Loading...
FISCAL YEAR 2017 TO FISCAL YEAR 2021 FILE 1 V ►. r a y 4kAl ill ti" 1 • lb •Z yl f ■• R�.. 1[* - � fit 'Yt . y I• '�:.. . FA E �y Town of Agawam Memorandum To: Agawam City Council From: Richard A. Cohen, Mayor Date: April 12, 2016 Subject: Capital Improvement Program (Fiscal Year 2017-2021) Pursuant to Section 5-3 of the Agawam Home Rule Charter, l hereby submit the Capital ' Improvement Program for Fiscal Year 2017 to Fiscal Year 2021 to the Agawam City Council. The Capital Improvement Program is a prioritized plan of proposed capital improvements over the next five fiscal years. The major purposes of the Capital Improvement Program are as follows: (a) to develop and prioritize needed proposed capital improvement projects; ' (b) to research and estimate the revenue necessary to fund proposed capital improvement projects; (c) to set parameters on the revenue dedicated to fund proposed capital improvement projects;and (d) to forecast future principal and interest expenditures. The program presented represents a realistic financially feasible long term program of Capital Projects. As revenue estimates become available, revisions shall be made and incorporated in the capital budget portion of the annual budget. Please calf with any questions. Respectfully submitted, 1 "t-Weld. 4 . Mayor Richard A. Cohen OEM am = r r� r�r r M M M � Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 INTRODUCTION For the purposes of this Capital Improvement Program, a capital improvement is a project, or undertaking which provides for (i) the planning, design, construction, reconstruction, renovation or replacement of a public building or facility; (u) an addition to a public building or facility; (iii) the purchase of land, buildings or facilities for a public purpose; or (iv) a long range development study. While the type of improvement is the basic criteria, a project costing at least $20,000 that has a life expectancy of ten (10) years or more is generally considered to be a capital improvement. The Capital Improvement Program is designed to accomplish the following purposes: I. To utilize town funds for capital improvements which are compatible with the town's mission of effective and efficient provision of quality services to the citizens and businesses of Agawam which in turn enhance the quality of life in our community; 2. To undertake Capital Improvement Projects on a coordinated basis; 3. To inform the community when needed and planned Capital Improvement Projects and corresponding expenditures are to be expected and initiated in the future; 4. To utilize town funds on the basis of community priorities in coordination with the availability of grants and/or other state, federal or private reimbursements; and S. To undertake Capital Improvement after careful planning and financial analysis to avoid 2 rr r -imam rr w rs r �r +r rr rr r r■w rrr ■r �r �r �r an undue burden on the town's fiscal capacity now and in the future. After many years of limited capital investment, the town was faced with many desperately needed projects which had to be undertaken in spite of projected limited revenue growth. Fiscal restraint and careful planning are required to assure long term stability, and care must be taken in project development and implementation in order that bond sales are timed so that principal and interest costs occur in the year scheduled. In addition, the funding requirements of the Education Reform Bill have placed severe limits on the Town's ability to undertake needed capital improvements. In developing this Capital improvement Program the following general assumptions on fiscal capacity were assumed and applied: 1. Growth in total property tax revenues will continue to be limited by the restraints of Proposition 2 1/2 and no debt exclusion overrides are contemplated in this plan; 2. The town will pursue the maximum property tax revenue allowed by Proposition 2 1/2; 3. For the upcoming fiscal year and future years, the Administration is continuing to recommend a greater emphasis be placed on capital improvements; and 4. During the next five years, the town should: a. Appropriate as much funding as possible annually from the general fund for capital improvements on a pay as you go basis while maintaining existing service levels; b. Utilize the Stabilization Fund if necessary to assist in meeting the above referenced goal for level principal and interest payments. 3 The process of capital planning involves setting priorities within, the fiscal capability of the town. Each year the entire plan is reviewed in light of changing needs and requirements. There are more needs for improvements by town departments that can be included in a five year time period, and certainly the net school spending requirements of the Education Reform Bill may cause further delays in making capital improvements. In developing the recommended Capital Improvement Program, the following priorities were addressed: 1. Growth - The town must meet the needs of a growing population and at the same time direct and manage growth through the timing of public utility expansion; 2. Improve or Assist -Service Deliv - Projects that will reduce the need for staff increases or make staff operations more efficient have been given priority; 3. Facilities - New and Maintenance of Existing Facilities - When Proposition 2 /z was implemented communities were forced to delay constructing new facilities and defer maintenance on existing facilities which has led to the current backlog of need for new facilities and the provision of maintenance to existing facilities; and 4. Prior commitments - The Town is bound by commitments made in prior years. The commitments were considered in the proposed budget and program. The attached Capital Improvement Program was developed around the previously cited constraints and program objectives. It includes a bonding and appropriation plan for each of the five program years, a brief description of each project item, spread sheets and charts showing existing and proposed bond payments and graphical, representations of these payments. 4 Town of Agawam Capital Improvement Program ,E Fiscal Year 2017 - Fiscal Year 2021 TABLE OF CONTENTS ITEM PAGE NUMBER (1) Cover Memorandum to City Council 1 (2) Introduction 2 (3) List of Projects (Bonding &Appropriation Schedules) (FY2017 - FY2021) 5 (4) Project Descriptions 21 (5) Bond Payment Spreadsheet 31 (6) Chart- Budget Appropriations 33 (7) Chart- Existing Bond Costs 34 (8) Chart - Projected New Bond Costs 35 (9) Chart-Projected Total Bond Costs(before grants and reimbursements) 36 (10) Chart- Projected Total Bond Costs (after grants and reimbursements) 37 (11) Chart.