FISCAL YEAR 2016 TO FISCAL YEAR 2020 Agawam, Massachusetts
Capital Improvement Program
Fiscal'Year 2016 to Fiscal Y 2020
. i •tj�.��,4��LKr � if { ' t � � _ y3 � ,�� �.
441 .
Mai-
- f '
1
l
r I c
IS Ir i
- '4 �--� � ��y�r �r� '�, tip '•r<�' - �:}` £rF' S'w ' F >«y{. - =� ,F..
l..1
r , yG i. ti'7S ��`��}✓ ' � r
' ,�er S' „' .�'k:�,�r,Y v� rr�Y t rye �',• i ,yq �k '� ,��s ;'�� ?�,�'^ 2_ �
n. - � - -
TR-2015-m�
A RESOLUTION ADOPTING THE
FISCAL YEAR 2016 -2020
CAPITAL IMPROVEMENT PROGRAM
WHEREAS, The Capital Improvement Program for Fiscal Year 2016-2020 was submitted
to the City Council on April 9,2015 in accordance with Article 5,Section 5-3(a)
of the Charter; and
WHEREAS, The Capital Improvement Program contains a prioritized plan of proposed
capital improvements over the next five fiscal years in accordance with Article
5, Section 5-3 (b)of the Charter; and
WHEREAS, The Capital Improvement Program is designed to utilize town funds for capital
improvements on the basis of community priorities in coordination with the
availability of grants and/or other state,federal or private reimbursements;and
WHEREAS, In developing the Capital Improvement Program each year, the planning
process includes consideration of the growth of the town,the improvement of
efficient service delivery reducing the need for staff increases,maintenance of
new and existing facilities,and consideration of existing commitments; and
WHEREAS, Each year the Capital Improvement Program is revised and updated in light of
changing needs, requirements,and funding availability; and
WHEREAS, In accordance with Article 5,Section 5-3(c)and(d),the Council shall conduct a
public hearing and on or before the twentieth day of the last month of the
current fiscal year, shall by resolution adopt the Capital Improvement
Program.
NOW THEREFORE,the Agawam City Council hereby resolves to adopt the Fiscal Year 2016—
2020 Capital Improvement Program as submitted by the Mayor on April 9,2015.
DATED THIS DAY OF ,2015.
PER ORDER OF THE AGAWAM CITY COUNCIL
Christopher C. Johnson,President
APPROVED AS TO FORM AND LEGALITY
Vincent F. Gioscia,City Solicitor
r r r r r r r r rr r r r r� rr r rr rr � r
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
TABLE OF CONTENTS
ITEM PAGE NUMBER
(1) Cover Memorandum to City Council 1
(2) Introduction 2
(3) List of Projects (Bonding&Appropriation Schedules) (FY2016 - FY2020) 5
(4) Project Descriptions 20
(5) Bond Payment Spreadsheet 26
(6) Chart- Budget Appropriations 27
(7) Chart-Existing Bond Costs 28
(8) Chart - Projected New Bond Costs 29
(9) Chart- Projected Total Bond Costs (before grants and reimbursements) 30
(10) Chart-Projected Total Bond Costs (after grants and reimbursements) 31
(11) Chart - Self Sustaining Funds - Existing Bond Costs 32
(12) Chart- Self Sustaining Funds -Projected New Bond Costs 33
(13) Chart - Self Sustaining Funds -Projected Total Bond Costs (before grants and reimbursements) 34
(14) Chart- Self Sustaining Funds -Projected Total Bond Costs (after grants and reimbursements) 35
Town of Agawam
Memorandum
' To: Agawam City Council
From: Richard A. Cohen, Mayor
Date: April 9, 2015
' Subject: Capital Improvement Program (Fiscal Year 2016-2020)
Pursuant to Section 5-3 of the Agawam Home Rule Charter, I hereby submit the Capital
' Improvement Program for Fiscal Year 2016 to Fiscal Year 2020 to the Agawam City Council.
The Capital Improvement Program is a prioritized plan of proposed capital improvements over
the next five fiscal years. The major purposes of the Capital Improvement Program are as
' follows:
(a) to develop and prioritize needed proposed capital improvement projects;
(b) to research and estimate the revenue necessary to fund proposed capital improvement projects;
' (c) to set parameters on the revenue dedicated to fund proposed capital improvement projects; and
(d) to forecast future principal and interest expenditures.
The program presented represents a realistic financially feasible long term program of
Capital Projects. As revenue estimates become available, revisions shall be made and
incorporated in the capital budget portion of the annual budget. Please call with any questions.
iRespectfully submitted,
' Mayor Richard A. Cohen
1
ww ww ww �■w �w w w■ w rw �w rw ww w ww w� w rw w w
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
INTRODUCTION
For the purposes of this Capital Improvement Program, a capital improvement is a project or
undertaking which provides for (i) the planning, design, construction, reconstruction, renovation or
replacement of a public building or facility; (h) an addition to a public building or facility; (iii) the
purchase of land, buildings or facilities for a public purpose; or (iv) a long range development study.
