TR-2013-29 CIP BUDGET (PH-2013-4) PUBLIC HEARING ■
�- 0 Xa
Town of Agawam, Massachusetts
ti
Capital P �p`�
s Amended
-al Year 2014 to Fiscal Year 2018
tS�S
S
t
r .
a
4 �
,
Submitted «
MayorRichard A., COhen,
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - fiscal Year 2018
Eis cal ear ZQ14 Appropriat on S-chedule
G=oJ Fury nr pr'atio
Projected
feet escri t`onAmmiM
Hampden County Land Acquisition $9,500.00
Department ofPublic Works Equipment $194X0.00
Street Improvement Pro $150, 00.00
Sidewalk Rehabilitation and Extension S5,000.00
Permit Tracking Software . $35,000.00
Fire Department Station 2 Electrical Service $73,000.00
Fire Department Hydraulic Extrication Equipment(Jaws of Life) $ 2,000.00
Inspections Services Department Motor Vehicle $l 8,663.00
Clark School Energy System $135,000.00
Junior High Rooftop Air Conditioners $240,000,00
TOTAL S l b
5
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2414 - Fiscal Year 2018
Fiscal Year2014 ro ' t`o u ti d
Write)rater Fund An r riat
Projected
Wastewater Equipment Replacement $47,174.00
TOTAL
Projected
PrJW Q0!gd0n11
Water Department Equipment Replacement $47,147.00
TOTAL
Agar m tunic na1 QWf Come Appnph
Projected
Ewicct Descri tp i ►n
Municipal GolfCourse Equipment Replacement $10,000.00
TOTAL t1
6
Town of Agawam
Capital Improvement Program, a&Amended
Fiscal Year 2014 Fiscal Year 201
Elsc l Year 2Q1.4 Bf)-ading Schedule
Gener l Furkd PEQ1itcts
Projected V Year
Pr ect Dopriwiott unt Delft mri
Fire Street Road hriprov ents $5241000.00 $58,5K00
Suffield Street Drainage Irnprovements $30%000.00 $33,500.00
High School Bathroom and Locher Room Renovation $2,08 ,000.00 $198,8 5.t
Early Childhood Center $4,000,0K00 $380,000.00
Wa tewa er Fund Pzaieci
Projected 1"Year
Pro" t 12gaWntion Amout ebt smio
Westfield River Force Main Design, $300,000.00 $28,500.00
Water Find 1'rWmh
Projected I" Year
P tr y e ' Q AmQu Debt Serrriee
Water Main Construction -forth Westfield Street $4,88 ,000.00 $463,6K00;
half Course Proiect
Projected V Year
Prod ct Desgd Lion Amount 1261mice
Golf Carts $315,+0(1 OO $77,175.00
Town of Agawam
Capital Improvement Program, as Amended;
Fiscal Year 2014 - Fiscal Year 2018
Fiscal Year. 2fl15 Appropriation Sgitedulf,
Geneial Fund Appropriation
Projected
I'r 'ect critr
Hampden County Land acquisition $9, 00.00
Department of Public Works Equipment $182,000.00
Street Improvement Program $160,000.00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $ 0,0OO.O0
Permit Tracking Software $35,000.00
Fire Department Repair Vehicle $371000.00
Fire>Department inspector's Vehicle $3 ,000.00
Fire Department Communications Receiver $12,000.00
Malice Station Renovation - Feasibility Study& Preliminary Design $25,000.00'
Robinson Park School Energy Management System $1 0,000.00'
tl
Pool Filtration System - Junior High School $150,000.00
TOTAL W5.500.00
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 201
Fiscal r 2,015 Appropriation Schedule nt" ed
Wgig ater bUd pl 12datiQns
Projected
Proms D=.6 m Amour
Wastewater Equipment Replacement $47,17 4.00
TOTAL J1ZJL4.J0A
Water Fund A¢�€�rr� "attar
RW.j -uoipJi= Amount
Water Equipment Replacement $47,147�00
TOTAL BUEM
Agawam MpWgi12al!QQJfCQ=c Ap=righm
PrQiw
PrQ-jw pcsilipl
Municipal Golf Course Equipment Replacement $15,00 .0
TOTAL L X=
9
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 201
Useal Ycar 2015 Bonding Schedule
general Fund'Projects
PrQi"!9d I'Year
Pra t Description A=unl Debt Service
High School Track&Bleachers $2,350,000.00 $277,500.00'
Wotewater Eund Fnjygs
PrQjeet DesWptiun AmQu EJ►elst Service
Westfield River Backup Force Main Construction $2,000 000.00 $200,000.00
VACTOR Truck $400,000.00 $100,000.00
Water Fund ProjgcAs
PEgiwed
EMject eseritRrn AMM& Debt e_ ic ;
Water Main Design -Main, Suffield and Reed Streets $455,000.00 $47,750,00
10
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 201
J'iscal Year 1+ prop iatiog Schgdule
den - Fund Aw=riatigns
pwiect Dmg ' burr Am2un
Hampden County Land Acquisition $9,5 0.00
Department of Public'Works Equipment $i 50,000.00
Street Improvement Program $400,000.00
Sidewalk Rehabilitation and Extension $40,000.00
Traffic Light Improvements $ 0,000.00
Fire Department SUV $ 6,000.t
TOTAL $ =
3Mgt Lwater Fund ate rations
prQ.ject Description
Wastewater Equipment Replacement $47,174.00
TOTAL 4
f;l
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
`sea 1 n ao a e uule a i ed
�tez-Fund x�ry "stigma
PrQj
ected
Pr jest Descri Lion Am u
Water quippment Replacement $47,147.00
TOTALWj!LWj
Agmmi Municil2aI Gal +Course_A ph ions
ErQiQQWd-
Pwiect p ion
Municipal Golf Course Equipment Replacement $15,000.00
TOTAL
1
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
Fiscal Ykar 2O t- Bnn WR Schedule
-Water Eund Pwigctts
rlw t ' yeff
Proct des ti�on Amount Dght smi!p!g
Water Main Construction - Main, Suffield& Reed Streets 2,600,000.00 $260,000.00
1
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
Fj ca 2 a ti + ul
{general Fund ApyLopriaiiens
c,ieet Dge ` tics t
Hampden County Land Acquisition $9, 00.00
Deparftnent of Public Works Equipment $150,000.00
Street improvement Program $500,000.00
Sidewalk Rehabilitation and Extension '$50,000.00
Fire Department Special'Hazards Vehicle $100,000.00
TOTAL 90220.0
Wastewater Emad tion
Pwjw l es p °on AMDMiA
Wastewater Equipment Replacement $47,174.00
TOTAL 142aL4,N
1
Town;of Agawam
Capital Improvement program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
Fiscal Ygar 2016 Appropriation Schgduk(Continued)
Water Eund nr® 'at c2ns
Proms 'e&t 12mchlition AmQ-uD-t
Water Equipment Replacement S47,147M
TOTAL m
Agave 1" tnieinago-If Ajmvialtians
r�r w l2r.5gription Amaurt
Municipal Golf Course Equipment Replacement $15,000.00
TOTAL
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018'
Fiscal Year 2Q117 londingchdule,
Water Fund Proj
FEW99LQd tl
PWjggt 9 scriplion AmQ= petit Service
Water Main Design - Silver Street to Elm Street; $192,500.00 $19,625.00
Water Main Design - South Street $200,000.00 $20,000.00
1
"Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 4 Fiscal Year 2018`
'sc l Ycar 2018-Appmria-tion e
eneraj Eund AppMbatigns
Ernimw
f ro'el ct T3ecriF ion Am=t
Hampdcn County Land Acquisition $ ,500.00
Department of Public Works Equipment $160,000.00
Street bripro ement Program $500,000A
Sidewalk Rehabilitation and Extension $50,000.00
Traffic Light Improvements $ 0,+Cl00.0l
Fire Station Improvements and Repairs $50,000.00
TOTAL
Wastewater Fund AnrorYaiions
EMigpt Dgapidalign
Wastewater Equipment Replacement $47,174. 0
TOTAL
17
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
Fiscal e io a i d
)ygig FungiElmd A112prurialignN
kwiWed
I!rQ.icct Desaiption
Water Equipment Replacement $47,147.00
TOTAL }�1
Agawam M icilval QoWCoum Ap ro jatioa
PW1iQA Ito t
Municipal Golf Course Equipment Replacement $15,000.00
TOTAL �i
1
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 - Fiscal Year 2018
Eisc l Year 2Q18 R-Qndjug Sghgdple
Water Eun+d Froiects
°eel Degiqdpfio Ammi Debt Swj
Water Main Construction - Silver Street to Elm Strut 1,100,000.00 $110,000.00
Water Main Construction - South Street $1,500,000.00 $1 0,000.00
1
Town of Agawam
Capital Improvement Programs, as Amended>
Fiscal Year 2014 — Fiscal Year 2018
PROJECT DESCRIPTIONS
I, MUNICIPAL BUILDINGS
FIRE DEPARTMENT STATION 2 ELECTRICAL SERVICE
t Station Two,the electrical service line from the street to the station and to the electrical panel
in the station needs to be upgraded in order to facilitate installation of the new generator. The
existing electrical system is almost fifty years old and has been modified heavily over the life of
the building. It now needs to be upgraded.
FIRE STATION IMPROVEMENTS AND REPAIRS
Funds are requested to make improvemcnts and repairs to both fire stations in fiscal year 2018 in
order to increase the longevity of the buildings and to provide state of the art facilities.
POLICE STATION RENOVATION
Funds have been set aside to provide for a use and feasibility study for repairs;and improvements
to the Police Station,
II. PUBLIC WORKS
HIGHWAY DEPARTMENT EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be caned from one fiscal year to the next in
order to provide funning for large,high cost Department of Public Works trucks and other capital
equipment
Over the past few years several trucks and other departmental equipment have been replaced and
financed over a number of years; Included in this line item arc the annual lease payments for a
dump truck, a CAT front end loader and a Toro 16 foot winged rotary mower. The fiscal year
2014 lease payments total $144,200,00, In fiscal year 2014, the equipment request includes the
purchase of a cargo van to replace a 1996 Ford E 250 used by the Engineering Department and
the replacement of a 2001 Ford -1 0 with over 95,000 miles with a Ford F-250 4X4. In fiscal
year 2015, funds are requested to purchase a Trackless MT
20
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 — Fiscal Year 2018
Municipal Tractor to replace a 1993 Milton Brower Tractor which finally met its end because
parts are no longer available to repair it. The tractor is used in conjunction with a snow thrower
for clearing the 19.07 miles of sidewalks after each snowstorm. Funds are also requested to
replace a 2002 Ford Ranger with 80,000 miles with a Ford F-250 4X4 with plow, The frame and
body of the Ranger are rusted.
STREET IMPROVEMENT PROGRAM
Funding is required for the improvement and maintenance of local roadways. Improvements
include the construction, reconstruction, widening and resurfacing of roads and the installation
and repair of drainage structures and systems. Funds will be utilized in combination with
Chapter 90 funding to meet routine maintenance, preventative maintenance and improvement
requirements. Annual increases in this account are recommended based upon the Pioneer Valley
Planning Commission Pavement Management Study performed in 2010..
SIDEWALK REHABILITATION AND EXTENSION
The Department of Public Works Highway Division's sidewalk construction and repair team will
continue rehabilitation work on sidewalks throughout the community. Funds will be used to
extend walks to provide connections to schools and recreation facilities. Future increases in this
account are recommended in order to implement a Sidewalk Master Plan currently under
development.
