No preview available
 /
     
8086_DEFINITIVE PLAN- RIVERS EDGE ESTATES-BARNEY ST.-LANGONE LanooTve., AGAWAM PLANNING BOARD DEFINITIVE SUBDIVISION DATA FORM Name of Development Ri ver' s Edge Estates File No. 8086 Developer or Owner Richard Langone Address: 61 Dark Drive, Agawam, MA Phone No. Date of Submission of Definitive Plan 01/31/00 +90 days +Extension +Extension +Extension Public Hearing Date 1/17/00 Statement of Ownership Received 01/31/00 Advertising Dates 02/03/00 & 02/17/00 Board of Health Reply 01/31/00 Town Engineer's Reply _ 2/17/on_ 05/18/00 Date of (Approval) (Approval as Amended) (Rejected) Appeal Period Up Appeal Taken (Yes) (No) Covenant Received All Easements Received Other Requirements Town Council Reviewed Comments Section # Bond Posted - Amount $ Date Signatures -- Planning Board -- Town Clerk Release of Covenant Date of Expiration of Bond Partial Release - Amount $ Date Partial Release - Amount $ Date Final Report of Town Engineer Final Disposition of Bond Released Amount $ Date Damages to Town - Amount $ Date 02 f'4'I _B l,1 � � 21 - PLANNING. BOARD T0: TOWN TREASURER -. RATE: 11-7-0 2 . SUBJECT: RELEASE OF PERFORMANCE BOND FILE N0. 8086 At an officially called and posted meeting held on • 11-7702 the Planning Board voted to release S IN FULL of the monies held- by.the Town to cover performance of work by developer otherwise known as Vi.ncon, Inc. for project River' s Edge Estates This amount is released for work accepted by the Agawam Planning Board. - HOLDING: $112 , 000 RELEASE I F LL �VC-)ev L-- PLANN BOARD CHAIRMAN \ 0 0 TOWN OF AGAWAM MEMORANDUM To: Planning Board CC: John P. Stone, DPW Supt. /File From: Engineering Date: October 8, 2002 Subject: Bond Release -River's Edge Estates - Barney Street A final walk-through of the subject site by Engineering on Tuesday, 10/8/02 indicates that all outstanding work has been completed. We recommend a full release of bond on River's Edge Estates and have no further comment at this time. If you have any questions, please do not hesitate to contact us. Sincerely, Rick S. Seidnitzer es T. Daley, P.E. Civil Engineer I Town Engineer Tit: HAsubdivlriversedge_08.wpd i D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School Street Fax #413-562-2091 SURVEYORS Westfield, Mass. 01085 ENGINEERS September 18, 2002 Agawam Engineering Department 35 Main Street Agawam, MA 01001 attn-. James Daley, Town Engineer RE: "Rivers Edge Estates" -Vincent Connor Dear Jim: This is to certify that all the concrete monuments and iron pipes designated to be set on the above referenced subdivision plan have been set by us,with no exceptions. Sincerely, D. L. Bean, In David L. Bean, President cc: Planning Department Vincent Connor DLB/ssc 4' SEP 1 8I TOWN OF AGAWAM 0 a. s. MEMORANDUM To: Planning Board CC: John P. Stone, DPW Supt. /File From: Engineering Date: October 3, 2002 Subject: Revised Street Acceptance Plan - Barney Street Per your request of October 3, 2002 we have reviewed the revised Street Acceptance Plan for Barney Street and note the following: As per a discussion on Thursday October 3, 2002 with Tom Avery of D.L.Bean, Inc., D.L.Bean will re- submit a corrected and final Barney Street Acceptance Plan prior to the Planning Boards' meeting on Thursday October 3, 2002. If you have any questions, please do not hesitate to contact us. Sincerely, (PAJ ),JI47 Rick S. Seidnitzer hJamensT2.�D_ aley, P.E. Civil Engineer I own Engineer H Asubdivlriversedge_07.wpd • TOWN OF AGAWAM MEMORANDUM y � 1 To: Planning Board CC: John P. Stone, DPW Supt. /File From: Engineering Date: October 3, 2002 Subject: Bond Release -River's Edge Estates -Barney Street Per your request of September 17, 2002 the following is our recommendation for the full release of bond on River's Edge Estates (Barney Street): A final inspection of the subject site and complete review of the corresponding files indicate that all proposed work that has been constructed, is satisfactory, and has been built according to the Town of Agawam's constructions standards. As per a discussion on Thursday October 3, 2002 with the developer of River's Edge Estates, Vincent Conner, the following items remain to be completed; 1. Install all bituminous concrete berm returns into the existing driveways. 2. Pickup and remove sidewalk form boards near the on-site detention pond. 3. Expose the outlet pipe and uncover the outlet structure in the on-site detention pond. Upon confirmation of completion of these items, we recommend a full release of bond on River's Edge Estates. If you have any questions, please do not hesitate to contact us. Sincerely, 'PJ I )ILJAf t___ Rick S. Scidnifzer Aames T. Daley, P.E. Civil Engineer I Town Engineer H Asubdivlriversedp_06.wpd w Town .of Agawam 36 NNf ahi ,fitm et Agawam, Massachusetts 01001-1837 RrEa � Tel. 413-786-0400 Fax 413-786-9927 o c_ -r October 7, 2002 Vincent Connor 73 Zachary Lane Agawam, MA 01001 Dear Mr. Connor: At its duly called meeting held on October 3,2002,the Agawam Planning Board voted not to release the bond for the River's Edge Estates subdivision. Attached please find a memo from the Engineering Department, dated October 3, which outlines the remaining items which must be completed before the bond can be released. The Planning Board will be happy to entertain this request again when all items are completed. If you have any questions, please contact the Planning Office at 786-0400, extension 283. Sincerely, Dennis B. Hopkins, Chairman Agawam Planning Board cc: Clerk Engineering File A TOWN OF AGAWAM a MEMORANDUM 1 To: Planning Board CC: John P. Stone,DPW Supt. 1 File From: Engineering Date: October 3, 2002 Subject: Bond Release-River's Edge Estates - Barney Street Per your request of September 17, 2002 the following is our recommendation for the full release of bond on River's Edge Estates (Barney Street): A final inspection of the subject site and complete review of the corresponding files indicate that all proposed work that has been constructed, is satisfactory, and has been built according to the Town of Agawam's constructions standards. As per a discussion on Thursday October 3, 2002 with the developer of River's Edge Estates, Vincent Conner, the following items remain to be completed; I. Install all bituminous concrete berm returns into the existing driveways. 2. Pickup and remove sidewalk form boards near the on-site detention pond. 3. Expose the outlet pipe and uncover the outlet structure in the on-site detention pond. Upon confirmation of completion of these items, we recommend a full release of bond on River's Edge Estates. If you have any questions, please do not hesitate to contact us. Sincerely, et--'- Rick S. Seidni er ames T. Daley,P.E. Civil Engineer I Town Engineer HAsubdivlriversedge 06.wpd MEMO TO: Engineering Department FROM: Planning Board DATE: October 2, 2002 SUBJECT: Street Acceptance Plan - Barney Street Attached for your review and comment is a blue-line print of the Barney Street - Street Acceptance Plan. DSD:pre D. L. BEAN, INC. • Land Consultants Emvvmew V �2&m&DVVLZIL Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE JOB NO. (413) 562-7566 October 1, 2002 FAX (413) 562-2091 ATTENTION Rick TO RE: down of Agawam Planning Department BarneyStreet — Agawam 36 Main Street Agawam, MA 01001 WE ARE SENDING YOU IIM Attached ❑ Under separate cover via the following items: ❑ Shop drawings IN Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 2 10-01-02 1 Blue Line Prints Street "Acceptance Plan" — Barney Street THESE ARE TRANSMITTED as checked below: N For approval ❑ Approved as submitted ❑ Resubmit copies for approval X For your use ❑ Approved as noted ❑ Submit copies for distribution X As requested ❑ Returned for corrections ❑ Return corrected prints X For review and comment ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS or t to �►'� 1. S i n q/4e I y COPY TO Vincon, Inc. SIGNED: liw_yil)� If enclosures are not as noted,kindly notify us at once. Ma . Shute, Sr. V. President MEMO TO: Engineering Department FROM: Planning Board DATE: October 3, 2002 SUBJECT: Revised Street Acceptance Plan - Barney Street Please review the attached revised Street Acceptance Plan for Barney Street to be sure it is ready for the Board's signatures this evening. Thank you. DSD:pre • � • MEMO TO: Engineering Department FROM: Planning Board DATE: September 17, 2002 SUBJECT: Bond Release - River's Edge Estates - Barney Street Mr. Connor has requested a full release of bond on River's Edge Estates (Barney Street). Please provide the Board with your recommendation prior to their October 3, 2002 meeting. Thank you. DSD:pre Vincent Connor 73 Zachary Lane Agawam, MA 0 100 1 September 17, 2002 Agawam Planning Board 36 Main Street Agawam, MA 01001 Dear Board Members: 1 hereby request a full release of bond on River's Edge Estates (Barney Street). Sincerely, U ea-� Vincent Connor TOWN OF AGAWAM MEMORANDU 1 SEP 0 7 20M 'F P°��0 PLAN Ni WAN To: John R Stone, Supt. DPW CC: Vincent Conner, Developer / Norman Pelley, Site Contractor / Planning / RSS / File From: Engineering Date: September 5, 2001 Subject: River's Edge Estates - Barney Street - Bituminous Concrete Wednesday, 9/5/01, the site contractor, Norman Pelley asked to install the base coat of bituminous concrete on Thursday, 916/01 at Rivers' Edge Estates. Allied Testing was immediately called to schedule compaction tests (at 8:00 AM Thursday) for the dense graded crushed stone in the roadway. At that time Allied informed us that the compaction test results would not be available before any bituminous concrete is placed. Also, the sanitary sewer main has only been in the ground 60 days. The Town specifications call for a mandrel to be pulled through the sanitary sewer main after a period of 90 days to check for deflection. Because of this, the developer will be responsible for any cost increase connected "with ultimate failure of deflection. The site contractor and developer have been informed of these two items and understand that the backfill and base coat of bit. conc. will have been installed at the risk of the Developer. A copy of this memo will be handed to Mr. Conner Thursday (916101). Sincerely, es T. Daley, P.E. Town Engineer S Asubdivlriversedge_o4,wpd /44z Town of Agawam 36 Main Street Agawam, Massachusetts 01661-1837 Tel, 4..3-786-0400 Fax: 413-786-9921 PLANNING BOARD July 20, 2001 Mr. Vincent Connor 73 Zachary Lane Agawam, MA 01001 Dear Mr. Connor: At its duly called meeting held on July 19, 2001, the Agawam Planning Board agreed to allow the planting of 4'-5', 6' on center, arborvitae along the southern 15'buffer in the Barney Street subdivision to replace the approved planting. The Planning Board also allowed the elimination of the plants along the easterly 10'buffer on Lot No. 1, also in this subdivision. If you have any questions, you may call this office at 786-0400, extension 283. Sincerely, oj_a�� 5e COL'L��� Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD DSD jsg cc: Building Department Department of Public Works ` I I I _._.� �. ._ •mod �,Ls� ��s `C�►-� Q ca,��,� �� .._.,__., ` 1 s .�'fir. +�.".1; r�I. "•;'; I r I � I PERFORMANCE AGREEMENT RIVERS EDGE ESTATES LOTS 1 -6 INCLUSIVE THIS AGREEMENT made by and between VINCON,INC.,a corporation,Vincent Connor its President and Treasurer and Vincent Connor,an individual, hereinafter called the DEVELOPER,having a usual place of business at 73 Zachary Lane,Agawam,Massachusetts and the Town of Agawam, Massachusetts,a municipal corporation having a usual place of business at 36 Main Street,Agawam, Massachusetts 01001,acting through its Planning Board,hereinafter called the TOWN;witnesseth: WHEREAS,the DEVELOPER desires to carry out the development of lots I thru 6 inclusive as shown on a set of definitive plans recorded in the Hampden County Registry of Deeds as indicated below: RIVERS EDGE ESTATES "DEFINITIVE"SUBDIVISION OF PROPERTY AGAWAM,MASSACHUSETTS FOR:RICHARD LANGONE,61 MARK DRIVE,AGAWAM,MASS. PREPARED BY D.L.BEAN,INC. DATE:]AN.28,2000,REVISED 5-15-2000 SCALE 1"=40' HCRD BOOK PAGE AND WHEREAS,on May 18,2000 the PLANNING BOARD of the TOWN endorsed plans entitled: RIVERS EDGE ESTATES "DEFINITIVE"SUBDIVISION OF PROPERTY FOR: RICHARD LANGONE PREPARED BY D.L.BEAN,INC. DATE:]AN. 28,2000,REVISED 5-15-2000 SCALE l"=40' NOW,THEREFORE,in consideration of the approval of the definitive Plans by said TOWN, providing for the construction of ways,clearing,grading and installation of municipal services to the above mentioned lots;the DEVELOPER hereby agrees to perform the required improvements in accordance with the "Rules and Regulations of the Planning Board as it Refers to Subdivision Control",as amended,and to construct the following items of work in a manner satisfactory to the TOWN: CONSTRUCTION STANDARDS AND REQUIRED IMPROVEMENTS: Section V of"Rules and Regulations of the Planning Board as it Refers to Subdivision Control",amended March 7, 1974,is hereby supplemented by the following descriptions,modifications, additions and deletions. These Construction Standards and Required Improvements shall prevail over those published in Section V and the Definitive Plans only where there is a discrepancy,and where the Town Engineer determines that these Construction Standards are more stringent. Wherever the term"Massachusetts Standard Specifications" is used it shall refer to"The Commonwealth of Massachusetts Department of Public Works Standard Specification for Highways and Bridges", 1973 ed., including the latest Supplemental Specifications. The term"Town Engineer"shall mean the Agawam Town Engineer,acting directly or through an authorized representative,such representative acting within the scope of the particular duties entrusted to him. The DEVELOPER shall notify the TOWN through its Department of Public Works in writing at least forty-eight(48)hours in advance of the time when he plans to begin work on any of the improvements required by this Agreement. Failure on the part of the DEVELOPER to provide such notification shall be cause for the TOWN to require the DEVELOPER to excavate and reconstruct the improvements as necessary in order to insure that the work has been done in a satisfactory manner. A. Street and Roadway. The entire area within the street layout shall be cleared of all stumps, brush, roots, boulders, debris and all trees not intended for preservation. All loam, clay, peat and other unsuitable material encountered within the layout shall be excavated and replaced with granular material conforming to Massachusetts Standard Specifications M1.01.0 to a depth of 4 feet below the subgrade. Install subdrains where the seasonal high groundwater elevation is within 4 feet of the proposed roadway surface. Subdrain sizes and locations shall be subject to the approval of the Town Engineer and shall be installed wherever necessary in the opinion of the Town Engineer. Subdrains shall conform to Massachusetts Construction Standards 209.1.1. All rock encountered within the street layout shall be excavated and replaced with granular material conforming to Massachusetts Standard Specifications M1.01.0 to such a depth of 4 feet below the subgrade. Before placing any subbase or base materials,the entire subgrade area shall be fine graded and compacted to not less than 90 percent of maximum dry density as determined by AASTHO Test Designation T99 Compaction Test Method C. Special Borrow for subbase shall conform to Massachusetts Standard Specifications M2.01.1. Subbase and base courses shall be fine graded and compacted to not less than 95 percent of maximum dry density in accordance with Section 401 and Section 405 of the Massachusetts Standard Specifications. The DEVELOPER shall be responsible for reimbursing the TOWN for the cost of all soils testing. The roadway surface shall be Class I Bituminous Concrete Type 1-1 applied in Two (2) courses in accordance with Section 460 of the Massachusetts Standard Specifications. The top course shall not be applied until one (1)winter season has passed since the completion of all underground work within the subgrade area. Only the roadway designs or alternatives shown on the Defintive Plans shall be constrcuted. Bituminous concrete curb conforming to Massachusetts Construction Standard 106.2.0, Type 2 shall be installed on both sides of the roadway. Granite curbing shall be installed along the arc of the curve at intersections. Type SA edging shall be used on Places and Lanes, and Type VA vertical curb shall be used on Sub-Collectors and Collectors, unless otherwise directed by the Town Engineer. B. Sanitary Sewers: Submit an "Application for Permit for Extension of Sewerage System"to the Superintendent of Public Works for his recommendation to the Director of the Massachusetts Division of Water Pollution Control. After receipt of a Sewerage Extension Permit, pay all fees and deposits, and apply for a connection to the public sewer. Install asbestos-cement, PVC or approved equal sewer pipe and fittings conforming to Massachusetts Standard Specifications M5.02.7, of the size, class and at the lines and grades shown on the Definitive Plans. The minimum design flexure strength of asbestos-cement sewer pipe shall be class 2400 for sizes 4 and 6 inch diameters and class 3300 for sizes 8 through 12 inch diameter. The minimum PVC sewer pipe class shall be SDR 35, however, special bedding will be required. Building sewer connections shall be at least 4 inch diameter laid at 118 inch per foot pitch minimum, and shall be separated from the water services by at least 10 feet horizontally. Building sewer connections shall not be made directly into manholes. Long sweep elbows shall be used for all bends 11 1/2 degrees or greater. A cleanout shall be installed no further than 20 feet upstream of any 45 degree or 90 degree bend. No foundation drains or roof leaders shall be