Loading...
FISCAL YEAR 1998 TO FISCAL YEAR 2002 Town of Olgabuam, llaaarbuzeto Capitaf Improvement Pro ram 'Fiscal Year 1998 - Fisca[Year 2002 AGAWAM PUBLIC LIBRARY - - -- --- - f ; froposedA awam Pubfic Libra = ansion Submitted by Christopher C. Johnson, Mayor ;! w w w■ w w ww ww rw w ■w �r w w w w � w � w obntr of .0g4tn capital Improvement Program Fiscal Year 1998 � Fiscal Year'2002. TABIIE OF CO TENTS ITEM PACE NUMBER (1) Letter of Submittal to Town Council 1 (2) Introduction 2 (3) List of Projects (Bonding& Appropriation Schedules) (FY1998 -FY2002) 5 (4) Project Descriptions . 15 (5) Bond Payment Spreadsheet 22 (6) Chart- Existing Bond Costs 23 (7) Chart-Budget Appropriations 24 (8) Chart -Projected New Bond Costs 25 (9) Chart-Projected Total Bond Costs(before grants and reimbursement) 26 (10) Chart-Projected Total Bond Costs(after grants and reimbursement) 27 Town of Agawam 36 Main Street, Agawam, Massachusetts 01001 Telephone - (413) 786-45201 FAX - (413) 786-9927 *� Christopher C.Johnson,Mayor Memorandum To: Agawam Town Council From: Christopher C. Johnson,Mayor Re: Capital Improvement Program (Fiscal Year 1998 - Fiscal Year 2002) Date: April 7, 1997 Pursuant to Section 5-3 of the Agawam Home Rule Charter, I hereby submit to the Town Council the Capital Improvement Program for Fiscal Year 1998 to Fiscal Year 2002. The Capital Improvement Program is an organized schedule of proposed capital improvements over the next five fiscal years. The major purposes of the Capital Improvement Program are as follows: (a) to prioritize proposed capital improvement projects; (b) to research and estimate the revenue necessary to fund proposed capital improvement projects; (c) to set parameters on the revenue dedicated to fund proposed capital improvement projects;and (d) to forecast future principal and interest expenditures. The program presented represents a realistic financially feasible long term program. With the problems presented by mandated municipal spending required by the Education Reform Act,as well as,diminishing state grant and project reimbursement money,the proposed plan may be delayed in its implementation. As revenue estimates become available, revisions shall be made and incorporated in the capital budget portion of the annual budget. Please call with any questions. Re tfull submitted, Christop r C. nson Mayor 1 r■� Mw m M M M M r M M Mon r M M r N fE pp 3 � Esd E F9k`n`,`A 9 ' sE a s €e s� Qx E saf d,r'ra3 a 6 s a, .. N. mk a @ g a is9 �d�!„y P.. F l p.�$� ,� A,�y■{F y� 9w d a �§ y k sC' ". s E Y dF a+�EB^pry gyp} Leo CL�� i h - � ry a L 3( q ,y3 E N o a as e e .° aa �kd' fk�za4 E� �' s "° ggy .°_ 3a a S �yy kak E a .F b �. fig_% MI gE d cam. rok a f w. 'm,, w INTRODUCTION For the purposes of this Capital Improvement Program, a capital improvement is a project which provides for planning, design, construction, reconstruction, renovation or replacement of a public building or facility; addition to a public building or facility; purchase of land,buildings or facilities for a public purpose; or a long range development study. While the type of improvement is the basic criteria, a project costing at least$10,000 and with a life expectancy of ten (10) years is generally considered to be a capital improvement. The Capital Improvement Program is designed to accomplish the following purposes: 1. Town funds will be utilized for capital improvements which are compatible with the town's mission of effective and efficient provision of quality services to the citizens and businesses of Agawam which in turn enhances the quality of life in our community and makes Agawam the best place in the Pioneer Valley to live, work and raise a family. 2. Capital Improvement Projects will be undertaken on a coordinated basis. 3. The community will be informed that needed and planned Capital Improvement Projects and expenditures are to be expected and initiated. 