While the type of improvement is the basic criteria, a project costing at least $20,000 that has a life
expectancy of ten (10) years or more is generally Considered to be a capital improvement.
The Capital Improvement Program is designed to accomplish the following purposes:
1. To utilize town funds for capital improvements which are compatible with the
town's mission of effective and efficient provision of quality services to the
citizens and businesses of Agawam which in turn enhance the quality of life in
our community;
2. To undertake Capital Improvement Projects on a coordinated basis;
3. To inform the community when needed and planned Capital Improvement
Projects and corresponding expenditures are to be expected and initiated in the
future;
4. To utilize town funds on the basis of community priorities in coordination with the
availability of grants and/or other state, federal or private reimbursements; and
S. To undertake Capital Improvement after careful planning and financial analysis to avoid
2
an undue burden on the town's fiscal capacity now and in the future.
After many years of limited capital investment, the town was faced with many desperately needed
projects which had to be undertaken in spite of projected limited revenue growth. Fiscal restraint and
careful planning are required to assure long term stability, and care must be taken in project
development and implementation in order that bond sales are timed so that principal and interest costs
occur in the year scheduled. In addition, the funding requirements of the Education Reform Bill have
placed severe limits on the Town's ability to undertake needed capital improvements.
In developing this Capital Improvement Program the following general assumptions on fiscal
capacity were assumed and applied:
1. Growth in total property tax revenues will continue to be limited by the
restraints of Proposition 2 1/2 and no debt exclusion overrides are
contemplated in this plan;
2. The town will pursue the maximum property tax revenue allowed by
Proposition 2 1/2;
3. For the upcoming fiscal year and future years, the Administration is continuing
to recommend a greater emphasis be placed on capital improvements; and
4. During the next five years, the town should:
a. Appropriate as much funding as possible annually from the general
fund for capital improvements on a pay as you go basis while
maintaining existing service levels;
b. Utilize the Stabilization Fund if necessary to assist in meeting the above
referenced goal for level principal and interest payments.
3
� � � ii � 1• 1• i � � � � � � � � � i• �
The process of capital planning involves setting priorities within the fiscal capability of the town.
Each year the entire plan is reviewed in light of changing needs and requirements. There are more needs
for improvements by town departments that can be included in a five year time period, and certainly the
net school spending requirements of the Education Reform gill may cause further delays in making
capital improvements.
In developing the recommended Capital Improvement Program, the following priorities were
addressed:
1. Growth - The town must meet the needs of a growing population and at the
same time direct and manage growth through the timing of public utility
expansion;
2. Improve or„Assist Service Delivery - Projects that will reduce the need for staff
increases or make staff operations more efficient have been given priority;
3. Facilities - New and Maintenance of Existing Facilities - When Proposition 2
was implemented communities were forced to delay constructing new facilities
and defer maintenance on existing facilities which has led to the current
backlog of need for new facilities and the provision of maintenance to existing
facilities; and
4. Prior commitments - The Town is bound by commitments made in prior years.
The commitments were considered in the proposed budget and program.
The attached Capital Improvement program was developed around the previously cited constraints
and program objectives. It includes a bonding and appropriation plan for each of the five program
years, a brief description of each project item, spread sheets and charts showing existing and proposed
bond payments and graphical representations of these payments.
4
1
' Town of Agawam
Capital Improvement Program
' Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2016 Appropriation Schedule
' General Fund Apptgpn
�ations
Projected
Project Description Amount
Hampden County Land Acquisition $9,500.00
' Department of Public Works Equipment $287,000.00
Street/Infrastructure improvement Program $175,000,00
Sidewalk Rehabilitation and Extension $30,000.00
Tragic Light Improvements $30,000.00
tFire Department Staff Vehicle $34,000.00
Fire Department Communications infrastructure Improvements $14,000.00
' Emergency Services Utility Terrain Vehicle $44,000.00
Early Childhood Center Feasibility Study $50,000.00
Building Maintenance Department Vehicle $27,500.00
' Emergency Management Radio Upgrade $21,425.00
TOTAL 722 425.00
5
i
Town of Ag swam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year__2016 AA a.,propriation Schedule (Continued)
Wastewater Fund Appropriations
Projected
Project Description Amount
Wastewater Equipment Replacement $62,405.00
r
TOTAL 6 405.00
r
rWater Fluid Appropriations
Projected
Project Description Amoun
Water Department Equipment Rep1wement $62,405.00
TOTAL JL,A05.00
r
r
r
r
6
r
r
r
Town of Agawam
' Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2016 Bonding Schedule
General Fund Proiects
Projected 15`Year
r Project Description Amount Debt Service
High School Track, Bathrooms &Locker Rooms $6,750,000.00 $653,700.00
High School Auditorium Wheelchair
and Companion Seating $250,000.00 $36,25U.00
i
1
r
r
1
1
1
7
r
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2017 Appropriation Schedule
' General Fund A ro riations
Projected
' Project Description Amount
Hampden County Land Acquisition $9,500.00
Department of Public Works Equipment $300,000.00
Street/Infrastructure Improvement Program $200,000.00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $30,000.00