connected to the sanitary sewers. Bedding shall conform to Subsection 230.61, and backfilling shall meet the requirements of Subsections 120.60B, 150.60 and 150.64 of the Massachusetts Standard Specifications. A special bedding of sand borrow conforming to M1.04.0 Type shall be well compacted around all PVC sewer pipe a minimum distance of 1 foot. Where the bottom of the trench is, in the opinion of the Town Engineer, found to be unstable, the DEVELOPER shall excavate the unsuitable material to the width and depth ordered by the Town Engineer, and shall replace all unsuitable materials, as directed,with a well compacted foundation consisting of granular material conforming to M1.02.0 (maximum stone size of 2 inches) or crushed stone conforming to M2.01.1 of the Massachusetts Standard Specifications. Where rock is encountered it shall be removed to a depth of 1 foot below and from all sides of the pipe or structure. Precast concrete sewer manholes shall conform to Agawam Construction Standard 202A.1 and shall be installed in accordance with Section 201 of the Massachusetts Standard Specifications. Pipe connections to manholes shall be made with a flexible rubber boot and shall be cast in a 6 inch concrete collar. Inverts shall be brick conforming to Massachusetts Stand Specifications M4.05.1. Preformed bituminous joint filler shall conform to M3.05.3 and cement concrete brick for adjusting frames and covers shall conform to M4.05.0 of the Page 2 Massachusetts Standard Specifications. Type A frames and covers shall conform to Massachusetts Construction Standards 202.6.0 and 202.8.0, and shall have the word "SEWER" imprinted in 3 inch high letters on the cover. The DEVELOPER shall furnish the labor and equipment, test plugs, gauges and appurtenances necessary for air testing all sanitary sewer pipes. If leakage of air at 4 psi exceeds 0.15 CFM per suqare foot in any section of pipe, as determined by the Town Engineer, the DEVELOPER shall locate the leaks and repair them at his own expense. In no event shall the total infiltration or exfiltration including manholes, exceed the equivalent of 100 gallons per 24 hours per inch diameter per mile of sewer main, in any section of the sewer system, as determined by the Town Engineer. C. Drainage: If any storm drains are to be connected to the TOWN drainage system, the DEVELOPER shall apply to the Superintendent of Public Works for a permit to conned to the public storm drains, and pay all fees and deposits required. Install reinforced concrete storm drain pipe conforming to Massachusetts Standard Specifications M5.01.1, of the size, Gass and at the lines and grades shown on the Definitive Plans. Storm drain connections to foundation drains and roof leaders shall be installed as shown on the Definitive Plans, and shall be at least 4 inch diameter laid at 1/8 inch per foot minimum pitch. The minimum flexure strength of 4 and 6 inch diameter asbestos cement pipe shall be class 2000 D. The minimum PVC pipe class for storm drain connections shall be SDR 41, however, special bedding will be required. Bedding shall conform to Subsection 230.61, and back-filling shall meet the requirements of Subsections 120.608, 150.60 and 150.64 of the Massachusetts Standard Specifications. A special bedding of sand borrow conforming to M1.04.0 Type b shall be well compacted around all PVC drain pipe a minimum distance of 1 foot. Where the bottom of the trench is, in the opinion of the Town Engineer, found to be unstable, the DEVELOPER shall excavate the unsuitable material to the width and depth ordered by the Town Engineer, and shall replace all unsuitable materials, as directed, with a well compacted foundation consisting of granular material conforming to M1.02.0 (maximum stone size of 2 inches) or crushed stone conforming to M2.01.1 of the Massachusetts Standard Specifications. Where rock is encountered it shall be removed to a depth of 1 foot below and from all sides of the pipe or structure. Storm drain manholes and Type C (Slope) catch basins shall conform to Agawam Construction Standards 202.2.1 and 201.3.1 respectively. Precast concrete catch basin tops shall be as manufactured by New England Precast Concrete, Agawam, MA; Arrow Concrete Products, Inc., Granby, CT; or approved equal. Cement concrete brick for inverts and adjusting frames and covers shall conform to Massachusetts Standard Specifications M4.05.0. Manhole frames and covers shall be Type A conforming to Massachusetts Construction Standards 202.6.0 and 202.8.0 and shall have the word "DRAIN" imprinted in 3 inch high letters on the cover. Class A cement concrete masonry and steel reinforcement work shall conform to Section 901 of the Massachusetts Standard Specifications. Headwalls shall be constructed to the designs and dimensions indicated on the definitive Plans, and as directed to close conformity with the lines and grades established by the Town Engineer. Headwalls shall be built in accordance with Massachusetts Construction Standards 206.4.0 or 206.6.0. Rip-rap, channel paving and stone for pipe ends shall consist of fumishing and installing uniformly placed stonework at the lines and grades shown on the Definitive Plans, in accordance with Section 258 and 983 of the Massachusetts Standard Specifications. Stone shall conform to M2.02.3 with the exception that rounded nobbles meeting the weight specifications may be used with the approval of the Town Engineer. D. Water. Install 8-inch Class 52 cement lined ductile iron water mains, or larger as shown on the Definitive Plans. Ductile iron pipe shall conform to Massachusetts Standard Specifications M5.05.3, Class 52. Joints shall be bell and spigot elastomeric gasket rings conforming to ANSI Specification A21.11. Standard laying lengths shall not exceed 20 feet. Ductile iron pipe shall be polyethylene encased in accordance with ASTM Specification A674. Hydrants shall be Protectop Type S as manufactured by A.P. Smith Manufacturing Co., East Orange, NJ; or approved equal. Hydrants shall have a 5-inch main valve seat, a bury length of 5.5 feet minimum, or as required for each individual installation, and shall be furnished with two (2) 2 1/2 inch hose nozzles. One (1) additional 4 1/2 inch steamer nozzle shall be furnished on the hydrant when deemed necessary by the Town Engineer. A Page 3 hydrant tee and valve shall open left, counterclockwise. Gate valves shall be New York Metropolitan Standard meeting the requirements of AWWA Specification C500, and shall have mechanical joint ends. Valve boxes shall be 4 1/2 inch diameter and the cover shall include the word "WATER" cast in the top. Corporations shall be New England Standard and shall be Mueller H-15002, Ford F-600NE, or approved equal. Curb stops shall be New England Standard and shall be Mueller H-15212, Ford Z22-333 SW, or approved equal. Type K copper tubing for water services shall be a minimum of 3/4 inch diameter. Where rock is encountered it shall be removed to a depth of 1 foot below the bottom of the pipe. Only granular material approved by the Town Engineer shall be used as backfill in any trench excavation. E. Sidewalks and Treebelts: The DEVELOPER shall construct sidewalks on both sides of the roadway of such width as is shown on the Definitive Plans. The gravel subbase and base courses shall consist of a 6 inch gravel subbase and 2 inch processed gravel base conforming to Massachusetts Standard Specifications M1.03.0 Type b, and M1.03.1 respectively, and said courses shall be wider by 3 inches on both sides than the bituminous surface. The bituminous concrete sidewalk surface shall be 2 inches thick laid in two (2) courses 1 inch each, and shall conform to the applicable requirements of Section 701 of the Massachusetts Standard specifications. Treebelts shall be constructed on both sides of the roadway to the width indicated on the Definitive Plans. Loam meeting the requirements of Massachusetts Standard Specifications M1.05.0 shall be placed to a minimum compacted depth of 6 inches. The DEVELOPER shall submit samples of the loam to the Town Engineer for analysis and determination of the amount of lime and fertilizer required. The work shall conform to Section 760 of the Massachusetts Standard Specifications, and the grass seed shall meet the requirements of M6.03.0. A copy of the seed certificate shall be submitted to the Town Engineer. The treebelts shall be watered, reworked, and reseeded as necessary to develop a satisfactory stand of grass. F. Utilities: Street lights shall be installed by the DEVELOPER at his expense and he shall be responsible for the cost of lighting until the street is accepted by the TOWN. Street lights shall be the type adopted by the Utility Committee of the Town Council. All underground utilities and service connections shall be installed prior to the construction of the roadway surface. G. Inspection: The DEVELOPER shall notify the Department of Public Works of the TOWN at least forty-eight(48) hours in advance of the time when he plans to begin or resume work on any of the improvements required by this Agreement. The TOWN will charge the DEVELOPER at the hourly rate established by the Department of PUblic Works for inspecting the work. No work will be accepted by the TOWN which has not been inspected on a daily basis during its progress. The presence of an inspector shall in no way relieves the DEVELOPER from full responsibility for completing the required work and providing the workmanship and materials specified. H. Shade Trees: On each lot two (2)shade trees shall be planted within twenty (20) feet from the street line and located so as not to conflict with underground utilities and sight distances. At the descretion of the Tree Warden,the shade trees may be planted on the treebelt within the street layout. Trees shall be 2 1/2 inches minimum in diameter, balled, burlaped, native and hardy species as approved by the Planning Board, and shall be planted subject to the direction of the Tree Warden. The DEVELOPER shall guarantee for one (1)full year that the trees remain alive and healthy, I. Cleadna and Grading. Clear and grade the site as shown on the Definitive Plans. All areas not to be paved which are disturbed by the DEVELOPER shall be limed, fertilized, seeded, mulched, watered, reworked and reseeded as necessary until a satisfactory stand of grass takes hold to prevent erosion. Any worts performed on the banks of streams, drainage ditches or swales shall receive priority. Mulching and seeding for erosion control shall conform to Section 767 of the Massachusetts Standard Specifications. Seed for erosion control shall meet the requirements of M6.03.1. Page 4 Where indicated on the Definitive Plans or deemed necessary by the Town Engineer to prevent erosion, haybales shall be placed. Hay bales shall meet the requirements of M6.04.1 and shall weigh at least 50 pounds each. Hay bales shall be placed in uniform rows and secured to at least two (2)2"x 2"x 36"stakes driven into the ground to prevent overtuming, floatation, or displacement. Any deposited sediment that collects at the hay bale structures shall be removed periodically as directed by the Town Engineer. Lightweight paper netting shall be applied on slopes steeper than 3.1 and on seeded areas shown on the Definitive Plans or as directed by the Town Engineer. The netting shall be secured to the ground with 1"x 1"x 12"stakes spaced no more than 6 feet apart to prevent it from blowing or washing away. The netting shall be removed when and as directed by the Town Engineer. J. Loam orTomoil: No loam ortopsoil shall be removed from the subdivision until all work is completed, and then only with a special permit from the Board of Appeals as required by Section 20-8(g) of the Town Code. K. Excavations: All excavations within the street layout, and to dwellings shall be barricaded, protected, lighted at proper times, and promptly backfilled as required by the Superintendent of Public Works and the Chief of Police. Any person not directly employed or under contract with the DEVELOPER, who wishes to excavate within the street layout must first obtain a permit from the Superintendent of Public Works as required by Section 164(a) of the Town Code. Right of entry or an appropriate utility easement must be given before a permit will be issued. L. a its: Each lot line must be clearly marked, and the lot identified by lot and street number, before the Building Inspector will make any inspections. Any sign required to be erected under an Order of Conditions issued by the Conservation Commission shall be maintained in good condition until a Certificate of Compliance is obtained by the DEVELOPER. M. Protection of Natural Features: All natural features to be preserved shall be suitably protected by the DEVELOPER during construction. The DEVELOPER shall notify the Tree Warden at least one (1)week prior to clearing of the site. No evergreen tree, shrub or tree over S inches in diameter outside the street layout and building site shall be removed without the consent of the Tree Warden. N. Cleaning Up: Before final inspection,the total area shall be cleared of debris, both natural and materials generated by construction. The particular attention of the DEVELOPER is directed to the requirement that on the day of the final inspection all paved areas must be swept and the drainage structures cleaned. O. Monuments: All monuments shown on the Definitive Plans shall be set, and their installation shall be certified by a registered land surveyor as of the date of final inspection. Monuments marking the street layout shall be granite or precast concrete bounds conforming to Massachusetts Specifications M4.04.8 or M4.06.1, set flush with finish grade. Iron pipe 1 112 inch diameter, schedule 40 galvanized, 3 feet long, may be used at lot comers, except where a granite or precast concrete bound is required for marking the street lines. P. Streel Acceptance: The DEVELOPER shall submit to the Town Engineer for review the final street layout plans and legal description suitable for recording in the Hampden County Registry of Deeds. The plans and description shall both meet the standards of the Street Acceptance Committee and the Department of Public Works, and shall be revised if required by the Street Acceptance Committee after an on-site public hearing. After completion of all of the improvements required by this Agreement, the DEVELOPER shall submit to the Town Council a Petition for Street Acceptance; and an Affidavit, releasing the TOWN from all damages which the DEVELOPER and his successors or assigns may incur by reason of acceptance of the street by the TOWN;together with the Street Acceptance Plans referred to above. Page 5 PERFORMANCE GUARANTEE: The DEVELOPER shall furnish to the Town a Performance Guarantee in the amount of$112,000 in the form of a proper bond;deposit of money,or negotiable securities;or irrevocable credit secured by the first mortgage to guarantee to the TOWN the faithful performance by the DEVELOPER within two(2)years after the date of this Agreement,or any extension thereof,of all work required herein. The DEVELOPER shall also repair,to the satisfaction of the TOWN,any damage to or failure of any completed work which may occur during the term of this Agreement. Any surety accepted by the TOWN under this 1 Agreement must satisfactorily protect the TOWNS interest,and said determination shall be made by the Town Treasurer. It is expressly understood and agreed by the parties that any and all security required under the Performance Guarantee will be applied as damages for the benefit of the TOWN for failure of the DEVELOPER to satisfactorily complete its obligation hereunder;and its is further understood and agreed by the parties that the TOWN specifically reserves its right to seek any additional damages incurred by the TOWN and not fully protected by the security under the Performance Guarantee. If the DEVELOPER fails to perform the work within the time specified and in accordance with the terms of this Agreement or,in the event that the DEVELOPER shall not satisfy all claims and demands incurred in connection with said improvements and work as herein specified,the DEVELOPER shall pay to the TOWN an amount of money which will equal the measure of damages sustained by the TOWN as a result of the failure to perform the work. The measure of damages shall be established by determining the lowest reasonable cost to complete the work unfinished plus reasonable administrative expenses,attomey's fees and legal costs incurred by the TOWN in case of breach of this Agreement by the DEVELOPER. The TOWN need not expend any funds to establish the said measure of damages,said measure of damages to be established by reasonable estimate to complete the said work plus the said administrative expenses,attorney's fees and legal costs herein mentioned. The DEVELOPER further warrants that all work done under this Agreement will be performed and completed in a workmanlike manner,and that the said work will be fit for the use intended. 1 NOTIFICATION OF COMPLETION: Upon completion of all work required herein,the DEVELOPER shall notify the TOWN,by registered mail sent to both the Town Clerk and the Planning Board,that the work is ready for final inspection with respect to the release of the Performance Guarantee. Release of the Performance Guarantee is contingent upon all work being completed in accordance with the Construction Standards and Required Improvements included herein. IN WITNESS WHEREOF,this i�n�s"ment is ex cuted in four(4) counter parts,each one of which shall be deemed an original this the /4T�1 day of /10'Lk 20 c)/ . ATTEST: DEVELOPER: 1z iVINCONN,INC. gY (witness to developer)a�ltVincen�t�6nnor,�Presid�ent&T�reasure­ A By (witness to developer) Vincent Connor,an individual ATT TOWN TOWN OF AGAWAM,MASSACHUSETTS TIAEROUIX OWN CLERK ANNING OARD DATE: J um t?