- Self Sustaining Funds - Existing Bond Costs 38 (12) Chart- Self Sustaining Funds -Projected New Bond Costs 39 (13) Chart- Self Sustaining Funds-Projected Total Bond Costs (before grants and reimbursements) 40 (14) Chart- Self Sustaining Funds -Projected Total Bond Costs (after grants and reimbursements) 41 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2017 Appropriation Schedule General Fund Appropriations Projected Project Description Amount Hampden County Land Acquisition $9,500.00 Police Station Locker Room Renovation $138,500.00 Town Hall Pitch Roof Replacement $159,500.00 Building Maintenance Garage Roof Replacement $24,100.00 Highway Department Equipment $352,109.00 Street/Infrastructure improvement Program $200,000.00 Sidewalk Rehabilitation and Extension $50,000.00 Traffic Light Improvements $301000.00 Fire Department Special Hazards Vehicle $199,000.00 Building Maintenance Department Vehicle $24,604.00 Building Maintenance Elevating Work Platform $8,775.00 Voting Machines $75,000.00 Robinson Park School Gym Roof Replacement $71,000.00 1 TOTAL 11,342,088.00 5 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2017,Appropriation Schedule (Continued) Wastewater Fund Appropriations Projected Project Description Amount Wastewater Equipment Replacement $47,174.00 TOTAL 47 74.00 Water Fend Ap opriations Projected Project Dc5cription Amount Water Department Equipment Replacement $69,117.00 TOTAL 69117.00 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2917 Bonding Schedule General Fund Proiects Projected I"Year Project Drgeri tio Amount Debt Service Early Childhood Center and Kindergarten Classrooms $21,350,000.00 $1,761,375.00 Wastewater Fund Proiects Projected 1'`Year Pro' t Desm lion Amount Debt Service Wastewater Pump Station Improvements Phase I $436,500.00 $97,121.25 Wastewater Collection System Inflow& Infiltration Project Phase I $650,000.00 $79,625.00 7 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2017 Bonding Schedule ontinued Water Fund Projects Project 1" Year Project Description Amount Debt Service Water Main Replacement- Springfield& Suffield Streets $441,000.00 $36,382.50 Liswell Hill Water Pump Station Improvements $77,500.00 $17,243.75 Water Main Design- Meadow Street $323,000.00 $26,647.50 Water Main Design - South Street $200,000.00 $16,500.00 r Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Ypar 2018 Apprropriation.Schedule General Fund Annropriations Projected project Description Amount Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $300,000.00 Streetari astructure Improvement Program $200,000.00 Sidewalk Rehabilitation and Extension $50,000.00 Traffic Light Improvements $30,000.00 Fire Station Improvements and Repairs $140,000.00 Doering School Sewer Storm Separation $245,000.00 TOTAL 974 500.00 Wastewater Fund Appropriations Projected Project Description Amount Wastewater Equipment Replacement $47,174.00 TOTAL 47174.00 I 1 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal. Year 2021 Fiscal Year 2018 Appropriation Schedule Continued Water Fund Appropriations Projected Project Description Amount Water Equipment Replacement $91,500.00 TOTAL 915 .00 Agawam Municipal Golf Course M.RMUriations Pro' Project Description Amount Municipal Golf Course Equipment Replacement $15,000.00 i TOTAL 15 00 .00 1 1 10 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2018 Bonding Schedule ' General Fund Projects ro'ected V Year Project Description oast Debt Service Fire Department Engines I and 2 Replacement $1,100,000.00 $134,750.00 Wastewater Fund Projects Projected V Year Project Description Amount Debt Service Wastewater Pump Station Improvements II $327,000.00 $73,575.00 i Wastewater Collection System Inflow and Infiltration Project Phase II $299,600.00 $25,466.00 Westfield River Interceptor Relocation $235,000.00 $19,975.00 ' Water Fund Projects _Projected V Year Project Descdption Amount Debt Service Water Main Design - Silver and Elm Streets $195,200.00 $16,592.00 Water Main Construction - Meadow Street $1,800,000.00 $153,000.00 i L lI Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 iFiscal Year 2019 Appropriation Schedule General Fund Appropriations Pr_ affected 1 Pra e_ct Descri ILVo Amunnt Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $3009000.00 Street/infrastructure improvement Program $200,000.00 Sidewalk Rehabilitation and Extension $50,000.00 Traffic Light Improvements $30,000.00 Fire Department Replace Hose& Firefighting Equipment $24,000.00 Fire Department Replace Staff Vehicle $45,000.00 TOTAL jKjh52L.00 WWasfewater Fund Appropriations Plroi ected Project Description Amount 1 Wastewater Equipment Replacement $47,174.00 TOTAL 7$4 •1�74.00 12 i Town of Agawam Capital Improvement Program P P g j Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2019 Approprigtion Schedule Co tinued 1 Water Fund ApBropiiations Projected Project Description Amount Water Equipment Replacement $91,500.00 TOTAL $91 1 Agawam Municipal Gold Course_Approltriatigns Projected Project Description Amount Municipal Golf Course Equipment Replacement $15,000.00 TOTAL $15-0-009-99 i 1 1 13 Town of Agawam Capital Improvement Program P P g j Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2019 Bonding Schedule r Wastewater Fund Projects Projected I"Year Project Description Amount Debt Service Wastewater Pump Station Improvements III $66,500.00 $15,128.75 Wastewater Collection System Inflo& Infiltration Project Phase 111 $4,850,000.00 $424,375.00 Westfield River Force Main Design $142,000.00 $13,135.00 Water Fund Projects Projected V Year Pro'ect Description Amount Debt Service Water Main Construction -South Street $1,500,000.00 $131,250.00 Water Main Design- Main Street $455,000.00 $39,812.50 ' 14 Town of Agawam Capital Improvement Program P P g Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2020 Appropriation Schedule ' General Fund Appropriations Proeec ed Project DgedRpon Amount Hampden County Land Acquisition $9,500.00 IDepartment of Public Works Equipment $300,000-00 Street/Infrastructure Improvement Program $200,000.00 Sidewalk Rehabilitation and Extension $50,000.00 Traffic Light Improvements $30,000.00 Fire Department Self Contained Breathing Apparatus $225,000.00 TOTAL $814.500.00 Wastewater Fund Appropriations Projected ' Project Description Amount Wastewater Equipment Replacement $47,174.00 TOTAL 47$ 15 Town of Agawam Capital Improvement Program P P g Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2020 