Fire Department Computer and IT Upgrade $8,000.00
' Fire Department Special Hazards Vehicle $200,000.00
Fire Department Communications Receiver $12,000.00
Robinson Park School Energy Management System $150,000.00
TOTAL 12L9,500.00
' 8
1
Town of Agawam
Capital Improvement Program
' Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2017 Appropriation Schedule (Continued)
Wastewater Fund Appropriations
Projected
Project Description Amount
Wastewater Equipment Replacement $47,700.00
' TOTAL iizao.000
Water Fund AppxglLnations
' Projected
Project Description Amount
' Water Equipment Replacement $47,147.00
TOTAL SIZ1.4700
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2017 Bonding Schedule
General Fund Projects
projected ist year
Project Descrj tio AWount Debt Service
Early Childhood Center $8,070,000.00 $808,500.00
Wastewater Fund Proms
Pa I'll Yfar
Project D cri tion Amount Debt Service
Westfield River Backup Force Main Design $300,000.00 $30,000.00
Water Fund !M ects
Projected 1"'Year
Project Description Amon Debt SWjoe
Water Main Design-Main&Suffield Streets $455,000.00 $47,750.00
Water Main Design - Silver to Elm Street $192,500.00 $19,625.00
Water Main Design - South Street $200,000.00 $20,000.00
1
10
Town of Agawam
' Capital Improvement Program
' Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2018 Appropriation Schedule
General Fund A ro nations
Projected
' Pro ect Description Amount
Hampden County Land Acquisition $9,500,00
' Department of Public Works Equipment $300,000.00
Street/Infrastructure Improvement Program $200,000.00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $30,000.00
' Eire Station Improvements &Repairs $50,000.00
' TOTAL j6l9.5QQ.00
Wastewater Fund ApRroprigtions
Projected
Project Desgi tion Amount
' Wastewater Equipment Replacement $47,1 74.00
t TOTAL 1EIZ4.0
1
t
ll
1
1 Town of Agawam
1 Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2018 Appropriation Schedule (Continued)
1 Water Fund ro riatians
Proaected
Project D ri tion Amount
Water Equipment Replacement $47,147.00
1 TOTAL 47147.00
1
Agawgm Municipal Golf Course A
MEnriations Proi
Project D scri tion Annount
' Municipal Golf Course Equipment Replacement $15,000.00
TOTAL 15 000.00
i
1
1
1
1
12
1
' Town of Agawam
' Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2018 Bonding Schedule
' General Fund,Projects
Projected 15'Year
Project Description Amount Debt Service
Replace Fire Engines 1 and 2 $1,000,000.00 $150,000.00
Wastewater Fund Projects
' Pmjected l st Year
Pwiect Description Amount Debt Service
' Westfield River Backup Force Main Construction $2,000,000.00 $200,000.00
' Water Fund ftgigsAs
' ro'ected 1 St Year
Project Description Amount Debt Service
Water Main Construction - Main&Suffield Streets $21600,000.00 $260,000.00
13
' Town of Agawam
' Capital Improvement Program
' Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2019 Appropriation Schedule
' General Fund Appropriations
Projocted
' Project Description Amount
Hampden County Land Acquisition $9,500.00
Department of Public Works Equipment $300,000.00
Street/Infrastructure hnprovement Program $200,000.00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $30,000.00
' Fire Hoses &Firefighting Equipment $24,000.00
' Fire Department Staff Vehicle $45,000.00
' TOTAL fi 5 0.00
' Wastewater Fund Appropriations
' Projected
Project Description Amount
Wastewater Equipment Replacement $47,174.00
' TOTAL 1EI7.400
14
i
' Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2019 Appropriation Schedule (Continued)
Water Fund A ro riations
Proj eetcd
Project Description Aft
Water Equipment Replacement $47,147.00
TOTAL JjZa47.00
' A awa Muni i Golf Course Apponrhon ss
' Proiected
Project Description Amount
' Municipal Golf Course Equipment Replacement $15,000.00
' TOTAL 15 .00
15
Town of Agawam
iCapital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2019 Bonding Schedule
' GreneraJ Fund Projects
Projected 1 S' Year
Project Description Amount Pebt Service
High School Renovations $15,000,000.00 $1,500,000.00
Town Hall Feasibility Study $100,000.00 $15,000.00
Water Fund Projects
Proiect I'Year
' L3roicct Description Amount Debt Service
Water Main Construction- Silver Street to Elm, Street $1,100,000.00 $l 10,000.00
Water Main Construction- South Street $1,500,000.00 $150,000.00
16
1 Town of Agawam
' Capital Improvement Program
' Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 2020 Appropriation Schedule
General Fund Approoiatians
Projected
Project Description Amount
Hampden County Land Acquisition $9,500.00
Department of Public Works Equipment $300,000.00
Street/Infrastructure Improvement Program $150,000.00
Sidewalk Rehabilitation and Extension $30,000.00
Traffic Light Improvements $30,000.00
' Fire Department Self Contained Breathing Apparatus $225,000.00
' TOTAL 1744JO0,
Wastewater Fund�Aprapriatians
Projected
Project Description Amount
' Wastewater Equipment Replacement $47,174.00
' TOTAL jjLL74..0Q
17
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
' Fiscal Year 2020 Appropriation Schedule (Continued)
Water Fund Appropnations
Projected
Project Description Amount
Water Equipment Replacement $47,147.00
TOTAL 47147.00
Agawam Municipal Golf Course Agpronriations
Projected
Project Description Amount
Municipal Golf Course Equipment Replacement $l 5,000.00
TOTAL 15 000 00
1
18
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 - Fiscal Year 2020
Fiscal Year 202�0 Binding Schedule
General Fund Protects
' Projected 151 Year
Qxojed Description Amount Debt Service
Town Hall Construction $7,000,000.00 $700,000.00
Water Fund Projects
Projected 15'Yee
Project Descd ion Arnount Debt Service
Water Main Design -Meadow Street $200,000.00 $20,000.00
1
19
' Town of Agawam
Capital Improvement Program
Fiscal Year 2016 — Fiscal Year 2020
PROJECT DESCRIPTIONS
I. MUNICIPAL BUILDINGS
FIRE STATION IMPROVEMENTS AND REPAIRS
Funds have been requested to make improvements and repairs to both Fire Stations in fiscal year
2018 in order to increase the longevity of the buildings and to provide state of the art facilities.