_ AS FORM: JO T CO Page 7 of 8 o�� 9 Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 y D MP Tel. 413-786-0400 Fax 413-786-9927 June 28, 2001 Mr. Vincent Connor 73 Zachary Lane Agawam, MA 01001 Re: Rivers Edge Subdivision Dear Mr. Connor: Michael Chase, our inspector, found a sewer manhole casting embossed with a" made in India" indication, at your subject subdivision this week and noted that condition to Norman Pelley, your Contractor. Your approved plans clearly specify that LeBaron castings are to be used for manhole castings. During the pre - construction conference held in our office on June 5, 2001, you signed the agreement which re -stated your agreement with the conditions and manhole castings were specifically discussed. Further, the need for submitting material specification sheets was also discussed. You have not sent any material submittals, yet you have begun work on this project and stored the wrong materials on the site. Had you sent in the submittals for approval, the delay and any re - stocking charges could have been avoided. Please send all needed material specifications to us as soon as you can, since we wish to avoid any errors in installation. Please read over the pre - construction agreement so that other required materials, such as field lock gaskets ( which require tyton joints ), will be furnished expeditiously. Please note also,that concrete collars are required around castings. Si erely, c� es T. Daley, E., Town Engineer C: John Stone, DPW Supt., Deborah Dachos. OPCD Dir. s:lsubdivlriversedge_03.wpd _: s FA Town of Agawam • 36 Main Street Agawam, Massachusetts 01001-1837 Tel. 413-786-0400 Fax 413-786-9927 June 13, 2000 ATTN: Planning Board RE: Performance Bond #8086 - River Edge Estates Please be advised that the office of the Treasurer is in receipt of a letter of credit, #110/2001, drawn on Westfield Savings Bank in the amount of$112,000.00, to cover performance for the above listed performance agreement. Very Truly Yours, Laurel A. Placzek, Treasurer/Collector PB RELEASE OF COVENANT This is to certify that the Agawam Planning Board has released Lots 1 thru 6 as .shown on a Definitive Plan entitled "Rivers Edge Estates", plans drawn by D.L. Bean, Inc. and dated Jan. 28, 2000, Revised 5-15-2000. Said plans being recorded in the Hampden County Registry of Deeds, said lots being subject to the provisions of a Covenant dated November 7, 2000 given by Richard Langone to the Town of Agawam, said covenant being recorded in the Hampden County Registry of Deeds, Book , Page AGAWAM PLANNING BOARD 0 cn�' cP c.r W Hampden cc Commonwealth of Massachusetts DATED: June 7 , 2001 Then personally appeared the above named, Dennis B. Hopkins , Charles R. Calabrese , Edward Shibley, Jrmembers of the Agawam Planning Board and acknowledge the foregoing to be their free act and deed before me. Notary Public Pamela R. Kerr My Commission expires: May 29 , 2003 cc: Town Clerk Building Inspector File k • i PERFORMANCE GUARANTEE PERFORMANCE GUARANTEE SECURED MORTGAGE LOAN LETTER OF CREDIT # 110 12001 KNOW ALL MEN BY THESE PRESENTS: that Westfield Bank, having a usual place of business at 141 Elm Street, Westfield, MA. 01085, hereinafter called the LENDER; pledges irrevocable credit in the form of a letter of Irrevocable Credit dated MAY 17, 2001 in which said Letter of Irrevocable Credit hereinafter is referred to as SURETY; said SURETY to be held by and firmly bound unto the Town of Agawam, a municipal corporation having an usual place of business at 36 Main Street, Agawam, MA. 01001, after called the TOWN; in the penal sum of ONE HUNDRED AND TWELVE THOUSAND DOLLARS ($112,000.00) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind said SURETY firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas, the PRINCIPAL, VINCON INC 6itererf into a certain Performance Agreement with the Town, dated MAY 17, 2001 a copy of which isdierepp attached and made a part hereof to carry out for the completion of the subdivision known as: M RIVERS EDGE ESTATES Lots 1-thru B Barney Street s� ;,C Agawam, Massachusetts 01101 U� co to PERFORMANCE GUARANTEE cn PROVIDED FURTHER, that said LENDER hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Performance Agreement, or to the work to be performed thereunder shall in any way affect its obligation under this Irrevocable Letter of Credit, and it does hereby waive notice of any change, extension of time, alteration or addition, provided the total obligation does not exceed $112,000.00. NOW, THEREFORE, in consideration of the mutual promises, undertakings and other lawful consideration hereinafter set forth, the parties agree as follows: (1) The Lender hereby authorizes the TOWN to draw from the SURETY on written demand up to an aggregate amount of ONE HUNDRED AND TWELVE THOUSAND DOLLARS ($112,000) being conditioned that the LENDER shall make no disbursements of funds from SURETY except by written instruction of the TOWN through it's Treasurer as authorized by vote of the Planning Board. The LENDER may, from time to time, make partial releases from said SURETY to the PRINCIPAL, or directly to its contractors and subcontractors, as various improvements and work have been completed and approved by the TOWN, but only upon the written approval of the TOWN stating the sum and the party to whom said partial releases shall be advanced. (2) In the event that the TOWN shall file with the LENDER a written statement that the PRINCIPAL is, in the judgment of the TOWN, in default of the terms of said Performance Agreement, the LENDER shall make any funds undisbursed available to the TOWN as hereinafter provided, subject to paragraph below. (3) The TOWN agrees that any payments received by it from the SURETY will be expended solely for the purpose of curing any default of the PRINCIPAL of its' obligations and commitments as set forth in said Performance Agreement, plus reasonable administrative expenses, attorney's fees, interest and legal costs needed to cure such default. (4) The TOWN shall provide the PRINCIPAL under paragraph (3) above, with all information concerning the alleged breach including, but not limited to the amount of money represented by said breach, together with the details wherein the said construction of installation has not been completed. (5) This Letter of Credit is not transferable or assignable. PROVIDED FURTHER that no final settlement between the TOWN and the PRINCIPAL shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. Westfield Bank Mortgage as recorded in Hampden County Registry of Deeds Book 11645 page 332 on MAY 17, 2001 covering subject premises located as described above which will additionally secure this Letter of Credit. IN WITNESS WHEREOF, this instrument is executed in four(4) counterparts, each one of which shall be deemed an original this day of MAY. ATT ST: PRIN I L: BY: ' Vincent M. Connor, President and Treasurer BY: ( ) eel�� Viaiz�ent M. Connor, Individually ATT T: LENDER: Westfield Bank Mark W. Baran, it's Duly Authorized Vice President ATT TOWN: To :fA awam,,,MMassachusetts Planning Board G BY• � ` 11/ Witness t lanning Board as m: DATE: June 7 , 2001 DATE: By: To n Treasurer MEMO TO: Attorney Thomas S. Locke, Town Solicitor FROM: Planning Board DATE: May 24, 2001 SUBJECT: Letter of Credit- Rivers Edge Estates - V. Connor Please review the attached Letter of Credit to be sure it is ready for the Board's signatures at their June 7`h meeting. Thank you. DSD:prk PERFORMANCE AGREEMENT RIVERS EDGE ESTATES LOTS I -6 INCLUSIVE THIS AGREEMENT made by and between Richard Langone . an individual, hereinafer called the DEVELOPER, having a astral place of business at 61 Mark Drive. Agawam. Massachusetts and the Town of Agawam,Massachusetts, a municipal corporation haying a usual place of business at 36 Main Street. Agawam,Massachusetts 01001 acting through its Planning Board, hereinafter called the TOWN: witnesselh: WHEREAS. the DEVELOPER desires to carry otrl the development of lots 1 Ihnr 6 inckrsive as shown on a set of definitive plans recorded in the Hampden County Registry of Deeds as indicated below: RIVERS EDGE ESTATES "DEFINITIVE" SUBDIVISION OF PROPERTY AGAWAM, MASSACHUSETTS FOR: RICHARD LANGONE,61 MARK DRIVE. AGAWAM. MASS, PREPARED BY D.L. BEAN. INC. DATE: JAN, 28. 2000. REVISED 5-I5-2000 SCALE I" =40' HCRD BOOK PAGE AND WHEREAS. on May 18. 2000 lite PLANNING BOARD of the TOWN endorsed plans entitled: RIVERS EDGE ESTATES "DEF[NITIVE" SUBDIVISION OF PROPERTY FOR: RICHARD LANGONE PREPARED BY D.L. BEAN. INC. DATE: JAN. 28. 2001). REVISED 5-15-2000 SCALE I"=40' NOW, THEREFORE. in consideration of the approval of the definitive Plans by said TOWN. providing for the constnrction of ways, clearing, grading and installation of municipal services to the above rnenlion.d lots: fire DEVELOPER hereby agrees to perform the required improvements in accordance with the "Rules and Regulations of the Planning Board as it Refers to Subdivision Control". as arttcnded, and to constnrct lire following items of work in a manner salisfactorzy to the TOWN: CONSTRUCTION STANDARDS AND REQUIRED iMPROVFMENTS: Section V of"Rules and Regulations of the Planning Board as it Refers to Subdivision Control", amended March 7. 1974. is hereby supplemented by the following descriptions. modifications. additions and deletions. These Construction Standards and Required inrproremcnts shall prevail over those published in Section Vaud the Definitive Plans only where there is a discrepancy, and where the Town Engineer determines that these Constnretion Standards arc more stringent. Wherever the Icrtn "Massachusetts Standard Specifications" is used it shall refer to "Tile Commonwealth of Massachusetts Deparlment of Public Works Standard Specification for Highways and Bridges". 1973 ed.. including the latest Supplemental Specifications. The term "Town Engineer" shall mean the Agawam Town Engineer,acting directly or through in authorized representative,such representative acting within the scope of the particular duties entrusted to hire. The DEVELOPER shall noli(y the TOWN through its Department of Public Works in writing at least forty-eight (48) hours in advance of the time when he plans to begin work on any of the improvements regnired by this Agreement. Failure on the part of Ilse DEVELOPER to provide such notification shall be cause for the TOWN to require the DEVELOPER io excavate mid reconsirttct the improvcments as necessary in order to insure that the work has been done in a satisfaclory manner. A. Street and Roadway: The entire area within the street layout shall be cleared of all stumps, brush, roots, boulders, debris and all trees not intended for preservation. All loam, clay, peat and other unsuitable material encountered within the layout shall be excavated and replaced with granular material conforming to Massachusetts Standard Specifications M1.01.0 to a depth of 4 feet below the subgrade. Install subdrains where the seasonal high groundwater elevation is within 4 feet of the proposed roadway surface. Subdrain sizes and locations shall be subject to the approval of the Town Engineer and shall be installed wherever necessary in the opinion of the Town Engineer. Subdrains shall conform to Massachusetts Construction Standards 209.1.1. All rock encountered within the street layout shall be excavated and replaced with granular material conforming to Massachusetts Standard Specifications M1.01.0 to such a depth of 4 feet below the subgrade. Before placing any subbase or base materials, the entire subgrade area shall be fine graded and compacted to not less than 90 percent of maximum dry density as determined by AASTHO Test Designation T99 Compaction Test Method C. Special Borrow for subbase shall conform to Massachusetts Standard Specifications M2.01.1. Subbase and base courses shall be fine graded and compacted to not less than 95 percent of maximum dry density in accordance with Section 401 and Section 405 of the Massachusetts Standard Specifications. The DEVELOPER shall be responsible for reimbursing the TOWN for the cost of all soils testing. The roadway surface shall be Class I Bituminous Concrete Type 1-1 applied in Two (2) courses in accordance with Section 460 of the Massachusetts Standard Specifications. The top course shall not be applied until one (1)winter season has passed since the completion of all underground work within the subgrade area. Only the roadway designs or alternatives shown on the Defintive Plans shall be constrculed. Bituminous concrete curb conforming to Massachusetts Construction Standard 106.2.0, Type 2 shall be installed on both sides of the roadway. Granite curbing shall be installed along the arc of the curve at intersections. Type SA edging shall be used on Places and Lanes, and Type VA vertical curb shall be used on Sub-Collectors and Collectors, unless otherwise directed by the Town Engineer. B. Sanitary Sewers: Submit an "Application for Permit for Extension of Sewerage System"to the Superintendent of Public Works for his recommendation to the Director of the Massachusetts Division of Water Pollution Control. After receipt of a Sewerage Extension Permit, pay all fees and deposits, and apply for a connection to the public sewer. Install asbestos-cement, PVC or approved equal sewer pipe and fittings conforming to Massachusetts Standard Specifications M5.02.7, of the size, class and at the lines and grades shown on the Definitive Plans. The minimum design flexure strength of asbestos-cement sewer pipe shall be class 2400 for sizes 4 and 6 inch diameters and class 3300 for sizes 8 through 12 inch diameter. The minimum PVC sewer pipe class shall be SDR 35, however, special bedding will be required. Building sewer connections shall be at least 4 inch diameter laid at 118 inch per foot pitch minimum, and shall be separated from the water services by at least 10 feet horizontally. Building sewer connections shall not be made directly into manholes. Long sweep elbows shall be used for all bends 11 112 degrees or greater. A cleanout shall be installed no further than 20 feet upstream of any 45 degree or 90 degree bend. No foundation drains or roof leaders shall be connected to the sanitary sewers. Bedding shall conform to Subsection 230.61, and backfilling shall meet the requirements of Subsections 120.60B, 150.60 and 150.64 of the Massachusetts Standard Specifications. A special bedding of sand borrow conforming to M1.04.0 Type shall be well compacted around all PVC sewer pipe a minimum distance of 1 foot. Where the bottom of the trench is, in the opinion of the Town Engineer, found to be unstable, the DEVELOPER shall excavate the unsuitable material to the width and depth ordered by the Town Engineer, and shall replace all unsuitable materials, as directed, with a well compacted foundation consisting of granular material conforming to 101.02.0 (maximum stone size of 2 inches) or crushed stone conforming to M2.01.1 of the Massachusetts Standard Specifications. Where rock is encountered it shall be removed to a depth of 1 foot below and from all sides of the pipe or structure. Precast concrete sewer manholes shall conform to Agawam Construction Standard 202.4.1 and shall be installed in accordance with Section 201 of the Massachusetts Standard Specifications. Pipe connections to manholes shall be made with a flexible rubber boot and shall be cast in a 6 inch concrete collar. Inverts shall be brick conforming to Massachusetts Stand Specifications M4.05.1. Preformed bituminous joint filler shall conform to M3.05.3 and cement concrete brick for adjusting frames and covers shall conform to M4.05.0 of the Page 2 Massachusetts Standard Specifications. Type A frames and covers shall conform to Massachusetts Construction Standards 202.6.0 and 202.8.0, and shall have the word "SEWER" imprinted in 3 inch high letters on the cover. The DEVELOPER shall furnish the labor and equipment, test plugs, gauges and appurtenances necessary for air testing all sanitary sewer pipes. If leakage of air at 4 psi exceeds 0.15 CFM per sugare foot in any section of pipe, as determined by the Town Engineer, the DEVELOPER shall locate the leaks and repair them at his own expense. In no event shall the total infiltration or exfiltration including manholes, exceed the equivalent of 100 gallons per 24 hours per inch diameter per mile of sewer main, in any section of the sewer systern, as determined by the Town Engineer. C. Drainage: If any storm drains are to be connected to the TOWN drainage system, the DEVELOPER shall apply to the Superintendent of Public Works for a permit to connect to the public storm drains, and pay all fees and deposits required. Install reinforced concrete storm drain pipe conforming to Massachusetts Standard Specifications M5.01.1, of the size, class and at the lines and grades shown on the Definitive Plans. Storm drain connections to foundation drains and roof leaders shall be installed as shown on the Definitive Plans, and shall be at least 4 inch diameter laid at 118 inch per foot minimum pitch. The minimum flexure strength of 4 and 6 inch diameter asbestos cement pipe shall be class 2000 D. The minimum PVC pipe class for storm drain connections shall be SDR 41, however, special bedding will be required. Bedding shall conform to Subsection 230.61, and back-filling shall meet the requirements of Subsections 120.608, 150.60 and 150.64 of the Massachusetts Standard Specifications. A special bedding of sand borrow conforming to M1.04.0 Type b shall be well compacted around all PVC drain pipe a minimum distance of 1 foot. Where the bottom of the trench is, in the opinion of the Town Engineer, found to be unstable, the DEVELOPER shall excavate the unsuitable material to the width and depth ordered by the Town Engineer, and shall replace