TRAFFIC LIGHT IMPROVEMENTS
VEMENTS
Funds are included to provide for upgrades of equipment and software for existing traffic lights,
PINE STREET ROAD IMPROVEMENTS
In conjunction with Phase 11 of the ]Feeding Hills Southwest Serer Extension, Pine Street will
have to be rehabilitated, graded and resurfaced.
SUF'FIELD STREET DRAINAGE IMPROVEMENTS
The culverts on Suffield Street are inadequate to provide drainage during storms. Funds are
included to enlarge the existing culverts to correct this problem. It is anticipated that partial
Funding of this project will be provided from the Massachusetts Emergency Management
Agency to reduce the costs to the Town for this project.
21
Town of Agawam
Capital tal Improvement Program, as ;Amended
Fiscal Year 2014 — Fiscal Year 2018
It. PUBLIC WORK -WASTEWATER
WASTEWATER EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
n a scheduled maintenance program, Funds may be carried from one fiscal year to the next in
order to provide funding for large, high value,wastewater capital equipment.
WE TI~IELD RIVER BACKUP FORCE MAIN
Failure of the newer force main during fiscal year 2008 required emergency repairs during which
the 10 inch backup Force main was used to continue flows to Bondi's Island. This backup force
main should be completed to be ready to be put in service should any of the existing four river
crossings fail in the future, Assistance will be sought from local communities that share the use
of the force main.
IV. PUBLIC WO -WATER
WATER REPARTMENT EQUIPMENT
An annual capital appropriation is included to provide for:the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide funding for high value, large water capital equipment:
NORTH WESTFIELD StREET.WATER MAIN CONSTRUCTION
The treed for the 24 inch water amain in North Westfield Street from the intersection of North
Street and North Westfield was first recommended in 2009 by Tighe and Bond based on a
hydraulic model of the Town's water system. The 24 inch water main is the highest priority of
the infrastructure improvements required to supply water to the Tb 's water distribution system
in the event that Springfield's southerly water transmission main were to be shut off for repair or
replacement.
The project consists of the installation of a 24 inch water main from the intersection of° north
Westfield Street and North Street to Springfield's middle transmission retain. The project also
- 22
Town of Agawam
Capital Improvement program, as Amended
Fiscal Year 2014 — Fiscal Year 2018
calls for installation of a 12 inch water main to from the middle transmission main to the
intersection of North Westfield Street with North West Street and the installation of an 8 inch
main the remainder of the distance north on North Westfield Street to the Westfield town line.
At that time ( 009) it was;planned to have the water main improvements incorporated into the
overall reconstruction of North Westfield Street(Rt. 187)but that project has been hindered with
permitting delays and has not reached the 75% design threshold) required to place it on the
Pioneer Valley Planning Commission's Transportation Improvement Flan for funding.
In the meanwhile,on November 26, 2012 Springfield's southerly transmission line experienced a
failure between North West and North Westfield Streets resulting in the Springfield Water and
Sewer Commission "SW SC") shutting down the southerly transmission line from Provin
Mountain to Colemore Street. The southerly transmission main is approximately 84 years old.
The SWSC has conducted an inspection of the pipe and is currently rendering repairs to allow
the line to be brought back into service for the near-term, but the failure and the results of the
inspection on this section of pipe have pushed the scheduled replacement of the southerly
transmission line up significantly.
Due to the acceleration of the southerly transmission line replacement project by Springfield, the
Town of Agawam needs to proceed with the North Westfield Street Water Main Improvement
Project independently of the reconstruction of North Westfield Street to ensure that the Town has
an adequate supply of drinking water.
MAIN SUFFIELD AND REED STREETS WATER MAIN IMPROVEMENT
e Springfield Water and Sewer Commission is planning maintenance work on their
transmission mains from: which we receive our water. A portion of the mains will be takers out
of service for the work. Hydraulic modeling of our system indicated that we do not have
sufficient capacity in our distribution system to insure adequate pressure for our residents if we
lase service from more than one connections. We need to build flow capacity in an east-west
direction. Funds are requested to construct a?twelve inch water main on Reed Street to replace
650 feet of six inch asbestos cement pipe and 1,050 feet of four inch cast iron pipe. This will
also improve the east—west flow capabilities as well as fire flows.
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2:014 — Fiscal Year 201
SILVER STREET—ELM STREET WATER REPLACEMENT
Funds are requested to replace the existing -six inch main running between Main Street and
Suffield Street with a twelve inch main to improve the east — west flow capabilities as well as
fire flows.
SOUTH STREET WATER MAIN REPLACEMENT
Funds are requested to replace the existing six inch main with: 5,420 feet of eight inch ductile
train water main.
V. MISCELLANEOUS
PLACE PERMIT TRACKING SOFTWARE
e Town of Agawam utilizes a permit tracking system "MGMS" to track and manage its
building related permits: The application is being utilized fair beyond its capacity and the
performance of the application continues to suffer to the paint where looking up information can
take 20 to 30 seconds per query. Upgrading permit tracking software would allow the Clerk's
office and the DPW to manage their permits and business licenses electronically in MLNIS.
Funds are included in appropriations to both FY2014 and FY2015 for full implementation in
FY2015.
FIRE DEPARTMENT HYDRAULIC EXTRICATIQN EQUIPMENT JAWS OF LIFE'
Funds are requested to replace two hydraulic power plants and hoses that are in excess of twenty-
five 25) years old. Hydraulic power plants are mission critical for the Fire Department and
supply the energy to operate extrication tools (haws of life that are used to disentangle victims
from vehicle crashes and heavy machinery,
FIRE DEPARTMENT lviC3TC}R VEHICLES
]Funding; is included in fiscal year 2015 to replace the Fire Department repair vehicle, a 190
Ford utility body pickup truck. This aging vehicle is relied upon to perform many tasks
including pick up and transport of vital parts and equipment, transport of tools used in the field
-24
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 — Fiscal Year 2018
for repairs, towing the; department rescue .boat and transport of heavy hoses, including
emergency response I-1AZMAT supplies. Funds are also needed to replace the Fire Inspector's
vehicle. In fiscal year 2016, fonds are requested to replace a 2010 Ford Escape with a hybrid
vehicle. Finally, in fiscal'year 2017 funds are needed to replace the special hazards vehicle with
newer used equipment.
FIRE DEPARTMENT COMMUNICATIONS RECEIVER
Funds are requested for installation of a communications receiver site at the Agawam Industrial
Park
INSPECTIONS SERVICES DEPARTMENT MOTOR VEHICLE
Funds are included for the replacement of a 1999 Ford Ranger with a Ford F-150 in the
Inspections Services Department.
GOLF COURSE GOLF CART FLEET
The fleet of golf carts needs replacement with seventy new carts. The present fleet is twelve(12)'
years old, with an average eaf five to seven carts down for repairs at all times during the season
due to their age. Some carts need significant, costly repairs in order to get them mnning,
GOLF COURSE EQUIPMENT
n annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. 'Funds may be carried from one fiscal year to the next in
order to provide funding for high value,large Municipal Golf Course capital equipment.
HAMPDEN COUNTY LAND ACQUISITION
Agawam acquired most of the holdings of the Hampden County government that were within the
Town's boundaries when the county was dissolved. The Town i required to reimburse the other
county communities for their share of these assets:
2
Town of Agawam
Capital Improvement Program, as Amended
Fiscal Year 2014 — Fiscal Year 2018
V1. SCHOOL DEPARTMENT
SCHOOL REPAIRS
These projects will continue to be funded through annual appropriation. They include a new
energy management system at James Clark Elementary School, rooftop air conditioners at the
Junior High School, a new energy management system at Robinson Park Elementary School, and
a new pool filtration system at the Junior High School.
LilGILSCHOOL LOCKER RQOM AND BATHROOM RENOVATIONS
Pursuant to the NEASC report, funds are included to provide for locker room and bathroom
refurbishment at the High School. This renovation is also needed to comply with Title Nine
requirements.
EARLY CHILDHOOD CENTER
The Early Childhood program has outgrown its present location on Perry Lane. A new facility is
needed to allow for much needed additional classroom space as well as to provide for private
bathroom and changing rooms for small children and an area for teachers to meet with parents.
HIGH SOH OOL ALL WEATHER TBACK AND BLEACHER REPAIR
An all weather track With field runways would greatly improve conditions while reducing
maintenance costs. Drainage facilities would also be included, Wooden bleacher planks
continue to rot and require replacement each year. This safety project will encompass sand
blasting and painting the metal runners and replacing the wooden planks with aluminum. A
special committee is presently researching the project to include the track, concessions, all
surrounding facilities and amenities,
- 26 -
IT$ 8 a g.8, lal g " g a a avi a$ a
,
"
«
8�18,g8t8ge 8; Bg8 8gg'e` aQ 8 4By$8Q[8858y�� pgp.88 8
,
8 #88 8aa,g'ag 8 ^a as a aaaB8i8.gga 8
"
w
iY r a c I ipg{S� jg8'gBtla S
P3MC
p �. � t i �i4„#S I 14�IV L rig ., �i6' I i;7S jF�,��29FR T
a s's 8,918 8 c SIB 8 P 8i8i ':8 ii, l
g S'B g a&B"8 g a
" P
R
�, ga x ,. a s.s «� +c�" s'
"
a mgg9�8 a B as r g"asa.a$ E al S 8 8 a 8 B as a a a
r, °s 18'aiatg 1 si a,a 8 a a . :a a ,a'a a. a
aa,gsaa 8 w as aaagas Aila�B' . as a a, a aaaia.48 a
I
8S'BB�ga 8 8` :8 a, B,aaa'8a - a s as a s a a,a a
sl 14 E , Tl III.I. ;�� � � ae l� Fig,'f s R a a;g g a
r s s *"II is "is v ffx �� ,
is a 8 8:8 8.8`B 8ix t
a`~a ;a s a 4 to°8 8 a a 8T8 a= •8's g a, a
e _ "
fli
.a `+pia'. : '� : a g 8`a R a•aAa "a agig g +* Y a are ala a a
gig I
r {- ,8xaaa8`8x8 8, :B8 BsBaag 8si rB«8g 8S" a88a a $'8ae,aa,aa a
B B:
a8 ,ag#g88ai8a8 >gs p! 8ga 98p81
g 8 S.a a8 � 8 8q:$'a8a', a 8
. , ��ag ,°atelag8a.g8� a' s gg a,aa•a,eg as -ig:, � �a'8assa� �erag �s a g s'aa a $ a
111Na� �..aQx s� �»�'�x� '•�� �c-�8sr",r'� ,�ai,xz .s'7 � � �: a
g,uas ea9STS Risasa aa, Big Big aa a ,as _ geag•a r ease - . a asit
� a �' .9�� a {:i�tgl ;-�?�� .�� -.t��x:�w� g "'�# x��� $iR= •�i ,�, �$ � � � s
a
ie
g" ga a.s aBgt �kta BS88$ ,aa as6g, 88i8q :s8i #8,8 8 8 s E 8# g 8 a
,
�'a' s"a � "rr•�� � .� :s g 8"�°s��. Rom' � "is i � q�'s;s.$I� P «i , '� ; �s� � �
s' s�$ a `8"e gas.aa8y .g(as Psg � - las"'�� a ' ar:s��a ,ss r ; �,�r w g •
M
w
x
a
a 8:9 11 8kC�8;E x s{a gi g a a B; I ; i ` . 8'b $ E �R 8�8 s'
1 ` Ria a g g g
ao- i 10zx gib a:# i s#xr
,
i
I 1.11.1
'Municipal Cori' Course 10 o $15, $15,WO 1
mom ,xx
SR# J Y
t} ..