POLICE STATION RENOVATION
Funds have been set aside to provide for a use and feasibility study for repairs and improvements
to the Police Station.
' TOWN HALL
Funds have been requested in fiscal year 2019 for a feasibility study and design for a new Town
Hall, and in fiscal year 2020 for Town Hail construction.
II. PUBLIC WORKS
' HIGHWAY DEPARTMENT EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment,
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide funding for large,high cost Department of Public Works trucks and other capital
equipment.
In fiscal year 2016, the equipment request includes the purchase of a new International 7300
SFA Dump/Sander/Plow, a Ford F250 4X4 truck with plow package and plow, a Ford F450
DRW 4X4 XL with dump body and plow package. This equipment will be used for snow and
ice operations and summer construction projects. In addition, a new EXMARK Laser "s" series
' 60"mower deck to provide equipment to maintain School Street Park, Phases 1 &2.
- 20 -
Town of Agawam
' Capital Improvement Program
Fiscal Year 2016 — Fiscal Year 2020
STREET/INFRASTRUCTURE IMPROVEMENT PROGRAM
Funding is required for the improvement and maintenance of local roadways. Improvements
' include the construction, reconstruction, widening and resurfacing of roads and the installation
and repair of drainage structures and systems. Funds will be utilized in combination with
Chapter 90 funding to meet routine maintenance, preventative maintenance and improvement
' requirements. Annual increases in this account are recommended based upon the Pioneer Valley
Planning Commission Pavement Management Study performed in 2010. In addition, funds may
be applied toward a variety of municipal infrastructure projects and improvements.
SIDEWALK REHABILITATION AND EXTENSION
The Department of Public Worms Highway Division's sidewalk construction and repair team will
continue rehabilitation work on sidewalks throughout the community. Funds will be used to
extend walks to provide connections to schools and recreation facilities. Future increases in this
account are recommended in order to implement a Sidewalk Mash Plan currently under
development.
iTRAFFIC LIGHT IMPROVEMENTS
Funds are included to provide for upgrades of equipment and software for existing traffic lights.
1
III. PUBLIC WORKS-WASTEWATER
WASTEWATER EQUIPMENT
' An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
' order to provide funding for large,high value, wastewater capital equipment.
Funds are requested to purchase a Ford F450 DRW 2 WD Crew Cab with a High Rise Utility
' Body. This is the primary vehicle used to transport crews and equipment to construction sites,
main line sewer maintenance and sewer backups.
- 21 -
i
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 — Fiscal Year 2020
' FEEDING HILLS - SOUTHWEST AREA SANITARY SEWER EXTENSION
This project has not been included in the Capital Improvement Program. This project is on the
City Council agenda and has been tabled indefinitely. The first phase of this program is
complete. The enormity of this project would require that it be completed and funded in phases.
It is anticipated that it would be completed in several phases over many years at a total cost of
over$40,000,000.
WESTFIELD RIVER BACKUP FORCE MAIN
' Failure of the newer force main during fiscal year 2008 required emergency repairs during which
the 10 inch backup force main was used to continue flows to Bondi's Island. This backup force
' main should be completed to be ready to be put in service should any of the existing four river
crossings fail in the future. Assistance will besought from local communities that share the use
of the force main.
IV. PUBLIC VfIt1RKS-WATER
' WATER DEPARTMENT EQUIPMENT
An annual capital appropriation is included to provide for the ongoing replacement of equipment
on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in
order to provide funding for high value, large water capital equipment.
Funds are requested to purchase a Ford F450 DRW 2 WD Crew Cab with a High Rise Utility
Body. This is the primary vehicle used to transport crews and equipment to construction sites
and water main breaks.