Appropriation Schedule (Continued) Water Fund Appropriations Projected ' Project Description Amount Water Equipment Replacement $47,147.00 TOTAL 7147.00 AgawlIn Municipal Golf Course AppjgRdations Poiected Project Description Amount Municipal Golf Course Equipment Replacement $15,000.00 TOTAL 15 000.00 1 16 1 r Town of Agawam 1 Capital Improvement Program r Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2020 Bonding Sc edule 1 Wastewater Fund Projects rProjected 1' ear Project Dgscri_pti:on Amount Debt Service Westfield River Force Main Construction $2,500,000.00 $231,250.00 Water Fund Proiects Projected 1*Year Project Descr:ipfi!)n Amour Debt Service Water Main Construction- Silver and Elm Streets $1,100,000.00 $101,750.00 1 1 1 r r r r 17 r Town of Agawam Capital Improvement Program I Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2021 Appropriation Schedule General Fund Appropriations Projected Project Description Amount ' Hampden County Land Acquisition $9,500.00 Department of Public Works Equipment $300,000.00 Street4nfrastructure Improvement Program $200,000.00 Sidewalk Rehabilitation and Extension $50,000.00 Traffic Light Improvements $30,000.00 i ' TOTAL 0 00.0 Wastewater Fund AppropriagoAs Primed Pro'ect Description Amount Wastewater Equipment Replacement $477174.00 TOTAL 47.17 ..00 18 Town of Agawam Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2021 Appropriation Schedule (Continued) Water Fund Agaronriations Pro.jected Project Description Amount Water Equipment Replacement $47,147.00 TOTAL 112147.00 . Agawam Municipal Golf Course Appropriations Projected ' Project Description Amount Municipal Golf Course Equipment Replacement $15,000.00 TOTAL 1M00.00 1 ' 19 Town of Agawam 1 Capital Improvement Program Fiscal Year 2017 - Fiscal Year 2021 Fiscal Year 2021 Bonding Schedule ' General Fund Proiects PrWec ed V Year Project Description Amount Debt Service Fire Department Aerial Platform Truck $1,225,000.00 $162,312.50 Water Fund Projects Pro'ec d 1s`Year ' Project Descri,p Amount Debt Service Water Main Construction -Main & Suffield Streets. $2,600,000.00 $247,000.00 ' Water Main Design-River Road $560,000.00 $53,200.00 1 1 1 20 1 r Town of Agawam ro Capital Improvement Program P P g ' Fiscal Year 2017 — Fiscal Year 2021 PROJECT DESCRIPTIONS rI. MUNICIPAL BUILDINGS POLICE STATION LOCKER ROOM RENOVATION Funds have been set aside in fiscal year 2017 to provide for the expansion of both the men's and Y F p women's locker rooms, installation of lockers with sufficient size and capacity to securely hold ' all of the equipment that police officers need with them to perform their dudes on a daily basis. Active electrical outlets would be available inside each locker for officers to connect charging systems for their portable radios and flashlights. Separate boot drawers would be available under the bench so that officers can change footwear when coming to or leaving the station. Finally, an internal pistol locker would be provided inside each locker that can be locked with a standard ' hasp lock,providing a higher level of weapon security for departmentally issued weapons. TOWN HALL Funds have been requested in fiscal year 2017 for the replacement of the pitch roof portion of the Town Hall roof It is leaking and beyond repair, requiring replacement at this time. ' BUILDING MAINTENANCE GARAGE ROOF REPLACEMENT In fiscal year 2017, funds have been requested for the replacement of the roof over the Building Maintenance Garage. It has deteriorated and is beginning to leak. This should improve the longevity of the building and protect the contents from water damage. rFIRE STATION IMPROVEMENTS AND REPAIRS r Funds have been requested to make improvements and repairs to both Fire Stations in fiscal year 2018 in order to increase the longevity of the buildings and to provide state of the art facilities. r r 21 r r 1 Town of Agawam Program Capital Improvement Pro P P g ' Fiscal Year 2017 — Fiscal Year 2021 II. PUBLIC WORKS HIGHWAY DEPARTMENT EQUIPMENT An annual capital appropriation is included to provide for on-going replacement of equipment on ' a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide fading for high value, large Department of Publics Works tracks and other capital equipment. ' The Department is in need for the following pieces of equipment to maintain safety for both the public and our employees and maintain the service to the community that the DPW provides. IThe equipment request is as follows: 1. Replace a 1999 dump/sander/plow (76,406 miles) because of extensive body rot. To 1 be replaced with a current year International 7300 SFA dump/sander/plow to be used for summer construction,projects and winter snow and ice operations ($165,000.00). 2. Replace a 2007 Ford F-150 4X4 pick-up (71,150 miles) needs extensive body work. To be replaced with a current year Ford F250 4X4 regular cab XL with plow package and hydraulic lift gate to be used winter snow and ice operations and for summer construction projects ($35,105.00) ' 3. Purchase a current year Ford F-450 DRW 4X4 XL crew cab with a 3-4 yard dump body and a plow package with a 9' power angle snow plow. This vehicle will replace a 2008 Ford F-450 Super Duty with 96,338 miles. Additionally the vehicle will participate in our snow and ice operations Truck will be used for patching, catch basin repair and maintenance. ($76,002.00). ' 4. Purchase a current year Ford F-450 DRW 4X4 XL crew cab with a 3-4 yard dump body and a plow package with a 9' power angle snow plow. In addition to being used ' for winter snow and ice operations, the truck will be dedicated to sidewalk repair and replacement. A crew of four (4) is included in the FY 17 budget to implement a cost effective means of addressing deteriorating sidewalks and comply with Title 11 of the ' Americans with Disabilities Act to Provide Curb Ramps. Finally, the purchase of this vehicle and creation of the crew will fulfill the sidewalk rehabilitation requirements 1 are outlined in our Complete Streets Policy and will allow the Town access to new sources of funds ($76,002.00). 