t
w...t
$400,000 f
h
rr�t\ht�t rs���
f
Y y
$ '°'"
8-
Gerieral Fund
bvisiinq Sri d Cc,,,,Sts (FY2014 -- FY201,8)
YZ,'O 14 Y201 15 FY20 16 FY201 7 FY2-01 6-
Ftre Headquarters $ 107,535
T'w,ka,hat I'vrf Frm,-n $ 62, 545 $ $
scha*f prvjects I -, 11 1 ZOO,4138 94 3,191,50
I'di t V Commun&Y Septic Mana -,,,1 mt 3,477
$ 3,337 $ 3,198 $ 3, 2,921
Pubfik. Library ENwarmiam $ 2 ac"3!5c. $ 26-,B,4&) $ 2 610,7 10 $ 242,120 s, 234,660
Apajamm KqJl Schoo� Libramy cm $ 48,810 $ 441,960 $ 45,130 $ 44,310 4 Z,LOG,
Fwe Defwrtmml Aerfal Plafforin Trvck $ 76,406 $ - $
9) P,W Fwfity Acquasitt4m, 721 811 t, $ '70,560r940 56,603
D P,,W, Facility Alterofians 99,964 $ 87,024 $ 94,672 $ 82,320
$ $ 16,746 $ 16,00,1 $
Middle SchatA Roof 3 3,6,60 S 32,5601 $ 31,660 30,800 $ 79,920
Midge A Juno- High Repmrs, 9"1 so $ 8,860 $ 1%m 1640,
F"'Iew."I'dry schlmls - ATHkAor clawooms 122,4t)O $ I a 4(X) $ 115,2c,* $ 112,MKI $ 1 108,8010
Senior Center coltsfmmelion $ 1548,740 $ 536,415 $ 522,815 $ 507,!�15 4 90,940
Fire punvArr I'mck's $ 66,910
Perry Lame Pow N-4yalions $ 2C675 $ 25,950 $ 25,1%- $ 24,21,K) 18,394
Ph'A'Se I'l, Stormwe"'er, Completion $ 6,538 $ 6,538 $ 6,5348k $ 6,538 $ 6,1538
W,Ading Maialenance SuidvV E'Poemsicrt $ 13,520 $ 12,3('X) $ 12,3(X) $ 11,9CK) $ 6,700
Y'cwp WW* rekpfwmt,, Syrtam 66,860 $ 63,600 $ 62,40D $ 6 MO
5114 $ 2,6m,,63Z $
2,313,639 2,105,924
Nne !,`*'rze DIct.W VP
"MIR
z5u,ffitlld SfreO,
p I 3k,
,Ahakl'� S c4 Locker i-lo-c-im, d $ $ 98 $25
m
f",,"or,ty ChWdhcud Center 80, $ P1,000 $
Existing Bond Costs (FY2024-FY201,.8)
1500,Oclo
cro
FY2014 FY2OJ 5 FY2016 FY2017 FYZOI 8
-29-
&eneral Fund
P r� � p�ed New � Costs J 1201. Y2
ter,.
FY2014 IF 20 6 FY2017 FY O S
Pima r tel Road Improv manti xs r.
430
x )
' k f t s
.K)„0100
f}r s,
3 s ,
General Fund
Tol-al Bond Costs �` �
be grans and reimbursements)
Y2 1
,ri j c t d New Seed Costs
91,
OW Projectec.1 Bond Costs (FY2014 - Y 0 8);
(before g n- ` and reimbursements)
�3 W) I'
OW, 03LI 1
v
� e
„
,OL "ti
„W , "
a,.
$500,
.,u
1
General Fund
(after grants and reirnburserments)
Prqiectcd New Batull, Costs 0 0 $6,70,905 $932,205
6,953 tt
rojected Total Boni Costs (Y2,0,1 xi.y, 1 )
(after greets and reimbursements)
4 ,50
,500,MID
€ ��ijtfi�tttt�
tft{✓fz7�F£t' 1
a0
Exisfirig, Sid Costs (FY2014FY2018)
" + t efd River a n, $ , ,1 `
"
`� 04 1, 01 off, 9r7 61
63,504 61,740 59,976
z 825
ate -) ,� a
35 115
w, 6i.,, 4,41 �;•�';"�
wt,3%'" a"+ ,r"s',°o,3 5 ti.�..v3,
66,1 e.70
1,692,036
Existing a Cosh's FY2 r , Y2018'
7 o-o
600� (
3Ol01,
200,00,
33
Self SUS S Funds
Pro
_New Bond Costs
Westficid Awtr a cku Foref mwn otsiqi,
Weslfa f r Risser Sackup Force hkain ctr
aAC'OP Tmvc ma., %'Xl 9 6, tea
O Moir, CmSt ur-I'mr - North W «tt^get Street $ 11 463,600,
t Water a a. are - 4i 50fiel"d A keed St s $ 7,"7 ,
"sags~ main C'On structi n, malm, Ofiaakd, A Reed Streets
a
Wattr Mtaif� Desir SiNer to M, Street x
Water, Adir, Design .. Smauth, sir e
Water Aaakak Constmelim n Sher to Elm,
Projected New Bond Cos' (F 2014 - FY2 1
7
mr00 t :;�yf 1}ylt
k 4 �tT-�..i151� pap
m ,("Mom fd44k�'?st `tY
f
s
$ 00 cioo j,, c$- Op
E
-34-
Funds
Total Costs ft2 F Y �
(before grants and reimbursernents)
Existim
ss
Total Projected Bond Costs FY20 -FY20 8)
befo . grwits ami reimbursemeats)
1 F oc
Y �
'c)'o
$1,400;OWOWO
1,200, "
,i, 00,
i
$400,000
Self Systainin& Funds
Pro ted Total lived Cosh
fte ra . and r mbur neri
FY2014 FY2015
i fasV, SomeeCosts $686,805 $6 ,693 $5M0,768 $574j,237 $559,911,1
Projected, w Bone: Costs, 7 1 7 $7 4 4
aK r� k5,436
Projected Total SOAd roosts FY2,01 . FY20 )
(affe,r grants and, m em n s)
00
$1,4W,000
$1,20o"00,0
'rot,
2„000 �b
CK)m -
tx
$A10 'lit 4
,
t
Agawam,looms 411B fill loom fill loll loll moms loll loll look OWN
Town of ,ss
Capital Improvement Program
Fiscal Year 2014 o Fiscal Year 2018
U,
4
vl{
4 ��
Sub Subm itted :
Town of Agawam
Capital Improvement Program
Fiscal Year 201 Fiscal Year 201
TABLE OF CONTENTS
ITEM PAGE NUMBER
(1) Cover Memorandum to City Council I
(2) Introduction 2
(3) List of Projects(Bonding& Appropriation Schedules) (FY2014.- FY2018) S
(4) Project Descriptions 20
( )', Bond Payment Spreadsheet 28
( ) Chart-Budget Appropriations 2
(7) Chart -`Existing Bond Costs 30
(8) Chart-Projected New Bond Costs 31
( ) Chart- Projected Total Bond Casts(before grants and reimbursements) 32
(10) Chart - Projected Total Bond Casts (after grants and reimbursements) 33
(1 l) Chart - Self Sustaining Funds - Existing Bond Casts 34
(12) Chart- Self Sustaining Funds - Projected New Bond Costs 35
(13)` Chart- Self Sustaining Funds - Projected Total Bond Costs (before grants and reimbursements) 36
(14) Chart- Self Sustaining Funds- Projected Total Bond Costs (after grants and reimbursements) 37'
-
�t ,r4ti
Town ot Agawam
Memorandum
To Agawam City Council
From: Richard A. Cohen, Mayor
Date. April 8, 2013
Subject; Capital Improvement Program (Fiscal Year 2014-2018
Pursuant to Section 5-3 of the Agawam Home Rule Charter, I hereby submit the Capital
Improvement Program for Fiscal Year 2014 to Fiscal Year 2018 to the Agawam City Council.
The Capital Improvement Program is a prioritized plan of proposed capital improvements over
the next five fiscal years. The major purposes of the Capital Improvement Program are as
follows
(a) to develop and prioritize needed proposed capital improvement projects,
(b) to research and estimate the revenue necessary to fund proposed capital improvement projects;
(c) to set parameters on the revenue dedicated to fund proposed capital improvement protects;and
(d) to forecast future principal and interest expenditures,
The program presented represents a realistic financially feasible long term program that
has been reviewed with the Council Capital Improvement Sub-Committee. As revenue
estimates become available, revisions shall be made and incorporated in the capital budget
portion of the annual'budget. Please call with any questions.
Respectfully submitted,
Mayor Richard A. Cohere
Capital Improvement Program
Fiscal Year 2014 - Fiscal "ear 2018
INT&ODUCTION
For the purposes of this Capital Improvement Program, a capital improvement is a project or
undertaking which provides for ( ) the planning, design, construction, reconstruction, renovation or
replacement of a public building or facility; (ii) an addition to a public building or facility; (''.) the
purchase of land, buildings or facilities for a public purpose; or (iv) a long range development study.
While the type of improvement is the basic criteria, a project costing at least $20,000 that has a life
expectancy of ten (10) years or more is generally considered to be a capital improvement.
The Capital Improvement Program is designed to accomplish the following purposes.
L To utilize town funds for capital improvements:which are:compatible with the..
town"s mission of effective and efficient provision of quality services to the
citizens and businesses of Agawam whichain turn enhance the quality of life in
our community;
2. To undertake Capital Improvement Projects on coordinated basis;
. To inform the community when needed and planned Capital Improvement
Projects and corresponding expenditures are to be expected and initiated in the
future;
4: To utilize town funds on the basis of community priorities in coordination with the
availability of grantsand/or other state, federal or private reimbursements; and
5. To undertake Capital Improvement after careful planning and financial analysis to avoid
2
an undue burden on the to "a fiscal capacity now and in the future.
After many years of limited capital investment, the town was faced with many desperately needed
projects which had to be undertaken in spite of projected limited revenue growth. Fiscal restraint and
careful planning are required to assure long term stability, and care must be taken in project
development and implementation in order that bond sales are timed so that principal and interest costs
occur in the year scheduled. In addition, the funding requirements of the Education Reform hill have
placed severe limits on the To 's ability to undertake needed capital improvements.
In developing this Capital Improvement Program the following general assumptions on fiscal
capacity were assumed and applied;
l. Growth , total property tax revenues will continue to be limited by the
restraints is of Proposition 2 l and no debt exclusion overrides are
contemplated in this plan,
. The town will pursue the maximum property tax revenue allowed by
Proposition 2 1,
For the upcoming fiscal year and future years, the Administration is continuing
to recommend a greater emphasis be placed on capital improvements; and
4. During the next five years, the town should:
a. Appropriate as much funding as possible annually from the general
fund for capital improvements on a pay as you go basis while
maintaining existing service levels
b. Utilize the Stabilization Fund if necessary to assist in meeting the above
referenced goal for level principal d interest payments.
3
The process of capital planning involves setting priorities within the fiscal capability of the to
Each year the entire plan is reviewed in light of changing needs and requirements. There are more needs
for improvements by town departments that can be included in a five year time period, and certainly the
net school spending requirements of the Education Reform Bill may cause further delays in snaking
capital improvements.
