Loading...
TR-2016-48 DOERING BOILERS WITHDRAWNS Lon&b6i Itots 5�eyfor-% W �� I Cno 130s Springfield Street Suite 1 Agawam Public Schools Feeding Hills, MA 01030-2198 5� WILLIAM P. SAPELLI,C.A.G.S. ALLISON LECLAIR, Ed. D. Superintendent of Schools ROBERT CLICKSTEIN, M.B.A. Assistant Superintendent for Curriculum, (413)821-0548 School Business Administrator instruction,6 Human Resources Fax(413)789-1835 (413)82"%B www.89awampubliwchcxAs.org (413)821-0550 MEMORANDUM TO: James Cichetti,Presidentt ity Council FROM: William P. Sapelli WP DATE: June 17, 2016 SUBJ: Resolution Withdrawal I respectfully request that TR2016-48, regarding the replacement of boilers at the Roberta G. Doering School,be removed from the June 20, 2016, City Council meeting agenda. MSBA has informed the school department that this resolution will not be necessary until January of 2017, because the replacement boilers will not be installed until the spring/summer of 2017. However, MSBA requires that the funding for the Feasibility Study/Schematic Design Phase of the project be allocated now. Consequently, I am respectfully requesting that the transfer of $15,000.00 within the Building Maintenance Department be approved and encumbered for the Feasibility Study/Schematic Design Phase of the project in order for the MSBA process to move forward. The cost for a Feasibility Study/Schematic Design is approximately $30,000.00. The transfer of$15,000.00 within the Building Maintenance Department line items would allow us to meet the$30,000.00 requirement. As you are aware,these boilers are over 50 years and in dire need of replacement. I truly appreciate your continued support and cooperation in this matter relating to the schools. of c: R. Cohen, Mayor P. Toney, City Solicitor B. Bard Put children,First" I �Qrf or� 1305 Springfield Street Suite 1 Agawam Public Schools Feeding Hills, MA 01030-2198 I WILLIAM P. SAPELLI, C.A.G.S. ALLISON LECLAIR, Ed. D. superintendent of Schools ROBERT CLICKSTEIN, M.B.A. Assistant Superintendent for Curriculum, (413)821-0548 Instruction,.&Human Resources Fax(413)789-1835 School Business Administrator(413)821-0550 (413)821-0568 www.agawampublicschools.org I i MEMORANDUM TO: James Cichetti, President ity Council FROM: William P. Sapelli (�P DATE: June 17, 2016 ' SUBJ: Resolution Withdrawal I!respectfully request that TR2016-48, regarding the replacement of boilers at the Roberta G. Doering School, be removed from the June 20, 2016, City Council meeting agenda. MSBA has informed the school department that this resolution will not be necessary until January of 2017, because the replacement boilers will not be installed until the spring/summer of 2017. However, MSBA requires that the funding for the Feasibility Study/Schematic Design Phase of the project be allocated now. Consequently, I am respectfully requesting that the transfer of $15,000.00 within the Building Maintenance Department be approved and encumbered for the Feasibility Study/Schematic Design Phase of the project in order for the MSBA process to move forward. The cost for a Feasibility Study/Schematic Design is approximately $30,000.00. The transfer of$15,000.00 within the Building Maintenance Department line items would allow us to meet the $30,000.00 requirement. As you are aware, these boilers are over 50 years and in dire need of replacement. I truly appreciate your continued support and cooperation in this matter relating to the schools. of c: R. Cohen, Mayor P. Toney, City Solicitor B, Bard " Put Chi(dren .first"