2 �■r �r r r r r �r r� r it � � r � � r r r r 4. Town funds will be utilized on the basis of priorities and the availability of grants and/or other state, federal or private reimbursements. S. Capital Improvements will be undertaken with careful planning and financial analysis to avoid an undue burden on the Town's fiscal capacity now and in the future. After many years of limited capital investment,the Town is faced with many badly needed and overly delayed projects which must be undertaken in spite of projected limited revenue growth in the immediate future. Fiscal restraint and careful planning are still required to assure long term stability,and care must be taken in project development and implementation in order that bond sales are timed so that principal and interest costs occur in the year scheduled. In addition, the funding requirements of the new Education Reform Bill have placed severe limits on the Town's ability to undertake needed capital improvements. In developing this Capital Improvement Program the following general assumptions on fiscal capacity were applied: A. Growth in total property tax revenues will continue to be limited by the restraints of Proposition 2 1/2. B. The Town will pursue the maximum property tax revenue allowed by Proposition 2 1/2. C. For the upcoming fiscal year and future years, the Administration is continuing to recommend a greater emphasis be placed on capital improvements. D. During the next five years, the Town should: 1. Limit General Fund principal and interest payments to about $ 1.8 million dollars per year. 2. Appropriate as much funding as possible annually from the general fund for capital improvements on a pay as you go basis while maintaining existing service levels. 3. Utilize the Stabilization Fund to assist in meeting the above goal for level principal and interest payments. 3 The process of capital planning involves setting priorities within the financial capabilities of the Town. Each year the entire plan is reviewed in light of changing needs and requirements. There are more requests for improvements by Town departments that can be included in a five year time period, and certainly the Education Reform Bill will cause further delays in making capital improvements. In developing the recommended Capital Improvement Program, the following priorities were addressed: A. Growth - The Town must meet the needs of a growing population and at the same time direct and manage the Town's growth. Timing of public utility expansion is an effective tool in growth management. B. Improve or assist service delivery - Projects that will reduce the need for staff increases or make staff operations more efficient have been given priority. C. Facilities - New and maintenance of existing -When Proposition 2 1/2 occurred, the Town was forced to delay new facilities and defer maintenance on other facilities. Today, the Town must construct or improve some facilities and provide needed maintenance to others or it faces the potential of losing its current infrastructure. D. Prior commitments - The Town is bound by commitments made in prior years, The commitments were considered in the proposed budget and program. The attached Capital Improvement Program was developed around the previously cited constraints and program objectives. It includes a plan for each of the five program years,a brief description of each project item, spread sheets and charts showing existing and proposed bond payments and graphical representations of these payments. 4 �vb�zY _of �g��a�itt Capital Improvement Program Fiscal Year. 1998 Fiscal Year 2002 Fiscal Y ar199 Bonding_&hedule General Fund Projects Projected 1st Year Project Description Amount Principal &_Interest New Dept. of Public Works Facility-Acquisition of Land and Design $ 1,200,000.00 $ 132,000.00 Revenue Fund Projects Projected 1st Year P" eeLDessription Amount Principal &Interest Water Department -Replace Water Main-North Westfield Street $ 600,000.00 $ 66,000.00 Wastewater Department-Florida Drive Sewer Improvement $ 490,000.00 $ 53,900.00 Wastewater Department- Westfield River CSO Project $ 3,140,000.00 $ 345,400.00 5 � � r