In developing the recommended Capital Improvement Program, the following priorities were
addressed.
1. growth - The town must meet the needs of a growing population and at the
same time direct and manage growth through the timing of public utility
expansion;'
. Improve or Assi;j Servige Delivery - Projects that will reduce the need for staff
increases or make staff operations more efficient have been given priority;
.. Facilities New and Maintenance of Existing Facilities - When Proposition 2 1
was implemented communities were forced to delay constructing new facilities
and defer maintenance on existing facilities which has led to the current
backlog of need for new facilities and the provision of maintenance to existing
facilities, and
. Prior commitments e Town is bound by commitments made in,prior years;
e commitments were considered in the proposed budget and program.
The attached Capital Improvement Program was developed around the previously cited constraints
and program objective . It includes a bonding and appropriation plan for each of the five program
years, a brief description of each project item, spread sheets and charts showing existing and proposed
band payments and graphical. representations of these payments.
4
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 2018
JEi5ggl Yegr 2Q14 ApprQp rialion Schedule
General Fund Appropriations
Projected
P olect Description Amount
Hampden County Land Acquisition $9, 00.00
Department of Public Works Equipment $19 ,000.00
Street Improvement Program $1 0,000.00
Sidewalk Rehabilitation and Extension $5,000.00
Permit Tracking Software $35,000.00
Fire Department Station 2 Electrical Service $7 ,000.00
Fire Department Hydraulic Extrication Equipment (Jaws of Life) $22,000M
Inspections Services Department Motor Vehicle $18,66 .00
Clark School Energy System $13 ,000,00
Junior High Rooftop Air Conditioners $240,000.00
TOTAL
5
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 2018
Eiscal Yggr 2014 o 1 chcd t. d
Wastewater Fund Appropriations
riations
Projected
oiect Oescri tine Amoun
Wastewater Equipment Replacement $47,174.00'
TOTAL
Water Food Appropriations
Projected
ft.ject Deseriplion Qlwt
Water Department Equipment Replacement $47,147,00
TOTAL
A&Iwam Munic; ate 1 Golf . u s Awro 'ations
Projected
`ect'I e- Lion
Municipal Golf Course Equipment Replacement $10,000,00
TOTAL 1 =
6
Town of Agawam
Capital Improvement Program
Fiscal Year 201 - Fiscal Year 2018
Fiscal Year 20141 ondina Schedule
neral Fund Pro°ects
Projected V Year
Project Descri ion unt Debt Service
Pine Street Road Improvements $ 24,000.00 $68,580r00
Suffield Street Drainage Improvements $300,000.00 $33,500,00
High School Bathroom and Locker Room Renovation $2,08 ,000.00 $1 8,825.00
Early (childhood Center S4,000,00U0 $380,000.00
Wastewater. Fund Project
Projected V Year
Project Deser tion Amunt D-di.-Lenice
Feeding Hills Southwest Sewer Extension Phase II $10,700,000.00 $1,016,500.00
Westfield River Force Main Desip $300 000.00 $28,600,00
Water umd Projects
Projected VYear
l!1QJerA Desgripli Amu= Debt Servigc
Water Main Construction -North Westfield Street $4,880,000.00 $463,600.00
Q&Cote Pr °ects
Projected 1�t Year
pr�iect sc ion unt DQbt Service
Golf C $316,000.00 $77,17 .00
7
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 2018
Baral Year 5 App-twiation Sg hedule
General Fund ApprQpriations
Projected
Rr iectDcacription Amount
Hampden County Land Acquisition $9,5 0,00
Department of Public Works Equipment. $182,000,00
Street Improvement Program $16 ,000,00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $30,000.00
Permit Tracking Software
$35,004.00
Fire Department Repair Vehicle $37,000.00
Fire Department Inspector's Vehicle $35,000. t
Fire Department communications Receiver $12,000.00
® Police Station Renovation-Feasibility Study &c Preliminary Design $25,0K00
■ Robinson Park School Energy Management System $150,000.00
Pool Filtration System -Junior High 'School $150,00UO
TOTAL
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 2018
Elscal.Year 2015 Aoropdafio-n.Sdeduleo tit ed
Wastewater Fund Ap=-12riatims
Projected
Pjggt I-cscri tionAmQun
Wastewater Equipment Replacement $47,174.00
TOTAL
Whaler F d Ax�nrgpriat on
"ecte
Project Desc ' tio, Amou
Water Equipment Replacement 47,147.00
TOTAL jCa4
AgawAm-b&micjrLa1 GolfCourse Ap rop iaati ns
',fir 'ec ed
Project Qe2cril2lion A, d t
Municipal Golf Course Equipment Replacement S15,000m
TOTAL 5 00
FFTown of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 201$
Fiscal Near 2015 Hondi Schedii
General Fuznd Projects
Projected V Y
Pr ject Descri t� ion: AmQunit Debt Service
High School'Track& Bleachers 2,350 000.00 $277,500.00
ante ater Fund P `acts PxDi t d st Ye
Prima ct DesghZign Arnq Debt Se ice
Westfield River Backup Force Main Construction $2,000,000.00 $200,000.00
Feeding hills Sewer Southwest Phase III Design $3 3,000.00 S39,650.00
VACTOR Track $400 000.00 $100,000.00
meter Fund Projects
P— Ly—=
P'r jet Desc-' try ion Amon Debt,5glyice
Water Main Design - Main, Suffield and Reed Streets $455,000.00 $47,750.00
10
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 -Fiscal Year 2018
Fiscal Year 2016 p prgUriation Sc te-duie
general Fed Apprnpriattp,
PLQject Descri flan
Hampden County Land Acquisition $9,600m
Department of Public Works Equipment S 150,000m
Street Improvement Program $400,000.00'
Sidewalk Rehabilitation and Extension $40,000.00
Trade Light Improvements $30,000.00
Fire Department SUV $36,000,00
TOTAL $665.50Q.00
3Mastewatq Fund A r priations
o' t
Prrject Desorption o t
Wastewater Equipment Replacement $47,174.00
TOTAL
11
TownofAgawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 2018
is al Year 2016 ApprQprigtignSchedule ont'
W Igr Eund &proyriations
E �ec� t Dogbptioja Amok
Water Equipment Replacement $47,147.00
TOTAL
Agawam Municipal Golf C-Qurse Appm riai --l-io s
r '
PrQject DescriZiion Am=
Municipal Golf Course Equipment Replacement S 1 5,0W00
TOTAL
12
Town of Agawam
Capital m t Program
Fiscal Year 201 - Fiscal Year 2018
Figgl Year 2016 Bonding Schedule
°Waggwater Fund Projects
REQjCc11-.d ! ear
Pr-gje j l escri lion AmoCant 12 ermic
Feeding Hills Southwest Sewer Phase III Construction $3,900,000.00 $ 90,000.00
water E nd Prs °ect
r coed � e
Projegj Desc g—n AM 12 bA service
Water Main Construction - Main, Suffield &Reed Streets $2,600,000.00 $ 60,0K00
13
Town of Agaw m
Capital Improvement Program
Fiscal Year 2014 -Fiscal Year 2018
Fiscal Yea
r-2017 Approriation Schedul,
General Fund ADnropriatioa5
1 ' cd
PrQ.j uc, , tioa Amount
Hampden County tend Acquisition S9,500.00
Department of Public Works Equipment $150,000.00
Street Improvement Program $ 00,Q00M
Sidewalk Rehabilitation and Extension $50,00�0.00
Fire Department Special Hazards Vehicle $100,000M
TOTAL 5
)MasWwatgj Fund ApPropriatigns
r`
Project Desc "' tion Amool
Wastewater Equipment Replacement $ 7,1 4M
TOTAL ULiaa
14
Town of Agawam
Capital improvement Program
Fiscal Year 2014 - Fiscal Year 2018
]'iscat Ypr 2016 Appropriation Schedu AContinu_ed
Water Fund A print ons
Ur ject
ect Dr tiun Am=t
Water Equipment Replacement $47,147.00
TOTAL
A ;awarn;;Muni ipal Golf`CggL5e .App riations
Pro-jrragd
erect Description Amou
Municipal Golf Course Equipment Replacement $15,000.00
TOTAL- Waal 0
1�
Town of Agawam
X
Capital Improvement Program
Fiscal Year 201:4 - Fiscal Year 2018
Eiscal,Tear 2017 Bonding Schedule
Wastewater Fund Projects
r c qd is"
rQ`ect 12gsdzim -mount Dgbt Service
Feeding Hills Southwest Fewer Phase IV Design $388,000.00 $39,400.00
ajecte' J'Ne
"mt ct De cri titan t Stryige
Water amain design - Silver Street to Elm Street. $192,500.00 $19,625.00
Water Main design - South Street $200 000,00 $20,000.00
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 - Fiscal Year 201
Fiscal Year 2018r0 riat Q �elye�ltale
enffa_l Fund Appropriations
PLWected
Erjaiegi 12eaghplion A of t
Hampden County Land Acquisition $9,500.00
Department of Public Works Equipment $160,000°00
Street Improvement Program $500,000.00
Sidewalk Rehabilitation and Extension $50,000.00
Traffic c Eight Improvements $30,000.00
Fire Station Improvements and, Repairs $50,000.00
■
TOTAL $222,00.00
Wastew ter F° d&inphafiwis
`acted
Project escri t
Wastewater Equipment Replacement $47,174.00
TOTAL JEX41,0
17
Town of Agawam
Capital m rovement Program
p
Fiscal Year 2014 •- Fiscal Year 2018
fiscal Year 2018 ro ria " ti d
Watt Fund Appropriations
a l
Er!Q,ject DeagdZion Amoun
Water Equipment Replacement $47,147.00
TOTAL WjAzM0
Aeanam— MunigipAl GolfCgme A nations
Fr .
PrQ"ect etc tion AnYd.u,nl
Municipal Golf Course Equipment Replacement $l , 00.0
TOTAL
18
Town of Agawam
Capital Improvement Program
P
Fiscal Year 2414 _ Fiscal Year 2018
Fisc Year 201 B—ondin Sc iLd-uIe
Wastewater Pd Proiet
P "ected " Yegr
Pr-Wea Utsc i tion m!L)ant Deljt Service
Feeding Hilts Southwest Sewer Phase IV Construction $3,755,300.00 $ 87,765.00
-Water fund Prowects
Peg ed Jae
Descril2lion Amount DQbt Sermice
Water Main Construction - Silver Street to Elm Street $1,100,000.00 $110,000.00
Water Main Construction- South Street $1,500,000.00 $1 0,000.00
19
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 — Fiscal Year 2018
PROJECT DESCRIPTIONS
1. MUNICIPAL BUILDINGS
FIRE DEPARTMENT TMENT STATION 2,ELECTRICAL SERVICE
At Station Two, the electrical service line from the street to the station and to the electrical panel
in the station needs to be upgraded in order to facilitate installation of the new generator. The
existing electrical system is almost fifty years old and has been modified heavily over the life of
the building. It now needs to be upgraded.
FIRE STATION IMPROVEMENTS AND REPAIRS
Funds are requested to make improvements and repairs to both fire.stations in fiscal year 2018 in
® order to increase the longevity of the buildings and to provide state of the art facilities.
■ POLICE STATION RENOVATION
.Funds have been set aside to provide for a use and feasibility study for repairs and improvements
P p P
to the.Police Station.
