTH CITY COUNCIL Cr ,�sehtw Coo ar—L C CLA-k-') Donallkheault, President AP ROVED AS TO OR AND LEGALITY Vincent �. 6io-sc7ia, Solicitor MAYORAL ACTION Received this dayof 2010 from Council Clerk. Signed by Council President this ) (0!� dayof . 2010, APPROVAL OF LEGISLATIO By the powers vested in me pursuant to Article 3, Section 3-6 of the Agawam Charter, as amended, I hereby approve the passage of the above legislation on this day of 2010. /? zz Richard.A. Cohen, Mayor DISAPPROVAL OF LEGISLATION By the powers vested in me pursuant to Article 3, Section 3-6 of the Agawam Charter, as amended, I hereby veto the passage of the above legislation on this day of 20 10 for the following reason(s) Richard A. Cohen, Mayor RETURN OF LEGISLATION TO COUNCIL CLERK Returned to Council Clerk this -7 day of 20 10. TR-2010-q A RESOLUTION AUTHORIZING THE APPROPIATION OF S151,000.00 FOR CONSTRUCTION OF THE EMERGENCY STREAM BANK PROTECTION ALONG THE WESTFIELD RIVER FROM THE WASTEWATER RETAINED EARNINGS ACCOUNT Whereas, it is necessary for the Town of Agawam to construction emergency erosion protection for a sewer interceptor along the Westfield River; and Whereas, the Town of Agawam has $15 1,000.00 in Wastewater Unreserved Retained Earning available for this project; and Whereas, the Town of Agawam has entered into a contact with the Department of the Army dated January 4, 2010; and Whereas, the terms of the contact will provide the placement of approximately 80 linear feet of steel sheeting along the Westfield River as erosion control and river bank stabilization by the Department of the Army; and Whereas, payment for the contact is due to the Department of the Army on March 1, 2010; NOW THEREFORE, The Agawam City Council hereby resolves to appropriate $15 1,000 from the Wastewater Retained Earnings Account (22500-315 10) for the construction of the Emergency Stream Bank Protection, DATED THIS DAY OF JANUARY, 20 10 PER ORDER OF THE CITY COUNCIL OD Donald Rheault, President AP OVED AS TO OR AND LEGALITY Vincent �. 6i&zia' Solicit-or TOWNbFAGAWAM Department of Public Works 1000 Suffield Street - Agawam NU 01001 Tel (413) 821-0600 - Fax (413) 821-0631 Anthony M, Sylvia, PE — Superintendent MEMORANDUM To: Richard A. Cohen, Mayor From: Anthony Sylvia, P.E.—DPW Supt. C C.. City Council; File Date.- 1/27/2010 Subject: Westfield River Bank Stabilization The Town of Agawam owns, operates and maintains a sanicary'sewer force main located beneath the Westfield River, conveying wastewater to the Springfield Water& Sewer Cornmission's treatment plant on Bondi's Island. The force main broke in 2008 and emergency repairs took place through Bruschi Brothers Construction Co. with engm' eenng assistance by Tighei &Bond. The fmal step of repair is to stabilize the River bank by installing approximately eighty linear feet(80 LF) of sheeting in cooperation with the Army Corp of Engineers. The ACOE submitted a proposed Agreement to the Town in December 2009, which outlines the project and the cost-sharing- Article VI-A,I of the Agreemeat notes the Town's portion at $15 1,000 and the FedmW shwe at $309,000 for a total estimated project cost of$450,000. The Agreemat was executed under the previous administration, and the ACOE sent us 1/5/2010 correspondence(copy attached)requiing payment of the $15 1,000, due by 3/1/2010. Pending authorization by the Treasurer and Auditor, I would recommend use of the =reserved retained earnings within the Wastewater Enterprise Fund which currently has mfficient fUnds. Please let me know of any questions or need for additional documentation. Sincerely, Anthony K Syllia;PE,DI?W Supt. Attachment: ACOE 1/5/2010 Letter DEPARTMENT OF THE ARMY NEW ENG�AND DISTRICT, CORPS OF ENGINEERS 695 VIRGINIA ROAD CONCORD, MASSACHUSETTS 01742-2751 REPLYTO: OATTEWrIONOP: January 5, 2010 Eagineering/Planning.Division Planning Branch Mr. AAony Sylvia, Superintendent Department of Public Works 1000 Suffield Street Agawam,Massachusetts'01001 Dear Mr. Sylvia: Enclosed for your use are two fully executed copies of the Project Partnership Agreement (PPA)for the Emergency Streambank Protection Project along the Westfield River in Agawam, Massachusetts. As stipulated in Article VI. of the PCA, your estimated cash contribution toward project costs is S 15 1,0 00.' We request that you transmit a check to cover this amount payable to L'FAO, USAED,NEW ENGLAND"to the attention of the Project Manager, Mr. Robert Russo. Tl-�s office mu t receive the check prior to our scheduled contract issue date, tentatively scheduled for March 1,2 01 O� If you have any questions or require any additional information, please contact me or Mr. Russo, at(978) 318-8505 or(978) 318-8553, respectively. Sincerely, ii��R el.1y h ef f PIM6 Enclosures fNX