22 1 Town of Agawam i Capital Improvement Program Fiscal Year 2017 — Fiscal Year 2021 iSTREET AND INFRASTRUCTURE IMPROVEMENT PROGRAM iMunicipal infrastructure projects include maintenance of historic street lights, repair and installation of guard rails, repair of culverts and drainage systems, catch basin cleaning, trimming and/or removing diseased and dead trees on town property, repair and paving of Town owned property and related work in the Towns' right of Ways, pavement markings and signage. Funding is required for the improvement and maintenance of local roadways. Improvements include the construction, reconstruction, widening and resurfacing of roads and the installation and repair of drainage structures and systems. Funds will be utilized in combination with Chapter 90 funding to meet routine maintenance, preventative maintenance and improvement requirements. Annual increases in this account are recommended based upon the Pioneer Valley Planning Commission Pavement Management Study performed in 2010. In addition, funds may be applied toward a variety of municipal infrastructure projects and improvements. iSIDEWALK REHABILITATION AND EXTENSION i In order to implement a cost effective means of addressing deteriorating sidewalks and comply with Title II of the Americans with Disabilities Act ("ADA") to Provide Curb Ramps and to fulfill the sidewalk rehabilitation requirements as outlined in the Town's Complete Street Policy, i a crew of four will be dedicated specifically to the repair, rehabilitation and replacement of sidewalks and implementation of a true Sidewalk Master Plan. Finds in this account will be used for material to repair, replace and construct new ADA compliant sidewalks. iTRAFFIC LIGHT IMPROVEMENTS ' Funds are included to provide for upgrades of equipment and software for existing traffic lights. As older lenses are burning out, the Department of Public Works implemented a policy to replace them with brighter, energy efficient L,CD lamps. i 1 i23 1 Town of Agawam Capital Improvement Program Fiscal Year 2017 — Fiscal Year 2021 1 1II. PUBLIC WORKS - WASTEWATER WASTEWATER EQUIPMENT An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for large, high value, wastewater capital equipment. PUMP STATION EWROVMENTS ' Pump Station Fuel Oil Tank Removal and Replacement: the MassDEP is requiring single wall steel fuel oil tanks to be removed by August of 2017. There are four pump stations that have to have their tanks replaced: School Street, North Street, South Street and Pleasant Valley Drive. ' This request will fund a project to remove and replace these tanks. As part of the project, the tanks will be optimally sized under MassDEP guidelines in order to minimize the project costs and also to minimize the volume of fuel oil stored at each location. These improvements will be completed in three phases in fiscal years 2017, 2018 and 2019. School Street Pump Station Odor Control Improvements: The DPW received several odor complaints from the area surrounding the School Street Pump Station that were forwarded to Suez (formerly United Water) to investigate. Suez determined that hydrogen sulfide levels were elevated outside of the pump station. They have recommended that we filter the exhaust from ' the wet well of the pump station. Funds will be used for the study, design and implementation of improvements. Currently, we are considering a bio-filtration system that has proven successful in Springfield at one of their large sanitary sewer pump stations. ' River Road Pump Station Improvements: Through Eversources's Energy Efficiency Program, we are seeking to replace the pump motors, motor drives (variable frequency drives— ("VFDs") ' and outside lighting. It is estimated that the project will have a simple payback period of 2.01 years. > versource's estimated contribution to the project is $27,600. Included in the project at the River Road Pump Station, we plan to install a Supervisory Control and Data Acquisition ("SCADA") system that would permit remote monitoring of the pump station, thereby minimizing delays and promoting efficiency in responding to alarms. The ' SCADA system also permits for automated digitized data logging that can be used in regulatory 24 1 Town of Agawam 1 FE Capital Improvement Program t Fiscal Year 2017 -- Fiscal Year 2021 reporting and engineering studies. The requested funds will ay for that portion of the cast not eP g � g e4 P covered by Eversource's incentive program and for the installation of the SCADA system. Westfield River PumpStation Improvements: Through Eversources's Energy Efficient P g gY Y Program, we are seeking to replace the pump motors, motor drives (variable frequency drives — ("VFDs") and outside lighting. It is estimated that the project will have a simple payback period of 3.36 years. Eversource's estimated contribution to the project is $21,000. The wet well level ' controller has to be upgraded as part of the energy efficiency upgrade since the new VFD system is not compatible with the existing level control system. Included in the project at the Westfield River Pump Station, we plan to install a SCADA system. The requested funds will pay for that portion of the cost not covered by Eversource's incentive program and for the installation of the new level controller and the SCADA system. 1 South Street Pump Station Improvements: The channel grinder at the South Street Pump Station (aka Three Mile Brook Pump Station) is broken beyond practical repair and requires replacement. Channel grinders are designed to grind the effluent coming into the station into small pieces that can then be passed easily through the pumps and the remainder of the wastewater collection system. Without the channel grinder in operation, the station needs to be closely monitored as it is a greater risk of"ragging up," having the pumps jam because of rags or ' other materials. WASTEWATER COLLECTION SYSTEM INFLOW AND INFILTRATION PROJECT The Town of Agawam's wastewater collection system is required by the MassDEP and contractually by SWSC to perform and Inflow and Infiltration ("I&I") study and remediation. 1 I&I to a wastewater collection system can represent a significant volume of water that has to be pumped and treated that does not require treatment. I&I therefore can have a significant impact on operational costs as well as have an environmental impact when the total volume of water entering the Springfield Regional Wastewater Treatment Plant exceeds the design capacity during wet weather events as this can cause wastewater to be discharged into the Connecticut River without full treatment. The I&I project will involve creating a GIS model of the ' wastewater collection system, system modeling, flow monitoring, video pipe inspections, smoke testing, property visits, sewer main rehabilitation or replacement, pipe spot repairs, manhole rehabilitation or replacement, manhole frame and cover replacement and public education. This project will be completed in three phases in fiscal years 2017, 2018 and 2019. 