II. PUBLIC WORKS
HIGHWAY DEPARTMENT ENT EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide:funding for large, high cost Department of Public Works trucks and other capital
equipment.
Over the past few years several trucks and other departmental equipment have been replaced and
financed over a number of years. Included in this line item are the annual lease payments for a
dump truck, a CAT front end loader and a Toro 16 Foot winged rotary mower. The fiscal year
2014 lease payments total 144,2 0.00. In fiscal year 2014, the equipment request includes the
purchase of a cargo van to replace a 1996 Ford E 250 used by the Engineering Department and
the replacement of a 2001 Ford -150 with over 95,000 miles with a Ford F-250 4 4. In fiscal
year 2015, funds are requested to purchase a Trackless MT
- 20
Town of Agawam
Capital Improvement Program
Fiscal Year 2014—Fiscal Year 2018
Municipal Tractor to replace a 1993 Milton Brower Tractor which finally met its end because
parts are no longer available to repair it. The tractor is used in conjunction with a snow thrower
for clearing the 19.07 miles of sidewalks after each snowstorm. Funds are also requested to
replace a 2002 Ford Ranger with 80,000 miles with a Ford F-250 4X4 with plow. The frame and
body of the Ranger are rusted.
STREET IMPROVEMENT PROGRAM
Funding is required for the improvement and maintenance of local roadways, Improvements
include the construction, reconstruction, Widening and resurfacing of roads and the installation
and repair of drainage structures and systems. Funds will be utilized in combination with
Chapter 90 funding to meet routine maintenance, preventative maintenance and improvement
requirements. Annual increases in this account are recommended based upon the Pioneer Valley
Planning Commission Pavement Management Study performed in 2010.
SIDEWALK REHABILITATION AND EXTENSION
The Department of Public Works Highway Division's sidewalk construction and repair to will
continue rehabilitation work on sidewalks throughout the community, Funds will be used to
extend walks to provide connections to schools and recreation facilities. Future increases in this
account are recommended in order to implement a Sidewalk Master Plan currently under
development.
TRAFFIC LIGHT IMPROVEMENTS
Funds are included to provide for upgrades of equipment and software for existing traffic lights.
PINE STREET ROAD IMPROVEMENTS
In conjunction with Phase 11 of the Feeding Hills Southwest Sewer Extension, Pine Street will
have to be rehabilitated, graded and resurfaced.
SUFFIELD STREET DRAINAGE IMPROVEMENTS
The culverts on Suffield Street arc inadequate to provide drainage during storms. Funds are
included to enlarge the existing culverts to correct this problem, It is anticipated that partial
Funding of this project will be provided from the Massachusetts Emergency Management
Agency to reduce the costs to the Town for this project.
- 21 -
Town of Agawam
Capital Improvement Program
Fiscal Year 2014— Fiscal Year 2018
It. PUBLIC WORKS w WASTEWATER
WASTEWATER EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide funding for large,high value, wastewater capital equipment.
FEEDING HILLS -:SOUTHWEST AREA SANITARY SEWER EXTENSION
This project involves extension,of the sewer service to the southwest portion of Town. This
project is on the City Council agenda and has been tabled indefinitely. The project continues to
be included in the Capital Improvement Program in order to provide for ongoing discussion of
this project and alternative• solutions in an effort to;alleviate the high costs and the burden that
would be placed on businesses and residents not directly beneftting from this expansion. The
first ~phase of this prograrn is complete, Funds are included for construction for recently
combined Phases 11 and 111, followed by additional construction in the second subsequent year.
The enormity of this project requires that it be completed and funded in phases. It is anticipated
that it will be completed in several phases over many years at a total cost of over$30 ,000.
WESTFIELD RIOTER BACKUP FORCE MAIN'
Failure of the newer force main during fiscal year 28 required emergency repairs during which
the 10 inch backup force main was used to continue flows to Bondi's Island. This backup force
main should be completed to be ready to be put in service should any of the existing four river
crossings fail in the future, Assistance will be sought from local communities that share the use
of the force main,
IV, PUBLIC WORKS - WATER
WATER DEPARTMENT EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. funds may be carried from one fiscal ;year to the next in
order to provide funding for high value, large water capital equipment.
-22
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 — Fiscal Year 2018
NORTH WESTFIELD STREET WATER MAIN CONSTRUCTION
The need for the 24 inch water main in North Westfield Street from the intersection of North
Street and North Westfield was first recommended in 2009 by Tighe and Bond based on a
hydraulic model of the Town's water system. The 24 inch water main is the highest priority of
the infrastructure improvements required to supply rater to the Town's water distribution system
in the event that Springfield's southerly water transmission main were to be shut off for repair or
replacement.
The project consists of the installation;of a 24 inch water main from the intersection of North
Westfield Street and North Street to Springfield's middle transmission main. The, project also
calls for installation of a '12 inch water train to from the middle transmission main to the
intersection of North Westfield Street with North West Street and the installation of an 8 inch
main the remainder of the distance north on North Westfield Street to the Westfield town line.,
At that time (2009) it was planned to have the water twain improvements incorporated into the
overall reconstruction of North Westfield Street (Rt. 187) but that project has been hindered with
permitting delays and has not reached the % design threshold required to place it on the
Pioneer Valley planning Commission's Transportation Improvement Flan for funding.
In the meanwhile, on November 26, 2012 Springfield's southerly transmission line experienced a
failure between North West and, Forth Westfield Streets resulting in the Springfield Water and
Sewer Commission (`aSWSC") shutting down the southerly transmission line from Provin
Mountain to Colemore Street. The southerly transmission; main is approximately 84 years old.
The SWSC has conducted an inspection of the pipe and is currently rendering repairs to allow
the line to be brought back into service for the near-term, but the failure and the results of the
inspection on this section of pipe have pushed the scheduled replacement of the southerly
transmission line up,significantly,
Due to the acceleration of the southerly transmission litre replacement project by Springfield, the
Town of Agawam needs to proceed with the North Westfield Street Water Main Improvement
Project independently of the reconstruction of North Westfield Street to ensure that the Town has
an adequate supply of drinking water.
23
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 — Fiscal Year 201
MAfN SUFFIELD AND REED STREETS TER MAIN IMPROVEMENT
The Springfield Water and Sewer Commission is planning maintenance work on their
transmission mains from which we receive our water. A portion of the mains will be taken out
of service for the work. Hydraulic modeling of our system indicated that we do not have
sufficient capacity in our distribution system to insure adequate pressure for our residents if we
lase service from more than one connection. We need to build flow capacity in an east-west
direction. Funds are requested to construct a twelve inch water main on Reed Street to replace
650 feet of six inch asbestos cement pipe and 1,050 feet of four inch cast iron pipe. This will
also improve the east—west flow capabilities as well as fire flows.
SILVER. ST ET-ELM STREET WATER MAIN REPLACEMENT
Funds are requested to replace the existing six inch main running between Main Street and
Suffield Street with a twelve inch maim to improve the east — west flaw capabilities as well as
fire flows.
SOUTH STREET WATER MAIN REPLACEMENT
Funds are requested to replace the existing six inch main with 5,420 feet of eight inch ductile
iron water main.
V. MISCELLANEOUS
PLANE PERMIT TRACKING SOFTWARE
The Town of Agawam utilizes a permit tracking system ("MGMS") to track and manage its
building related .permits. The application is being utilized far beyond its capacity and the
performance of the application continues to suffer to the paint where looking up information can
take 20 to 30 seconds per query. Upgrading permit tracking software'would allow the Clerk's
-
office and the DPW to manage their permits and business licenses electronically in MUNIS.
Funds are included in appropriations in both FY2014 and FY2015 for full implementation in
FY2015.
2
Town of Agawam
Capital Improvement Program
Fiscal Year 2014— Fiscal Year 2018
FIRE DEPARTMENT HYDRAULIC EXTRICATION EQUIPMENT( AWS OF LIFE
Funds are requested to replace two hydraulic power plants and hoses that are in excess of twenty-
five (25) years old. Hydraulic power plants are mission critical for the Fire Department and
supply the energy to operate extrication tools Oaws of life) that are used to .disentangle victims
from vehicle crashes and heavy machinery.
FIRE DEPARTMENT MOTORVEHICLES
Funding is included in fiscal year 201 to replace the Fire Department repair vehicle, a 199
Ford utility body pickup truck; This aging vehicle is relied upon to perform many tasks
including pick up and transport of vital parts and equipment, transport of tools used in the Field
for repairs, towing the department rescue boat and transport of 'heavy hoses, including;
emergency response HAZMAT supplies. Funds are also needed to replace the Fire Inspector's'
vehicle. In fiscal year 2015, funds are requested to replace a 2010 Ford Escape with a hybrid
vehicle. Finally, in fiscal year 2017 funds are needed to replace the special hazards vehicle with
newer used equipment.
FIRE DEPARTMENT COMMUNICATIONS RECEIVER
Fonds are requested for installation of a communications receiver site at the Agawam Industrial
Park
INSPECTIONS SERVICES DEPARTMENT MOTOR VEHICLE
Funds are included for the replacement of a 1999 Ford Ranger with a Ford F-1; 0 in the
Inspections Services Department,
GOLF COURSE GOLF CART FLEET
The fleet of golf carts needs replacement with seventy new carts. The resent fleet is twelve 12
p y p � )
years old, with an average of five to seven carts down for repairs at all times during the season
due to their age. Some carts need significant, costly repairs in order to get them running,
25
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 — Fiscal Year 2018
GOLF COURSE EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide funding for high value,large Municipal Golf Course capital equipment.
HAMPDEN COUNTY LAND ACQUISITION
Agawam acquired most of the holdings of the Hampden County government that were within the
Town's boundaries when the county was dissolved. The Town is required to reimburse the other
county communities for their sham of these assets.
`'VI. SCHOOL DEPARTMENT
SCHOOL REPAIRS'
These projects will continue to be funded through annual appropriation. They include a new
energy management 'system at .Tames Clark Elementary School, rooftop air conditioners at the
Junior High School,a new energy management system at Robinson Park Elementary School, and
a new pool filtration system at the Junior High School.
HIGH SCHOOL LOCKER ROOM AND BATHROOM RENOVATIONS
Pursuant to the NEASC report, funds are included to provide for locker room and bathroom
refurbishment at the High School. This renovation is also needed to comply with Title Nine
requirements.
EARLY CHILDHOOD CENTER:
e Early Childhood program has outgrown its present location on Perry Lane. A new facility is
needed to allow for much needed additional classroom space as well as to provide for private
bathroom and changing rooms for small children and an area for teachers to meet with parents.
- 26-
Town of Agawam
Capital Improvement Program
Fiscal Year 2014 — Fiscal Year 2018
HIGH SCHOOL ALL WEATHER TRACK AND BLEACHER REPAIR
An all weather track with field runways would greatly improve conditions while reducing
maintenance costs. Drainage facilities would also be included. Wooden bleacher planks
continue to rot and require replacement each year. This safety project will encompass sand
blasting and painting the metal runners and replacing the wooden planks with aluminum. A
special committee is presently researching the project to include the track, concessions, all
surrounding facilities and amenities.
-27 -
a8 $$ 8 8 aBaa as-8a a 88888888 S
8 8 a$ 8"8a8 � ., 8 88 8�8a8l8S$8 8 8Sa888sS B
asm`a g rtac Azle skafi
S B a8 68$888 a B'B BarBs B46$ B aaSa.BBa,a 8
x`z are' as ftx gzi as 'Raab .
