Loading...
FISCAL YEAR 2010 TO FISCAL YEAR 2014 I.' i� 5 sill G II II I j I _ G 6 N w •T� ICI s � _ '- l i III, ii I Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 TABLE„Of CONTENTS ITEM PAGE NUMBER (1) Cover Memorandum to City Council 1 (2) Introduction 2 (3) List of Projects (Bonding & Appropriation Schedules) (FY2010 - FY2014) 5 (4) Project Descriptions 20 r cis (5) Bond Payment Spreadsheet 25 (6) Chart -Budget Appropriations 26 (7) Chart - Existing Bond Costs 27 - (8) Chart- Projected New Bond Costs 28 " = (9) Chart- Projected Total Bond Costs (before grants and reimbursements) 29 , (10) Chart- Projected Total Bond Costs (after grants and reimbursements) 30 (11) Chart - Self Sustaining Funds - Existing Bond Costs 31 (12) Chart- Self Sustaining Funds - Projected New Bond Costs 32 (13) Chart - Self Sustaining Funds -Projected Total Bond Costs (before grants and reimbursements) 33 (14) Chart- Self Sustaining Funds Projected Total Bond Costs (after grants and reimbursements) 34 r M M am Town of Agawam 36 Main Street, Agawam, Massachusetts 01001 Telephone (413) 786-4520 1 FAX (413) 786-9927 �A Susan R. Dawson, Mayor Memorandum To: Agawam City Council From: Mayor Susan R. Dawson Re: Capital Improvement Program (Fiscal Year 2010 - Fiscal Year 2014) Date: April 14, 2009 Pursuant to Section 5-3 of the Agawam Home Rule Charter, I hereby submit the Capital Improvement Program for Fiscal Year 2010 to Fiscal Year 2014 to the Agawam City Council. The Capital Improvement Program is a prioritized plan of proposed capital improvements over the next five fiscal years. The major purposes of the Capital Improvement Program are as follows: (a) to develop and prioritize needed proposed capital improvement projects; (b) to research and estimate the revenue necessary to fund proposed capital improvement projects; (c) to set parameters on the revenue dedicated to fund proposed capital improvement projects; and (d) to forecast future principal and interest expenditures. The program presented represents a realistic financially feasible long term program that has been reviewed with the Council Capital Improvement Sub-Committee. As revenue estimates become available, revisions shall be made and incorporated in the capital budget portion of the annual budget. Please call with any questions. Respectfully submitted, Mayor Susan R. Dawson 1 Town of Agawam Capital xmprovemeAt Program Fiscal Year 2010 - Fiscal Year 2014 INTRODUCTION For the purposes of this Capital Improvement Program, a capital improvement is a project or undertaking which provides for (i) the planning, design, construction, reconstruction, renovation or replacement of a public building or facility; (ii) an addition to a public building or facility; (iii) the purchase of land, buildings or facilities for a public purpose; or (iv) a long range development study. While the type of improvement is the basic criteria, a project costing at least $20,000 that has a life expectancy of ten (10) years or more is generally considered to be a capital improvement. The Capital Improvement Program is designed to accomplish the following purposes: 1. To utilize town funds for capital improvements which are compatible with the town's mission of effective and efficient provision of quality services to the citizens and businesses of Agawam which in turn enhance the quality of life in our community; 2. To undertake Capital Improvement Projects on a coordinated basis; 3. To inform the community when needed and planned Capital Improvement Projects and corresponding expenditures are to be expected and initiated in the future; 4. To utilize town funds on the basis of community priorities in coordination with the availability of grants