r �r rr rr � rr r■ r r rr ■r rr r� � r � �owit ofgWa Capital Improvemont Progrann Fiscal' Year 1998 F s:6d Year 2002 FiscaMar-l"-&Appmpriation_SchQ-dulc General Fund Appropriations Projected Project Description Amount Connecticut River Walk and Bikeway- Town Match $ 120,000.00 North Agawam Drainage Improvement-Phase I $ 35,000.00 Sidewalk Improvement Program $ 20,000.00 Park Improvement Program S 20,000.00 Street Improvement Program $ 30,000.00 TOTAL 225 0, 00 6 45own OUA gab)oitt Capital Improvement Program Fiscal Year 1998 -, Fiscal Year 2002 FiseaLY-ear_1"9_B_ondingSehedule (wenera Tojects Projected 1st Year Prafect Description Amount Prin-dpaL&Interest New Dept of Public Works Facility- Construction $ 3,500,000.00 $ 385,000.00 Agawam Public Library Expansion-Design $ 400,000.00 $ 20,000.00 Re.enue Fund Projects Projected 1st Year Project Description AltoWLt Principal& Interest No Projects Planned $ 0 $ 0 7 Tobin of. AgaWarrt Capital Improvement`Program Fiscal 'Yeas 1.998 Fiscal Year 2002 Fiscal Ye r-1992Appronriatiom-Sehedule Gen.eraMnd-Agpr.Qgriatians Projected Project.DescriptiQn Amauut North Agawam Drainage Improvement -Phase II $ 45,000.00 Sidewalk Improvement Program $ 20,000.00 Park Improvement Program $ 20,000.00 Street Improvement Program. S30,000.t TOTAL $,=11 QIi0.4 8 Capital Imprrovement Program Fiscal Year 1998 FiscaLYear 2002 FiscaLYear_.2004anding_ s�h�s�u enerai Fund Pro ects Projected 1st Year Project-Description Amount Principal & Interest Agawam Public Library Expansion- Construction* $ 2,775,000.00 $ 305,250.00 (* net Town share after state grant) �v�nu�Eun�Pr4�� Projected Ist Year Eroject DeseriptiQn Amount Principal& Interest No Projects Planned $ 0 $ 0 9 Tobin of.:214abiam Capital Improvement Program Fiscal Year 1998 Fiscal Year 2002 Fiscal -ear-100-0APpropriation-Schedule Gen Pral Fund Appropriations Projected Project._D_eseription Amount Sideway Improvement Program $ 20,000.00 Park Improvement Program $ 20,000.00 Street Improvement Program 5 30,000.00 TOTAL S70 000.00 10 own of IgaW Ant Capitial,Improvemeh Program Fiscal Year 1998 - Fiscal Year 2042 Fiscal-Ye 2401_BQn g—Schednll, General Fund Projects Projected IA Year Prnject Description Amount Princig.aL&Interid Agawam Senior Center Expansion-Design $ 100,000.00 $ 11,000.00 Agawam Town Hall -Design $ 250,000.00 $ 27,500.00 Revenue-Fund Projected 1st Year Projul-Deunption Amount PrincipaL&LInterest Wastewater Dept. Feeding Hills Trunk Sewer South-Design $ 315,000.00 $ 34,650.00 11 r r� r r r r �r rr rr rr r rr r rr r rr r r rr Town of Aga AM Capital Improvement program . Fiscal Year 1998: -. Fiseal Year 2002 Fiscal.YeELr-041Appr p- iation-Schedule GenEr l Fund Appropriations Projected Project D-e- r ption Amount Sidewalk Improvement Program $ 20,000.00 Park Improvement Program $ 20,000.00 Street Improvement Program 3D,OOO.D0 TOTAL S 70 Q .00 12 A . �QTI 0t> dd11� Capital Improvement;Program Fiscal Year 1998.. -- Fiscal Year 2001 . Eis-cal Year 2002. BondingQnhgduk Generaffund_P ojects Projected 1st Year Proje"escription Amount Principal & Interest Agawam Senior Center Expansion- Construction $ 1,250,000.00 $ 137,500.00 Agawam Town Hall - Construction $ 2,500,000.00 $ 275,000.00 Revenue Fund Projects Projected 1st Year Project Description Aumunt PrincipaLALi tit No Projects Planned $ 0 $ 0 13 �r r �■ rr �r r r r r r � r r r r r r r ■■r film... Capital Improvement Program Fiscal Year 1995 - Fiscal Year 2002 Fi r_2002Apprupriatio -Sd cdulc GeneraLEundApprop riations Projected Pr.ojtctIZes- ription Amount Sidewalk Improvement Program $ 20,000.00 Park Improvement Program $ 20,000.00 Street Improvement Program $-30.fflom TOTAL S— -000-M 14 I areas in Feeding Hills where roads freeze up first. Response time to these problem spots would be cut in half with a centrally Town of Agawam located site. Capital Improvement Program Fiscal Year 1998 - Fiscal Year 2002 PROJECT D-ESCRE ONS I. N UNiCIP L -B IILDINGS CO NEW DST. P1 B1 I-C_W1)RKS FACILITY -- - _-. The present Public Works facility is: Af? � (1) improperly