-- B B 8a 88aa8`8a a _w, + 98.� a8a6=a sBBa s68a8aSB�
az ga R aft ,:�w c _ gyzaa`
r 8 R a 888:8a8 R T Rag a 888 88aa� 8 SIR Sa88a88 8
C 8$ 88�g8$� $ , , BS$ 8$�$9 S$ag 8 88a5$888 8
a 88$,$ 8 8 Ba 88818168 S at$a 4288 gaR$a a .. a -�8A189aaB3 a
s moll
^$ SS$$ C,B C aS a68888 8 G , 8a8 88�8B a888 __- w .. B.� 8,8ae88aS a
s:;ra."a .. as asI :a;az ms� P
88;8658$ F8 as 888S'8
B I R 63a7 aaS8 88a 0r S aaaBs a 8
Il
a ;. tit t Zi
$•Si838SIR aSS 4
14
$98,649 892 as"ax aa6aB Base x $ aBBg'RI.
sa S :>
xlrlt alg o f a s fis°a .'i� s a
r$8 8!Raa SIR$aa8 t as J alS,a+a"aa 81$8 R Sit a's88 gig 8S8a088 ! 8 8q$aBga88y
a •r'rM"'x 3 a �� a s g"xsle. � ♦ a z'3 rzFg t+a ma i j:i„t
a's g)fi888i88,F468 7. " a8 88S,usa B'SS 8 aa6 R 8,8688aaaa "
¢." 0f g a SrR�x n x a W:t :t a
R8.8 BSlsiaSR8 S a 885j$;a9 8$gg89 Res goes a` 86 a 8 8°$$58 8..8
asx+rx elg tea$ a�xg xaaaR, ai a ge,�Ta,
8l tit Sr8{$a
_. �k1. s? 0ClIt "., Elf II Iafis# atsc9It I I 19 9 i , a
If
ar SS $8r$P8888aa$$B1 yT88 886,8;8ST- 6 8$ $a68g8 $8688 a 4 ".. a.g
8kka � xEI3 as l a x
iz $a"zg _ 'sz s g z. a "a a :az wad s` a
F�
w � __
8 S+$F,j$$B8R,86889,. 8 S _. B, , 9 8,8.S 8 r3$F :R, x,8$8R8.A
�I a°xs, ^, sR
_rgg wti s as°x s " s $' asvgn
8 It all a5stlsis,$38 882 $ 8R .$E a vI886AsS R'A"S _ 8 a a
+" 5t sra a a
381a'398Fasaa8 26m 8a a'aiag 1 a R$88Ra :a4
k neral Fund $882,163 $855,15("'X) $665,500 $8091, I
Sudget Appropriations (FY2014018
$ 0 , "
,
$ 00,000
001" O
00$ '
r
29,
General Fund
Existing Bond Cosh" FY2, ,' FY '8
OT
Ilia\& '.�M'N:E 'cCk,YI Y'M1"015 @
Firo H u*rftr a 107,515 $ 97,470,
School Pro, is I ,3T $ 1 „938 151,950 4,6 098,338 1,041,650'
Title V Caa a aaa,ty, Sieptic Maflaq*ment $ 3 4T7 $ 3,337 $ 3,198 3 has 2,921
Agawam High SchocA Library E,xpansion 48,810 4-6,960 . .1 3 4 310 4 Z,!5d)0,
Phase ,11 eta seater, arm9 rn Est $ 6,261 � =X � 15,440,
Middle china r $ 33,660
1 k 1
Middlo x rnih, Higgh, Revairs S 9 1 wc�" $ 8,880 8,'
r,lementary h " modUct, c£�"mmoom v 122"4krX 118,4 " ' 15,2W x 112, Via $ 1018,8100
w
Net Pumjmr Trucks citi,9 10 $ 65,0966.:
Perry L n't P0111 kerKw .„C 8
,394
Phase I. Stomweer Campletim $ 6o 8 $ 6,5 8 $ 6,538 6.53 8
Building Mxtimleraxme RuAding Extemon 13,520 $ 12,,: 12,1cXI I.'
awn Wick, Tefcphaw System S 68,880' $ 63, ( 4X) 61,200
IU ft
N, � � Ry � ok 3 ''1O
371" �.0 3 6 2,(XN)
3,116,429
Existing Bond, Costs (F-Y2014-FY'2018)
t t %)
,t �r
F
General Fund
ected New Bond
Pirmt Street Read rovern r s 58,lap N7,CIO 515,4 30
SO
f d Street brainafg, ItAproverrents 3 iscm 32,660' ' 1 r
�,,6gh School LAcke fk*am & „t e«s air, a ,s- 94 '1 tX, 189,375)
Early Childhood Center, 3 80,CM, 3 62.O ;
�-figs ":ikchcal Track sl ackheP's 4 a3 �7- �.,a „� 26 Ra M,
Y�sasN uuN4}�wyklvva 'a'�v;H�� atss!a'sNN.uvr�� tnMat<}aAaMafi4:;PwftxlNa'uH3�% uaN�Ranuo-rmmia,Nx�.sNhvt� atwtdMh ntv'�kn4.CaR
p
�'` uwaa mw�w :aaagwsaam�se�vawrom�„muv+.�m�s, amwm g
81,005 a
wa�*u, wa;.:a�a�,mzw.ae�wauaxwua-�.vuareav�zneaaaaabw:v' apruraawwt�,a �m>aansow.�aaaunxi..�au :n�rxivwwaa�nae�w.m4m+wnn a> an�swnm�a��manaawe�:arorw.� m.�nw+:s ua�.ww�wn�^ ��;,
Projected New Sond giros FY2014- FY2018)
$11, ),. '
$800,0w .
t
400,r a
(before grants and reimbursements
$>
Jected New Sand Cost $0 VI $670,90 $932,205 $9018,005
Total Projected Bond Costs (FY20 4 -FY20 8
(before grants and e burs ry nts
�3,5m,
r
x
2,( , 0001
y 01
3
i
7
General Fund,
and CgLt U,Y2014
(after grants and reimbursements)
FY2014 FY2015FY201 7 FY
Existint
2,06,953
Projected dotal Bond Costs ,FY20 4 FY2018
(After 'grants and reimbursements)
n�500 ; }...
$1, CM,, O t` "i
k ar rt��
Mx) 000
r� 3 3-
kc
kt r
Self 5ustaining, Funds
Existing CostsFY2
+� ri�nwms�a;>. :uxwwxi-rmw:.w �xitn;, aas:�mara ,w,a,�a �s�wswnw�:u �4esesw:az�naw.��., ;, e�m�.�,a.'�m�.w';�*ca-a�mnsn�aas,..xvx•;oraw>rv.ww,wsa.� r;yewzxaxe'w<ewE
PRE TECT F ` 0 14 FV2015 NCY2016 FY2017 Mots
` esff mid Kivu' C' Lccc€ Share 9, $ 47,240 $ 40,
*tampbekk bwi Flom, a DrNw. .5' s?e $ o ',nt h s 29,220 $ 28,700 r �.7 190 26,69(l)
b,P.W, F*611ty $ 67,473 $ W268 $ 6 5,%A, w 61,740 $ 59,976
6
Wevilhald $liver F-'Orce, Main w 401 626 '�€,.625 4ci, aka Z6 S 40,625
Fekedm4 Wills , werr sevvr Phase r
V C M �A N;
au.amals-I'meti Pt v t
Feec.fiftg,400s Sw t weirt mower tmsd a $Thaw I"$ n
Water Moir O Istt"'u«°wl'on ,,. M-A-fb ',`eestfiel, 5,t`T;;"?e > a3 akD 452,620
,
lot s: muafn (Amm"wk' r hkct m ,5vff k, Al Red Str*t%
Water Main sip Over at, EIRW sire t
r maid tmsigr, South treel
u
+a
k . � • � �a ,.ate°,. 3,089,036
dc
Existing Bond C : ( 2 4 IFY201,8
g
5". ( X I i
ti
}ts
1
I
t{
2,N),0C),
. M
Selft� Fs
P!t!2j!LqLJed, New Bon4 .2sls a 1, FYI 1 ),
Wl "Palm % t"` sockup Force "to"'Ohn Dm as 2 P„C., a t 9 „D
D f'*Aing� HARS Southwest Setvgr, �.,e,�€�'a"�S�S,.,�;�x�'.�3`1 Phase ,��'VE $ ,` � 3"OK),COG
Feedfi% Hills wAhwesk° Via, x, awsa a Pha'a e, IV ^m� $
Feeding D HII Saaaa`hwas Sew'vr C�,,*;'*�Mx user Da aaa V
water Main si as ry ., aahk, tSvffi ld & kletd Stnuats $ s 47,75,0far
D aater Maria, Constmxflon Main, SuffWd a Reets t" is t 246 0,CXQ
Wait" Main 1Usaa South Street.
Water Daa .aata tructiaa - Dl a Daa EFfini Scree $ ,
Water hkain 'area n"s a°iaaaa - '155,%ith Street
Gaff Carts $ 77,175 S 4is 40, D %m' K), 6563
ff 17T—Al Z,529,12 5,
Projected New Bond Costs (FY201A FV2018)
4 �
5 q,C ) t k
$2,00,10,MOO
" ux °.,) {
` E
!W,COAD \
-5-
Self Susiginft- Funds
(before gronts and reimbursements)
s
Exis Rune Cast,.; 8 ,8,0 .21.6 $580,768 $,575,237 $559,911
Projected New Owns Costs 7 75 $ 4 4 `'1,M0 ,105 $1,928,49,40 $2,529,125
36
, G
Projected Bond Costs (F,,Y2014-,FY2018)
(before. grants and reimbursements)
F o0
t
w.5 M)
Y
2,(X #000
$1,SIN, ,0CX0 �
$1,OW"000
3
$ , M) d
0
ti6a�
..
Total So
(after grants and r b ement
frxisting Send Costs, $686,805 $ 7 ,693 $5,80, 6 $575,237 $559,911
�',',Ivojecicd New Barecosts 17 7 3 5 80
Projected Total Bond Costs (FY2014 FY201,8)
(after grants and reimbursements)
$rye,M)0,1700
..000,000,
2, (XI
�
2,0 "(W
1,5 0 I
wo wo
m
,e
`F a -
AGAWAM CITE' COUNCIL
36 MAIN STREET
AGAWAM, MASSACHUSETTS 01001
� f
s
LEGAL NOTICE LEGAL NOTICE
PUBLIC HEARING
AGAWAM CITY COUNCIL
77
PRESIDENT CY1
Christopher C Johnson The Agawam City Council will conduct a public hearing on Monday, (((
VICE PRESIDENT June 3, 2013, at 7:00pm, at the Roberta G. Doering School, 68 Mann
Dennis J. Perry Street, Agawam, MA on the Capital Improvement Program for Fiscal
Year 2014 to Fiscal Year 2018 as submitted to the City Council by the
COUNCILORS Mayor on April 11, 2013,
George Bitzas
Cecilia P. Calabrese The Capital Improvement Program is a prioritized plan of proposed
Paul C. Cavallo capital improvements over the next five fiscal years. A capital
James A Cichetti
Gina M. Letellier improvement is a project or undertaking which provides for the
Robert A. Magovern planning, design, construction, reconstruction, renovation or
Joseph Mineo replacement of a public building or facility; an addition to a public
Donald M. Rheault building or facility; the purchase of land, buildings or facilities for a
Robert E. Rossi public purpose; or a long range development study.