and/or other state, federal or private reimbursements; and 2 r Mao W r ■r No > err � 5. To undertake Capital Improvement after careful planning and financial analysis to avoid an undue burden on the town's fiscal capacity now and in the future. After many years of limited capital investment, the town was faced with many desperately needed projects which had to be undertaken in spite of projected ]united revenue growth. Fiscal restraint and careful planning are required to assure long term stability, and care must be taken in project development and implementation in order that bond sales are timed so that principal and interest costs occur in the year scheduled. In addition, the funding requirements of the Education Reform Bill have placed severe limits on the Town's ability to undertake needed capital improvements. in developing this Capital Improvement Program the following general assumptions on fiscal capacity were assumed and.applied: 1. Growth in total property tax revenues will continue to be limited by the restraints of Proposition 2 Yz and no debt exclusion overrides are contemplated in this plan; 2. The town will pursue the maximum property tax revenue allowed by Proposition 2 1/2; 3. For the upcoming fiscal year and future years, the Administration is continuing to recommend a greater emphasis be placed on capital improvements; and 4. During the next five years, the town should: a. Limit General Fund principal and interest payments to approximately $1 million dollars per year; b. Appropriate as much funding as possible annually from the general 3 �r r� � � � r � ■■� � � arm r r r �r r .� � rr fund for capital improvements on a pay as you go basis while maintaining existing service levels; and C. Utilize the Stabilization Fund to assist in meeting the above referenced goal for level principal and interest payments. The process of capital planning involves setting priorities within the fiscal capability of the town. Each year the entire plan is reviewed in light of changing needs and requirements. There are more needs for improvements by town departments that can be included in a five year time period, and certainly the net school spending requirements of the Education Reform Bill may cause further delays in making capital improvements. In developing the recommended Capital Improvement Program, the following priorities were addressed: 1. Growth - The town must meet the needs of a growing population and at the same time direct and manage growth through the timing of public utility expansion; 2. Improve or Assist~Service Delivery - Projects that will reduce the need for staff increases or make staff operations more efficient have been given priority; 3. Facilities - New and Maintenance of Dds i g Facilities - When Proposition 2 YL was implemented communities were forced to delay constructing new facilities and defer maintenance on existing facilities which has led to the current backlog of need for new facilities and the provision of maintenance to existing facilities; and 4. Prior commitments_ - The Town is bound by commitments made in prior years. The commitments were considered in the proposed budget and program. The attached Capital Improvement Program was developed around the previously cited constraints and program objectives. It includes a bonding and appropriation plan for each of the five program years, a brief description of each project item, spread sheets and charts showing existing and proposed bond payments and graphical representations of these payments. 