all unsuitable materials, as directed, with a well compacted foundation consisting of granular material conforming to M1.02.0 (maximum stone size of 2 inches) or crushed stone conforming to M2.01.1 of the Massachusetts Standard Specifications. Where rock is encountered it shall be removed to a depth of 1 foot below and from all sides of the pipe or structure. Storm drain manholes and Type C. (Slope) catch basins shall conform to Agawam Construction Standards 202.2.1 and 201.3.1 respectively. Precast concrete catch basin tops shall be as manufactured by New England Precast Concrete, Agawam, MA; Arrow Concrete Products, inc., Granby, CT; or approved equal. Cement concrete brick for inverts and adjusting frames and covers shall conform to Massachusetts Standard Specifications M4.05.0. Manhole frames and covers shall be Type A conforming to Massachusetts Construction Standards 202.6.0 and 202.8.0 and shall have the word "DRAIN" imprinted in 3 inch high letters on the cover. Class A cement concrete masonry and steel reinforcement work shall conform to Section 901 of the Massachusetts Standard Specifications. Headwalls shall be constructed to the designs and dimensions indicated on the definitive Plans, and as directed to close conformity with the lines and grades established by the Town Engineer. Headwalls shall be built in accordance with Massachusetts Construction Standards 206.4.0 or 206.6.0. Rip-rap, channel paving and stone for pipe ends shall consist of furnishing and installing uniformly placed stonework at the lines and grades shown on the Definitive Plans, in accordance with Section 258 and 983 of the Massachusetts Standard Specifications. Stone shall conform to M2.02.3 with the exception that rounded cobbles meeting the weight specifications may be used with the approval of the Town Engineer. D. Water: Install 8-inch Class 52 cement lined ductile iron water mains, or larger as shown on the Definitive Plans. Ductile iron pipe shall conform to Massachusetts Standard Specifications M5.05.3, Class 52. Joints shall be bell and spigot elastomeric gasket rings conforming to ANSI Specification A21.11. Standard laying lengths shall not exceed 20 feel. Ductile iron pipe shall be polyethylene encased in accordance with ASTM Specification A674. Hydrants shall be Protectop Type S as manufactured by A.P. Smith Manufacturing Co., East Orange, NJ; or approved equal. Hydrants shall have a 5-inch main valve seat, a bury length of 5.5 feet minimum, or as required for each individual installation, and shall be furnished with two (2) 2 1/2 inch hose nozzles. One (1) additional 4 1/2 inch steamer nozzle shall be furnished on the hydrant when deemed necessary by the Town Engineer. A Page 3 hydrant tee and valve shall open left, counterclockwise. Gate valves shall be New York Metropolitan Standard meeting the requirements of AWWA Specification C500, and shall have mechanical joint ends. Valve boxes shall be 4 112 inch diameter and the cover shall include the word "WATER" cast in the top. Corporations shall be New England Standard and shall be Mueller H-15002, Ford F-BOONE, or approved equal. Curb stops shall be New England Standard and shall be Mueller H-15212, Ford Z22-333 SW, or approved equal. Type K copper tubing for water services shall be a minimum of 314 inch diameter. Where rock is encountered it shall be removed to a depth of 1 foot below the bottom of the pipe. Only granular material approved by the Town Engineer shall be used as backfill in any trench excavation. E. Sidewalks and Treebelts: The DEVELOPER shall construct sidewalks on both sides of the roadway of such width as is shown on the Definitive Plans. The gravel subbase and base courses shall consist of a 6 inch gravel subbase and 2 inch processed gravel base conforming to Massachusetts Standard Specifications M1.03.0 Type b, and M1.03.1 respectively, and said courses shall be wider by 3 inches on both sides than the bituminous surface. The bituminous concrete sidewalk surface shall be 2 inches thick laid in two (2) courses 1 inch each, and shall conform to the applicable requirements of Section 701 of the Massachusetts Standard specifications. Treebelts shall be constructed on both sides of the roadway to the width indicated on the Definitive Plans. Loam meeting the requirements of Massachusetts Standard Specifications M1.05.0 shall be placed to a minimum compacted depth of 6 inches. The DEVELOPER shall submit samples of the loam to the Town Engineer for analysis and determination of the amount of lime and fertilizer required. The work shall conform to Section 760 of the Massachusetts Standard Specifications, and the grass seed shall meet the requirements of M6.03.0. A copy of the seed certificate shall be submitted to the Town Engineer. The treebelts shall be watered, reworked, and reseeded as necessary to develop a satisfactory stand of grass. F. U ilities: Street lights shall be installed by the DEVELOPER at his expense and he shall be responsible for the cost of lighting until the street is accepted by the TOWN. Street lights shall be the type adopted by the Utility Committee of the Town Council. All underground utilities and service connections shall be installed prior to the construction of the roadway surface. G. Inspection: The DEVELOPER shall notify the Department of Public Works of the TOWN at least forty-eight (48) hours in advance of the time when he plans to begin or resume work on any of the improvements required by this Agreement. The TOWN will charge the DEVELOPER at the hourly rate established by the Department of PUblic Works for inspecting the work. No work will be accepted by the TOWN which has not been inspected on a daily basis during its progress. The presence of an inspector shall in no way relieves the DEVELOPER from full responsibility for completing the required work and providing the workmanship and materials specified. H. gihade Trees: On each lot two (2) shade trees shall be planted within twenty (20) feet from the street line and located so as not to conflict with underground utilities and sight distances. At the descretion of the Tree Warden, the shade trees may be planted on the treebelt within the street layout. Trees shall be 2 112 inches minimum in diameter, balled, burlaped, native and hardy species as approved by the Planning Board, and shall be planted subject to the direction of the Tree Warden. The DEVELOPER shall guarantee for one (1) full year that the trees remain alive and healthy. I. Clearing and Grading: Clear and grade the site as shown on the Definitive Plans. All areas not to be paved which are disturbed by the DEVELOPER shall be limed, fertilized, seeded, mulched, watered, reworked and reseeded as necessary until a satisfactory stand of grass takes hold to prevent erosion. Any work performed on the banks of streams, drainage ditches or swales shall receive priority. Mulching and seeding for erosion control shall conform to Section 767 of the Massachusetts Standard Specifications. Seed for erosion control shall meet the requirements of M6.03.1. Page 4 Where indicated on the Definitive Plans or deemed necessary by the Town Engineer to prevent erosion, haybales shall be placed. Hay bales shall meet the requirements of M6.04.1 and shall weigh at least 50 pounds each. Hay bales shall be placed in uniform rows and secured to at least two (2) 2" x 2"x 36"stakes driven into the ground to prevent overturning, floatation, or displacement. Any deposited sediment that collects at the hay bale structures shall be removed periodically as directed by the Town Engineer. Lightweight paper netting shall be applied on slopes steeper than 3:1 and on seeded areas shown on the Definitive Plans or as directed by the Town Engineer. The netting shall be secured to the ground with 1"x 1" x 12" stakes spaced no more than 6 feet apart to prevent it from blowing or washing away. The netting shall be removed when and as directed by the Town Engineer. J. Loam or Topsoil: No loam or topsoil shall be removed from the subdivision until all work is completed, and then only with a special permit from the Board of Appeals as required by Section 20-8(g) of the Town Code. K. Excavations: All excavations within the street layout, and to dwellings shall be barricaded, protected, lighted at proper times, and promptly backfilled as required by the Superintendent of Public Works and the Chief of Police. Any person not directly employed or under contract with the DEVELOPER, who wishes to excavate within the street layout must first obtain a permit from the Superintendent of Public Works as required by Section 16-4(a) of the Town Code. Right of entry or an appropriate utility easement must be given before a permit will be issued. L. Permits: Each lot line must be clearly marked, and the lot identified by lot and street number, before the Building Inspector will make any inspections. Any sign required to be erected under an Order of Conditions issued by the Conservation Commission shall be maintained in good condition until a Certificate of Compliance is obtained by the DEVELOPER. M. Protection of Natural Features: All natural features to be preserved shall be suitably protected by the DEVELOPER during construction. The DEVELOPER shall notify the Tree Warden at least one (1) week prior to clearing of the site. No evergreen tree, shrub or tree over 8 inches in diameter outside the street layout and building site shall be removed without the consent of the Tree Warden. N. Cleaning p: Before final inspection, the total area shall be cleared of debris, both natural and materials generated by construction. The particular attention of the DEVELOPER is directed to the requirement that on the day of the Final inspection all paved areas must be swept and the drainage structures cleaned. O. Monuments: All monuments shown on the Definitive Plans shall be set, and their installation shall be cerlified by a registered farad surveyor as of the dale of final inspection. Monuments marking the street layout shall be granite or precast concrete bounds conforming to Massachusetts Specifications M4.04.8 or M4.06.1, set flush with finish grade. Iron pipe 1 112 inch diameter, schedule 40 galvanized, 3 feet long, may be used at lot comers, except where a granite or precast concrete bound is required for marking the street lines. P. Street Acceptance: The DEVELOPER shall submit to the Town Engineer for review the final street layout plans and legal description suitable for recording in the Hampden County Registry of Deeds. The plans and description shall both meet the standards of the Street Acceptance Committee and the Department of Public Works, and shall be revised if required by the Street Acceptance Committee after an on-site public hearing. After completion of all of the improvements required by this Agreement, the DEVELOPER shall submit to the Town Council a Petition for Street Acceptance; and an Affidavit, releasing the TOWN from all damages which the DEVELOPER and his successors or assigns may incur by reason of acceptance of the street by the TOWN; together with the Street Acceptance Plans referred to above. n Page 5 PERFORMANCE GUARANTEE, The DEVELOPER shall guarantee to the TOWN the faithful performance by the DEVELOPER within two(2)years alter the date of this Agreement,or any extension thereof, of all work required liercin. The DEVELOPER shall also repair, to the s<htisfaction of the TOWN,any damage 10 or failure of any completed work m,hich may,occur daring the term of this Agreement. If lite DEVELOPER fails to perform the work«-ithin the time specified and in accordance with the terms of this Agreement or, in the event that the DEVELOPER shall not satisfy Al claims and demands incurred in connection with said improvements and %vork as herein specified_ the DEVELOPER shall pay to the TOWN an amount of money which will equal the measure of damages sustained by the TOWN as a result of the failure to perform the%vork. The measure of darnagccs shall be established by determining the lowest reasonable cost to complete the work uufrnished phis reasonable administrative expenses,attorney"s fees and legal costs incurred by the TOWN in case of breach of this Agreement by the DEVELOPER. The TOWN need not expend any funds to establish the said measure of damages, said measure of damages to be established by reasonable estimate to complete the said%vork plus the said administrative expenses. attorneys fees and legal costs herein mentioned. The DEVELOPER further warrants That all work done under this Agreement wilt be performed and completed in a workmanlike manner,and that the said work will be fit for the use intended. NOTIFICATION OF COMPLETIQN: Upon completion of all work required herein, the DEVELOPER shall nruifv the TOWN, by registered mail sent to both the Town Clerk and the Planning Board. that the work is readY ror final inspection with respect to the release of the Performance Guarantee. Release of the Performance Guarantee is contingent ul)on all %vork being completed in accordance with the Consinrction Standards and Required huprovenrenis included herein. IN WITNESS WHEREOF. this ins rument is executed in four(4) counter parts, each anc of which shall be deemed an original this Ilhc day of Q fvB( 2000. ATTEST: DEVELOPER RICHARD LANGONE By (witness to developer) Richard LangoAc. an indiv' I TOWN TOWN OF AGAWAM. MASSACHUSETTS H M.THER UX TOWN CLERK P NI G BOAR 7� DATI : ROVED S M: TOW NSEL Page 7 I UWILi C-LLi(A �] r16L planning 1.0,oard TO:. Town Treasurer '01-FEB -2 AM ID 44� Date 2-1-01 Subject : Performance Bond File No. 80866 At an officially called and posted meeting held on 2-1-01 the Planning Board .voted .4-0 in favor of setting $ 112 , 000' as the amoubt required to be filed -with- the Town Treasurer to cover performance for a period of two years by developer otherwise known as Vincent Connor for project known as Rivers Edge Estates This is to cover. lots # 1 thru 6 Barney Street The Board reserves the right to. r o mounte;e t the app de.SiXes/ o post securi Planning Board Chairman 1--59-7/74-200 0 0 TOWN OF AGAWAM �O! _ 9 MEMORANDUM ��R�o May To: Planning Board CC: MCC, File From: Engineering Date: February 1, 2001 Subject: Bond Estimate - River's Edge Estates - Barney Street Per your request, we have completed the bond estimate for River's Edge Estates. The value of uncompleted work is $112,000 (one hundred twelve thousand dollars). If you have any questions, please do not hesitate to contact our division. Sincerely, Sincerely, Q ames T. Daley, P.E. Michael C. Chase, E.I.T. Town Engineer Civil Engineer I FEB Elai"sNGIN61iRISU13D1 Vlriversed�e_O1.wpd MEMO TO: Engineering Department FROM: Planning Board DATE: January 17, 2001 SUBJECT: Bond Setting - Rivers Edge Estates - Barney Street Please prepare a bond estimate for the Rivers Edge Estates subdivision prior to the Board's February I" meeting. Thank you. DSD:prk l � � kiAL G } i 0 TOWN OF AGAWAM INTEROFFICE yc� MEMORANDUM 0 MPy To: Planning Board CC: Mitchell T. Allen, File .z £ f h From: Engineering Date: November 15, 2000 Rol Subject: Easements - River Edge Estates - Barney Street - Lan n�, - y Per your request dated November 7, 2000 we reviewed the submitted easements for River's Edge Estates. We have the following comments: 1. To reduce confusion, easements should not all be labeled as Exhibit "A". We suggest Exhibit "A", Exhibit "B" and Exhibit "C". 2. The following correction for the drainage easement on Lot 6 should be made (the drainage easement description labeled exhibit "A"). Sentence reads, " thence running S77°-35'- 52"E a distance to s0.00 feet to a point." The sentence should read, " thence running S77°-35'-52"E a distance of 20.00 feet to a point." We would like to make the following reminders regarding this subdivision. 3 A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 4. A sewer extension permit is required by the DER If you have any questions please do not hesitate to contact our division. /Silcerely, � 0mes T. Daley, P.E. 9CiV' Enginee;r kis Town Engineer I h:lengineerlsubdivUangone_10.wpd COVENANT c n The undersigned Richard Langone, hereinafter called the "Covenantor", having submitted to the Planning Board of the Town of Agawam a definitive plan of a " . �r- subdivision entitled "Rivers Edge Estates" and particularly lots 1 thru 6 does hereby to 7 covenant and agree with said Planning Board and the successors in office of said . Board, pursuant to General Laws (Terr.Ed.) C. 41, Section 81 U, as amended that: Cn `- 1. The Covenantor is the owner of record of the premises shown on said plan. un 2. This Covenant shall run with the land and be binding upon the executors, administrators, heirs and assigns of the Covenantor, and their successors in title to the premises on said plan. 3. The construction of ways and the installation of municipal services shall be provided to serve any lots in accordance with the applicable rules and regulations of said board before such lot may be built upon or conveyed, other than by mortgage deed, provided that a mortgagee who acquires title to the mortgaged premises by foreclosure, or otherwise, and any such lot subject only to the portion of this Covenant which provides that no lot so sold shall be built upon until such ways and services have been provided to serve such lot; provided however, that prior to release of a lot or lots to be built upon or conveyed, the Board may require a deposit of money sufficient in the opinion of the Board to secure final completion of ways and services required for the lots in the subdivision, as shown on said definitive plans. 4. Nothing herein shall be deemed to prohibit a conveyance subject to this covenant by a single deed of the entire parcel of land shown on the subdivision plan of all lots not previously released by the Planning Board, without first providing such ways and services. 