located for efficient operation; �: F (2) antiquated and unsafe; ,• , (3) insufficient in land use; _ (4) improperly designed for this use; and (5) not energy efficient. i The location of the present garage means that 1 to 1.5 man years of time are lost in transportation vs a centrally located facility. This represents $24,664 to $44,978 per year at the current pay scale. In addition to basic transportation savings, response time �. in emergency situations and sanding/salting operations would also be reduced. Currently the DPW is very remote from the 15 The program proposes that the acquisition and design of AGAWAM PUBLIC a facility be undertaken in FYI 998 with construction to begin in FY 1999. The preferable location of the site would be in the area bounded by Mill St. (Rte 57), Poplar Street, Garden Street, Silver Street and Suffield Street. Temporary bonding would be utilized T to fund the project during development and permanent principal and interest payments would begin in FY2000 when existing A G A W X M P U B F f C L I B R A R Y bond costs have dropped substantially. i I The Agawam Public Library was originally constructed ��z I mainly with an EDA Grant. The building size was adjusted to i come close to the reduced grant amount and was not built to the size originally planned or the size necessary to provide for Agawam's current population. At the time it was recognized that expansion would be necessary and this was allowed for in the design. Also, the new central library and the additional features and services it offers greatly increased public use of the library. Interior space at the building, excluding the cellar storage area and restrooms is only 10,100 square feet. Of this only 5,800 16 square feet is actually devoted to the library materials and public reading and study areas. In 1995 a building study program and needs analysis was developed for the public library to determine the space requirement for a library serving a population of 28,400. This study was funded by the Agawam Center Library Association. The program indicates area requirements for the various functions of a public library operation and determined that a library of 33,258 square feet would be needed to meet = ` Agawam's needs. This program provides the information = = required by an architect developing building plans. During 1996 preliminary design plans were prepared with funding coming from the Library Endowment Funds. The preliminary plans were required to enable the Town to seek assistance under the current Massachusetts Board of Library Commissioners grant program for library buildings. The plans were revised in early 1997 and the town is awaiting definitive approval by the state. It is expected that the revised plans will be — ■; approved and the town will be placed on a waiting list for grant funding. Given current state appropriation levels, construction would tentatively be scheduled to begin in FY2000. AGAWAM SE A large addition to the senior center is sought to provide space for Agawam's growing elderly population. The present over 60 population in Agawam is 6,000. The permitted capacity of the present facility is 185. Existing space has been utilized as efficiently as possible but no room is available for additional meet anticipated future needs. The addition, scheduled for programs or activities. The Council on Aging is presently construction in FY2002, will allow for greater client privacy, working on an interior facelift program for the center which will additional health programs and more classroom and activity help with potential overcrowding, but expansion is needed to space. 