4 Town of Agawam 1 Capital Improvement Program P P g Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2010 An=prQpriation Schedule General Fund Appropriations Projected Project Description Amount Hampden County Land Acquisition S9,500.00 Department of Public Works Equipment $150,000.00 Street Improvement Program $150,000.00 Sidewalk Rehabilitation and Extension $30,000.00 Phelps School Gym Floor Replacement $48,765.00 DPW Facility Boiler Replacement $24,800.00 TOTAL LL6 Wastewater Fund-&pmpriatio Projected Project Description Amount Wastewater Equipment Replacement $47,174.00 DPW Facility Boiler Replacement $18,600.00 TOTAL a0aZL4=00 5 Town of Agawam Program Capital Improvement Pro P P g Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2010 Appropriatim S hed , e (Continued) Water Fund AVpropriations Projected Project Description Amount Water Department Equipment Replacement $35,995.00 DPW Facility Boiler Replacement $18,600.00 TOTAL UA95 Adam Municipal Golf Course Ap�ro iom Projected Urojcct Description Amount Municipal Golf Course Equipment Replacement =10=0M 6 Town of Agawam Capital Improvement Program P P �' Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2010 Bonding Schedule Gencral Fund Project Projected I'Year Project Deception Amount Debt.Service Voice Over Internet Protocol Telephone System $477,410.00 $67,335.11 ' Wastewater Fund Projects Projected 1 S`Year Project Description Amount Debt Service Westfield River Bank Stabilization $127,000.00 $11,643.50 1 Water Fund Frojects Projected 151 Year Project Desgbption Amount Debt Service Water Main Improvements - Main Street & Suffield Street $1,632,496.00 $151,116.09 i t 1 1 1 Town of Agawam Capital Improvement Program P P g Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2011 Appropriation Schedule General Fund A ?ronriations Projected PLQjgct Descri tio Amount Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $150,000.00 Street Improvement Program $157,500.00 ' Sidewalk Rehabilitation and Extension $31,500.00 Robinson Park School Energy Management System $128,000.00 ' TOTAL 4 0.00 Wastewater Fund Al2 onriations Projected ProJect Description Desghption Amoun Wastewater Equipment Replacement $47,174.00 TOTAL UZ17LW i 1 Town of Agawam Capital Improvement Program P P �' Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2011 Appropriation Schedule (Continued) )Mater Fund A �ppropriafions PrQjectgd Project Description of Water Equipment Replacement D 00 Agawam Municipal Golf Course Appropriations Pr to Project Descrimtion rn Municipal Golf Course Equipment Replacement 1 0 I 1 1 1 1 i 9 1 Town of Agawam ' Capital Improvement Program P P g i Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2011 Bonding Schedule General Fund Pros Projected smear Pro-ject Description oun Debt Service School Department All Weather Track&Bleachers $2,329,000.00 $256,653.50 Wastewater Fund Projects ro'e I st Year Project Descriptition Amount Debt �� 1 Feeding Hills Southwest Sewer Extension Phase II &III Plans $751,600.00 $106,691.4 0 1 10 Town of Agawam Capital Improvement Program P P g ' Fiscal Year 2010 - Fiscal Year 2014 ' Fiscal Year 2012 Appropriation Schedule ' General Fund Appropriations Projected PP jet Description Amount Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $150,000.00 Street Improvement Program $300,000.00 Sidewalk Rehabilitation and Extension $33,075.00 Junior High Gym Door $25,000.00 ' TOTAL $5 i Z575.00 Wastewater Fund AMpro rian tions Project ' Project Desgdptio Amount Wastewater Equipment Replacement 4 174 Water Fund A=opria giona Projected Projlect Description A Aunt Water Equipment Replacement WZ9=0 11 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 IFiscal Year-2012 Appropriation Schedule (!Confimed) Agawam Municipal Golf Course Appropriations Prpjegled Project Descri fiion Amount Municipal Golf Course Equipment Replacement r 1 ' 12 1 