5. This Covenant shall take effect upon approval of said plans. 6. Reference to this covenant shall be entered upon said plans and this Covenant shall be recorded when said plan is recorded. EXECUTED AS A SEALED INSTRUMENT THIS November 7 , 2000 Date RICHARD LA ONE By2LJ_-62" Richard Langone COMMONWEALTH OF MASSACHUSETTS Hampden, ss Then personally appeared the above-named, Richard Langone jawZledd&11ore,,6,ng instrument to be the free act and deed of company May 29 , 2003 Notary Public My Commission Expires COVENANT OF LANGONE REALTY CORP. I AN CLERK OFFICE s. AS TO BUFFER STRIP �'.'riAM• M60 '00 DEC 19 AM ICE 15 Langone Realty Corp. , a duly organized Massachusetts corpora- tion with offices at 108 Front Street, West Springfield, Hampden County, Massachusetts with regard to Lots 1, 2 , and 3 of RIVERS EDGE ESTATES subdivision as shown on a plan entitled "Definitive Subdivision of Property Agawam Massachusetts" prepared by D.L. Bean, Inc. - Surveyors & Engineers dated January 28, 2000, revised 3/l/00 , 5/l/00 , 5/15/00 , which plan is to be recorded herewith, hereby covenants that Lots 1, 2, and 3 each contain a permanently protected buffer strip, as more fully set forth on said plan, specifically the page of that plan entitled Topographical Plan, and incorporated herein by reference thereto. No substantial deviation from said plan with respect to landscaping,. plantings, ground cover, or shrubbery shall be allowed in the buffer strip, and same shall be maintained in substantial and reasonable confor- mity with said plan. Other than usual and customary pruning and removal of debris, brush, and old growth, no plantings shall 'be cut, removed, or destroyed, and no construction of buildings or other structures shall be allowed in the buffer strip. This covenant runs with the land and is applicable to all successors . and assigns including purchasers of said lots. Said Lots 1, 2, and 3 being a portion of the premises conveyed to 'Langone Realty Corp— by deed of Langone Plumbing and Heating Supply, Inc. dated February 26 , 1999, said deed recorded in the Hampden County Registry of Deeds, Book 10679, Page 381, on March 9, 1999 . Executed as a sealed instrument this g clay of December, 200 . LANGONE RE TY CORP. By &� j Witness Richard/J. L gone, its President/Treasurer COMMONWEALTH OF MASSACHUSETTS $ Hampden, ss. December a, 2000 Then personally appeared the above-named RICHARD J. LANGONE and acknowledged the foregoing to be true to the best of his know- ledge and belief, before me Notary Public My commission expires: s CITY OF AGAWAM GRANT OF STORM DRAINAGE EASEMENT Langone Realty Corp . , by and through its President and Treasurer, Richard J. Langone, an entity with a usual place of business in Agawam, Hampden County, Massachusetts , for no monetary consideration, but for other good and valuable consideration, the sufficiency of which is hereby acknowledged , hereby Grant to the CITY OF AGAWAM, a municipal corporation located in the County of Hampden with its principal office at 35 Main Street , in said Agawam, Massachusetts , the following described easement for public pur- poses in Agawam, Hampden County, Massachusetts , to wit : BEING an easement for the purposes of constructing, repairing and maintaining a permanent storm drainage easement necessary for public convenience and health over a parcel herein described, said easement and right of way over said parcel to be an easement together with the right to enter with men, equipment , machinery and material to construct drainage facilities , landscape, alter grades and slopes , to move or remove any structures , together with the right to inspect , repair , maintain, and improve said storm drainage facilities , including the right to trim, and remove any and all trees and shrubbery located on the land within said easements, and do any and all other other things reasonably necessary for construction and maintenance of said storm drainage easement . SAID storm drain easement is shown on a plan entitled "Definitive Subdivision of Property, Rivers Edge Estates , Agawam, Massachusetts" , prepared by D.L. Bean, Inc . - Surveyors and Engineers dated January 28 , 2000, for Richard Langone and Revised May 15 , 2000, which plan is to be recorded herewith. The description of the land over which the said storm drainage easement is granted is more particularly bounded and described on the attached Exhibit "A" . IN WITNESS WHEREOF, the Langone Realty Corp. has caused its corporate seal to be hereto affixed and these presents to be signed, acknowledged and delivered in its name and behalf by Richard J. Langone its President/Treasurer this ay of 0C-r0,ffFA 2000. Signed and sealed in presence of LANGONE REALTY CORP. �. By _ 'f Richard J. Langon it � N President/Treasurer r IN WITNESS WHEREOF, the Planning Board of the Town of Agawam has accepted the rights conveyed hereby and has signed and acknowledged this instrument and shall cause it to be recorded with the Hampden County Registry of Deeds on behalf of the Town of Agawam, Massachusetts this 14th day of December, 2000 . TOWN OF AGAWAM (PLANNING BOARD) Charles R. Calabrese, Chairman COMMONWEALTH OF MASSACHUSETTS Hampden, ss. December 14 , 2000 Then personally appeared the above-named Charles R. Calabrese and acknowledged the foregoing instrument to be his free act and deed, and the free act and deed of the Town of Agawam, before me, Not ry Pub c My commission expires; May 29 ; 2003. dr Exhibit "A" Beginning a-t a point at the southwesterly corner of a 20 ' wide storm drain easement , said point being located in the northeasterly sideline of Barney Street at the southeasterly corner of Lot #5 and the south- westerly corner of Lot #6, thence running . Nl2-24-08E, along - the property line separating Lot 5 .& Lot #6 , a distance of 125 .13 feet to a point , thence running S77-35752E a distance to 20. 00 feet to a point, thence running S12-24-08W- a distance of 125. 00 feet to a point in the .north- easterly sideline of - Barney Street , the last two courses being through Lot #6 , thence running N77-57-34W, along the northeasterly sideline of Barney Street, a distance of 20. 00 feet to the point of beginning. r TUWN CLL13K OFFICE AGAWAM, Mass. CITY OF AGAWAM tiW GRANT OF '00 DEC 19 AM 10: 15 STORM DRAINAGE EASEMENT Langone Realty Corp. , by and through its President and Treasurer, Richard J. Langone, an entity with a usual place of business in Agawam, Hampden County, Massachusetts, for no monetary consideration, but for other good and valuable consideration, the sufficiency of which is hereby acknowledged, hereby Grant to the CITY OF AGAWAM, a municipal corporation located in the County of Hampden with its principal office at 36 Main Street, in said Agawam, Massachusetts, the following described easement for public purposes in Agawam, Hampden County, Massachusetts, to wit: BEING an easement for the purposes of constructing, repairing and maintaining a permanent storm drainage easement necessary for public convenience and health over a parcel herein described, said easement and right of way over said parcel to be an easement togeth-er with the right to enter with men, equipment, machinery and material to construct drainage facilities, landscape, alter grades and slopes, to move or remove any structures, together with the right to inspect, repair, maintain, and improve said storm drainage facilities, includ- ing the right to trim, and remove any and all trees and shrubbery IE located on the land within said easements, and do any and all other things reasonably necessary for construction and maintenance of said storm drainage easement. SAID storm drain easement is shown on a plan entitled "Plan of Storm Drain Easement, Agawam, Massachusetts" prepared by D. L. Bean, Inc. - Surveyors and Engineers dated April 27, 1999, for Langone Realty Corp._ , which plan is recorded in the Hampden County Registry of needs in Book of Plans 317, Page 127 . The description of the land over which the said storm drainage easement is granted is more particularly bounded and described on the attached Exhibit "P," . IN WITNESS WHEREOF, the said Langone Realty Corp. has caused its corporate seal to be hereto affixed and these presents to be signed, acknowledged and delivered in its name and .behalf by Richard J. Langone its President/Treasurer this ' _ - day of 2000 . Signed and sealed in presence of LANGONE REALTY CORP. ByXQ a - Richar ango , its �t �TC-4CLL — �tE� President reasur ! IN WITNESS WHEREOF, the Planning Board -of the Town of Agawam has accepted the rights conveyed hereby and has signed and acknowledged this instrument and shall cause it to be recorded with the Hampden County Registry of Deeds on behalf of the Town of Agawam, Massachusetts this 14th day of December, 2000 . TOWN OF AGAWAM (PLANNING BOARD) 1 By Charles R. Calabrese, Chairman COMMONWEALTH OF MASSACHUSETTS Hampden, ss. December 14, 2000 Then personally appeared the above-named Charles R. Calabrese and acknowledged the foregoing instrument to be his free act .and deed, and the free act and deed of the Town of Agawam, before me, Zilv� II otary PUTTYE My commission expires: May 29 , 2003 Exhibit "B" Beginning at a point marking the southeasterly corner of a 20' wide storn drain easement, said point -being loca.ted. in the northeasterly sideline of North Alhambra Circle at the southwesterly corner of land now or formerly of John S. Korvek and the southeasterly corner of land now or formerly of Langone .Realty Corp., thence running N64-32-45W, along the northeasterly sideline of North Alhambra Circle, a distance of 20 . 00 feet to a point , thence running N25-27-15E, through land now or formerly of Langone Realty Corp. , a distance of 115 . 86 feet to a point at land now or formerly of Langone Plumbing and Heating Supply Inc . , thence running S66-07-15E, along land now or formerly of Langone Plumbing and Heating Supply Inc . , a distance of 20. 01 feet to a point marking the northeasterly corner of land now or formerly of Langone Realty Corp . and the northwesterly corner of land now or formerly of John S. Korvek, thence running S25-27-15W, along the property line separating land now or formerly of Langone Realty Corp. and land * now or formerly of John S. Korvek, a distance of 116 . 41 feet to the point of beginning. r CITY OF AGAWAM GRANT OF STORM DRAINAGE EASEMENT Langone Realty Corp . , by and through its . President and Treasurer , Richard J. Langone , an entity with a usual place of business in Agawam, Hampden County, Massachusetts , for no monetary consideration, but for other good and valuable consideration, the sufficiency of which is hereby acknowledged, hereby Grant to the CITY OF AGAWAM, a municipal corporation located in the County of Hampden with its principal office at 36 Main Street , in said Agawam, Massachusetts , the following described easement for public pur- poses in Agawam, Hampden County, Massachusetts , to wit : BEING an easement for the purposes of constructing , repairing and maintaining a permanent storm drainage easement necessary for public convenience and health over a parcel herein described , said easement and right of way over said parcel to be an easement together with the right to enter with men, equipment , machinery and material to construct drainage facilities , landscape , alter grades and slopes , to move or remove any structures , together with the right to inspect , repair , maintain, and improve said storm drainage facilities , including the right to trim, and remove any and all trees and shrubbery located on the land within said easements , and do any and all other , things reasonably necessary for construction and maintenance of said storm drainage easement ., SAID storm drain easement is shown on a plan entitled "Definitive Subdivision of Property, Rivers Edge Estates , Agawam, Massachusetts ' , prepared by D . L. Bean, Inc . - Surveyors and Engineers dated January 28 , 2000, for Richard Langone and Revised May 15 , 2000, which plan is to be recorded herewith. The description of the land over which the said storm drainage easement is granted is more particularly bounded and described on the attached Exhibit "C" . IN WITNESS WHEREOF, the Langone Realty Corp. has caused its corporate seal to be hereto affixed and these presents to be signed , acknowledged and delivered in its name and behalf by Richard J. Langone its President/Treasurer this 162 day of OC;70134ER , 2000. Signed and sealed in presence of :LANGONE REALTY CORP. Richard J Lango , its iTCtf�LC AL 4,C- ( President Treasu r IN WITNESS WHEREOF, the Planning Board of the Town of Agawam has accepted the rights conveyed hereby and has signed and acknowledged this instrument and shall cause it to be recorded with the Hampden County Registry 'of Deeds on behalf of the Town of Agawam, Massachusetts- this 14th day of December, 2000 . TOWN OF AGAWAM (PLANNING BOARD) B Y Charles R. Calabrese, Chairman COMMONWEALTH OF MASSACHUSETTS Hampden, ss. December 14 , 2000 Then personally appeared the above-named Charles R. Calabrese and acknowledged the foregoing instrument to be his free act and deed, and the free act and deed of the Town of Agawam, before me, JL Notary blic My commission expires: May 29 , 2003 Exhibit "C" Beginning at a point at the northwesterly corner of a 30 ' wide storm drain easement , said point being located in the southwesterly sideline of Barney Street , and also located N77-57-34.W a distance of 15 . 12 feet from a point marking the northwesterly corner of lot #1 and the north- easterly corner of Lot #2 , thence running S77-57-34E, along the south- westerly sideline of Barney Street , a distance of 30. 24 feet to a point , thence running S4-47-10W, through Lot #1 , a distance of 151 . 38 feet to a point at land now or formerly of Langone Realty Corp . , thence running N78-04-44W, along the property line separating land now or formerly of Langone Realty Corp . and Lots #1 & #2 , a distance of 30 . 24 feet to a point , thence running N4-47-10E, through Lot #2 , a distance of 151 . 44 feet to the point of beginning r Law Office Of MITCHELL T. ALLEN Attorney 276 BELMONT AVE. SPRINGFIELD, MASS.01108 TEL: (413)737-0066 FAX: (413)737-3907 December 11, 2000 t DEC 1 2 2098 Town of Agawam P:.ANN ING BOARD .';36 ruin Street PLAN Agawam, MA 01001-1837 Attn: Pam Kerr Re: Richard Langone/Rivers Edge Estates Dear Pam: Enclosed for recording please find original Covenant as to Buffer Strip, and three (3) Storm Drainage Easements, all executed by Mr. Langone and witnessed by me. Thank you for your time and attention in this matter. Very truly yours, Mitchell T. Allen MTA/min Encls. MEMO TO: Attorney Thomas S. Locke FROM: Planning Board DATE: November 15, 2000 SUBJECT: Buffer Covenant -Rivers Edge Estates- Langone Please review and comment on the attached Buffer Covenant for the Rivers Edge Estates subdivision. The easements for this subdivision were sent to you on November 7' for your review. The Board would like your comments or approval prior to their December 7te meeting. Thank you. DSD:prk Law Office Of -: MITCHELL T. ALLEN Attorney z76 BE-V0NT AYE. • SPPINGF=,Kass:01108 TEL (413)737-0066 FAX (413)737-3907 FACSIMILE/TELECDPIER TRANSMISSION COVER SKEET DATE: November 13 , 2000 smm TO: Planning Dept. - Agawam (Firm Name, if any) A,TTN: PAM KE RR PAX No. . 786 9927 (1zcludinc� area code) x recu_xer NO . PACES .- 2 (Tncludinc cover sheet) Dear Pam: Please find following my proposed covenant re: Richard Langone ' s buffer strip, which I believe will meet the town' s requirements . Please advise after review. Mitchell T . Allen SENDER .. LAW OFFICE OF T. ?L:. N Z=IVIDTIAL: -- .. MMAA�......, ._ Please contact the SEMER at (423) i 3 1-0066 !,maed4 ats:.y if less than t_e. rea_uired number of races arrived or a `~a.nsm;,sz cn error accur.;sd. The documents transmitted by this facsimile message may contain confidential ,and/or priv:Uered informal-on, which is intended only for the, use of the addressee used above. if you are not such addressee, any. discio sure, photocopying, distribution, or use of such document (s) or is oroh- .ited . You have received chi s =acstmile message I I n ar=cr , =lease s=ed?.atal'e notify us by telephone so that we can __range tc rat---a re such � document(s) . f TSANx Y0[f. I Od J1�38S S11S '� pSS1� Ini`d90 60 00 'E L ' L i MEMO TO: Engineering Department FROM: Planning Board DATE: November 7, 2000 SUBJECT: Easements - Rivers Edge Estates - Langone Please review and comment on the attached easements for Rivers Edge Estates. Thank you. DSD:prk MEMO TO: Attorney Thomas S. Locke FROM: Planning Board DATE: November 7, 2000 SUBJECT: Easements - Rivers Edge Estates - Langone Please review and comment on the attached easements for Rivers Edge Estates prior to the Board's November 16' meeting. Thank you. DSD:prk 0 0 TOWN OF AGAWAM �O 9 INTEROFFICE ;;; - z . ..... MEMORANDUM 0 MPy To: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: October 26, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone Per your request dated October 20, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive - Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, revised May 15, 2000, Scale 1" =40`. " The plans are ready for the board's signatures. We would like to make the following reminders: l. A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 2. All easements are to be executed and submitted to the Planning Board for its approval. 