17 AGAWAM TOWN HALL and meeting space for boards and commissions. Design plans are — scheduled for FY2001 and construction in FY2002. - A - �F7 i2 TO\A/ N O F AG AVVA M i This project would encompass either the construction of a new town hall building or the expansion of the existing facility. i A new facility could be centrally located within the community to provide easy access for all residents. The new or expanded facility would also be fully handicap accessible for residents and employees. The existing town hall structure is too small to meet existing needs, and the space constraints have led to productivity �-- problems. The new or expanded town hall facility would include adequate office space,conference room space, bathroom facilities 18 I1. PUBLIC WORKS down Meadow Window to the High Street storm drain. In addition existing catch basins on Howard Street would be SIDEWALK IMPROVEMENT PROGRAM diverted to the Moore Street-Ottawa Street drain system. Sidewalks throughout the community are deteriorating. NORTH AGAWAMI)RAINAGF. PHASE H Old concrete walks are cracked,kicked up from tree roots and/or crumbled from salt action. Bituminous walks are suffering Phase H of this project would improve capacity of the similar deterioration. To avoid potential liability, the town needs storm drain system serving High Street and lower Moore Street to begin a long term program for maintenance of our existing and is related to the above project. walks. In addition certain sidewalk systems should be extended to increase walking areas to schools and eventually reduce transportation costs. III. PUBLIC WORIiS - WASTEWATER STREET IMPROYEMEINT PROGRAM ELI.dUDA DRIY K-SE RIMPR There are 16 unaccepted streets in the community which This project has two elements. The first element involves are gravel roads. These streets require tremendous effort to keep the replacement of 2,300 feet of sewer line in Florida Drive. This in a passable condition year round. The rutty, muddy and dusty sewer line has suffered substantial deterioration over the years as conditions which frequently exist are also a source of annoyance a result of high ground water from the Connecticut River leading for residents. Ordinance revisions adopted in 1989 now allow the 1K"- DPW to surface these roads prior to acceptance. It is proposed that the streets be improved with a bituminous concrete surface over several years. These streets include Acorn, Audubon, Barden, Carmen, James, Mardale, Melrose, New York, Oak Street, Twin Oaks and Valley. NORTH AGAWAMDRAINAGE PHASE I An old private drainage system has deteriorated which is resulting in water surfacing in yards and possible damage to structures. Phase I of the project would intercept the pond discharge that the old pipe system currently handles and divert it 19 r ■r r r �■■ r ■■� r■� r r r r r r r rr r r r to infiltration of soil into the sewer through poor joints. This loss Town to eliminate the overflows. The project as contemplated if soil contributed to farther problems with the pipeline because involves the construction of an interceptor sewer on Main Street the loss of soil left unsupported portions of pipe that subsequently between the new pump station behind Hoods and the corner of cracked allowing further infiltration and pipe movement. Suffield Street; the construction of new sewers and storm drains Numerous repairs have been made and the sewer is routinely in lower Suffield Street;culvert improvements at Main Street near checked and maintained. Television inspection of the pipeline Federal Street; new sewer lines in Cooley Street; and the revealed settlement, dips and alignment problems on several construction of new storm drainage in Elm Street. Not only will sections of the sewer which are proposed to be replaced. The this project improve water quality in the Westfield River, but it estimated cost of the first element of this project is $330,000.00. will insure long term sewer capacity in the Westfield River sewer area. The first element of this project,the Westfield River Sewer The second element of the project is the conversion of the Pump Station began construction in 1992 and was completed in Campbell Drive Sewer Pump Station from an ejector station to May of 1994. The remainder of the project is estimated to cost centrifugal pumps which will increase the capacity of the station. $3,140,000.00. The town will seek state assistance in