Town of Agawam ' Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 Fecal Year 2012 Bonding Schedule Wastewater Fund Projects Pro-jected 1 S`Year ' Proj_ect Descri to ion Amount Debt Serve Feeding Hills Southwest Sewer Extension Phase II & III $6,764,700.00 $644,41 t.50 Water Fund Proiects Pro-jeQted 1 g`Year Project Description Amount Debt Service Water Main Improvement North Westfield Street $1,891,000.00 $180,095.00 i I i 1 1 i � 13 1 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2013 Appropriation Schedule General Fund Appropriations Projected Project Description Amount Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $150,000.00 Street Improvement Program $315,000.00 Sidewalk Rehabilitation and Extension S34,729.00 TOTAL $509.229.00 Wastewater Fund,Appropriations Prajectgd Project Description Amount Wastewater Equipment Replacement 47 174.00 Water Fund Appropriations Projecte, Project Description Amount Water Equipment Replacement 35 99 .0 14 Town of Agawam Capital Improvement Program ' Fiscal Year 2010 - Fiscal Year 2014 ' Fiscal Year,...,2013 Appropriation Schedule (Continued) Agawam Municipal Golf Course AWronriations Projected ' Project Description Amount Municipal Golf Course Equipment Replacement 3 U 1 1 i 1 1 1 i t 1 15 1 Town of Agawam ' Capital Improvement Program ' Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2013 Bonding h ' - General Fund Projects Projected 15,Year ' Project Description Amount Debt Junior High Roof Replacement $1,575,000.00 $158,750.00 Wastewater Fund Projects ' Projected 5`1 Year Proms ct Descri2tion Amount Debt Service ' Westfield River Backup Force Main $1,575,000.00 $196,500.00 Water Fund Projects ' ro'e I'Year Project Description Amount Debt. Service ' Water Main Replacement - Silver Street to Elm Street $1,074,031.00 $108,701.55 1 1 16 Town of Agawam ' Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2014 Approgiriation SchedWe G n al Fund Appropriatiow Projected PLQject Descri tion Amount Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $150,000.00 Street improvement Program $330,750.00 Sidewalk Rehabilitation and Extension S36,465.00 TOTAL 52 0 ' Wastewater Fund Appropriations Projected ' Pr 'ect Description Amount Wastewater Equipment Replacement $47,174.00 Water Fund Appropriations ' cted Project Description Amount rWater Equipment Replacement 9 .00 17 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 Fiscal Year 2014,Appropriation Schedule(.Continued) Agawam Municipal Golf Cour5_Aoro2ddions Projected Project Description Amount Municipal Golf Course Equipment Replacement guago 18 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 fiscal Year 2014 Bondinu Schedule General Fund Projects Projected 15`Year Project Des rippt o Amount Debt Service Police Station Renovation $250,000.00 $37,500.00 Water Fund Projects PrQjecte `Year Project Description Amount Debt Service South Street Water Main Replacement $883,000.00 $89,150.00 19 w Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 PROJECT DESCRIPTONS 1. MUNICIPAL BUILDINGS DPW FACILITY ENERGY UPGRADES Funds are requested to replace the existing boiler in the Department of Public Works facility. The new Weil-McLain boiler is rated at 93% efficiency. The existing boiler is rated at only 45- �, 55% efficiency. This project has been submitted to the state for possible funding through the American Recovery and Reinvestment Act stimulus funds. POLICE STATION RENOVATION Funds have been set aside to provide for a use and feasibility study for repairs and improvements to the Police Station. Funds are requested to upgrade the Police Station pursuant to the findings of the study. II. PUBLIC WORKS HIGHWAY DEPARTMENT EQUIPMENT An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in, order to provide funding for high value, large Department of Public Works trucks and other capital equipment. STREET IMPROVEMENT PROGRAM Funding is required for the improvement and maintenance of local roadways. Improvements include the construction, reconstruction, widening and resurfacing of roads and the installation and repair of drainage structures and systems. Funds will be utilized in.combination with state Chapter 94 funding to meet routine maintenance and improvement requirements. 