MAIN AND SUFFIELD STREETS WATER MAIN IMPROVEMENT
' The Springfield Water and Sewer Commission is planning maintenance work on their
transmission mains from which we receive our water. A portion of the mains will be taken out
1 of service for the work. Hydraulic modeling of our system indicated that we do not have
sufficient capacity in our distribution system to insure adequate pressure for our residents if we
lose service from more than one connection. We need to build flow capacity in an east-west
direction. Funds are requested to construct a twelve inch water main on Reed Street to replace
- 22 -
Town of Agawam
' Capital Improvement Program
' Fiscal Year 20t6 — Fiscal Year 2020
650 feet of six inch asbestos cement pipe and 1,050 feet of four inch cast iron pipe. This will
also improve the east—west flow capabilities as well as fire flows.
SILVER STREET—ELM STREET WATER MAIN REPLACEMENT
Funds are requested to replace the existing six inch main running between Main Street and
Suffield Street with a twelve inch main to improve the east — west flow capabilities as well as
fire flows.
' SOUTH STREET WATER MAIN REPLACEMENT
Funds are requested to replace the existing six inch train with 5,420 feet of eight inch ductile
1 iron water main.
MEADOW STREET WATER MAIN REPLACEMENT
Funds are requested for water main design to replace the existing six inch main with 5,420 feet
� � � g
of eight inch ductile iron water main.
V. AUSCEL LANEOUS
FIRE DEPARTMENT MOTOR VEHICLES
' Funding is included in fiscal year 2016, funds are requested to replace the Fire department Staff
Vehicle. Finally, in fiscal year 2017 funds are needed to replace the special hazards vehicle with
newer equipment with a smaller chassis. This vehicle will act as a tow vehicle for the rescue
boat. Replacement of Engines 1 and 2 is requested for fiscal year 2018. At that time, the present
vehicles will be 10 years old, the age at which the National Fire Protection Association
recommends replacing front line vehicles.
' FIRE DEPARTMENT COMPUTER AND INFORMATION TECHNOLOGY
UPGRADE
' Funds are requested to provide for upgrades to the departments computer hardware and software.
- 23 -
Town of Agawam
Capital Improvement Program
' Fiscal Year 2016--- Fiscal Year 2020
FIRE DEPARTMENT COMMUNICATIONS INFRASTRUCTURE IMPROVEMENTS
Funds are requested to improve the overall communications infrastructure at the Fire department_
Funds are requested for installation of a communications receiver site at the Agawam Industrial
Park.
' FIRE AND POLICE DEPARTMENT UTILITY TERRAIN VEHICLE
A Utility Terrain (off road) vehicle is requested to provide for emergency services for accessing
remote woodland areas for emergency responders, and would provide service to both the Fire
and Police departments. This vehicle would allow for Emergency Medical Personnel to evacuate
patients in rernote areas and for search and rescue. Funds are requested in 2016 for the purchase
' of a vehicle and to provide for a small storage facility.
EMERGENCY MANAGEMENT RADIO UPGRADE
' Funds are requested to-upgrade the base radio and communications equipment to a digital
�
format.
' GOLF COURSE EQUIPMENT
Resuming in fiscal year 2018, an annual capital appropriation is included to provide for the
ongoing replacement of equipment on a scheduled maintenance program. Funds may be tamed
from one fiscal year to the next in order to provide funding for high value, large Municipal Golf
Course capital equipment.
' HAMPDEN COUNTY LAND ACQUISITION
Agawam acquired most of the holdings of the Hampden County government that were within the
Town's boundaries when the county was dissolved. The Town is required to reimburse the other
county communities for their share of these assets.
-24 -
1
Town of Agawam
Capital Improvement Program
Fiscal Year 2016 — Fiscal Year 2020
' VI. SCHOOL DEPARTMENT
HIGH SCHOOL ALL WEATHER TRACK AND BLEACHER REPAIR PROJECT,
INCLUDING HIGH SCHOOL LOCKER ROOM AND BATHROOM RENOVATIONS
TR-2014-36 has been approved to fund a new track, field and school locker facility at the
Agawam High School.
EARLY CHILDHOOD CENTER
' The Early Childhood program has outgrown its present location on Perry Lane. A new facility is
needed to allow for much needed additional classroom space as well as to provide for private
bathroom and changing rooms for small children and an area for teachers to meet with parents.
Funds are requested to build a 30,000 square foot facility.
' HIGH SCHOOL RENOVATIONS
Funds are included in fiscal year 2019 to provide for renovations to Agawam High School.
Renovations would include new science laboratories, windows, boilers, electrical panel boxes,
heating and ventilation systems, lockers and information technology upgrades and accompanying
wiring.