the form of During periods of peak flow, the current ejector pots can barely a no interest loan from the Department of Environmental keep up with the flow which creates the potential for sewage Protection Revolving Loan Fund for eligible portions of the backup in the system. New centrifugal pumps will eliminate the project(estimated at $2,585,000.00). Council authorization for problem and greatly increase the capacity of the station. The appropriation and construction will be sought in late FYI 997 or estimated cost of the second element of this project is early FY1998 with construction to begin in late FY1998 and be $160,000.00. completed no later than July 1, 1999. WESTFIELD RIVER SO PROJECT FEEDING J IS TRUNK SOTITH The town has undertaken a feasibility study over the past This project involves extension of the sewer system several years to determine the optimum way to eliminate southerly to the Police Academy on South Westfield Street, the combined sewer/storm drain overflows into the Westfield and construction of a sewer pump station and extension of sewer Connecticut Rivers. In addition, the town in early 1997 received service to the remainder of South Westfield Street and Barry an administrative order from the United States Environmental Street. This is the first step in providing sewer service to the Protection Agency which requires the town to abate the discharge south west section of the town where there are some areas of of wastewater from combined sewer overflows by July 1, 1999. moderately drained soils and Health Department reports problems The feasibility study and the Lower Connecticut River Phase 11 with on site disposal. Recently a petition has been received from Combined Sewer Overflow Study both indicate separation of one neighborhood in this area requesting sewer service. sewer lines from storm drains is the best course of action for the 20 IV. PUBLIC WORKS -WATER V. MLS-CELLANEOUS NORTH WESTFIELD STREET WATER MAIN CONNECTICUT RIVER WALK AND BIKEWAY As the design of highway improvements for Route 187 Phase I of the Connecticut River Walk and Bikeway have progressed, it has become evident that: 1) substantial Project is a 5.8 mile segment of a 17 mile multi-use trail. The elevation changes in May Hollow will impact the existing water trail is proposed to nun from West Springfield to Agawam on the main installation; and 2) there will be no possibility for future west side of the Connecticut River and from Chicopee to installation of the larger water main recommended in the Water Longmeadow on the east side of the river. In Agawam, a 2.1 mile Distribution Study between North and North West Streets without segment is proposed under Phase I funding. This segment runs along River Road from Chestnut Lane in a northerly direction to the South End Bridge. It consists of a dedicated multi-use trail on property owned by Hampden County to School Street. From School Street north the trail would become a 4 foot wide bike lane on River Road to just south of the South End Bridge where it would then become a multi-use trail to Pynchon Point. NO WEST-FIELD ST I PARK IMPRQVEMENT PROGRAM In FY 1996, the town began the process of annual appropriation of funding to repair and rehabilitate its existing parks and recreation facilities. The funding would be utilized to excavating the proposed roadway improvements.. It is replace existing outdated recreational equipment such as swings, recommended that the larger water main be installed at the time slides,basketball hoops,backstops, etc. The funding can also be of the highway work to eliminate road repair costs, avoid utilized to leverage additional state and federal funding via excavation of a new roadway and take advantage of the highway competitive grants. work funding a substantial portion of the cost where existing main relocation is required. The net cost of this 12" water main project is estimated at $600,000. 