ADMINISTRATIVE< The Capital Improvement Program for Fiscal Year 2014 to Fiscal Year
ASSISTANT 2018 its available for public inspection at the City Clerk's Office, 36
Barbara A. Bard Main Street, Agawam, MA between the hours of 8:30am to 4:30pm,
Monday through Friday: The Capital Improvement Program is also
available at the Agawam Public Library, 750 Cooper Street, Agawam,
MA and the Agawam Senior Center, 954 Main Street, Agawam, MA.
BY ORDER OF:
Christopher C. Johnson
President of the City Council
TO BE ADVERTISED ON 5/16/13
TELEPHONE
(413) 726:9716
FAX
(413) 726-9717
EMAIL
bbard@agawam.ma.us
TR-2013- 2-�
A RESOLUTION ADOPTING THE
FISCAL YEAR 2014 _ 2018
CAPITAL IMPROVEMENT'PROGRAM
WHERE AS, The Capital Improvement Program for Fiscal Year 2014.20I8 vas submitted
to the City Council on April 11, 2013 in accordance with Article 5,Section 5-3
(a) of the Charter; and
WIIkREAS, The Capital Improvement Program contains a prioritized plan of proposed
capital improvements over the next five fiscal,years in accordance with Article
5, Section 5-3 (b) of the Charter; and
WHEREAS, The Capital Improvement Program is designed to utilize town funds for capital
improvements on the basis of community priorities in coordination with the
availability of grunts and/or other state,federal or private reimbursements; and
WHEREAS, In developing the Capital Improvement Program each year, the planning
process includes consideration of the growth of the town, the improvement of
efficient service delivery reducing the need for staff increases,maintenance of
new and existing;facilities, and consideration of existing commitments; and
WHEREAS, Each year the Capital I`mprovemcnt Program is revised and updated in light of
changing needs,requirements, and funding availability; and
WHEREAS, In accordance with Article 5,Section 5-3 (c)and(d),the Council shall conduct tr
public hearing and on or before the twentieth day of the last month of the
current fiscal year, shall by resolution adopt the Capital Improvement
Program.
NOW THEREFORE,the Agawam City Council hereby resolves to adopt the Fiscal Year 2014-
2018 Capital Improvement Program as submitted by the Mayor on April 11, 2013.
DATED THIS DAY OF , 2013,
PER ORDER OF THE AGAWAM CITY COUNCIL
Christopher C. Johnson, President
APPROVED AS TO FORM AND I,F.GA1.ITY
Vw
Vincent F. Gioscia, City Solicitor �X,'
�1
&rAetOeoC
'fit" o u ncA
TIC-2013-2-R
A RESOLUTION ADOPTING THE
FISCAL YEAR 2014 - 201
CAPITAL IMPROVEMENT PROGRAM
WHEREAS, The Capital Improvement Program.for Fiscal Year 2014-2018 was submitted
to the City Council on April 11,2013 in accordance with Article 5,Section 5-
(a) of the Charter; and
WHEREAS, The Capital Improvement Program contains a prioritized plan of proposed
capital improvements over the next five fiscal years in accordance with Article
5,Section 5: (b)of the Charter;and
WHEREAS, The Capital Improvement Program is designed to utilize town funds for capital
improvements on the basis of community priorities in coordination with the
availability of grants and/or other state,federal or private reimbursements;and
WHEREAS, In developing the Capital Improvement Program each year, the planning
process includes consideration of the growth of the town,the improvement of
efficient service delivery reducing the need for staff increases,maintenance of
new and existing facilities,and consideration of existing commitments; and
WHEREAS, Each year the Capital Improvement Program is revised and updated in light of
changing needs,requirements,and funding availability;and;
WHEREAS, In accordance with Article 5,Section 5-3(c)and(d) the council shall conduct a
public hearing and on or before the twentieth day of the last month of the
current fiscal year, shall by resolution adopt the Capital Improvement
Program.
NOW THEREFORE,the Agawam City Council hereby resolves to adopt the Fiscal Year 2014
2018 Capital'Improvement Program as submitted by the Mayor on April 11,2013.
DATED THIS 3 DAY OF 2013.
PER ORDER OF THE AGAWAM CITY COUNCIL
Christopl;er C.JAinson, President
LA
APPROVED AS TO FORM AND LEGALITY �
Vincent F. Giosci.a, +City.Solicitor
MAYORAL ACTION
Received this 4-MI _day of ju , 2013 from Council Cleric.
Signed by Council President this day of 2013.
APPROVAL OF LEGISLATION
By the powers vested in me pursuant to Article 3, Section -6 of the Agawa Charter, as
amend, I hereby approve the passage of the above legislation on this I L
day of
1
Richard A. Cohen, Mayor
DISAPPROVAL OF LEGISLATION
By the powers vested in me pursuant to Article 3, Section 3-6 of the Agawam Charter, as
amended, I hereby veto the passage of the above legislation can this day of
, 2013for the following reasons)
Richard A. Cohen, Mayor
RETURN OF LEGISLATION TO COUNCIL CLERK
Returned to Council Clerk this day of , 2013.
P 1s AGANVAINI ADVERTISER NEN S gray9,2013
YCRBU,_`*,
r a noon flato'on banquet
Center lunch menu
Monday, May 13: Chicken stir-fry,
stir-fry vegetables,brown rice,bananas. Y
Tuesday, May 14:Stuffed shells with
meatballs,garden salad,birthday cake.
Wednesday, May 15: Pork chops,
trashed potatoes, gravy; peas and car«
rots,applesauce.
Thursday,May 16: Beef stew,mixed
vegetables, homemade biscuits, beet
salad,pudding.
Friday, May 17: Linguini and red
clam sauce,Caesar salad,peaches, t j
t}
Ll RCS5
Turley publications courtesy photo
Chapter I of the Agawam Senior Center'Gold
Age Club held is installation banquet re-
LKTNG TO CURB HUNGER Gold-
en t - -- The, Agawam Senior Center Golden Age Club Chap-
• to I held its installation banquet last month at Crestview
- Country Club. Chapter I is the.original Golden Age Club
of Agawam and was established in November 1955.
Meetings are held the second and fourth Wednesday of
each month from 1:30 to 3 p.m. at the Agawam Senior
Center.Guests are welcome and the groin welcomes new
D J ° members.
? fX, Nq Berard members, pictured above from left, include Al-
t h ' 'ter - w - c•" ~ r ice Buell.chaplain;Marie Fay,correspondence secretary;
r. ` Joyce Asia-Ferrero, secretary; Millicent Barnard. vice
president: Louise Balboni, treasurer; and Becky Wash-
r - t bum.president.
7
r .t
Notes from the Music Room
Li
V(,., € 'f ` ' By Marcy Davis
When the fourth grade singers from Phelps School
t: r came down to the Agawam Senior Center with some t
4 Christmas songs,the performance was entrancing.The }`
Robinson Park Elementary School coricon at the Aga-
wam Junior High School was, in many aspects, unhe
lievable
Paul Sawyer,music director,was a dynamo of activity
Turtay Pub4cat ons courtesy photo and all of the singers from kindergarten through;grade
Citizens Sank colleagues volunteered and walked the 44th annual Walk for Hunger held May 5 4 were incredible.The.senior center singers,who were
in Boston. Citizens Sang Foundation is an underwriter for Project Bread's annual fundraising invited to be a part of;the program,enjoyed it beyond
event that's aimed at ending hunger in Massachusetts. belief,We hope some of that Marie atmosphere will be
created at the Agawam High School auditoriuru on Fri-
day,May 10,when the fourth grade singers will join the
L N(It L _ Agawam Senior Center Memory Lane chorus and the
Cgd[
Melody Band in an Irving Berlin concert,
The senior center groups have had a bit of multi-gcn
erational aspect to some of their programs,but nothing
LEGAL NOTICE- City Council:by the Mayor., 3, 2013, at 7:00prn, at the the City Clerk's Office and that comes even close to the magnitude of this year's
PUBLIC HEARING TR-2013-28 is available Roberta G. Doering School,, the Planning department, 36 combination,It should be a memorable event.
AGAWAM for public inspection at the 68 Main street, Agawam. Main Street, Agawam, MA
CITY COUNCIL City Clerk's Office and the MA on TOIL-2013-5 which between the hours of 8:30am
The Agawam+City Council Planning Department, 36 is an Ordinance Amending to 4:30pm, Monday through A R � B I � q L K
will conduct a public hearing Main Street„ Agawam, MA §180 of the Agawam Zoning Friday.
on Monday, June 3; 2013, between the hours of 8 30arn Ordinance Entitled "Article BY ORDER OF: A 8 A L 0 N E A R I A
- at 7:00pm„ at the Roberta to 4:30pm, Monday through, KII, Fyloodplain Zone" as Christopher C.Johnson L a S AN - F t
G. ring School, 68 Main Friday, submitted to the Agawam President of the
Street,Agawam,MA on TR BY ORDER OF; City Council by the Planning Agawam City Council R E T I R E $ H E K E L
201 -28 which is a resolu- Christopher C.Johnson Board.TOR-2013-5 is avail- 19,5/16113 G 2 E D T A S
tion authorizing the adoption President of the able for public inspection at
of an Order of Taking for Agawam City Council s C H A 11 E AR p
the Connecticut River Walk 5/9.5116/13 Loop under the authority of AGAWAM COMMUNITYM A R I S C H P C
Section 14 of Chapter 40 and LEGAL NOTICE M I A M U R Y A P
Chapter 79 and Chapter 84 PUBLIC FEARING PRESERVATION COMMITTEEN T I R 1r1 L P B
of the Massachusetts{general AGAWAM
Laws for the construction CITY COUNCIL 1 C L E B M G JE
and maintenance of the Con The Agawam City Conn- �..,E+GAL A DYER RISE E T S O R E S A lV necticut River Wally Loop, cit will conduct a publicas submitted-to the Agawam hearing on Monday, June NoticeisherebygiventhattheAgawamCotnmunity O A B A A E E C
Preservation Committee (CPC} will hold a public s L A S M A D R E S H
hearing at the Agawam Literary Community Room; C A U I A t A C I A S
750 Cooper Street,Agawam, MA on Wednesday, H HOWTO ff May 9, 2013 tit 7:fl4PM. The Committee will ` N s E nl a E R
provide an overview of the financial performance
LEGAL S of the CPA fund and will also be seeking input on
All legal;notices to be published in the Agawam Art- goals,activities,procedures and spending The CPC call
verniser News should be sent directly to klanier@turley. is encouraging residents,town boards,committees 41.3-746-9)(800 Karen Lanier processes all legals for this newspa- and commissions to attend to discuss the needs
per and can answer all of your questions regarding these For Legal Services
and possibilities of projects that may qualify for
notices, Please indicate the newspapers and publication ,Community Preservation Act funds. Please be Criminal Defense Law-Civil ,iti at on
dates}for the notice(s)in the subject line of yourematt, g
For questions regarding average area, procedures or advised that the CPA Cornmittee is required by Wills—Divorce-Real Estate Transactions
cost,please call Karen directly at 413-28 -8'393 x271. WG.L.Ch.44B to consult with existing municipal Sales,Refinances,Purchases
Turley Publications, Inc,publishes 15 weekly news- boards to study the needs the needs, possibilities
papers throughout Western Massachusetts. Visit www. and resources of the city regarding community
turtey.com for more information. preservation.