- 25 -
a.9 8 8 Bs a B88 8 as aaaB'84aS. 8
888S88a8 8
- - - '8' � -88 -- '8. $ 8$ - - 8 - - $8 - .$•8B - 8 88 BB688,888 $
A Si SSS
„ n 8 68 8, 9. 88 8 68B 688 a 88 88888866 8
8 S 88 a 8868 R ABR BBB R 88 888.8$996 8
8 8 R 88 8888s8 8S x g88 ass E, 8$. 86888,888 B
8. -8aa8. . - .B. a 88 8-ag$-a.$8 .8S 8 8i•89 998 i as 8us gas 8.88 8
N • z °xa $ ss'a asa s3�s say # B _:- 3
8 � 8866 B S 88 889aBa9 S ' G Ss8n B98 '~, 888 aaaaa888 8
:sea x9 $� =3s1 ^ " ^ »2t - 3
HBaaaa qH 8..- 68 8888s$8 AIs 8 8384 B88 i 888 68888'888 8
e33»�8 �s: sax «Aa # a :x=�`•s "s
8a8888 ass 8: 88 88-88888 �8� 8686 B8a 6 888 88819aa a, a
a
e_ a
a�e xg c83i^s3 . i 3 . saL e� » o s" ,vxAs3 3
as'eas8�R sa - a8a8.$8e 8rc 8 R a 88a _ S88 9.29as88B s
xaa Il i B t gib "a,
ca »�x' s � • s� Rk�&�,3s" k sis3 age r:, 3 .ccs .= u
i88 s•eaa8H88s8 B:. 88 8.8888$8 gRR R g.$_g•$a 888 T 88B 88B88888 H
88 Bz6888RR-8,8 8C 88 8.8888 S.Ba s SB888v8R 6B8 B 886 8.8658;888 8
G7« x98� ,iit A I
' 8'8 8 S B 8 8 9'R$P 8 B 21 8 8 8 8 E B H 8 :a.5i 8 8,8 8 6'B B.B lies, &� S a 8 gi 8 8'8 8 8 8 8 8
tit
aidil'ig
' 8'R888s.xs8888K 8 8S 88 8:88 8. --8>'.I�88
IN
��vac*�e-agR- • • a 33 sA3 # �s R :xRse # cgs 3x x � ss= # a
8�a88,ga8 111
a x a a a 9 �a8:8ait $ 8 - •. S E88 688 Y $ $
a rsas •� s« �:9c 9� x3 "$ aa^ asn a A $ 9e S
R 8R8 ,819as E.aaa -- - - B� �:S t BBHBx8 8 HHB T a
a
�isi�a
1
1 Budget Appropriations FY2016 - FY2020
Category FY2016 FY2017 FY2018 FY2019 FY2020
' General Fund $722,425 $929,500 $619,500 $638,500 $744,500
Sewer Fund $62,405 $47,700 $47,174 $47,174 $47,174
' Water Fund $62,405 $47,147 $47,147 $47,147 $47,147
Municipal Golf Course $0 $0 $15,000 $15,000 $15,000
TOTAL $847,235 $1,024,347 $728,821 $747,821 $853,821
1
Budget Appropriations (FY2016 - FY2020)
' 1 200 000
$2,000,000
$800,000
$600,000
' $400,000
$200,000
$0
FY2016 FY2017 FY2018 FY2019 FY2020
1
i
1
' -27-
General Fund
' Existing Bond Casts (FY2016 - FY2020)
PROJECT FY2016 FY2017 FY2018 FY2019 FY2020
' School Projects I + II $ 1,098,338 $ 1,041,650 $ 943,950 $ - $
Title V Community Septic Management $ 3,198 $ 3,058 $ 2,921 $ 2,785 $
Public Library Expansion $ 260,710 $ 242,110 $ 234.680 $ 223,350 $ 216,120
' Agawam High School Library Expansion $ 45,130 $ 44,310 $ 42,500 $ 40,710 $ 33,990
D.P.W. Facility Acquisition $ 63,223 $ 60.940 $ 58,603 $ 56,210 $ -
D.P.W. Facility Alterations $ 84,672 $ 82,320 $ 79,968 $ 77,616 $ 75,264
Phase II Stormwater Management $ 16,746 $ 16,000 $ 15,440 $ 14,897 $ 14,368
Middle School Roof $ 31,680 $ 30,800 $ 29,920 $ 29,040 $ 28r160
Middle d Junior High Repairs $ 8,640 $ 8,400 $ 8,160 $ 7,920 $ 7,680
Elementary Schools - Modular Classrooms $ 115,200 $ 112,000 $ 108,800 $ 105,600 $ 102,400
Senior Center Construction $ 522,815 $ 507,515 $ 490,940 $ 476,065 $ 462,465
' Fire Pumper Trucks $ Oro" $ 60,048 $ 58,410 $ 51,323 $ 49,523
Perry Lane Pool Renovations $ 25,150 $ 24,250 $ 18,394 $ 17,738 $ 17,138
Phase II 5tormwater Completion $ 6,538 $ 6,538 $ 6,538 $ 6,538 $ 6,538
Building Maintenance Building Extension $ 12,100 $ 11,900 $ 6,700 $ 6.600 $ 6,500
Town Wide Telephone System $ 62,400 $ 61.200 $ $ $
Junior High School Roof and HVAC System $ 106,780 $ 100,080 $ 96,480 $ 96,080 $ 92,880
' Subtotal - Existing Bond Costs $ 2,526,418 $ 2,413,919 $ 2,204,404 $ 1,212,472 $ 1,113,026
High School Track, Bathrooms de Locker Roams $ 653,750 $ 638,000 $ 622,250 ? 606,500
New Projects:
' High School Auditorium Wheelchair 3 Companion SE $ $ 36,250 $ 35.125 $ 34,000 $ 32.975
Early Childhood Center $ $ 808,500 $ 788,250 $ 768.000 $ 747.750
Fire Engines 1 and 2 $ - $ 150,000 $ 145,000 $ 140,000
High School Renovations $ - $ - $ 1-500,000 $ 1,462.500
Town Hall Feasibilitiy Study 8 Preliminary besign $ $ $ 15,000 $ 14,500
Town Hall Construction $ - $ 700.000
Tatal Existing and Projected Bond Costs $ 2,526,418 $ 3,912,419 $ 3,615,779 $ 4.296,722 $ . 4,817,151
( denotes project which is authorized but not yet permanently bonded)
Existing Bond Costs (FY2016-FY2020)
$3,000,000
$2,500,000
$2,000,000
' $1,500,000
$1,000,000
$500,000 j
FY2016 FY2017 FY2018 FY2019 FY2020
' -28-
General Fund
Projected New Bond Costs (FY2016 - FY2020)
1
' FY2016 FY2017 FY2018 FY2019 FY2020
High School Track, Bathrooms A Locker Roo $ 653.750 $ 638,000 $ 622,250 $ 606,500
High School Auditorium Wheelchair A Compa $ - $ 36,250 $ 35,125 $ 34,000 $ 32,875
' Early Childhood Center $ $ 808,500 $ 788,250 $ 768,000 $ 747,750
Fire Engines 1 and 2 $ - $ $ 150,000 $ 145,000 $ 140,000
High School Renovations $ - $ $ - $ 1,500,000 $ 1,462,500
' Town Hall Feasibilitiy Study d Preliminary D $ $ $ - $ 15,000 $ 14,500
Town Hall Construction $ - $ - $ - $ - $ 700,000
TOTAL $ - $ 1,498,500 $ 1,611,375 $ 3,084,250 $ 3,704,125
1
1
Projected New Bond Costs (FY2016- FY2020)
' $4,000,000
' $3,000,000
$2 000 000 k,, rt.
IMI
f�
$1,000,000 !4
$- -
FY2016 FY2017 FY2018 FY2019 FY2020
1
' General Fund
Projected Total Bond Costs (FY2016 - FY2020}
(before grants and reimbursements)
' FY2O16 FY2O17 FY2018 FY2O19 FY2O20
Existing Bond Costs $2,526,418 $2,413,919 $2,204,404 $1,212,472 $1,113,026
Projected New Bond Costs $0 $1,498,500 $1,611,375 $3,084,250 $3,704,125
TOTAL. BOND COSTS $2,526,418 $3,912,419 $3,815,779 $4,296,722 $4,817,151
1
Total Projected Bond Costs (FY2O16 -FY202O)
(before grants and reimbursements)
' $5,000,000
$4,500,000
$4,000,000
$3,500,000
' $3 000 000
$2,500,000
$2,000,000
' $1,500,000
$1,000,000
$500,000 - -
' $a
—FY2016 FY2017 FY2018 FY2019 FY2020
-30-
' General Fund
Projected Total Bond Costs FY2016 - FY2020
(after grants and reimbursements)
' FY2016 FY2017 FY2018 FY2019 FY2020
' Existing Bond Costs $2,526,418 $2,413,919 $2,204,404 $1,212,472 $1,113,026
Projected New Bond Costs $0 $1,498,500 $1,611,375 $3,084,250 $3,704,125
' Projected Grants & Reim6. $ 967,377 $ 964,818 $ 881,976 $ 126,123 $ 121,616
NET BONA COSTS $1,559.041 $2,947,601 $2,933,803 $4,170,599 $4,695,535
1
1
Projected Total Bond Costs (FY2016 - FY2020)
(after grants and reimbursements)
$5.000,000
$4,000,000
$3,000,000
$2,000,000
$1'000'000
$0
FY2016 FY2017 FY2018 FY2019 FY2020
' -31-
Self Sustaining Funds
Existing Bond Costs (FY2016 - FY2020)
PROJECT FY2016 FY2017 FY2018 FY2019 FY2020
Westfield River Pump Station $ - $ - $ - $ - $
' Westfield River CSO (MWPAT) $ 138,275 $ 136,551 $ 130,064 $ 128,902 $ 127.461
Westfield River CSO - Local Share $ 40,460 $ 44,690 $ 42,880 $ 41,090 $ 44,270
Campbell Drive / Florida Drive Sewer $ 28,700 $ 27,190 $ 26,690 $ 25,200 $ 24,720
' D.P.W. Facility Alterations-Wastewater $ 63,504 $ 61,740 $ 59,976 $ 58,212 $ 56,448
Westfield River Force Main $ 40,625 $ 40,626 $ 40,625 $ 40,625 $ 40,625
Feeding Hills Sewer Extension Phase I $ 205,700 $ 202,700 $ 199,700 $ 196,700 $ 193,700
' D.P.W. Facility Alterations-Water $ 63,504 $ 61,740 $ 59,976 $ 58,212 $ 56,448