21 BOND PAYMENT SCHEDULE(F1'1998-F12007) FISCAL. ITEM AMOUNT IMPACT 'BOND PAYMENTS YEAR - YEAR FY1998 I FY1998 FY2000 FY2001 FY2002 FY2003 FY2004 FY2006 FY2006 FY2007 PHASE IV SEWER- -- - $ 216,630 $ 202,022 $ 157,100 ; 186,750 $ 176.260 § 165,7511 ; 155,250 MIDDLE SCH,RENOV.I $ 1D7,98b S..----72,328 - - - MIDDLE SCHIASBESTO5 II _._. -- $ 4299,050 $ 405,600 $ 382,063 $ 310.125 - WESTFLD RIV.PUMP STA, $ 131,923 S 132,757 ; 9025 $ 49.135 $ 50,094 S 51,100 $ 52,156 $ 53,285 $ 54,432 § 55,060 JR.HIGH HEATING $_ 133.472 $ 126,786 $ 124.752 $ 121,166 $ 117.600 $ 109,125 $ 105.683 $ 102.164 S 98,58_9 $ 95,236 COUNTRY CLUB - S 138,771 $ 133,070 $ 129,837 $ 12fi,163 $ 122,5 10 5 1 T8,836 i M078 $ 111.237 $ 1g7,313 $ 102,764 SUBTOTAL $ 1,158,026 $ 1,076AS3 $ 924,677 $ 793.339 $ 466,464 $ 444,611 i 428,167 $ 266.666 $ 260,313 ; 263,660 .-- _ ^FIRESTAVON_$ 1,775.000_ 1899 $ 104,0W S 195,250 8 ' 189,925 $ 184.800 S 176,275 $ 173,950 ; 188,825 $ 163,3W $ 157,075 i 152,650 SC_HOOL ARCHA DESIGN $ 1,0DO,000 1899 ; 36,313 $ 110AW S 107,000 $ 104,000 $ 101,000 $ 98.000 $ -".OW $ 92,OW $ 80,000 ; 80,000 CQUNTftY CLUB IRRIG. i_ 310,000 1999 ; i3,206 i 34.100 $ 33,170 $ 32.240 S 31,310 3 3DA80 S 29,450 $ 28.520 _; 27.NO $ 28,66i -- - - _ MAINST,WATER $ 540,460 1999 $ 59AW $ 57,780 ; 56,160 $ 64,540 $ 52,220 8 51,300 $ 49,680 $ 48.000_ 4 46.440 TLICKAHOE TURF FARU.- ; 976,0W- 1999 $ 13IA21 $ 107.380 $ 104,432 $ 101,504 $ 08.578 $ 95,648 S 92.720 $ 89.792 $ 86.064 $ 83,936 -- -- SCHOOLADDITKIN8 $18,650,000 20W ; 2,051,5D0 $ 1,936AW $ 1,939,60D $ 1,883,650 ; 1,827,700 $ 1,771,750 $ 1,715,1W $ 1,659,650 SUBTOTAL $?3,251,D00 ; 2/5,030 S 606,170 $ 2,543,507 S 2,474JM $ 2AO.30i i 2,334648 $,2.264,795 $ 2.195,042 $ 2,125AN $ 2,066,536 .am - - - 1998 WFLO,RIV.POL.98 ELIM_JCSO $ 3,140000 200D _ $ 345,400 ; 335,90 i 326,560 5 317,140 ; 307.720 $ 298,300 ; 288,880 3 279,460 19 _FL4RIDA DR,SEWER IM_PR. $----490,666 2MG $ 53,800 ; 52.430 $_ 50,961) $ 49,490 $ 48,020 ; 46.550 $ -45,080 5 43.610 1998 Pl)B WRK_S FAC LAND&DE5 ; 1 200,000 2000 $ 132,000 $ 128,4D0 ; 124,800 ; 121200 ; 117,Ba0 S 114,D00 $ 11g40p ; 106,600 -. - 1996 NO_.WESTFLD ST.WATER ; 600,000 1999 $ 66,0W $ 64,2W $ 62,400 5 60.800 $ 68,800 $ 57,000 S 55,200 $ 53.400 6 51,800 -.-.-. 0 ---� - ...- -- ---- �-'-- -- _ 1999 PUB.LIBRARY DESIGN 3 - 40D,000 __2001 _ $ 20,000 $ 20,000 $ 20,ODD $ 20,000 S 39,200 $ 38,DOO__; 36,800 PUB WRKS FAC. ; 3,500,600 2001 $ 385,0oa $ 374,500 3 364,000 $ 353.500 $ 343,000 $ 332.500_ $ '_322,000 2000 PT8_._LIBRARY AUD,(Net Cost)..f 2,775,OD0 2002 _ $ 305,250 $ 296,925 $ 288,600 $ 260,275 $ 271.950 $ 253,825 20D1 TOWN HALL DESIGN ; 250.000 2003 § 27,500 8 26,750 $ 28.000 $ 25,25D $ 24,500 2001 SENIOR CENTER DESIGN $ 100.000 2003 $ 11,000 $ 10,700 $ 10.400 $ 10,100 6 9,8D0 2D01 F.H.TRUNK SEWER DES_. $ 315.000 2002 $ 34,850 $ 33,705 S 32.760 $ 31,815 $ 30,870 $ 29,925 2W2 TOWN HALL i 2,500,000 2004- $ 275,000 $ 287,500 $ 260,000 $ 252,5oD 2OD2 SR,CEN.EXPANSION A 1,250,D00 2004 $ 1V 6W $ 133,750 $ 130,01)0 $ 128,250 SUBTOTAL $16,520,QOD $ 60,600 $ $96,600 ; 9842iD S 1,297.320 S 1,299,780 S 1,675.160 $ 1,645,990 $_ 1,696,430 $ l,646,67D TOTAL BOND PAYMENTS S 1,413,064 $ 1,647,673 $ 4s063,984 $ 4.251,1903 $ 4,1611,075 S 4.079.119 $ 4,308,112 $ 4.107,699 S 3,092,032 ; 3,666 M POTENTIAL_AID/GRANTS WFLD RIV POL ELIMICSO S 2,585,OD0 - S (155.OM $ (147A45) $ (139,590) ; 131,836 $ (124.000)1; 1116.325) ; (108.5T0) 6 (100,815) SR.CEN.EXPANSION $ i,2W.OW S (13T,500) $ (133,7M $ (130,0W $ 126250) F.H.TRUNK SEWER DES. $ 78,750 $ (6.663) $ (8,4 $ {8,190) ; (7.964) ; [7,718) $ !7,481 SCHOOL ADDITIONS 6 13,241,500 ; 1,456,56) 5 VA16,841) $ (1,377.116) S(i,337,392)A(1297.667) $ (1,257MM i (1.218,218) $ 1,178494) EXISTING SCHOOL BONDS $ 177.431y $ (142,J81) $ (88.574) $ {86,028) 6 83,496) : 479) § (75,035) ; (72,53M ; (68.983) ; 87,818) SUBTOTAL S (171.431) ; 142,791) $(1,700,239) $ (1.650,2131 $ (1,60 ; 1.65d,132 S N,642,472) ; (1,589,506) S (1.534.459) $ (1,460,887) -NET BONA PAYMENTS-- _ - $ 1,771,633 ;E(3 2 S 2,363,745 ; 2,601,390 S 2,559,211 $ 2,523,988 ; 2,72H 640 i 2,519,190 S 2,447,543 ; 2 376,399 -� WATBR FUND PAYMENTS - 6 __ $ 0) S (121,980) $ (118,560) $ (116,14% ;-(111,720L $_ (1a8,3o0) $ (104,880) S (101,460) 5" (BB,046) - SEWER FUND PAYMENTS _S (348.753) $ 9 S 532,225) $ (476.950) $ (498.924} § (485,350) $ �334,326) $ (179.855) $ (180,692) $ 181,59000UNTRY CLUBPAYMENTS S (157,977 ; b S (163,007) $ (158,403) $ 053,820) $ (140,216) $ (144,528) 6 (139,757) $ (134,903 .,$ (129,414) STA61LIL4TION FUND USE -_ 1107282 INVESTED 5.595 $ (47,477) $ _ S S {538,488) $_ (294,698) $ (230,486) $ (188,355 GEN.FUND BOND PAYMENTS - $ 770,903 $ 676 533 $ 1 5448 633 $ 1.800,000 $ 1 791 327 $ 1,777,702 $ 1,000,000 $ 1,800,000 $ 1 800,000 $ 1,800,000 22 1 1 I I 1 h 1d W on M ONE M M ME M 000 no I, onI , Existing,Bond Costs (FY 1998 - FY200D PROJECT FY1998 F 71999 FY2000 FY2001 FY2002 Middle School Ren. 1 $107,980 $72,328 Middle/Asbestos U S429,050 $405,600 $382,063 S310,125 Jr.High Heating $133,472 S128,786 $124,752 $121,166 $117,600 Phase IV Sewer S216,830 $202,022 $197,100 $186,750 S176,250 Main Street Pump Station S131,923 S132,757 S90,925 $49,135 S50,094 Agawam Country Club $138,771 $133,970 $129,837 $126,163 $122,510 Tuckahoe Turf Farm* $131,421 S107,360 $104,432 S101,504 $98,576 Fire Headquarters" $104,098 $195,250 $189,925 S184,600 $179,275 School Projects" 536,313 $110,000 S2,158,500 S2,099,550 $2,040,600 Agawam CC Irrigation* S13,206 S34,100 S33,170 $32,240 S31,310 Main Street Water" $0 $59,400 $57,780 S56,160 $54,540 TOTAL $1,443,064 $1,581,573 S3,468,484 $3,267,393 $2,870,755 ('denotes project which is authorized but not yet permanently bonded) Existing Bond Costs(FY1998-FY2002) $3,500,000 $3,000,000 f ' s $2,500,000 1 $2,000,000 $1,500,000T:4' $1,000,000 a>` S5ao.0o0 So - FY1998 FY1999 FY2000 FY2001 F1'2002 23 rvn= es...�..�.,r„w+s '�d'!9•+"^' .•rMrn�e-r+-c t Budget Appropriations (FY1998 -_FY2002) Category FY1998 FY1999 FY2000 FY2001 FY2002 General Fund 5225,000 $115,000 S70,000 $70,000 S70,000 Sewer Fund s0 $0 SO s0 s0 Water Fund s0 s0 $0 s0 $0 Coll Fund s0 s0 s0 so s0 TOTAL $225,000 $115,000 $70,000 $70,000 S70,000 Budget Appropriations (FY1998 FY2002) f i $250,000 $200,000 $150,000 $100,000 $50,00() t $0 FY1998 FY1999 FY2000 FY2001 FY2002 24 R.S M.A L.J K..J Projected New Bond Costs_(FY1998_-_FY20_02) FY1998 FY1999 FY2000 FY2001 FY2002 New DPW Facility $0 $0 $132,000 $513,400 $499,300 No.Westfield St Water Main $0 $66,000 $64,200 $62,400 $60,600 Westfield River CSO Project s0 $0 $345,400 S335,980 $326,560 Florida Drive Sewer Imp. SO SO S53,900 $52,430 S50,960 Library Expansion $0 $0 SO $20,000 $325,250 Senior Ctr Expansion $0 SO S0 $0 $0 Town Hall $0 $0 $0 $0 $0 Feeding Hills Sewer(design) $0 $0 $0 SO S34,650 TOTAL so $66,000 $595,500 $984,210 S1,297,320 Projected New Bond Costs (FY1998 - FY2002) $1,400,000 $1,200,000 $1,000,000 $800,000 S600,000 S400,000 S200,000 &0 FY1998 FY1999 FY2000 FY2001 FY2002 25 M M AIM M M M Pro*ected Total Bond Costs(FY1998 - FY2002) (before grants and reimhursements) FY1998 FY1999 FY2000 FY2001 FY2002 Existing; Bond Costs $1,443,064 $1,581,573 $3,468,484 $3,267,393 $2,870,755 Projected New Bond Costs $U $66,000 $595,500 $984,210 $1,297,320 TOTAL BOND COSTS $1,443,064 $1,647,573 $4,063,984 S4,251,603 $4,168,075 Projected Total Bond Costs (FY1998 - FY2002) (before grants and reimbursements) $4,500,000 $a,000,000 -�' r $3,500,000 -" $3,000,000 - $2,500,000 - f $2,000,000 - z $1,500,000 $1.000,000 . l FY1998 FY 1999 FY2000 FYMo i FY2002 26 � � r r � r■ �■■ � r � r rr rr �r r � r � rr Projected Total Bond Costs (FY1998-- FY2002) (after grants and reimbursements) F'Y1998 FY1999 FY2000 FY2001 FY2002 Existing Bond Costs $1,443,064 $1,581,573 $3,468,484 $3,267,393 $2,870,755 Projected New Bond Costs $0 $66,000 $595,500 $984,210 $1,297,320 Projected Grants do Reimb. ($171,431) ($142,791) ($1,700,239) ($1,650,213) ($1,608,865) h'ET13ONDC08Ts $1,271,633 $1,504,782 $2,363,745 $2,601,390 $2,559,210 Projected Total Bond Costs (FY1998 - FY2002) (after grants and reimbursements) �y $3,000,000 $2,500,000 $2,000,000 $1,500,000 E $1,000,nOn W $500,000 $o FY 1998 FY 1999 FY2000 FY2001 FY2002 27