25 1 1 Town of Agawam Capital Improvement Program ' Fiscal Year 2017— Fiscal Year 2021 WESTFIELD RIVER INTERCEPTOR RELOCATION The Westfield River Interceptor sanitary sewer runs along top of the embankment of the Westfield River. In recent years erosion has encroached on the easement for the sewer and despite slope stabilization by the Army Corps of Engineers, the erosion seems to continue. We are proposing to fund a design to reroute the sewer away from the area of erosion to minimize future financial and environmental impacts that may occur if the 24-inch line were to fail. WESTFIELD RIVER BACKUP FORCE MAIN In fiscal year 2008, the newer force main failed requiring emergency repairs. During the repairs, the 10-inch backup force main was used to continue flows to Bondi's Island. A new backup force main should be completed to be ready to be put in service should any of the existing four ' river crossings fail in the future. Assistance will be sought from local communities that share the use of the force main. ' IV. PUBLIC WORKS- WATER WATER DEPARTMENT E UIPMENT ' An annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for high value, large water capital equipment. In fiscal year 2017, funds are requested to purchase a Ford Transit T350 High Top Van with an interior rack and bin system. This van carries the meter crew, tools, and material to a work site to install and repair water meters, test water backflow devices, and respond to water quality complaints. Funds are also included to purchase an Atlas Copco 185 CFM air compressor to replace a 1992 model. Funding requests are increased in fiscal years 2018 and 2019 to enable the purchase of a wheeled excavator to replace the current 2008 Volvo Backhoe. The excavator is used to repair and install water mains, service connections, fire hydrants and appurtenances. ' 26 Town of Agawam Capital Improvement Program Fiscal Year 2017 — Fiscal Year 2021 SPRINGFIELD STREET & SUFFIELD STREET WATER MAIN REPLACEMENT In advance of MassDOT's planned work in the area around the Morgan Sullivan Bridge between Agawam and West Springfield, we are planning to replace the water main in this area. This main was identified by Tighe & Bond in 2009 for improvement; we plan on replacing approximately 1,300 feet of water main and appurtenances. The replacement will help to improve the fire flows,resiliency and age of the water system. LISWELL HILL WATER PUMP STATION IMPROVEMENTS Through the Eversource Energy Efficiency Program, we are seeking to replace the pump motors, motor drive (VFD) and outside lighting. It is estimated that this project will have a simple payback period of 1.98 years. Eversou.rce's estimated contribution to the project is $27,600. In ' addition to the VFDs, we are seeking to install a SCADA system, a climate control system, and a hydraulic check valve. The requested funds will pay for the portion of these costs not covered by the Eversouce incentive program. WATER MAIN REPLACEMENT ' In 2009, Tighe and Bond prepared a hydraulic model of the Town's water distribution system. The model showed that replacement of water mains would provide unproved fire flows, increased resiliency and improvement in the overall age of the water distribution system. The ' following mains were recommended for replacement. Meadow Street Water Main Replacement: Funds are requested for water main design to replace Lthe existing six inch main with 8,730 feet of water main. South Street Water Main.Replacement: Funds are requested to replace the existing six inch main with 5,420 feet of water main. This will also improve the hydraulic connection of the water mains on Main and Suffield Streets. Silver Street and Elm Street Water Main Replacement: Funds are requested to replace the existing six-inch main running between Main Street and Suffield Street with approximately 5,000 of water main. ' 27 Town of Agawam Capital Improvement Program Fiscal Year 2017 —Fiscal Year 2021 Main Street Water Main Replacement: The replacement of approximately 6,040 feet of water maize between Suffield Street and Route 57. This will also improve the hydraulic connection to ' the water mains on Main Street South and Reed Street. River Road Water Main Replacement: The replacement of approximately 15,470 feet of water 1 main and improve the hydraulic connection of the water mains on Main and Suffield Streets. V. MSCELLANEOUS FIRE DEPARTMENT MOTOR VEHICLES iIn fiscal year 2017, funds are requested to replace the special hazards vehicle with newer equipment with a smaller chassis. This vehicle will act as a tow vehicle for the rescue boat. Replacement of Engines 1 and 2 is requested for fiscal year 2018. At that time, the present vehicles will be 10 years old, the age at which the National Fire Protection Association recommends replacing front line vehicles. In fiscal year 2019, funds are requested to replace the ' current staff vehicle, a 2005 Ford Expedition, with an SUV. Replacement of the 2001 Aerial Platform Truck is requested in fiscal year 2021. ' FIRE DEPARTMENT EQUIPMENT Funds are requested to provide in fiscal year 2019 to replace hoses and firefighting equipment. There are presently hoses that are over 25 years old. In fiscal year 2020, funds are sought to replace outdated Self Contained Breathing Apparatus("SCBA"). ' BUILDING MAINTENACE DEPARTMENT VEHICLE Funds are requested in fiscal year 2017 to purchase a new van that would replace the 1999 Ford ' Econoline van that is no longer able to pass inspection. BUILDING MAINTENACE DEPARTMENT EQUIPMENT Funds are requested to purchase a One Man Elevating Work Platform to replace the current model that is over 25 years old and is not in working order. 28 i 1 Town of Agawam Capital Improvement Program Fiscal Year 2017 — Fiscal Year 2021 ' VOTING MACHINES H ES The Town currently uses nine Accu-Vote machines. There is one for each precinct and one spare. They are reaching the end of their useful life and have been subject to feeding jams at some locations. During the recent Presidential Primary, the machine at Doering School had a complete failure at approximately 6.10 prn which necessitated a hand count of the remaining ballots. The Accu-Vote machines are no longer in production and it is difficult to obtain replacement parts and effect repairs. Funds are requested in fiscal year 2017 to obtain new equipment, training and additional items, such as ballot boxes, software and support for new voting equipment. GOLF COURSE EQUIPMENT Resuming in fiscal year 2018, an annual capital appropriation is included to provide for the ongoing replacement of equipment on a scheduled maintenance program. Funds may be carried from one fiscal year to the next in order to provide funding for high value, large Municipal Golf 1 Course capital equipment. HAMPDEN COUNTY LAND ACQUISITION Agawam acquired most of the holdings of the Hampden County government that were within the Town's boundaries when the county was dissolved. The Town is required to reimburse the other ' county communities for their share of these assets. VI. SCHOOL DEPARTMENT ' ROBINSON PARK.SCHOOL GYM ROOF REPLACEMENT ' The existing roofing covering the gym and the gym office and storage area has deteriorated to a point where the shingles are buckling and falling off onto the play area beneath. There are two layers of roofing, with the first being installed in 1960 and the second layer placed over that. 1 Funds are requested to replace this roof in fiscal year 2017. 