20 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 SIDEWALK REHABILITATION AND EXTENSION The Department of Public Works Highway Divisions' sidewalk construction and repair team will continue rehabilitation work on sidewalks throughout the community. Funds will be used to extend walks to provide connections to schools and recreation facilities. III. PUBLIC WORKS - WASTEWATER WASTEWATER EQUIPMENT An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for large, high value, wastewater capital equipment. FEEDING HILLS SOUTHWEST SEWER EXTENSION This project involves extension of the sewer service to the Southwest portion of Town. The first phase of this program has been approved. Funds are included for plans and specifications for phases II and III, followed by construction in the subsequent year. The enormity of this project requires that it be completed and funded in phases. It is anticipated that it will be completed in six phases over a period of approximately ten years at a total cost of over$31,000,000. WESTFIELD RIVER BANK STABILIZATION This project is being undertaken with the US Army Corps. of Engineers. Funds are included for the Town's share of the project and will be needed upon approval of the Corps. of Engineers. WESTFIELD RIVER BACKUP FORCE MAIN Failure of the newer force main during fiscal year 2008 required emergency repairs during which the 10" backup force main was used to continue flows to Bondi's Island. This backup force main should be completed to be ready to be put in service should any of the existing four river crossings fail in the future. 21 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 IV. PUBLIC WORKS -WATER WATER DEPARTMENT EQUIPMENT An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for high value, large water capital equipment. MAIN STREET - SUFFIELD STREET WATER MAIN IMPROVEMENT The Springfield Water and Sewer Commission is planning maintenance work on their transmission mains from which we receive our water. A portion of the mains will be taken out of service for the work. Hydraulic modeling of our system indicated that we do not have sufficient capacity in our distribution system to insure adequate pressure for our residents if we lose service from more than one connection. We need to build flow capacity in an east-west direction. NORTH WESTFIELD STREET WATER MAIN IMPROVEMENT This project will provide a link from our only connection t e Springfield n erl p � py ectt o the northerly transmission main to the rest of our system which only has connections to the southerly transmission line, allowing us to maintain service should the southerly transmission line go out of service. SILVER STREET—ELM STREET WATER MAIN REPLACEMENT Funds are requested to replace the existing six inch main running between Main Street and Suffield Street with a twelve inch main to improve the east — west flow capabilities and well as fire flows. SOUTH STREET WATER MAIN REPLACEMENT Funds are requested to replace the existing six inch main running between Main Street and Suffield Street near the Connecticut line with a twelve inch main to improve the east—west flow capabilities and well as fire flows. 