Water Main Construction - North Westfield Street $ 471,900 $ 465,900 $ 459,900 $ 450,900 $ 438,900
1 Subtotal - Existing Bond Costs $ 1,052,668 1,041,137 1,019,811 999,841 982,572
Westfield River Backup Force Main Design $ - $ 30,000 $ 29.250 $ 28,500 $ 27,750
Westfield River Backup Force Main Construction _ '$ - $ 200.000 $ 195,000 $ 190,000
Water Moin Design - Main & Suffield Streets $ $ 47,750 $ 46,500 $ 45,250 $ 44,000
Water Main Design - Silver to Elm Street $ - $ 19,625 $ 19,125 $ 18,625 $ 18.125
Water Main Design - South Street $ $ 20,000 $ 19,500 $ 19,000 $ 18,500
Water Main Construction - Main a Suffield Streets $ $ $ 260,000 $ 253,500 $ 247.000
Water Main Construction - Silver to Elm Street $ - $ - $ - $ 110,000 $ 107.250
Water Main Construction - South Street $ = $ _ $ - $ 150.000 $ 146,250
Water Main Design - Meadow Street $ $ $ $ $ 20,000
' Total Existing and Projected Bond Costs $ 1,052,668 1,158,512. - 1,594,186 1,819,716 1,801,447
�= denotes project which is planned but not yet authorized)
Existing Bond Costs (FY2016 - FY2020)
$1,060,000
$1,040.000
$1.ozo,000 �
' $1,000,000
$980.000
$960,000
' $94Q 000
FY2016 FY2017 FY2018 FY2019 FY2020
-32-
1
' Self Sustaining Funds
Pr2 jetted New Bond Costs (FY2016 - FY2020)
!
' FY2016 FY2017 FY2018 FY2019 FY2020
West-field River Backup Force Main Design $ - $ 30,000 $ 29,250 $ 28,500 $ 27,750
Westfield River Backup Force Main Construction $ _ $ - $ 200,000 $ 195,000 $ 190.000
Water Main Design Main A Suffield Streets $ $ 47,750 $ 46,500 $ 45,250 $ 44,000
Water Main Design Silver to Elm Street $ - $ 19,625 $ 19,125 $ 18.625 $ 16,125
! Water Main Design - South Street $ _ $ 20,000 $ 19,500 $ 19,000 $ 18,500
Water Main Construction - Main A Suffield Streets $ $ $ 260,000 $ 253,500 $ 247,000
Water Main Construction - Silver to Elm Street $ - $ $ - $ 110,000 $ 107,250
Water Main Construction - South Street $ _ $ _ $ _ $ 150,000 $ 146,250
Water Main Design - Meadow Street $ $ $ $ $ 20,000
JITOTAL $ - $ 117,375 $ 574,375 $ 819,875 $ 818,875
i
1
Projected New Bond Costs (FY2016 - FY2020)
$900.000
$800 000 ;
' $700,000
$600,000 '
$5w.000
! $400,000
$300,000
' $200,000 -
$100,000
$-
! FY2016 FY2017 FY2018 FY2019 FY2020
! -33-
Self Sustaining Funds
' Projected Total Bond Costs (FY2.016_ - FY2020�
(before grants and reimbursements)
1
FY2016 FY2017 FY2018 FY2019 FY2020
Existing Bond Costs $1,052,668 $1,041,137 $1,019,811 $999,841 $982,572
iProjected New Bond Costs $0 $117,375 $574,375 $819,875 $818,875
TOTAL BONE) COSTS $1,052,668 $1,158,512 $1,594,186 $1,819,716 $1,801,447
' Total Projected Bond Costs (FY2016-FY2020)
(before grants and reimbursements)
$2,000,000
' $1,800,000
$1,600,000
$1,400,000
$1,200,000
' $1,000,000
$800,000
' $600,000
$400,000
' $200,000
$0
FY2016 FY2017 FY2018 FY2019 FY2020
-34-
' Self Sustaining Funds
Projected Total Bond Costs (FY2016 - FY2020)
(after grants and reimbursements)
' FY2016 FY2017 FY2018 FY2019 FY2020
' Existing Bond Costs $1,052,668 $1,041,137 $1,019,811 $999,841 $982,572
Projected New Bond Costs $0 $117,375 $574,375 $819,875 $818,875
' Projected Grants & Reimb. 5 52,499 1 4 _y ; a, 44 ;30 39,692
' NET BOND COSTS $1,000,169 $1,108,913 $1,547,586 $1,775,586 $1.761,755
1
Projected Total Bond Costs (FY2016 - FY2020)
' (after grants and reimbursements)
$1,800,000
$1,600,000
' $1.400,000
$1.200,000
$1,000,000
$800,000
$600,000
' $400,000
$200,000
I
$0
' FY2016 FY2017 FY2018 FY2019 FY2020
t
' -35-