3. A sewer extension permit is required by the DER If you have any questions please do not hesitate to contact our division. j 'ncerely, mes T. Daley, P.E. Van Kaco a is own Engineer Civil E ine r I 1i:lengineerlsubdivllangone49.wpd OCT2 6 LYW MEMO TO: Engineering Department FROM: Planning Board DATE: October 20, 2000 SUBJECT: Definitive Plan -Rivers Edge Estates - Langone. Please review the attached Definitive Plan of Rivers Edge Estates for Langone to be sure it is the approved plan. We are holding the mylars in this office. Thank you. DSD:prk Town of Agawam y 36 Main Street Agawam, Massachusetts 01001-1837 c� D Mpy� Tei. 413-786-0400 Fax 413-786-9927 August 9, 2000 Atty. Mitchell T. Allen 276 Belmont Avenue Springfield, MA 01108 Re: Storm Drainage Easement-Richard Langone, Barney Street Dear Atty. Allen: I am responding to your letter, sent to Tom Locke, requesting wording that is commonly used by the Town in recording Storm Drainage Easements. Attached please find a copy of language that is commonly used by this office for filing purposes. Should you have any questions or wish to further discuss this wording, please do not hesitate to call me at the Town of Agawam, Dept. Of Planning and Community Development, 786-0400 Ext. 283. Sincerely, .0 i Deborah S. Dachos 1 Director Office of Planning and Community Development DSD:mah CITY OF AGAWAM GRANT OF STORM DRAINAGE EASEMENT individuals residing in'Agawam, Hampden County, Massachusetts, for no monetary consideration, but for other good and valuable consideration, the sufficiency of which is hereby acknowledged, hereby Grant to the CITY OF AGAWAM, a municipal corporation located in the County of Hampden with its principal office at 36 Main Street, in said Agawam, Massachusetts, the following described easement for public purposes in Agawam, Hampden County, Massachusetts, to wit: BEING an easement for the purposes of constructing, repairing and maintaining a permanent storm drainage easement necessary for public convenience and health over a parcel herein described, said easement and right of way over said parcel to be an easement,together with the right to enter with men, equipment, machinery and material to construct drainage facilities, landscape, alter grades and slopes, to move or remove any structures, together with the right to inspect, repair, maintain, and improve said storm drainage facilities, including the right to trim, and remove any and all trees and shrubbery located on the land within said easements, and do any and all other things reasonably necessary for construction and maintenance of said storm drainage.easement. SAID storm drainage easement is shown on Lots Y on a plan entitled "Definitive Subdivision of Property, Agawam, Massachusetts for.' dated 2000 , which plan is recorded in the. Hampden County Registry of Deeds in Book of Plans , Page The description of the land over which the said storm drainage easement is granted is more particularly bounded and described on the attached Exhibit "A". ` 41 INTEROFFICE MEMORANDUM To: Debbie Dachos From: Law Department Date: August 2, 2000 Re: "Spite" strip for a subdivision on Barney Street Attached is a copy of a letter from Attorney Mitchell T. Allen and a copy of the plan of the storm drain easement. Tom had asked me to forward this information to you for your response. Thank you, Christina Cc: Jack Stone .L. :J D 6 pub 'II �VI i �V I I Law Office Of MITCHELL T. ALLEN Attorney 276 BELMONT AVE. SPRINGFIELD,MASS:01108 E TEL: (413)737-0066 FAX. (413)737-3907 I July 25, 2000 Thomas Locke, Esquire 430 Main Street Agawam, MA 01001 Dear Tom: jI You may recall assisting Richard Langone and this office with respect 1 to a one foot "spite" strip for a subdivision on Barney- Street. The final paperwork is now being processed by D.L. Bean, and during the course of our discussion, Dave Bean referred to a document which is required, to show the town' s legal interest in the recorded easement. Dave suggested getting the necessary language from you, and then he would do the description. ' The easement ran through land recently conveyed by Mr. Langone, and I include a copy of .the plan showing the easement. Please call at your earliest convenience so that we may discuss same further. I Very truly yours, ams - i Mitchell T. Allen MTA/run Encl. (f I i GAiYD DFI k yb 1A. LA/YGc�VE �U�►78/HG .9/�' yEAy/�YG .�`U j� lAle-. _ P a O� ter• 'A,G`��"�,�'.�' God :re ,3 i fix: �B.9:/0709 4Va3—) , NSF I. .N hts Qx I {O, \ 1� h 1 Q -- ' WAY INC r 'V ' (�-- iod as". '. .. `•d .- /<a+a9 • -� ` i 9z yS'GcJ R�so 20 v• m' uv' Lo' �;.'. 1i11If.i1'i(-}�7!TIiY i-i ;�i •+r �'? ,. �5 fl!I;:,i .�:•.., .e•:. " ' DATE rrw= ;!It.t sv>:r a rs' i:tF _•T+i:: •f THIS SURVEY&PLAN WERE PPFPlFtr0 /�t!�9N Of ,P/�J D.eq/N E�j SE/yE/11 7 Oa r�nt�ri•?tay4tl,r,:iF rttt:,::t. t•I' : ,I:.1 (`. IN ACCORDANCE WITH THE .A�•acu.SrM /slAxS,9CrSu.S6TTs * '�•t•:•,TF 3t;?r tip ;�}ia u:s: �, r M J"I-RUS TIME ;I_- -'t I PROCEDURAL&TECHNICAL STA . Fca� IM o, 'JJr _ FOR THE P TICE OF LAND SURYL Ykt/C +� "*s LA,v�n�✓E R tT vt' ' r I. +a r, EA Y CaJPP:" =�k?' r ric' 't." IN THE M Qf MASS AVID s 6/ 1JA.P�' I>iP%4E arm a AGAavAM� MASS. .t 0 DATE SCALE- �C S. Zff�Zdb 4 `+. PP/G Z7/N9CHECKED' �;. 1 CERTIFY THAT I HAVE CONrORNIFTf PLAN NO. Sf Ef TiN� WITH THE RULES A REGULATIONS .r'oF Of THE RE04STER OF .FAD I IH p EP 6 L r ❑ . L. BEAN, INC. SURVEXORO ' 40 SCHOOL-STREET : ,... ENGiN ER1 WESTFIELD, MASSACHUSETTS i i Town of Agawam � 36 Main Street Agawam, Massachusetts 01001-1837 i pq�o MPy� Tel. 413-786-0400 Fax 413-786-9927 4 May 19, 2000 m -� 7 c- Richard Langone rn ' N 61 Mark Drive -0 P` Agawam, MA 01001 c --, . Dear Mr. Langone: At its duly called meeting held on May 18, 2000, the Agawam Planning Board voted to approve the Definitive Subdivision Plan entitled: "Rivers Edge Estates, "Definitive" Subdivision of Property, Agawam, Massachusetts, For: Richard Langone, 61 Mark Drive, Agawam, Mass." prepared by D.L. Bean, Inc. and dated January 28, 2000, revised May 15, 2000 with the following conditions: 1. All easements are to be executed and submitted to the Planning Board for its approval. 2. A Performance Agreement and Covenant are to executed. 3. No additional lots can be created without amending the Definitive Plan as required in M.G.L Chapter 41, Section 81-U. 4. An original Definitive Plan with approved waivers and one full set of the entire submission is to be submitted to the Planning Board for its signatures. Also approve by the Planning Board is the waiver of Section 159-8 E (1) of the Subdivision Rules and Regulations limiting dead-end streets to 500'to allow for a street of approximately 800' as shown on the above referenced plan. The Board decision to approve this waiver was in part influenced by the fact that all but 270' of Barney Street presently exists. The Board also granted a wavier of Section 159-31 C of the Subdivision Rules and Regulations requiring an undisturbed 30' buffer strip to allow for a 15' buffer strip planted according to the approved plan. If you have any questions, please contact the Planning Office at 786-0400, extension 283. Sincerely, Dennis Hopkins, Acting Chairman Agawam Planning Board cc: Clerk, D.L. Bean, Inc., Engineering, Building, File 0 0 TOWN OF AGAWAM INTEROFFICE z oo�� MEMORANDUM 0 To: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: May 18, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone Per your request dated May 18, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive, Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, revised May 15, 2000, Scale I" =40'. " We approve the plans but the following items remain: 1. A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 2. We received calculations for the proposed leaching basin late yesterday afternoon. We are in the process of reviewing the submitted calculations. The remaining drainage issues can be resolved with the issuing of a Storm Drain Permit by the Department of Public Works. If you have any questions please do not hesitate to contact our division. Sincerely, Z'am6es T. DaIey, P.E. glEngineer annakis Town Engineer I h-.kngineeAsubdMiartgone 8.wpd MEMO TO: Engineering Department FROM: Planning Board DATE: May 18, 2000 SUBJECT: Revised Plan and Additional Information - River's Edge - Definitive Plan .Langone This office received a package of revised information concerning the River's Edge Definitive Plan for Langone. The item is on the Board's agenda for this evening. DSD:prk D. L. BEAN, INC. -- LAND CONSULTANTS 413-562-7566 Forty School Street Fax #413-562-2091 SURVEYORS Westfield, Mass. 01085 May 17, 2000 ENGINEERS Jack Stone, Superintendent Agawam Department of Public Works 36 Main Street Agawam, MA 01001 RE: "Rivers Edge Estates" - Supplemental Design for Detention Basin Dear Jack: As discussed last Friday at our meeting regarding the above referenced project, we have performed the work necessary to supplement the capacity of the storm system by incorporating a leaching structure in the Detention Basin. We accomplished this task by performing a soil examination at the proposed area on that Friday afternoon. The engineering . department sent their representative, Van Kacoyannakis, to witness the excavation to 11 feet and the soil extraction at 7 feet. The soil was delivered to the lab for a sieve analysis, and the laboratory report is included herein with our calculations. Based on the soil analysis, we have calculated the capacity of this leaching basin to accept 5.07 CFS, which is much greater than the projected run-off form the entire site for a 100 year storm event. We expect that this supplemental design will reduce the off- site flows to an acceptable level. Included herein are the following which support our design: 1 . Leaching basin design - 2 pages. 2 . Soil Report: Sieve Analysis and Gradation Curve - 2 pages. 3 . Excerpts from SCS manual - 4 pages. 4. Subdivision plans revised 5-15-00: (design highlighted) - 4 sheets. Thank you for your assistance with this project. If you have any question or concerns, please contact us. Sincerely, ,r D. L. Be , Inc. ,��►� David L. Bean, President Enclosures: as listed A't�' cc: Agawam Planning Department Agawam Engineering Department `` �i Richard Langone D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 May 17, 2000 ENGINEERS LEACHING BASIN DESIGN for DETENTION BASIN SUPPLIMENT at "RIVERS EDGE ESTATES" Barney Street, Agawam Prepared for: RICHARD LANGONE GIVEN: FROM U.S.D.A. - S.C.S. SOIL SURVEYS, THE TYPE OF SOIL ON SITE AT THE DETENTION BASIN IS "HINCKLEY" . THIS IS AN "A" GROUP SOIL WITH A VERY RAPID RATE OF PERMEABILITY. THE SOILS OBSERVED, AND ANALIZED AT ALLIED TESTING LABORATORIES, INDICATE GRAVEL AND MEDIUM COARSE SAND. UTILIZING "HAZEN' S FORMULA" FOR PERMEABILITY WHERE: D = ( 10%) PASSING SIZE OF SIEVE ANALYSIS 10 2 K = C (D } C = 1 - 1. 5 CONSTANT (USE: 1. 25 AVE. ) 10 CORRECTED FOR VISCOSITY TO 50 F. : ( x 86% ) SOIL SAMPLE #1. : D = 0. 33 10 2 K = C (D } X 86% 10 2 K = 1. 25 (0 . 33 ) X 0.86 K = 0. 117068 cm/sec. X 1 in. % 1 ft. _ 2.54 cm 12 in. K = 0.003841 FT./SEC. DESIGN LEACHING BASIN 1. EACH CELL = 10 ' X 10 ' IN SURFACE AREA WITH DEPTHS TO VARY ACCORDING TO DESIGN CAPACITIES NEEDED. 2. EACH CELL TO CONTAIN ONE PRECAST CONC. DRYWELL OF H-10 DESIGN LOADING SURROUNDED BY 3 ' MINUS DOUBLE WASHED STONE TO PROVIDE A PERVIOUS AREA. 3. VOIDS ASSUMED TO BE 35% . 4. CONSTANT HEAD PERMEABILITY ASSUMED FOR BOTTON OF LEACHING CELL. 5. HYDRAULIC GRADIENT ASSUMED TO BE THE DEPTH OF HEAD. 6 . SIDEWALLS: HYDRAULIC GRADIENT TO BE . 5 THE DEPTH OF HEAD. 7 . TOTAL PERMEABILITY VARIES WITH HEAD. SOIL SAMPLE K = 0 .003841 PERMEABILITY OF BASE: Q = KiA (i = HYDRAULIC GRADIENT) D = 61 Q = 0 . 003841 ( 61 ) ( 10 ' X 101 ) = 2. 30 CFS PERMEABILITY OF SIDES: Q = (K) (D/2) (D X 40) D = 61 Q = 0 . 003841 ( 31 ) (6 ' X 401 ) = 2 . 77 CFS TOTAL PERMEABILITY: 10 ' SQUARE X 6 ' DEEP = 2 . 30 CFS (bottom) + 2 .77 CFS (sides) = 5.07 CFS �ZH QF y�0. moo{' Lmy Gr � RIClfJ1M �, CLINK No.2M9 WAL FROM = * FAX NO. • MaL. 16 .%nnI A?: 15AM P2 ALLIED TESTING LABORATORIES, INC. 115 St. George Road . Springfield. Massachusetts 0; ;c>' Phone: (413) 736•-1816 Fax: (413) 736-1838 Report No. 29 of Soils Tests Date: 5/1 ,00 Client: D.L. Bean, Inc. Project: Quality Control Subject: Solis Tests Reported to: D.L. Bean, Inc. Herewith is submitted, results of soil test conducted on material delivered to the laboratory by client's representative on 5112/00. TEST: SIEVE ANALYSIS Lab. No. 2285 Identification: Barney St. Sieve No. Z Passing 3/4 100.0 1/2 - 94.5 3/8 92.6 4 88.0 8 84.5 16 73.9 30 34.3 50 3.6 100 0.5 200 0.2 ATTACHED: GRADATION CURVE Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Chester. V. Dawi.cki. Director of Testing Servi.ces .. wlwl��rr Ili �ilil■i�1 �� ■ • ' ■■ �■ 11111111111111,1110 ►. MINES um �1 �! ■■■ '.Ill 1■■■ ' ., 1 �I1 1■�■�11 ■■■■■ 11 RISEN 11■■� �I■■■■■■ � 1 �lilies�� llmmm lilia ■ ■� I111■ �llllit■■r11111� ■�1N�11■■ 111 • ■ ■� H 1l111m■mI 1i■ ■III■1■■■ lion M . . �s ilII11■i■� 1�i1�■■� 111 1!1■1■1■s 11 0=e■ �■ III! I1I■S■� Ill ■■ !i ��■ • ■� i �Ilimmm MINEliiiiilmmmflm Iliii■■�ilA�■■ IIIf■■■' • �■ 1 1111■■■�111�I11■■� ■M III■■ � ■ MIS li■■■' i 1\� �■ HAMPDEN COUNTY, MASSACHUSETTS, CENTRAL PART 27 HgB—Hinckley loamy sand, 3 to S percent slopes. growth is often restricted by lack of moisture. Reaction This gently sloping and undulating soil is deep and exces- ranges from extremely acid to medium acid. sively drained. It is on glacial outwash deposits. Slopes Included with this soil in mapping are areas, generally are complex and 50 to 200 feet long. Areas range from 10 smaller than 3 acres, of Carver, and Sudbury soils. In a to 100 acres in size and are irregular in shape. few places are excessively drained soils that have red or In a typical profile in a wooded area that was once cul- reddish brown colors in the profile. Included soils make tivated; the surface layer is friable, brown loamy sand up about 25 percent of this map unit. about 5 inches thick. The subsoil is loose, single grained, Most of the acreage of this soil is in scrubby woodland. brown and yellowish brown gravelly loamy sand 9 inches Some acreage is in homesites. thick. The substratum, to a depth of 60 inches, is al- This soil has poor potential for farming, woodland, and ternate layers of loose, single grained, brown sand and wildlife habitat. It has fair potential for most urban uses gravel. and poor potential for most sanitary waste disposal facili- Permeability is very rapid. Available water capacity is ties. very low. Roots grow into the loose substratum. Reaction This soil is poorly suited to cultivated crops because of ranges from extremely acid to medium acid. droughtiness. Fertilizer is leached away by rapidly per- Included with this soil in mapping are areas, generally colating water. The hazard of erosion is moderate. When smaller than 3 acres, of Carver, Windsor, and Sudbury this soil is cropped, striperopping, *minimum tillage, use of soils. In a few places are excessively drained soils that cover crops, and incorporating grasses and legumes in the have red or reddish brown colors in the profile. Included cropping system reduce the amount of runoff and control soils make up about 25 percent of this map unit. erosion. Mixing crop residue and animal manure into the Most of the acreage of this soil is scrubby woodland. plow layer maintains tilth and increases organic matter Some of it is used for homesites. content. Irrigation and frequent fertilization are also im- This soil has poor potential for farming, woodland, and portant management practices. wildlife habitat. It has good potential for most urban uses This soil is better suited for hay and pasture. Proper and poor potential for most sanitary waste disposal facili- stocking rates, deferred grazing and pasture rotation help ties. to maintain desirable plant species- This soil is poorly suited to cultivated crops because of This soil is poorly suited to trees. Productivity is low. droughtiness. Fertilizer is leached away by rapidly per- Important tree species are eastern white pine and colating water. The hazard of erosion is slight. Important northern red oak. management practices are irrigation accompanied by This soil is limited for most urban uses by slope. Lawns frequent fertilization, use of cover crops, and addition of are commonly difficult to establish because of droughti- organic matter to the plow layer. ness. This soil is limited for most other sanitary waste This soil is better suited to hay and pasture. Proper disposal facilities by the very rapid permeability and stocking rates, deferred grazing, and pasture rotation slope. Capability subclass IVe. help to maintain desirable plant species. HgD—Hinckley loamy sand, 15 to Li percent slopes. This soil is poorly suited to trees. Productivity is low. This moderately steep or hilly soil is deep and excessively Important tree species are eastern white pine and drained. It is on glacial outwash deposits. Slopes are com- northern red oak. plex and 50 to 200 feet long. Areas range from 10 to 70 This soil has few limitations for most urban uses. Slope acres in size are irregular in shape. is a limitation for the construction of some buildings. In a typical profile in a wooded area, the surface layer Lawns are commonly difficult to establish because of is friable, brown loamy sand about 3 inches thick. The droughtiness. This soil is limited for most sanitary waste subsoil is loose, single grained, brown and yellowish disposal facilities by the very rapid permeability. Capa- brown gravelly loamy sand 11 inches thick. The sub- bility subclass IIls. stratum, to a depth of 60 inches, is alternate layers of HgC—Hinckley loamy sand, 8 to 15 percent slopes. loose, single grained, brown sand and gravel. This moderately sloping or rolling soil is deep and exces- Permeability is vey rapid. Available water capacity is sively drained. It is on glacial outwash deposits. Slopes very low. Roots grow into the loose substratum, but are complex and 50 to 300 feet long. Areas range from 10 growth is often restricted by lack of moisture. Reaction to 100 acres in size acid are irregular in shape. ranges from extremely acid to medium acid. In a typical profile in a wooded area that was once cul- Included with this soil in mapping are areas, generally tivated, the surface layer is friable, brown loamy sand smaller than 3 acres, of Carver, and Sudbury soils. In a about 5 inches thick. The subsoil is loose, single grained, few places are excessively drained soils that have red or brown and yellowish brown gravelly loamy sand 9 inches reddish brown colors in the profile. Included soils make thick. The substratum, to a depth of 60 inches, is al- up about 25 percent of the map unit. ternate layers of loose, single grained, brown sand and This soil has poor potential for farming, for most urban gravel. uses, and for most sanitary waste disposal facilities. It Permeability is very rapid. Available water capacity is also has poor potential for woodland and for wildlife very low. Roots grow into the loose substratum, but habitat. SOIL SURVEY friable; Hadley series HAMPDEN COUNTY MASSAC The Hadley series consists of coarse-silty, mixed, the same landscape as the Carver and Deerfield soils, r frog- nonacid, mesic Typic Udifluvents. These soils are deep which lack gravel in the subsoil. t ranges and well drained. The have an olive brown and light Typical pedon of Hinckley loam sand 3 to 13 Id Imo Y g YP P Y Y e percent olive brown, very fine sandy loam C horizon and an olive, slopes, 2,600 feet southeast of the intersection of North value of very fine sand IIC horizon. Hadley soils formed in medi- Road and U.S. Route 10 in the city of Westfield: :o loamy um textured alluvium. 