May 9,2013< AGAVVAM ADWRESER N<=WS Page 17
CITY COUNCIL NOTEBOOK
iscov rwn themysteries
By Jennifer Wroblewski ter, Department of Revenue, and bond
Staff Writer ing agencies to provide for the planning, of The Fifteen Ho
design, construction and renovation of
public building; an addition to public By Sarah Platanitis
Public heariggs set for land takings, a g�
building; purchase of land or buildings Turley Publications Correspondent
capital improvement Y P
The City Council,at its May meeting, for public purpose or long-range develop
unanimously tabled a resolution authoriz- ment study.Generally,it consists of about: Jeanne Claire Probst, the local author of
$20,000 and would last 10 years.or more, The Fifteen Houses,visited the Agawam Pub-
said ing land takings for the Connecticut Riverg ' w
Said Cohen. lie Library for April's Author Talk series.
Walk Loop,pending a public shearing. r5
Included in the C1P for this year are The Fifteen Houses is set in East
The two easements - one temporaryLong-
and one permanent-are located in a sub- projected bond requests for phases two meadow in the early 1950s.Julianne Ivlargue--
division that were previously owned by and three of the Southwest Area Sewer ri l'
te,the main character and one of 1 l children;.
Extension Project; improvements or keeps a di while she investigates reoccur
the developer of the property, said Deb- P diary g
orah Dachos. director of Planning and renovations to the police and fire depart ring memories of her younger years.
ments; highway department; traffic light Determined to learn them mysterious motive Turley Publications photo by Sarah Platanitis
Community Development. y
improvements; wastewater and water de- that the downfall of her family, Juli-
a Local author Jeanne Claire Probst
"[The developer] mistakenly filled out Y.
a donation form and we found out he had partment equipment;replacement of per anne's memories become the clues to finding;; Visited Agawam Public Library
transferred the property to someone else," mit tracking software and more. out the true story,each opening a different door' last month for a discussion of her
she said,adding,"That individual did not
A total of$882,162 in capital improve to the 15 different homes where she lived, book The Fifteen Houses,
story g in East Lon
want to donate:'
ments will appear in the fiscal year 2014 "The begins meadow,
g
Dachos said the easements,for proper- budget, which is due to the council by continues in Springfield and away to another, nal story," said Probst, who also hopes one
ty located on Michele Lane in Agawam, May 15. undisclosed place,"said Probst. "Some people day in her retirement,she can write children's
are"very small. think Julianne moves to New Hampshire,New books,
"We've done the appraisals and we South Westfield'Street construction York or Vermont but it's all u the ima ina
pp p to g The book tour is sponsored by Winter Tree
know how much they're worth," she set for this season, tion'of the reader to decide where she goes. Productions,which generously allowed Probst
said. According to a May 1 memo from The book,self-published through Outskirts a stipend to dress up the table and offer re
The property is owned by Travis and Agawam Department of Public Works; Press in January 2013,ends on a positive note freshments of gourmet cupcakes,cookies and
Joanna K. Searles, according to the Superintendent Christopher J. Golba to when Julianne reconnects with members of chocolates. She also held a small raffle give-
resolution submitted to the city council. Councilor Donald M.Rheault and Cohen;- her family after being away for over 30 years' away of a copy of her book and signed books=
Damages will be$270 for the,temporary construction and paving on South West- and works at becoming the family that she, for the near dozen in the audience.
easement and $1,910 for the;permanent field Street is Feeding Hills is tentatively` feels they should have always been. Probst's spring tour began March 5 and also
easement.: scheduled for this construction season. "The book is all about surviving and mov- included visits to libraries in Ludlow, Mont.
That public hearing will be Mon- The preliminary work, including rec ing on. It takes readers on a fictional journey gomery, Holyoke, Palmer, Longmeadow,
day,June 3. lamation and reconstruction, will be about a person who leaves behind the idea of Granby,South Hadley and Easthampton. She
Also on June 3, the city council will completed in late Summer with paving; staying a victim," said Probst. "The author's will start her summer book tour in late June.
hold a public hearing for the 2014-2018 expected by early September. note is the most important page in the boot; "We're getting a very nice response from
Capital Improvement Program (C1P), The estimated cost for the work on the because it shares how some real life expert this book and I'm very happy about that,"said
recently submitted by Agawam Mayor approximately 3900 feet of roadway is ences of my own are in the story.The book is Probst. "Readers can really connect with the
Richard A.Cohen, around$245,000. not all based on my life,though." characters and many people have come out to
The CIP is required by the town char Probst started writing in high school in the events and have seen us on Channel 5 in
English classes and has written much poetry' Longmeadow and Channel 12 in Granby.
over the years.She always dreamed of writing Readers can borrow the book at the.library
a book and The Fifteen Houses,her first pub or purchase it online. It is available as an e
e '+�rSchool Committee lished work,is fulfilling that dream, book on amazon.com or bamesandnoble,
"J just finished the second book in the se- coin.
• ries. That took about three months to write. For more information about the book or
meeting agenda The editors are planning on six more books, author Jeanne Probst, visit www.thef fteerr
each highlighting a character from this origi houses.com;
Roberta G.Doering School d. SCR-13-17,Request to designate June
68 Main St 25,2013,as a half-day of school
May 14-7 m. 10.Business Meeting:
y h• t 2 3 4 5 S- T 9 c 9 10
a.Routine Matters
1.Call to Order 1)Approval of Minutes
2.Moment of Silence 2)Calendar/Correspondence
3.Roll Cal l of Attendance
b.Warrants/Transfers is 14
4.Regular Meeting-7 p.m. c.Reports: ,e 17
5.Citizen's Speak Time 1).Scheduled Reports
6. Highlights on Education: Doering *Curriculum Writing/Delivery(paper re-
School z 22 z3
School chorus performance port) 2a as 26
7.Superintendent's Notes * Coordinated Family&Community En
a ement Grant Update-R.Fernandes 27 2s; 29 30
8. Student Advisory Committee Repre- g g p
sentative Update. 2).Subcommittee Updates 39 3z 33 34
9. Unfinished Business: IL New Business:
a. SCR-13-14, Approval to establish a a.SCR-13-19,Approval of use of AH S au- ss 39' 3 3s
Foreign Language Club as an extracurricular ditorium by The Academy of Artistic Perfor 39 40 41 42
activity with advisors mance for recital on June 19 and 22,2013
b. SCR-13-15, Approval to establish the b.SCR-13-20,Approval of continued par 43 44 4
Winter and Spring Arts Festival as an extra- ticipation in the School Choice Program 46 47 4e 4n, 50
curricular activity with advisors 12.Any other items that may legally come
c. SCR-13-16,-Request to establish Camp before the committee 51 sz s3 s4 ss
S.E.E.K. 13.Adjournment
se 57
59>Free paper shredding for residents CLUES ACROSS Murphy Oi1
rp y Corp. 2.T ore down(gar. overacts
AGAWAM-A free paper-shredding event confidential documents to be shredded on 1.Our 10 numerals 33,Talk noisily SO 28.Facial gesture
will take place Saturday,June 22 at the De- site. A maximum' of 5 standard boxes of 7•Horseshoe cleat 35.-New Testament 3.22nd state(abbr.) 30.Absence of
partmentof Public Works, 1000 Suffield St., confidential documents per vehicle will be 11.Ear shell 36.Tax collector 4.Tropical aggression
from 9 a.m.until noon,,or until the truck is accepted.All three-ring binders and binder 12.Soprano solo 37.Mediation council constrictor 34.China
full• clips must be removed. 13.Vestments 39.Not in use 5.Hostelry 38.Older Bridges'
Residents are encouraged to bring their 14.Heart's singer 41.Act as master of 6.Examine and brother
Wilson ceremonies expurgate 40,Plays;
15.Set of type in one 43.Skin lesions 7.Small restaurants 42.Term denoting
1 style 44.Stiff bristle 8.E.,Asian anis psychic abilities
16.Withdraw from 45.Equally liquor 43.Oral polio
FLOWEP\ work 46.Pool dressing 9.Infestation of head vaccine developer
�� t 18.Ancient Hebrew room louse 44.Any habitation at
„ I coin 49.Eyebath 10.New Yorker film a high altitude
THE PEOPLE YOU LOVE WITH LOVE: .sa 20.Megacycle 51.Thick piece of critic Pauline 46.Hyperbolic
► - - 2].26th British letter
THOUSANDS OF BEAUTIFUL something 11.An orange-red cosecant
PLANTS FOR MOTHER'S [yAY! % = 22.Colonnaded 52.Angry crystalline dye 47.Russian
�' Greek walks55,20th Hebrew 13.Indicates position mountain range
ANNUALS I PERENNIALS I ROSE BUSHES = 24.Russian sourgrass letter 16.Root mean 48.An aromatic'
HANGING BASKETS I MIXED PLANTERS I CLEMATIS soup 56.3rd largest square(abbr.) salve
PROVEN WINNERS I HERBS I VEGETABLE PLANTS 26.OK Corrals` Colombian city 17.Electronic 50.Venezuelan
ORNAMENTAL GRASSES I SOIL I POTS I MOREL *SORRY r.rt Wyatt 57.Gum arabics counter- fashion designer
27.Cheremiss` 59.A song of praise countermeasures initials
28.Schenectady to God 19. 12-31 greeting 53.Highest card
County Airport 60.Dispatcher 22.Fastens 54.5th son of Jacob;
c �'a.Y' ]1 S 29.Laptop 23.Himalayan wild 58 Music storage
E. Ir,, SPRINGFIELD STREET 31.Actress Farrow CLUES DOWN goats device
FEEotrto HILLS, MASS. '1'Ti "Everythingyou'dgmv if you had forty aereu," 32.NYSE for 1.Word shortening , 25.One who
hearing on Monday, June MA between the hours of 1
3, 2013, at 7:00pm, at the 8.34am to 4:30pm, Monday l
Roberta G. Doering School, through Friday. The Capital I
68 Main Street, Agawam, Improvement Program is
MA on the Capital Improve, also available at the Agawam
ment Program for Fiscal Year Public library, 754 Cooper
2014 to Fiscal Year 2018 as Street,Agawam,.MA and the
submitted to the City Council Agawam Senior Center, 954
by the Mayor on April I[, Main Street,Agawam,MA
2013. BY ORDER OF
The Capital Improvement Christopher C.Johnson
Program is a prioritized plait President of the City Council
of proposed capital improve- 5116/13'
ments over the next five fiscal
years.A capital improvement
is a project or undertaking
which provide% for the plan.
ning, design, construction,
reconstruction, renovation
or replacement of a public
building or facility; an addi-
tion to a public building or
facility;the purchase of land,
buildings or facilities for a
public purpose; or a long
range development study:
LEGAL NOTICE The Capital Improvement
PUBLIC HEARING Program for Fiscal Year 2014
AGAWAM to Fiscal Year 2018 is-avail-
CITY COUNCIL able for public inspection
The Agawam City Coun at the City Clerk's Office,
cil will €.onduct a public 36 Main Street, Agawam
26
2S 29 3D
32,
34
36 37 38
40 1 1 41
43 44 45
48 49
52
55
ely, 21.Runs
disconnected'
of 23,Mourners
nt 28.Old world,new
29.Atomic#25
30.Sweet potato
wind instrument
31.Legend
eep 32,3rd tone of the The boutique offers br
} scale: lured furnishings from Hickc�
Ling 33.Russian Jeweler Thibaut, CTH Sherrill Occasu
Peter Call guard Furniture.
Traditional and trendy act-
idates 35.Capital lighting to fabrics come fr(,
and of Mali companies like Robert Allen n