22 Town of Agawam Capital Improvement Program Fiscal Year 2010 - Fiscal Year 2014 V. MISCELLANEOUS VOICE OVER INTERNET PROTOCOL TELEPHONE SYSTEM Nearly all of the phone systems at the schools and municipal buildings are at the end of their useful lives. Most of the phone systems are at capacity and cannot be upgraded without significant investment. New phone systems would leverage the town fiber network which would result in significant reduction of phone costs by reducing the number of phone lines that are run into and between each building by the phone company. GOLF COURSE EQUIPMENT An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for high value, large Municipal Golf Course capital equipment. HAMPDEN COUNTY LAND ACQUISITION Agawam acquired most of the holdings of the Hampden County government that were within the Town's boundaries when the county was dissolved. The Town is required to reimburse the other county communities for their share of these assets. VI. SCHOOL DEPARTMENT HIGH SCHOOL ALL WEATHER TRACK AND BLEACHER REPAIR An all weather track with field runways would greatly improve conditions for this sport while reducing maintenance requirements. Drainage facilities would also be included. Wooden bleacher planks continue to rot and require replacement each year. This safety project will encompass sand blasting and painting the metal runners and replacing the wooden planks with aluminum. 23 Town of Agawam Capital Improvement Program Fiscal Year 2010 -Fiscal Year 2014 JUNIOR HIGH SCHOOL ROOF REPLACEMENT The roof at the Junior High School is 22 years old and has been tested. It should last for another five to six years. A new roof will be required to ensure that the structure of the building and its contents are protected. SCHOOL REPAIRS These projects will continue to be funded through annual appropriation. They include a new gym floor at the Benjamin Phelps School, a new energy management system at Robinson Park School, and a new folding gym door at the Junior High School. 24 8 x. 8 8 „ « ^^ 88 8 S88 $8 8 &888` 1 as a �Rs 9£ s. ass9 8 8888 8 98 R S. Si9>r 8s 8 8,88 SS 8 8 S8R8 Dada 828888 R SS S8s $ $ $ 3 $ m 88 8 a 8 a 88 « 8 S818' 17988$8 8 888$ P P 8s 88 8 8 R8IRsm $^0$888«k"m 82 R88$ 818C 80o SS �° S8S 88 a 8 a8R8� $^ sa8$$SSR� 8S 8888 :8$ 8 8.�-8 3.�.-- 88 8S88R s8 a, 8 S"8R 8S S $12 8I;88S888�r SS 888a i488 9a2 R8 8&S8R a.8:1 :. $. RSRS� �8Sdk S w w$I-', 88g88888R9 go �8588 2^w,.4.Xt .B 81eR8R: 88 832SS. 8sR! 8 $ RSIABI a na ssNcR6 Ea�£ z is � $ maaR"x 8 �8F 88288a88p5 Ss 8RR8w = n 1°8 A g $S �"RRBs 38:, 5I $ R'8sS 1 � � SSmR� ssssssssss ss �SSs� S��RB � ��asa 88 8��as s: � s as�sa a �, 6 , SBenfCi". 88.ry8888s8: SS �SBS 8r�S "., " ii8N88� 8$ IES888 �88 R 8 R8S8� S Aa� s��:a �� sas air :tie ". 8 S^2i^ � 88`"88s8S8B �888� 8S�s�{ 57R;8 R 88 898$s 48R 8$8,B81�ieR887l888S88g $S " R8 a 8S"8>u R v8:8 8 SsBR g:85 ik. 8 8SR 8858 RRR$8R8$$8$sa S 8a�$S S RSRR8.&8 89 8 S 8 r:s R t 8 a 8 >g 88 I°8 R 8 9 R 8 8 8 8 88 8 S 8,8 S$ S $R`;$o +R.R,8 S - 8 8 LQS S.S, i 8 a... R 8 _q_8888SRI"R88188s828p S R 98R FZ;r :8AR 88 8 58 X E 8 S. ..... .s S "so £ s a � ? a ro� s 999 �s 188RStaRRS88A8a8828S SS 8Isis s R8R RR8 R &fit m 'i Z Z mssa �mo. A zR P-- mi . . ... .. .. . . Budget Appropriations (FY2010 - FY2014) I Y or Cate9 FY2010 FY2011 FY2012 FY2013 FY2014 General Fund $413,065 $476,500 $517,575 $509,229 $526,715 Sewer Fund $65,774 $47,174 $47,174 $47,174 $47,174 Water Fund $54,595 $35,995 $35,995 $35,995 $35,995 Municipal Golf Cour $31,100 $31,100 $31,100 $31,100 $31,100 1 TOTAL $564,534 $590,769 $631,844 $623,498 $640,984 1 - Budget Appropriations (FY2010 - FY2014) $660,000 $640,000 ' $620,000 $600,000 I $580,000 / $560,000 $540,000 r $520,000 - - 1120111 