01-3 to 1-1/2 inches; loose litter that is mainly pine needles with a few ery fine Hadley soils are on the flood plains of the larger rivers. oak leaves and many twigs. Slope ranges from 0 to 6 percent. 02-1-1/2 inches to 0; dark brown (IOYR 3/:3)partly decomposed Utter; Hadley soils formed in the same kind of material as the common fine and medium tree roots; extremely acid; abrupt wavy associated, moderate] well drained Winooski and poorly boundary. }' P Ap-0 to 5 inches; brown {IOYR 4/3) loamy sand, weak fine granular drained Limerick soils. Hadley soils are in the same land- structure; friable; common fine and medium roots; 10 percent mixed, scape as the Podunk soils, which have more sand or gravel; very strongly acid;clear smooth boundary. p and coarser :,and in the subsoil. B21-5 to 9 inches; brown (7.5YR 5/4) gravelly loamy sand; single grained; loose: common fine and medium roots: 20 percent gravel; k y eI- Typical pedon of Hadley very fine sandy loam, high very strongly acid;clear smooth boundary. brown bottom, 0 to :3 percent slopes, in a field at the intersection B22-9 to 14 inches; yellowish brown QOYR 514) gravelly loamy sand: light of Vfeadow Road and West Road in the town of lung- single grained: loose: common fine and medium runt.,; -95 percent meadow: grtvel: very strongly acid:abrupt smooth boundar. tad C' IIC-14 to 60 inches; brown r lu1'I{ c>I:;) stratifie+d sand and gravel: sin- Al)-0 to 12 inches: very riark grdyish brown r_':;1'::.�r von- fine sand}- gle graine(l: loose: few rYtots to inches; 4.5 i)ercent gravel: ver;r Is and I(+;tm: weak fine anti medium ),mdnu[ar structure: very friahle, stronFh acid. slight]} iris=[icy: strYmgEw acid:ahrvpt wacv I,ounrlat-%CI—[: to ]'.r inches: ,dive brown f•'.:�1- 4,4r 5•en Iinr sandy loam; mas- The soium is 1') to l� inches thick. Gravel and cobblestones make up as the IO to sire: friable,slightiv Eel:c-tic: medium acid:clear rrmwah lk�unrl:u;w. ;iQ percent of the s01um and a:i to 70 irerceni of the 1IC horizon. :store ( =-1!+ toe _ti; iruh+:�; liLht olive bIYHSy, l_'.o,l' :,oar vrt� fine ..:u„I}• Lr:+m: The"'°l`are extremely acid to medium acid• unless limed, m:t_«iv-e: fri:+hit•, siighd%' ledastit•: n14,411Um acid: ahead+t sntreoth IKatn- The dp horizon ha• value of n and andchr c a of '? r o The The horizon hr- bur of.,;)YE{ or•l+el'E; and color and c•ht„rr,a of d or:i. The dart. r,r)ric•rl upper part (if the f1 horizon, 'toe a dci,th of adx)ut It) inches. is loamy HC:;—_h:to:;7 invIles: light relive brown 12.:i1" .•4r vt•r• tine rand: rnas- sand, loamw coarse sand, or Fink sandy loam. The Ft horizon, helhw• a to 15 rive: fri+hlt• [o 6,,,.. nortstickv, nnnishr>tic: s[rongl� acid: clear depth of P)inches.is iournv sand,loamy course sand.or course sand.The 1t1 -dIN) snte.eth tKnrnd:u�. IIC horizon has hot-of 1nY1: tee 2.51', valu+•of 5 or r;,and chrY,ma of 2.:1. f1(•4_::-, tee a:e inehv -live r31• :),,4j ver-7• line :and: ewtirruen roar•>e or 4. The II(• horizon it d rninantlw AI-.A dfied --and anti water-rounded distinct R,:+y t:,1- 6.11 m(Pttle: in 110"N' E„O'L: m:cssire: fiiahle to gravel and c•obhlestones, 1 +,se,nunstickv,rrontila=tic:strony;l}•acid:cleat-rm„eeth h+eundnrti. ltongl} IW-i- -,i to ra; inch+•,; olive 4-51' 5AP very fine rand: fv w Sint• prominent t;r:ty 1:,1' +; l t and ce•Iluwtirh r•c-rl 1511; 4,S) mottdes: n,:+ssivr: friable Hollis series to loos•,rn,naick�•,noniel:trt'sc•: sUY,pglY acid. t,srrr:: The Hollis series consists of loamy, mixer], mesic I,ithic nc luo• The thicknes> ;uul the numher of horizons w:u•ier. anti h,oiztin, tether Dystrochrepts. These soils are shallows' and somewhat ex-' v of an,l than tht• :ale ll.wizon eonfor'm In the thic•kne-=:tt,d variation of:ht.allmi- :+1 dt•i,,,:its. E:e:ic•tion of, individual horiruns ranges ftYem very str,er,t•1}• cessively drained. The}• have a 'underlain brown fine sand}• acid to n4•utral. sandy loam 13 horizon that is underlain b} granite man.• The Ap hmlzim has hue ref IoYY, to S1'. value of:t m-4.and chr•on,a of bedrock. Hollis soils formed in thin deposits of glacial till. r _'lot-",. Itr;,- w;tlue is+;ut The .ale horizon i- very hialde or-1'riahle. The Hollis soils are on the tops and sides of hills and ridges. trong.r , C horizon has hue ref lo1-R it,5Y, value of to 5, and chr orna of 2 to 4- Slope ranges from 3 to 25 percent. The color alel,eais u, t•esult from ot'gtu,ic matter content ant the in- Hollis soils formed in the same kind of material as the Coto>r heivnt color of the .serlin,ents. Texture. to a ded)th of Orr inches, is silt. , ,moon ;ill loam. eery fine s;enrl}• loam, loam}' vet}• fine son+I. and wr:•.- tine associated deep, well drained Paxton and Charlton soils. ) :rongd4' .and. The C horizon is generally ftiahle or•1rNtse. Hollis soils are in the same landscape as the Gloucester and Montauk soils, which are deep to bedrock. CrH`t}r Hinckley series Typical pedon of Hollis fine sandy loam in an area of - rkrcent Charlton-Rock outcrop-Hollis complex, 3 to 15 percent The Hinckley series consists of sanely-skeletal. mixed, slopes; 2,400 feet south of the intersection of Monson to Orr mesic Typic Udot•thents. These soils are deep and exces- Road and Glendale Road in the town of Wilbraham: f the R sively dt ained. They have a brown and yellowish brown Ap-0 to 7 inches; very Clark gra�ish brown(IOYR 3/2)fine sandy loam; tizons. gravelly loamy sand B horizon and a brown, stratified weak fine and medium granular structure: ven• friable; 15 percent F i� f. sand and gravel C horizon. Hinckley soils formed in coarse fragments;medium acid,abrupt smooth boundary. ul)l"'t' water-sorted sand, gravel, and cobblestones. B21-7 to II inches;yellowish brown(IUYR 516)fine candy loam, weak >rt has Hinckley soils are on kames, outwash plains, and ter- fine and medium subangular blocky structure: friable: 15 pet-cent a 4 to 6coarase fragments:strong]+•acid:clear smooth boundary. w r tint races. Slope ranges from 0 to 35 percent. 1 11122_lI to 14 inches;yellowish brown(10YR 5/4)fine sanrLy imam:weak s l Hinckley ,oils formed in the same kind of material as ! medium subank-ular blocky structure: friable; 15 percent coame t•Poet. is ref I the associated somewhat excessively drained Mer•1-imac !r fragments;:strongly acid;abrupt smooth boundary. h, soils, the mucdelately well drained Sudbury coils, and the R�14 incite+;}•ranite bedrock.ltt:rmy Y ' fc very poorly drained Scarboro soils. Hinckley soils are in Depth to rol:k ranges from to to -4) inches. Content of coat-se fraig- 6ent-4 ranges from 5 to 215 dxrtent. Reaction, whcr•e this soil is unlime+d, F j ►tstrrongly acid or very strongly acid. k t k 80 SOIL SURVEY T TABLE 14,--ENGINEERING PROPERTIES AND CLASSIFICATIONS--Continued 1 = 1 Classification IFrag- I Percentage passing I Plas- Soil name and IDepthl USDA texture I I I Iments I sieve number-- ILiquid I ticity map symbol I I I Unified I AASHTO I > 3 1 4 1 10 1 40 1 200 1 limit I index as i 1 Pct ! :loucester: I I 1 1 I i GxB, GxC, GxD-----1 0-3 !Extremely stony ISM 1A-1, 115-25 175-95 165•-90 145-85 120-40 1 --- I NP I I sandy loam. I I A-2, I i I I I I 1 I I I i A-4 I i I I I I 1 13-11!Gravelly sandy ISM IA-1, 1 5-25 170-90 165-80 140-70 120-40 1 --- I NP I I loam, fine I I A-2, I I I I i I I I ! sandy loam. I I A-4 1 111-60!Gravelly loamy ISM, GM, IA-1, A-2! 5-15 145-75 135-70 120-40 1 5-15 I --- 1 NP I I sand, loamy I SP-SM, I 1 1 I I I i I 1 1 coarse sand. I GP-GM I I .adley: na, hoA, Hba------I 0-121very fine sandy IML, CL, !A-4 1 0 1 100 195-100195-100170-95 I <30 1 NP-9 i I loam. I CL-ML 1 I I I I I I I 112-551Silt loam, very 1ML, CL, IA-4 1 0 1 100 195-100190-100160-95 1 <39 1 NP-13 1 1 fine sandy 1 CL-ML ! ! ! ! ! I ! ! ! ! loam, very fine! ! ! ! ! ! I ! ! 1 ! sand. 155-bb!Silt :cam, si:t, IML, CL, !A-4 ! 0 1 100 195-100:75-95 140-65 1 <30 1 NP-13 ! ! loamy very fine! CL-ML, 1 ! 1 I ! ! ! ! ! ! ' sand. I SM [ 1 1 I 1 I 1 1 I I I I 1 .inckley: ! ! ! ! 1 ! ! ! ! I ! • I I , Z9A, H98, ngC, r r 1 I 1 1 , 11 1 1 1 -gD, HgE----------1 0-5 !Loawy sand------:SM, SP-SM:A-1, 1 0-20 :65-95 165-65 130-65 :10-25 ! --- I NP 1 i i I A-2 ! ! 1 i ! ! I 1 5-141.3ravelly loamy :SM, GM, IA-1 , A-2! 0-20 :75-95 :65•-65 :20-70 I10-35 ! --- 1 NP ! 1 sand, gravelly ! GP-GM, ! ! ! ! ! ! ! ! ! 1 ;aamy coarse ! SF-SM 1 1 1 ! 1 1 ! I 1 1 sand. ! ! 1 I 1 1 I ! 114-6015tratified 1SP, SM, !A-1; A-211 0-45 '60-75 130-55 :25-45 ! 2-35 1 --- ! NP 1 1 I gravely loamy I GP 1 I I I 1 + I I I ' ' fine sand to ! ! ! ! ! 1 ! I 1 1 1 ! 1 very cobbly ! ! ! ! ! 1 ! ! ! 1 ,1 , coarse sand. 1 1 1 t I 1 I 1 1 1 1 r I 1 1 I 1 I ! I �lyoke: 1 I 1. 1 I 1 I I 1 1 I Hob, hoC----------! 0-4 ltiery fine sandy lML, SM, IA-4, A-21 0-10 175-95 155-90 145-65 125-75 1 <25 1 NP-5 ! ! loan.. 1 CL-ML ! ! ! ! ! ! ! ! 1 4-121,Si7t loam, very 1ML, 5M !A-4, A-2: 0-10 :75-95 155-90 :45-65 !25-75 1 <25 1 NP-3 ! 1 fine sandy I I ! ! ! ! ! ! ! ! 1 l oar... ! 1 1 ! 1 1 ! 1 ! ! 1 12 If;nweatnered 1 1 bedrock. ! 1 I I I ! 1 ! I 1 ! 1 1 1 l 1 R rC: 1 1 1 1 ! I 1 I 1 I 1 Holyoke part----! U-Lr :Very fine sandy IML, Sh, !A-4, A-21 0-10 :75-95 155-90 145-b5 125-75 1 <25 1 NP-5 ! 1 load. ! CL-ML ! 1 ! ! I ! I ! : 4-121S;lt loam, very :ML, SM IA-4, A-21 0-10 175-95 155-90 145-85 125-75 1 <25 1 NP-3 ' fi ne sand 1 r Y ! ! loam. ! 1 ! ! ! 1 ! ! I 1 12 !Unweathered i ! bedrock. ! ! ! ! ! ! ! I I ! ! ! 1 ! 1 ! ! ! ! Rock outcrop part. ! ! ! ! ! ! ! 1 ! ! I See footnote at end of table. a 1 190 SOIL SURVEY ' TABLE 15.--PHYSICAL AND CHEMICAL PROPERTIES OF SOILS--Continued J 1 Available= 1 Shrink- I Risk of corrosion__ ) Erosion Soil name and j Depthl Permea- water J Soil I swell ( Uncoated I I factors map symbol I 1 bility ; capacity : reaction j potentiall steel I Concrete i K I T 1 3'1 i n/hr 1In/in 1 PH IJ Deerfield: j : J 1 11J J J J De----------------1 0-10 1 2.0-20 10.07-0.15 1 4.5-6.0 jLow-------!Low-------=Moderate 1 0.17 1 5 110-25 1 6.0-20.0 10.01-0.13 1 4.5-6.0 .Low-------!Low-------!Moderate 1 0.17 J 125-60 1 >20.0 10.02-0.08 1 4.5-6.0 !Low-------JLow-------(Moderate 1 0.15 1 1 1 J 1 i i I Eldridge; 1 EdB---------------: 0-10 : 6.0-20 10.07-0.16 1 5.1-6.5 .Low-------:Moderate IModerate 1 0.32 1 3 11Q-27 : 6.0-20 10.04-0.11 1 5.1-6.5 :Low-------IModerate :Moderate j 0.32 ! 127-60 : 0.2-0.6 ;0.18-0.30 1 5.1-7.3 :Low-------:Moderate :Low-------: 0.43 1 Enfield: J EnA, EnB, EnC-----1 0-6 1 0.5-2.0 10.17-0.26 1 4.5-6.0 ;Low-------!Low-------;Moderate : 0.49 : 3 16-25 : 0.5-2.0 10.14-0.26 : 4.5-5.5 !Low-------!Low-------!Moderate 1 0.64 1 125-60 : >20 10.01-0.06 1 4.5-5.; :Low-------!Low-------!Moderate : 0.17 1 I ' inosburE: c.G+2C :0.67-0.1 ! 4.5-c.? ;Low-------:;;fah --!Mloderate i 0.32 1 ; i0+26 ; -• -2G ;O.G4-O.Oa ! c•- _ : o --+----:Hi6a------1Moderate 1 0.32 J :Lot: -------.y_6n------;Low------- : 1 I f 1 l 1 I 1 1 ! ! 1 I I 1 I 1 G:oucester: 1 1 Gfb---------------i G-� : -. -2C� :0.1C-G.15 1 u.5-- .5 :Lo:---••.•__:LDw"--+++.•_ri11p5 ++-_-r C.17 1 3 . -cC 10.1G- .15 : 4. : Cw :LGK--------h_g�•------! C.17 ! ]- 0 : 5.1- !Low-------;Low-------:;44rn------_ : 1 r 1 ! I 1 I 1 1 u r . r 13 1 4.5-P :Low-------:Low-------;h ------; 0.17 ! 3 .Lcw-------:Low-------:a_Er------1 G.17 1 .'•/ 0.G1-G. ! 'r.. :LOw-------;Low-------!Hiz:.------. C.17 : � ;Lc. -_+_+-;Low-------ihi6n------1 0.17 : I 3-'1 1 -Gli 1.7.1U'-r.'.la ! 1.. I..C.w-__---+I Law_+----+I:1�E,f---__-i .17 1 ill-ED ; 6.v+C1 :O.U}+G.10 ! 4.�-..� :Lc?w-------:Low-------:NiE'------i C.17 : 1 1 1 1 I 1 1 I 1 1 1 1 Had:ey: Ha, HbA, HGn------1 0-12 ; C' 6-2.0 10.15-0.25 : 4.5-7 :Low-------:Low•-------:moaerate : G.49 i 3 -0.0 :0.17-0.26 ; 4.5-7.3 :Law-------;Low+++++__.Moderate : 0.4i 0.b-_.0 10.10-0.20 : 5.5-7.Z ;Low-------:Lou-------lKocerate : 0.4Y : I 1 I I t r Hinck:ey: HgA', 'gcl HgD, ng£----------; 0-5 ; e.0-20 :0.07-0.13 : 3.6-t.J 'Low---------Low-------Ih,grl------1 0.17 I 3 -- 5-14 . 0.0-24 1.0.01-0.11 : 3.o-t.l '1Low---------Low---------H=g -------- 0.17 li 114-60 ; >20 10.01-C'.G6 ! Igo"a !Low lhic;n+-----1 0.15 , 1 1.. 1 1 1 I 1 1 I 1 I HoyouRe: nob, hoC----------1 G-4 . C o-2.0 10.12-0.20 1 4.5-e.0 :Low-------!Low-------1Hign------: 0.24 2 : 4-72 ; G.6-2.0 :0.11-0.22 1 4.5-5.5 ;Low-------!Low-------thigh------. 0.43 ; 1 4 1 1 __+-_____I----------I-------+ 1 1 r:o7yoke part------ 0-4 1 0.6-2.0 110.12-0.20 1 4.5-;�.G !Low-------!Low-------1hign------t 0.24 1 2 : 4-12 1 0.6-2.0 ;0.11-0.22 : 4.5-5.5 ;Low-------:Low-------;Hign------1 0.43 ; I 12 1 +++ i --- 1 --- '----------1--------`-I 1 ! 1 I 1 , I 1 1 - I _ flock outcrop art. p 1 1 I I I 1 1 1 1 Limerick: Lk----------------1 0-12 1 G.6-2.0 10.18-0.25 1 5.6-7.3 !Low-------:High------:Low-------1 0.20 ; 3 -- 12-24 ; 0.6-2.0 '0.18-0.25 1 5.6-7.3 :Low-------(High------.Low--------- 0.20 : 124-60 ; 0.6-2.0 10.18-0.25 ! 5.6-7.3 !Low-------Nigh------!Low-------: 0:20 ; : 1 1 : 1 1 See footnote at end of table. a 4135622091 4135622091 Op, BEAN INC. 794 P01 MAY 05 100 09:56 D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School :'ltreet Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01485 ENGINEERS TELECOPY COVER SHEET TO: .r h. � � � 'r[� DATE. tS _S— Co TIME: )6 M j PM EST TELECOPY NUMBER: { ) FROM: C- TOTAL NO, PAGES: 2- (including cover sheet) RE: REMARKS: x> Cn c..3 +4 *******M *#i***Y*a *MM�#***kkkkk#M*#****#�**#M***s***Rw►#***+k**t*i*s**�***�*k*lcle+µk:l�**L���,**M***�%*MM+4 IF YOU DO NOT -RECEIVE ALL OF THE PAGES, PLEASE CALL AT (41 t) 562-7566 AS SOON AS POSSIBLE. THE FOLLOWING IS FOR YOUR INFORMATION IN TRANSMITTING TO US: FAX X� NO. MODEL (413) 562-2091 TOSHIBA TF-211 41356220,31 B.L. BEAN INC. 794 P02 MAY 05 '00 09:56 D. L. BEAN, INC. -- LAND CONSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 May 5, 2000 ENGINEERS j -t Z I>r- Charles Calabrese, Chairman Agawam Planning Board -o 36 Main Street40, Agawam, MA 01001 RE: "Rivers Edge Estates" - Barney Street c-n `T Dear Board Members: On behalf of our client, Richard Langone, I am requesting a 30 day extension on the above project . Since ;l.y, D. L Sean, In Marc iE Phute, Senior vice President MES/ssc D. L. BEAN, INC� 0. '�=' 1a44lg� p 4 0 ° u� omm Land Consultants Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE J08 NO, May 1 2000 (413) 562-7566 ATTENTION FAX (413) 562-2091 Deborah Dachos own Planner RE: TO Agawam Planning Board "Rivers Edge Estates" 36 Main Street Barne Street Agawam, MA 01001 WE ARE SENDING YOU (N Attached ❑ Under separate cover via the following items: ❑ Shop drawings IN Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter E3 Change order ❑ COPIES DATE NO. DESCRIPTION r 2 5—Tv-60 4 Blue Line Set of Definitive Plans "Rivers Edge Estates" THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints > 0 For review and comment ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Debbie: These plans have been modified to address the Comments issued by- the - Engineering Department. I have also revised the landscaping per the Planning Boards request. If you have any questions please feel free to contact me at your convenience SirjejeW, COPY TO SIGNED: If enclosures are not as noted, kindly notify us at once.Mare E. Shute, Sr. V. President MEMO TO: Engineering Department FROM: Planning Board DATE: May 1, 2000 SUBJECT: Revised Definitive Plan - Rivers Edge Estates - Barney Street - Langone Please review and comment on the attached revised Definitive Plan for River's Edge Estates prior to the Board's May 4' meeting, if possible. Thank you. DSD:prk F D. Dachos Date_ February _10— 2Q00 1/31/0 0 Dist. Date 1/31/00 oard Public Hearing Date2/17/00 Date for Final Action April 30 , 2000 OFFICE OF PLANNING & COMMUNITY DEVELOPMENT DEFINITIVE PLAN REVIEW Name of Subdivision_ River ' s Edge Estates _ Location northwesterly end of Barney Street Name of Owner Richard Langone Address 61 Mark Drive , Agawam Telephone# Name of Applicant Address Telephone# Engineer D. L. Bean , Inc. Address 40 School St . , Westfield Telephone# 562-7566 1. Preliminary Plan Approved July 2 2 , 19 9 9 9 if. Definitive Plan conforms with zoning regulations III. Notice filed with the Town Clerk (date) IV. Filingfee $390 .00 V. Contents of Application: A. Statement of Interest in land O. K. B. Attested copy of deed O.K. C. Updated Environmental Study Comment See attached comments . D. Final Plans 1. Title Sheet ( V = 1200' ) O.K. 2. Lot survey with road layout and lot lines O.K. a. Subdivision name, boundaries, north point, date and scale O. K. d b. Name and address of record owner, subdivider, and engineer or surveyor with stamp 0.K. c. Abutters as found on recent tax list 0.K. d. Existing and proposed lines of streets, ways, lots, easements, and public common areas, new street names 0.K. e. Sufficient data to determine the location, direction and length of every street 0.K. f. Location, names, and widths of streets bounding subdivision 0.K. g. Signature block 0.K. 3. Topo sheet at 2' intervals, spot elevations, center line for road, spot elevations for septic systems, location of building and final grade 0.K. 4. Road layout and profiles (utilities and curb cuts) see Engineering comments . 