29 Town of Agawam Capital improvement Program Fiscal Year 2017 — Fiscal Year 2021 DOERING SCHOOL SEWER STORM SEPARATION Currently the roof drains and the parking lot drains at Doering School flow into the sanitary sewer drain. This project will allow for proper runoff of storm water and alleviate any storm water back-up from entering the school basement. 1 EARLY CHILDHOOD CENTER AND KINDERGARTEN CLASSROOMS ' The Early Childhood program has outgrown its present location.on Perry Lane. A new facility is needed to allow for much needed additional classroom space as well as to provide for private bathrooms and changing rooms for small children and an area for teachers to meet with parents. iFunds are requested to build a 50,000 square foot facility that could also provide for Kindergarten classroom space and make classroom space available for special programming at the elementary schools. HIGH SCHOOL RENOVATIONS Funds are included in fiscal year 2021 to provide for renovations to Agawam High School. Renovations would include new science laboratories, windows, boilers, electrical panel boxes, heating and ventilation systems, lockers and information technology upgrades and accompanying wiring. 30 M M = M M = M M M era and i r _ M s M M M benPro-iect 2017 I OSQ I 2019 1 2020 2C21 2022 2023 Existing Bands- General Fund: School Projects I + 1= 1,041,650.00J r 943,950.00 - I Title V Community Septic Management 3,058,32 I 2,920.78 ' 2,784.93 Public Library Expansion 242,110,00 234 680,00 223 350.00 I 216,120,00 ; 203,Qi0.00 - Agawam High School Library Expansion M,310.00 42 500.00 W,710.00 33,990,00 33,330.00 - i - - - -- 10.00 - - - D.P.W. Facility Alterations 82,320,00 79,968.00 77,b j. 16.00 75,264.00 72,9]2.00 i 70,560001 68,208.00 D.P.W. Facility Acquisition _. .-. 60,940.00 _...__.. 58,602.°0_i_.._.. 56,2._.. _. _. . .._ _. ......_-.,..._...- _,,. Phase II Storinwpter,Management 16,000.09 15.439. 14,897.02 ? ]4,367.7Z 1 - _ 17,310.25 f 16,61T.67 I ]5,881,92 Middle School Roof 30,800.00 29,020.00 29,040.00 28,160,00 27,280,00 • 26,400.00 I 25,520.00 Middle &Junior High Repairs ) 8,400.00 8,160.00 7,9ZC1 00 7,680.001 7,440.00 I -1200.001 6,960,00 Elementary Schools - Modular Classroans ]]2,000.00 108,800.00 105.600 00 I 102 400.00 99,200.00 96,000.00 92,800.00 Senior Center Construction 507,515 00 490.940.00 476,065.00 1 462.465.00.1 448.866 00 435,190,00 I 421,155.00 Fire Pumper Trucks 60,647 50 58,410.001 51,322.50 1 49,522.30 47,722.50 45 911.25 - Perry Lane Pool Renovations 24,250 00 18 393.75 17 737.50 : 17 137 SQ 16,537.50 1 f5,933.75 15,315.00 Building6,700. -, ._. i - .-7 .. .. I . 6.537.70 .. 6,537,55 BuildingMaintenance Buildin Extension 11,900.00 —`_ 6,700.00 -6,600.00 6,500.00 6,400.00 Phase II Storrnwater Cam etion 6,597 86 6 538.42 6 5g7.73 5 537.75 6,538.42 . .��_... �_. 6,300,00I 6,200.00 Town Wide Telephone System 61,200.00 - - - - - - Junior High School Roof and HVAG System 100.080,0p ~� 98,480.00 — 95,080.00 92,880.OQ - 89,680.00 86,480,00 f 83,280.00 Subtotal 2,413,918.77 2,204,403.0I 1,212,470.69 1,113,024.47 1,076,225.67 813,120.37 1 741,857.47 Authorized/Scheduled Bonds: High School Track, Bathrooms b Locher Roams 692,500.00 j - 681,165.00] 669,830,00 i. 658,495.00 I 647,160.00 635,825,00 624,490-00 Subtotal 692,500.00 681,165-00 669,830.00 658,495.00 , 647,160.00 ' 635.825,00 624,490.00 New Projects: I I i:nrly Childhood Center Q Kindergarten Class - 1,761 375,00 1 726,681,25 1,b91,987.50 1,657,293.75 i 1,622,600.00 1,587,906.25 Fire Engines 1 and 2 - 134 7i50,00 I 132,279.00 129,800.00 i 127,325.00 124,850.00 t 122,375.00 1 ._.. ... _. _. !.. - I Fire Mea! Platform Trk - - � - - - � 162,312'5 _ . _ n uc 0.I 15$,331.2'S f 154,350.00 High Sthoot Renovations 1 1,387,500-OQ l 2,355,625.00 Subtotal - 1,896,125.00 1,858,956.25 1,822,707.50 I 1,946,931.25 3,293,281.25 1 3,220,256.25 Potential Aid pnd Grants MA 58A9 - €acisting Bonds 901.116.00 748.999.00 Title V Community septic Management (MWPAT 341.32 203.78 j 67.93 _ - - 2,51324 i ,23Z.93 093. 5 40 1,734.00 i 1,542.73Phase II Stormwater Management(MWPAT) , 7 . , Ambulance Fund Contribution 60,847.50 125,765.00 127,460.00 114,422.50 111,385.00 108,336.25 61,187-50 Subtotal 964,818.06 874,350.51 119.760.86 . 116,515.55 113,303.40 110,070-25 62,730.23 Net debt Service-General Fund 2,141,600.71 3,907,342.50 3,621,496,07 3,476,791,42 3,557,013.52 1 4,632,156.37 4,523,873.49 31 MI MI A m Seim staff Fu~ M M ! � i Bond Payment Schedule trekct MA...--... ___.,_ � � ? 2022 zo23 2024 2025 xlsti Bends,Wastewater Fund: 13 �. - - -.r. Was"ald Rive I + wsstfiaW Rtver e5E)-Local44 , _ r C50(MWP _ 6,551,12 1 130,063.37 �it/,901.65�-- 527,463.14 _ •- - __.__ - -._-•._ --_ __....- - Share 44.690-00 42.1180-00 41 o9D.0o 4►27D.00 42,42QoD Campbell Drive I Florida prlve Sewer 27,190.00 26,00-00 25,200.00 j 24,720,00 I 24,240.00 - - » O.P.W. Facility AltaraNaa-Wastewater 61,740.00 59,976.00 s.M.212,00� —.-4 -._.�_---•-----___.. _ ._. - ..._ _ ... +tr 116.441.00� 54,b34.00� 82,920.00�.. 31,1u.Oo 49.342.00 47,828.00 Westfield River Fares Main 40 625.80 40,625.45 40,625.00 40,625.16 I 40,625.61i 40,625,22 40,625.57 40,625,44 40.625.51 Feeding Mils Sswar Extension Phew 1 102,700.00 J!",700.00 1P6,700,D0 193,700.OD S90,1170.00 �- 1/2,700.00 179,800.00 176,900.00 173,275,00 Subtetal 513,496.92 449,935.02 490,72/.65 467,224.30 352,60.65; 276,245.22 271,381,57 266,917.44 261,528,51 New Pro.Sects: Wastewater Pump Station Improvements Y I 97,321.25 95,357.Op� - 93,192.75 •.