1121111 FY2012 FY2013 FY2014 ' 26 General Fund Existing Bond Costs (FY2010 - FY2014) PROJECT FY2010 FY2011 FY2012 FY2013 FY2014 Junior High Heating $ 83,256 $ 79,098 $ - $ - $ - Fire Headquarters 127,715 122,740 117,715 112,640 107,515 Tuckahoe Turf Farm 73,665 70,680 67,665 64,620 61,545 School Projects I 723,844 701,400 678,694 655,725 632,363 School Projects II 763,768 737,553 711,070 684,320 657,236 Title V Community Septic Management 3,895 3,756 3,616 5,952 3,477 Public Library Expansion 333,614 325,064 316,064 307,064 298,064 Agawam High School Library Expansion 59,049 57,529 55,929 54,329 52,729 Fire Department Aerial Platform Truck 86,813 84,469 81,938 79,219 76,406 D.P.W. Facility Acquisition 81,140 79.265 77,240 75,065 72,815 D.P.W. Facility Alterations 99,372 97,020 94,668 92,316 89,964 Phase II Stormwater Management 16,674 16,579 16,475 16,368 16,261 Middle School Roof 37,180 36,300 35,420 34,540 33,660 Middle & Junior High Repairs 10,140 9,900 9,660 9,420 9,180 ' Elementary Schools - Modular Classrooms 135,200 132,000 128,800 125,600 122,400 Senior Center Construction 590,815 580,615 570,415 559,790 548,740 Fire Pumper Trucks 73,098 71,598 70,098 68,535 66,910 Perry Lane Pool Renovations 29,150 28,550 27,950 27,325 26,675 Subtotal - Existing Bond Costs $ 3,328,388 $ 3,234,116 $ 3,063,417 $ 2,972,828 $ 2,875,940 Phase II Stormwater Completion 8,399 8,185 7,970 7,756 Voice Over Internet Protocol Telephone System 67,335 65,391 63,447 61.503 School Deparment All Weather Track & Bleachers 256,654 250,014 238,374 Jr. High Roof - - - 158,750 1 Police Station Repairs - - Total Existing and Projected Bond Costs $ 3,337,002 $ 3,309,850 $ 3,393,647 $ 3,294,259 $ 3,342,323 ( denotes project which is authorized but not yet permanently bonded) (` denotes project which is planned but not yet authorized) Existing Bond Costs (FY2010-FY2014) $3,400,000 $3,300,000 $3,200,000 $3,100,000 $3,000,000 $2,900,000 �� l $2,800,000 $2,700,000 $2,600,000 FY2010 FY2011 FY2012 FY2013 FY2014 27 General Fund Projected New Bond Costs (FY2010 - FY2014) i FY2010 FY2011 FY2012 FY2013 FY2014 Phase II Stormwater Completion $ 8,614 $ 8,399 $ 8,185 $ 7,970 $ 7,756 Voice Over Internet Protocol Telephone Systi - 67,335 65,391 63,447 61,503 School Deparment All Weather Track & Bieac - - 256,654 250,014 238,374 Jr, High Roof - - - 158,750 Police Station Repairs - - - - - ' TOTAL 14 75,734 0 2 0 21 4 1 4$ i,i $ $ 33 3 $ 3 3 $ 66,383 1 1 i 1 iProjected New Bond Costs (FY2010- FY2014) $500,000 $400,000 $300,000 $200,000 $100,000 . p � FY2010 FY2011 FY2012 FY2013 FY2014 1 28 General Fund Projected Total Bond Costs (FY2010 - FY2014) (before grants and reimbursements) ' FY2010 FY2011 FY2012 FY2013 FY2014 Existing Bond Costs $3,328,388 $3,234,116 $3,063,417 $2,972,828 $2,875,940 Projected New Bond Costs $8,614 $75,734 $330,230 $321,431 $466,383 TOTAL BOND COSTS $3,337,002 $3,309,850 $3,393,647 $3,294,259 $3,342,323 1 Total Projected Bond Costs (FY2010 -FY2014) (before grants and reimbursements) ' $3,400,000 $3,380,000 $3,360,000 _ $3,340,000 $3,320,000 - $3,300,000 $3,280,000 $3,260,000 — $3,240,000 FY2010 FY2011 FY2012 FY2013 FY2014 29 General Fund Projected Total Bond Costs (FY2010 - FY2014} (after grants and reimbursements) FY2010 FY2011 FY2012 FY2013 FY2014 Existing Bond Costs $3,328,388 $3,234,116 $3,063,417 $2,972,828 $2,875,940 Projected New Bond Costs $8,614 $75,734 $330,230 $321,431 $466,383 Projected Grants A Reimb. $ 1,056,766 $ 1,055,018 $ 1,053,266 $ 1,053,923 $ 1,049,703 NET BOND COST5 $2,280,236 $2,254,832 $2,340,381 $2,240,336 $2,292,620 1 ' Projected Total Bond Costs (FY2010 - FY2014) (after grants and reimbursements) j $2,360,000 $2,340,000 -- $2,320,000 $2,300,000 $2,280,000 $2,260,000 $2,240,000 $2,220,000 f $2,200,000 / $2,180,000 FY2010 FY2011 FY2012 FY2013 FY2014 i 1 30 r Self Sustaining Funds Existing Bond Costs (FY2010 - FY2014) PROJECT FY2010 FY2011 FY2012 FY2013 FY2014 Agawam Country Club $ 89,744 $ 85,262 $ - $ - $ - 1 Country Club Irrigation 21,495 20,500 - - - Westfield River Pump Station 76,706 76,641 76,600 76,540 76,499 Westfield River C50 {MWPAT, 154,731 143,406 146,171 147,040 143,194 Westfield River CSO - Local Share 59,759 58,239 56,639 55,039 53,439 Campbell Drive / Florida Drive Sewer 37,194 36,244 35,244 34,244 33,244 D.P.W. Facility Alterations-Wastwater 74,529 72,765 71,001 69,237 67,473 Westfield River Force Main 41,270 41,270 41,270 41,270 41,270 D.P.W. Facility Alterations-Water 74,529 72,765 71,001 69,237 67,473 Subtotal - Existing Bond Costs 629,957 607,092 497,926 492,607 482,592 Feeding Hills Sewer Extension Phase I 341,065 333,370 325,675 317.980 Westfield River Bank Stabilization 11,644 11,380 11,117 10,854 ' Feeding Hills Sewer Extension Phase II & II Plans - 106,691 103,558 100,425 Feeding Hills Sewer Extension Phase II & III 644,412 629,112 Westfield River Backup Force Main - - - 196,500 Main Street-Suffield Street Water Main Improvement 151,116 147,674 144,231 140,789 North Westfield St Water Main Improvement 180,095 175,820 Elm Street Water Main Replacement - 108,702 South Street Water Main Replacement - Total Existing and Projected Bond Costs $629,957 $1.110,917 $1,097,041 $1,901,695 $2.162,774 (" denotes project which is authorized but not yet permanently bonded) {'denotes project which is planned but not yet authorized) j Existing Bond Costs (FY2010-FY2014) 700,000 600,000 500,000 400,000 300,000 200,000 100,000 FY2010 FY2011 FY2012 FY2013 FY2014 1 31 Self Sustaining Funds Projected New Bond Costs (FY2010 - FY2014) FY2010 FY2011 FY2012 FY2013 FY2014 Feeding Hills Sewer Extension Phase I $ - $ 341,065 $ 333,370 $ 325,675 $ 317,980 Westfield River Bank Stabilization - 11,644 11,380 11,117 10,854 Feeding Hills Sewer Extension Phase II & II P 106,691 103,558 100,425 Feeding Hills Sewer Extension Phase II & III - - - 644,412 629,112 Westfield River Backup Force Main - - - - 196,500 Main Street-Suffield Street Water Main Impr 151,116 147,674 144,231 140,789 North Westfield St Water Main Improvement - -- - 180,095 175,820 Elm Street Water Main Replacement - _ - - 108,702 South Street Water Main Replacement TOTAL $0 $503,825 $599,115 $1,409,088 $1,680,182 Projected New Bond Costs (FY2010 - FY2014) $2,000,000 $1,500,000 1 $1,000,000 $500,000 $0 FY2010 FY2011 FY2012 FY2013 FY2014 j32 Self Sustaining Funds Pr9jected Total Bond Costs (FY2010 - FY2014� (before grants and reimbursements) FY2010 FY2011 FY2012 FY2013 FY2014 Existing Bond Costs $629,957 $607,092 $497,926 $492,607 $482,592 jProjected New Bond Costs $0 $503,825 $599,115 $1,409,088 $1,680,182 TOTAL BOND COSTS $629,957 $1,110,917 $1,097,041 $1,901,695 $2,162,774 Total Projected Bond Costs (FY2010-FY2014) ' (before grants and reimbursements) $2 500 000 $2.000.000 $2,500,000 ' $500,000 - - --— $0 FY2010 FY2011 FY2012 FY2013 FY2014 33 1 Self Sustaining Funds Projected Total Bond Costs (FY2010 - FY2014) (after grants and reimbursements) ' FY2010 FY2011 FY2012 FY2013 FY2014 Existing Bond Costs $629,957 $607,092 $497,926 $492,607 $482,592 Projected New Bond Costs $0 $503,825 $599,115 $1,409,088 $1,680,182 1 Projected Grants & Reimb. $ 87,856 $ 80,013 $ 77,568 $ 74 204 s .09 157 NET BOND COSTS $542,101 $1,030,904 $1,019,473 $1,827,491 $2,053,617 Projected Total Band Casts (FY2010 - FY2014) (after grants and reimbursements) $2,500,000 $2,000,000 � — - r $1,500,000 i ' $1,000,000 $500,000 o --------171"W FY2010 FY2011 FY2012 FY2013 FY2014 34