- 91,22E-50 I 09,264.25 I - I - Wastewater Cal1eC110a System Inflow d,1 nf llirdl 79,625.00 76.162,50 37 � - 76,700.00 r 75 1 .50 73,775.00 72.312.30 -- 70,850.00 I 69,357.50 Wastewater Pump Station Improvements II 1, - -- 73,575.00 1 71.940.00 i jr 69,670,00 67.095.00 Wastewater Collection System Inflow 6 Infiltral 26,466.01) 24,941.70 24,417.40 i^ 23,893,10 1 23,361.so Z2,644.50 22,320.20 Westfield River Interceptor Relocation ' l9 97>S.00l 19,56;1.75 19,112.50• 1/,741.25 111 330 00 1 17,918.75 11,507.50 Wastewater PumpStatlens Im vemeMs II1 ` - t - -- 15,121,7R 14,769.00 _ I4,397.29 14 031 50 i 13,665,75 pro :—j _- —_._ I� _ _. — Wastewater Collection System Inflow 6 I 4,371l,00 415, 01.23 406,187.50 397 093,75 388,000,00 378,906. Westfield River BackupForce Main Design1 13.235.00 12.033.29 12,531.50 12,229,75 11.928 00 Westfield River Backup Force Main constructlen 231,210.00 225,937.50 1 270,625.00 2I5,312.50 210,000.00 Subtotal - 176,746.25 292,335.50` 725,841-95 1 954,770.13 933,699.10 825,323,05 740,821.25 710,009-45 P_atentmf Aid and Grants Westfield River Pump Station(MWPAT') Westfield River CSO(MWPAT) 49,599.47 46,6W-- 44,129.95 39,692.12 Steal 49,599,47 46,600,43 44,129,95 39,692.11 - - I Net bebt 5ervice-Wastewater Fund 463,197.45 630,080.84 738.934.Z0 1,173,374.14 1.M7,439.10 1,209,941.32 1,096,909.d2 1,007,738.69 i 971.577-96 +__.-Emsting - { D P W1londs- Alterations Water 67,740 00 59,976.00 51,21t,00{ I Facility 56,44E-00 54,684.00 52.920.00 I 51,1,36 00# 49,392.00 1 47,628.00 -j- -..-.. -. -_. . .- .6- . T .__-._._ _. - -- _- .. ._ - _ . . Water Main Construction - North Westfield 465.900-00 499,900.00 450,900,00 ! 438,900.00 426,900.00 1 414,900,00 402,900-00 396,900.00 390,600,00 Subtotal 527,640.00 519,576,00 1 90,112,001 498,348.00 481,584.00 467.920,00 454,M 00 446,292.00 436,226-00 New P",F+s_ ate : ' Water Main Raplecoment- Springfield d Suffle - 1 36 312.00 35 66B-/1 84,940.25 l 34 232,63 - - 33,516.001 32,799.38 32.012.75 31,366.13 ..---. - Liswell Hill Water Pump Station ImpravameMs - 17 243,73 1 lb 05.00� 16,546.25� 16 197.50 15,00.75 1 - - Water Main[xsign- Meadew street - Z6,647.80 26 122 63 25,597,75 25.0n-W 24,548 00 24 023.13 23.491.25 22.M- -39. Water Main Design - South Street - 16,500,DD 16 175 00 esy Sb,890.00! 55,525.00 15,200.00 14 875.00 14,55D,00 14,225.DO Wafer Main Dn- Saver and Ebn f>treats - I - 1b,592.00 1b,250,40 15,904.10 i -'i5,S67.20 I 11,223.60 - 14 8/4,00 14,542.40 Water Main Construction- Meadow St. - 1 - 16,000.00, 149.E50.06 146,706-00 j 143."0.00 140,400.00 137 2DOA0 134,100.00 Water Main Construction - Soot%St. - 131,Z30.00 124,437.50, 125.625.00 1 122,812 50 220,000.00 237,107.50 Water Main Design- Mein Street I - - 39,i12,50 3/,98iA,31 - 1a.106.25 37,258,13 36.400.OD 35,%6_EE t _ - 4 .. .�_... . ... .-•-- - ... -- _ Main nfruction- SHver 8 Elm Sfs. 101,750.00 ! 99,412.50 97 075,00 94,737.50 92,400.00 - - . , Water Main CsMrictNn- Mein tram Suffield - _ ~ - 247,000.00 241 150.00 235,300.00 229,450-00 Water Main ba Water sl River Road gn - - - - - - 53,200.00 51,940.00 50,680,00 49,420.00 Subtotal 96,773.73 264,45013 430,106.15 522.783.69 1 111,11".70 Tn.5".74 759,382-50 741,211.29 Net Debt Service.Water Fund 61,740.00 156,749.75 322,662,51 416,554.1E 577,467,69 1 164,493.70 828,709,74 808,774.50 781,839.29 32 Budget Appropriations (FY2O17 - FY2O21) 1 Category FY2017 FY2018 FY2019 FY2020 FY2021 1 General Fund $1,342,088 $964,000 $658,500 $814,500 $580,000 ' Sewer Fund $47,700 $47,174 $47,174 $47,174 $47,174 Water Fund $69,117 $91,500 $91,500 $47,147 $47.147 Municipal Golf Course $15,000 $15,000 $15,000 $15,000 $15,000 TOTAL $1,473.905 $1,117,674 $812,174 $923.821 $689,321 1 1 ' Budget Appropriations (FY2017 - FY2021) $1,600,000 $1.200,000 ' $1,000,000 — - $800,000 y 1 $600.000 $400,000 $200,000 - $0 — - ' FY2017 FY2018 FY2019 FY2020 FY2021 1 1 1 1 General Fund Existing Bond Costs (FY2017 - FY2021) ' PROJECT FY2017 FY2018 FY2019 FY2020 FY2021 School Projects I . II $ 1,041,650 $ 943,950 $ $ Title V Community Septic Management $ 3,058 $ 2.921 $ 2.785 $ $ ' Public Library Expansion $ 242.110 $ 234.680 $ 223.350 $ 216.120 $ 203,010 Agawam High School Library Expansion $ 44,310 $ 42.500 $ 40.710 $ 33,990 $ 33,330 D.P W. Facility Acquisition $ 60,940 $ 58,603 $ 56.210 $ - $ - ' D.P.W. Facility Alterations $ 82,320 $ 79,968 $ 77,616 $ 75,264 $ 72,912 Phase 11 5tormwater Management $ 16,000 $ 15,440 $ 14,897 $ 14,368 $ 17,310 Middle School Roof $ 30,800 $ 29,920 $ 29,D40 $ 28,160 $ 27,280 ' Middle a Junior High Repairs $ 8,400 $ 8,160 $ 7,920 $ 7,680 $ 7.440 Elementary Schools - Modular Classrooms $ 112,000 $ 108,800 $ 105,600 $ 102,400 $ 99,200 Senior Center Construction $ 507,515 $ 490.940 $ 476.065 $ 462.465 $ 448,865 ' fire Pumper Trucks $ 60,848 $ 58.410 $ 51.323 $ 49,523 $ 47,723 Perry lane Pool Renovations $ 24.250 $ 18,394 $ 17,738 $ 17,138 $ 16,538 ' Phase II Starmwater Completion $ 6,538 $ 6,538 $ 6,538 $ 6,538 $ 6,538 Building Maintenance Building Extension $ 11.900 $ 6,700 $ 6,600 $ 6,500 $ 6,400 Town Wide Telephone System $ 61,200 $ - $ - $ - $ - tJunior High School Roof and HVAC System $ 100,080 $ 98,480 $ 96,080 $ 92,880 $ 89,680 Subtotal - Existing Bond Costs $ 2,413,919 $ 2,204,404 $ 1,212,472 $ 1,113,026 $ 1.076,226 High School Track, Bathrooms d Locker Rooms $ 692,500 $ 681,165 $ 669,830 $ 658.495 $ 647.160 tNew Projects: Early Childhood Center d Kindergarten Classrooms $ $ 1,761.375 $ 1,726,681 $ 1.691,988 $ 1.657.294 Fire Engines 1 and 2 $ $ 134.750 $ 332.275 $ 129.800 $ 127,325 ' Fire Aerial Platform Truck $ $ - $ - $ $ 162.313 High School Renovations $ S $ _$ $ Tatal Existing and Projected Bond Costs $ 3,106,419 $ 4,781,694 $ 3,741,258 $ 3,593,309 $ 3,670,318 (` denotes project which is authorized but not yet permanently bonded) ' Existing Bond Costs (FY2017-FY2021) ' $2,500,000 $2.000.000 $1.500.000 $1.000 000 ' $500,000 r $ FY2017 FY2018 FY2019 FY2020 FY2021 i 1 - ' General Fund Projected New Bond Costs (FY2017 -- FY202Q_ ' FY2017 FY2018 FY2019 FY2020 FY2021 High School Track. Bathrooms d Locker Roo $ 692,500 $ 681,165 $ 669,830 $ 65B,495 $ 647,160 ' Early Childhood Center d Kindergarten Ciass $ _ $ 1.761.375 $ 1,726,681 $ 1.691,988 $ 1,657,294 Fire Engines 1 and 2 $ $ 134,750 $ 132,275 $ 129,800 $ 127,325 Fire Aerial Platform Truck $ $ - $ - $ - $ 162,313 ' High School Renovations $ $ - $ - $ - $ - TOTAL. _'$ 692.500 ^$ 2,577,290 $ 2,528,786 $ 2,480,283 $ 2,594.092 1 - - — — — - - - ' Projected New Bond Costs (FY2017- FY2021) $3•000.000 $2,500,000 1 $2,000,000 $1,500,000 1 I �1•�•� $500,000 1 $- FY2017 FY2018 FY2019 FY2020 FY2021 1 1 35 ' General Fund ' Projected Total Bond Costs (FY2017 - FY2021) (before grants and reimbursements) ' FY2017 FY2018 FY2019 FY2020 FY2021 ' Existing Bond Costs $ 2,423,919 $ 2,204,403 $ 1,212,471 $ 1,113.024 $ 1.076,226 Projected New Bond Costs $ 692,500 $ 2,577,290 $ 2,528,786 $ 2,480,283 $ 2,594,092 TOTAL BONE) C05T5 $3,106,419 $4,781,693 $3,741,257 $3,593,307 $3,670,318 1 I ' Total Projected Bond Costs (FY2017 -FY2021) (before grants and reimbursements) $5.000,000 ' $4,500,000 — -- $4,000,000 $3,500,000 $3.000,000 $2,500,000 — t $2 000 000 $1,500,000 $1,000,000 I $500,000 $0 -- FY2017 FY2018 FY2019 FY2020 FY2021 1 ,� Genera! Fund ' Projected Total Bond Costs (FY2017 - FY2021 (after grants and reimbursements) 1 FY2017 FY2018 FY2019 FY2020 FY2021 ' Existing Bond Costs $2,413,919 $2,204,403 $1,212,471 $1,113,024 $1,076.226 ' Projected New Bond Costs $692,500 $2,577,290 $2,528,786 $2,480,283 $2,594,092 Projected Grants d Reimb $ 964,818 $ 874,351 $ 119.761 $ 116.516 $ 113,303 NET BOND COSTS $2,141.601 $3,907,342 $3,621,496 $3,476,791 $3,557,015 1 I ' - 2 21 Projected Total Band Casts (FY2017 FY 0 ) (after grants and reimbursements) $4 000,000 $3.500.000 r� $3.000.O 1 $2'5M'000 b $2.000,000 $1,500,040 $1.000.000 $500.000 i $0 E FY2017 FY2018 FY2019 FY2020 FY2021 1 ' Self Sustaining Funds Existing Bond Costs (FY2017 - FY2021) ' PROJECT FY2017 FY2018 FY2019 FY2020 FY2021 ' Westfield River CSO (MWPAT) $ 136.551 $ 130,064 $ 128,902 $ 127,461 Westfield River CSO - Local Share $ 44,690 $ 42,880 $ 41,090 $ 44,270 $ 42,420 Campbell Drive / Florida Drive Sewer $ 27.190 $ 26,690 $ 25,200 $ 24.720 $ 24.240 ' D.P.W. Facility Alterations-Wastewater $ 61.740 $ 59,976 $ 58,212 $ 56,448 $ 54,684 Westfield River Force Main $ 40,626 $ 40,625 $ 40,625 $ 40,625 $ 40,626 Feeding Hills Sewer Extension Phase I $ 202,700 $ 199,700 $ 196,700 $ 193,700 $ 190,700 ' D.P.W. Facility Alterations-Water $ 61,740 $ 59,976 $ 58,212 $ 56,448 $ 54,694 Water Main Construction - North West-field Street $ 465,900 $ 459,900 $ 450,900 $ 438,90C $ 426.900 Subt(.tal - Existing Bond Costs $ 1,041,137 1,019,811 999,841 982,572 834,254 ' Wastewater Pump Station Improvements I $ $ 97,121 95,157 $ 93,193 $ 91,229 Wastewater Collection System Inflow 6 Infiltration 1 $ $ 79,625 $ 78,163 $ 76,700 $ 75,236 Wastewater Pump Station Improvements II $ - $ - f 73,575 $ 71,940 $ 70,905 Wastewater Collection System Inflow 6 Infr7tration 1 $ $ 25,466 $ 24,942 $ 24,417 Westfield River Interceptor Relocation $ - $ - $ 19,975 $ 19,564 $ 19,153 ' Wastewater Pump Stations Improvements III $ = $ - $ = $ 15.129 $ 14,753 Wastewater Collection System Inflow d Infiltration 1 $ $ $ ; 424,375 $ 415.251 Westfield River Backup Force Maain Design $ - $ - $ - ; - $ 23.135 ' Westfield River Backup Farce Maim Construction $ = - $ - $ $ 231,250 Springfield Water Main Replocenent - d Suffield 51 $ $ 36.383 $ 35.666 $ 34,949 $ 34.233 L isweli Bill Water Pump Station Improvements $ $ 17,244 $ 16,895 $ 16.546 $ 16,1" ' Water Moin Design - Meadow Street $ = $ 26,648 $ 26.123 $ 25,598 $ 25,073 Water Main Design - South Street $ $ 16.500 $ 16.175 $ 15,850 $ 15.525 Water Main Design - Silver and Elm Streets $ - $ - $ 16.592 $ 16,250 $ 15.909 ' Water Main Construction Meadow St $ = $ = $ 153.000 $ 149.850 $ 146,700 Water Main Construction - South St $ $ $ $ 131,250 $ 328.439 Water Main Design - Main Street $ $ - $ - $ 39,623 $ 38.959 Water Main Construction Silver & Elm Sts. $ $ - $ $ - $ 101,750 Water Main Constriction - Main from Suffield St- $ $ - $ $ - $ - Water Main Design - River Road $ $ $ - $ - $ Tatal Existing and Projected Bond Costs $ 1,041,137 1.293,332 1,556,628 2,138,521 2.311,910_ ("derates project which is planned but not yet authorized) ' Existing Bond Costs (FY2017 - FY2021) ' $1.200,000 ` $1.0oo,00a t $800,000 $6 00.000 $400,000 ' $200=0 $- FY2017 FY2018 FY2019 FY2020 FY2021 1 l Self Sustaining Funds Projected New Bond Costs (FY2017 - FY2021) FY2017 FY2018 FY2019 FY2020 FY2021 ' Wastewater Pump Station Improvements I $ _ $ 97,121 $ 95,157 $ 93,193 $ 91,229 Wastewater Collection System inflow d Infiltration Prop $ $ 79,625 $ 78.163 $ 76,700 $ 75,238 Wastewater Pump Station Improvements II $ $ - $ 73.575 $ 71.940 $ 70,305 ' Wastewater Collection System Inflow 6 Infiltration Proje $ $ _ $ 25,466 $ 24.942 $ 24,417 Westfield River Interceptor Relocation $ $ $ 19,975 $ 19,564 $ 19,153 Wastewater Pump Stations Improvements III $ $ $ - $ 15,129 $ 14,763 Wastewater Collection System Inflow d Infiltration Pro je $ $ Y $ = $ 424,375 $ 415,281 Westfield River Backup Force Main Design $ $ $ $ $ 13,135 Westfield River Backup Force Main Construction $ $ $ $ - $ 231.250 ' Water Main Replacement - Springfield b Suffield Street $ $ 36,383 $ 35,666 $ 34.949 $ 34,233 Liswell Hill Water Pump Station Improvements $ $ 17,244 $ 16,895 $ 16,546 $ 16,198 Water Main Design - Meadow Street $ $ 26,648 $ 26.123 $ 25,596 $ 25,073 ' Water Main Design South Street $ _ $ 16,500 $ 16,175 $ 15,850 $ 15,525 Water Main Design Silver and Elm Streets $ $ $ 16,592 $ 16,250 $ I5,909 Water Main Construction AAeadow St. $ $ $ 153,000 $ 149.850 $ 146,700 ' Water Main Construction - South St $ $ $ - $ 131,250 $ 128,438 Water Main Design - Main Street $ $ $ - $ 39,613 $ 38,959 Water Main Construction - Silver d Elm Sts $ $ - $ - $ - $ 101,750 Water Main Constriction - Main from Suffield St. $ $ - $ - $ - $ - Water Main Design - River Road $ $ $ - $ - $ - TOTAL $ $ 273,521 $ 556,787 $ 1,155.949 $ 1,477,556 ' Projected New Bond Costs (FY2017 - FY2021) 1 $1,600,000 ' $1,400,000 $1.200,000 $1,000,000 - ' $a00,000 i $600,000 - -- $4X. $200,000 1 $ , FY2017 FY2018 FY2019 FY2020 FY2021 ' Self Sustaining Funds Pro jected Total Bond Costs (FY2017 - FY2021) ' (before grants and reimbursements) ' FY2017 FY2018 FY2019 FY2020 FY2021 Existing Bond Costs $1,041,137 $1,019,811 $999,841 $982,572 $834,254 Projected New Bond Costs $0 $273,521 $556.787 $1,155.949 $1,477,556 TOTAL BOND COSTS $1,041,137 $1,293,332 $1,556.628 $2,138,521 $2,311,810 ' Total Projected Bond Costs FY2017-FY2021) J � (before grants and reimbursements) ' $2,500,000 ' $2,000,000 ' $1,500,000 $1,000,000 7. $500,000 FY2017 FY2018 FY2019 FY2020 FY2021 5elf 5ustaining Funds ' Projected Total Bond Casts (FY2017 - FY2021) (after grants and reimbursements) 1 FY2017 FY2018 FY2019 FY2020 FY2021 tExisting Bond Costs $1,041,137 $1,019,811 $999,841 $982,572 $834,254 ' Projected New Bond Costs $0 $273,521 $556,787 $1,155,949 $1.477,556 Projected Grants d Reimb. $ 49,599 $ 46,600 $ 44,130 $ 39.692 $ - ' NET BOND COSTS $991,538 $1,246,732 $1,512,498 $2,098,829 $2,311,810 1 Projected Total Bond Costs (FY2017 - FY2021) t (after grants and reimbursements) $2.500,000 $2'000'000 ' $1 500 000 ! $1,000,000 1 $Soa,000 ' $0 FY2017 FY20I8 FY2019 FY2020 FY2021