5. Detail sheets See Engineering comments . E. Time development sequence Not provided. 1. Town utilities and services Not provided. 2. Sale price and square footage Not provided . F. Soil borings See waiver requests . G. Perc Test H. Two (2) sets of originals/five (S) sets of copies 1. Number and type of requested waivers see attached . Ali I ' I II IV ' III I �! I �t ,ti CQMMENIES Engineering/DPW Board of Health Other In' LIST OF REQUESTED WAIVERS 1) . Waive Section 159 - 8 E. ( 1) to allow the street to be 821+/-long. 2 ) . Waive Section 159-31c. to allow a 10 ' wide buffer strip on south and west sides of the proposed submission. 3) . Waive Section 159-7.c.8(a) to require test borings. Soil Maps indicate Agawam, Hadley. i i ,i TOWN OF AGAWAM INTEROFFICE - .... MEMORANDUM ED�Py Th: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: May 4, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone Per your request dated May 1, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive, Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, revised May 1, 2000, Scale 1" =40'. " We have the following comments: 1.) A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 2.) We recommend that the depth and location of the existing water main in Alhambra Circle North be verified before any construction is started which might be affected by such information. Any necessary modification should then be implemented. 3.) In order to allow for the drainage of this subdivision to enter the system in Alhambra Circle North, a drainage study would be required to see if this system (in Alhambra Cirlce North) has the capacity for the additional flows being created. The study should consist of analyzing the existing flow in the pipes until it reaches its outfall. A hydraulic gradient should be determined for the entire reach if flows exceed just full capacity. The study should be certified by a Massachusetts Professional Engineer. The calculations submitted do show that the post conditions are less than pre conditions but the drainage entering Alhambra Circle North should be considered as additional flow to this system. The drainage system can only enter Alhambra Circle North under the direct approval of the Department of Public Works. This subdivision should not be approved until drainage is accepted by the Department of Public Works and at that time a Storm Drain Permit will be approved (We have asked for this previously 3 times). 4.) If the proponent wishes to avoid a drain manhole at the low point, the low point in the road, including the catch basins, should be moved westerly +I- 11 feet to accommodate the proposed drain line running along the property line of lots 5 and 6 in a straight line. M If you have any questions please do not hesitate to contact our division. Sincerely, �t James T. Daley, P.E. Van c annakis Town Engineer Civil Engineer I h:lengineerlsubdivllangone_7.wpd D. L. BEAlf, INC. LAND 16NSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 April 20, 2000 ENGINEERS Charles Calabrese, Chairman Agawam Planning Board 36 Main Street Agawam, MA 01001 RE: "Rivers Edge Estates" - Barney Street Dear Board Members: on behalf of our client, Richard Langone, I am requesting a 2 week extension on the above project. We anticipate performing deep hole soils observations within the next week. Sincerely, //�� D. L. Bean, IKq F i 9 David`. Bean, President DLB/ssc .,'�:.,• -•;:.: ..•ter %Uki �F* R 2 41pp� D. L. BEAN [L[EV 1J D*O[� � �U Li (mo LJ mm Land Consul n Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE JOB No. (413) 562-7566 Aril 6 2000 FAX (413) 562.2091 ATTENTION Deborah Dachos Town Planner TO RE: Agawam Planning Board "Rivers Edge Estates" 36 Main Street BarneyStreet Agawam, MA 01001 WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items: ❑ Shop drawings ® Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 2 4rgv6o 4 Blue Line Set of Definitive Plans "Rivers Edge Estates" THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Debbie: Per Planning Board request, I have changed the size and type of the landscaping in the buffer area and have added a note on sheet #3 of 4 to address an Engineering comment on the sanitary sewer laterals crossing the water main on lots #5 and #6. Sincerely, COPY TO SIGNED: !f enclosures are not as noted,kindly notify us at once. Marc E. Shute, Sr. V. President r n 1 , � • TOWN OF AGAWAM INTEROFFICE ` MEMORANDUM 0 To: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: March 27, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone Per your request dated January 31, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive, Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, revised March 13, 2000, Scale 1" =40'. " We have the following comments: L) Test borings will need to be implemented for this subdivision (information and location included on the plans) to compare basement floor elevations to the ground water elevations present on site. 2.) A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 3.) We recommend that the depth and location of the existing water main in Alhambra Circle North be verified before any construction is started which might be affected by such information. Any necessary modification should then be implemented. 4.) The sewer laterals for lots 5 and 6 will be required to be cast iron and encased in concrete because they will cross above the proposed water main. A note should be included on the plans to address this matter. 5.) In order to allow for the drainage of this subdivision to enter the system in Alhambra Circle North, a drainage study would be required to see if this system (in Alhambra Cirlce North) has the capacity for the additional flows being created. The calculations submitted do show that the post conditions are less than pre conditions but the drainage entering Alhambra Circle North should be considered as additional flow to this system. The drainage system can only enter Alhambra Circle North under the direct approval of the Department of Public Works. This subdivision should not be approved until drainage is II accepted by the Department of Public Works, at that time a Storm Drain Permit will be approved. 6.) The Catch Basin Detail should include a view showing the rectangular base for clarity. 7.) The grading in the rear of lots 5 and 6 will cause ponding in the case of a 100 year storm. An overflow pipe from the graded area in the rear of lots 5 and 6 to the catch basins in the proposed roadway should be added (with an easement). 8.) Due to the location of the detention area, the houses on lots 1 and 2 should be raised because of the ponding elevation (61.1') for the 100 year storm, which is above the basement floor elevations for these lots. If you have any questions please do not hesitate to contact our division. Sincerely, Sincerely, Zames T. Daley, P.E. Van oyannakis Town Engineer Civil Engineer I h:lengineerlsubdivVangone_6.wpd it D. L. BEAN, !,NLand Consulta Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE JOB NO. (413) 562-7566 March 14 2000 ATTENTION FAX (413) 562-2091 Deborah Dachos Town Planner RE: TO Agawam Planning Board "Rivers Edge Estates" 36 Main Street BarneyStreet Agawam, MA 01001 WE ARE SENDING YOU IN Attached ❑ Under separate cover via the following items: ❑ Shop drawings IN Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES ggDATE NO. DESCRIPTION 2 3r1i-00 4 Blue Line Set of Definitive Plans "Rivers Edge Estates" THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval Nf For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints a ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Debbie: These Rlans have been modified to address the comments issued by the Engineering Department. We have also modified all the lots to show new style houses and grading around the same. If you have any questions, lease feel free to contact me at your convenience. Sin ely, COPY TO SIGNED: Y enclosures are not as noted, kindly notify us at once. Marc E. S ute, Sr. V. President MEMO TO: Engineering Department FROM: Planning Board DATE: March 27, 2000 SUBJECT: Revised Plan - Rivers Edge Estates - Barney Street Please review and comment on the attached revised plan for Barney Street prior to the Board's April 6'h meeting. Thank you. DSD:prk 1 TowN OF AGAWAM � 3 INTEROFFICE ��A�ED Mpy MEMORANDUM To: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: March 2, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone Per your request dated January 31, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive, Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, Scale 1" =40'. " We have the following comments: L) Although the applicant is requesting a waiver to not require test borings, our division suggests that test borings be implemented for this subdivision to compare basement floor elevations to the ground water elevations present on site. 2.) A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 3.) A 4' fence (with 10' gate) will be required around the proposed detention area. 4.) We recommend that the depth and location of the existing water main in Alhambra Circle North be verified before these plans are approved. The drainage system for this subdivision may have to be altered depending on the depth of the existing water main. The proposed roadway may have to be raised (depending on the drainage) for adequate cover over the drain pipes. 5.) The sewer laterals for lots 5 and 6 will be required to be cast iron (encased in concrete) if they cross above the proposed water main. 6.) The proposed waterline should be shown on the profile. 7.) In order to allow for the drainage of this subdivision to enter the system in Alhambra Circle North, a drainage study would be required to see if this system (in Alhambra Cirlce North) has the capacity for the additional flows being created. The calculations submitted do show that the post conditions are less than pre conditions but the drainage entering Alhambra Circle North should be considered as additional flow to this system. The drainage system can only enter Alhambra Circle North under the direct approval of the Department of Public Works. This subdivision should not be approved until drainage is accepted by the Department of Public Works. On the Catch Basin Detail add a view showing rectangular base for clarity. 8.) The grading in the rear of lots 5 and 6 will cause ponding in the case of.a 100 year storm. An overflow pipe from the graded area in the rear of lots 5 and 6 to the catch basins in the proposed roadway should be added (with an easement). 9.) Due to the location of the detention area, the houses on lots 1 and 2 should be raised because of the ponding elevation (61.1') for the 100 year storm, which is above the basement floor elevations for these lots. If you have any questions please do not hesitate to contact our division. Sincerely, Sincerely, ., ames T. Daley, P.E. Va coyannakis Town Engineer Civil Engineer I h:lengineerlsubd Mla�one_3.wpd D. L. BEAR, INC. LAND ONSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 March 2, 2000 ENGINEERS Charles Calabrese, Chairman Agawam Planning Board 36 Main Street Agawam, MA 01001 RE: "Rivers Edge Estates" - Barney Street Richard Langone - Owner Applicant Dear Board Members: On behalf of our client, Richard Langone, we are requesting that the public hearing on the above referenced subdivision be continued until the next meeting of the Board. We are in the process of deciding the proposed size and style of houses for the lots, and are still reviewing the landscaping scheme for the buffer strips. we expect to have these items finalized within a week for the Town Departments to review. Thank you for your consideration of this request. sinceAely, D. jBean, In . Marc . Shute, Senior Vice President cc: Richard Langone - Property Owner MES/ssc D. L. BEAN, INC. io44* OIF w e limmumd Land Consultants Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE Boa NO. (413) 562.7566 March 1, 2000 FAX (413) 562-2091 ATTENTION Deborah Dachos, Town Planner RE: TO —Agawam Planning Board "Rivers Edge Estates" 36 Main Street BarneyStreet —Agawam,- MA 01001 WE ARE SENDING YOU M Attached ❑ Under separate cover via the following items: ❑ Shop drawings IN Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 2 3-1-00 4 Blue Line Set of Definitive Plans "Rivers Ede Estates" 1 3-1-00 1 Revised Waiver Request THESE ARE TRANSMITTED as checked below: KI For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Debbie: These plans have been modified to address the comments issued by the Engineering Department. Briefly, the changes are: New proposed houses on lot #1 — 2, and 4, curb reveal to 6j", and per Planning Board reqeust have proposed a landscaping scheme. If you have any questions please feel free to contact me at your convenience. Sin COPY TO SIGNED: IIf enclosures are not as noted, kindly notify us at once. Marc E. Shute, Sr. V. President • • List of Revised Requested Waivers 1 ) . Waive Section 159-8E. ( 1 ) to allow the street to be 804 +/- long. 2) . Waive Section 159 - 31c. to allow a 15 ' wide buffer strip abutting property on the north side of Alhambra Circle North and a 10 , wide buffer abutting property at the southwest corner of Barney Street. MEMO TO: Engineering Department FROM: Planning Board DATE: March 1, 2000 SUBJECT: Revised Plan - River's Edge Estates - Langone Please review and comment on the attached revised plan for Langone on Barney Street prior to the Board's March 2°d meeting. Thank you. CRC/DSD:prk �o Town of Agawam 1 36 Main Street Agawam, Massachusetts 01001-1837 c� ,q� MPy�1 Tel, 413-786-0400 Fax. 413-786-9927 o G o ,= r March 17, 2000 -4 LP ` Richard Langone 61 Mark Drive Agawam, MA 01001 Dear Mr. Langone: At its duly called meeting held on February 17, 2000, the Agawam Planning Board acted on the waiver requests that were submitted on January 31, 2000 concerning the River's Edge Estates Definitive Plan. The Board, in a 2-2 vote, denied the waiver request of Section 159-8E to allow for a street length of 821'. The Board voted to waive section 159-31c which requires a 30' buffer on all sides of the subdivision with the exception of the south side where there shall be a 15' buffer which will be cleaned and re-established by the developer and shall be protected by a deed covenant. The Board allowed the withdrawal of the third waiver request - Section 159-7.c.8(a) which requires test borings. At its duly called meeting held on March 16, 2000, the Agawam Planning Board voted to reconsider the waiver requests and then tabled any action on to the April 6, 2000 meeting at the request of your representative. If you have any questions, please contact this office at 786-0400, extension 245. Sincerely, Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD CRC/DSD:prk cc: Town Clerk Engineering D.L. Bean, Inc. File #8086 TOWN OF AGAWAM LAW DEPARTMENT 36 MAIN y STREET,AGAWAM,MA.SSACHUSETTS 01001 TEL(413)786-0400,Ext.281 or 786-5400 J FAX(413)786-9927 ��RA7� MP Thomas S. Locke Solicitor LAW DEPARTMENT MEMORANDUM Date: February 17, 2000 To: Town of Agawam Planning Board cc: Deborah Dachos, Director of Planning and Development From: Law Department RE: RIVER'S EDGE ES Please be advised that the Law Department received and reviewed an opinion from Attomey Mitchell T. Allen pertaining to the 400' x 1' strip, which purportedly precludes access to the proposed subdivision. Additionally, the Law Department has reviewed the layouts as public ways of Bamey Street and Sterling Road, as well as copies of deeds filed with the Hampden County Registry of Deeds. After the above stated review, the Law Department has determined that any property interest which there may have been in the 400' x 1' strip at Bamey Street and Sterling Road, became part of Bamey Street and Sterling Road as public ways. Please call with any questions. 1 r TOWN OF AGAWAM INTER FFICE G z MEMORANDUM To: Planning Board CC: John P. Stone, D.L. Bean, Inc., File From: Engineering Date: February 17, 2000 Subject: Definitive Plan - River Edge Estates - Barney Street - Langone 1 Per your request dated January 31, 2000 we reviewed the Definitive Subdivision Plan entitled, " Definitive, Subdivision of Property, Agawam, Massachusetts, for Richard Langone, by D.L. Bean, Inc., dated January 28, 2000, Scale 1" =40'. " We have the following comments: 1.) Although the applicant is requesting a waiver to not require test borings, our division suggests that test borings be implemented for this subdivision to compare basement floor elevations to the ground water elevations present on site. 2.) The following note should be added to the plan, " Developer must place bounds prior to paving driveways wherever driveways surround any street bound and approved bound box is to be placed with bound. " 3.). A disk of the entire subdivision should be submitted showing that the subdivision has been tied into the Town's coordinate system. 4.) A 4' fence (with 10' gate) will be required around the proposed detention area. 5.) We recommend that the depth and location of the existing water main in Alhambra Circle North be verified before these plans are approved. The drainage system for this subdivision may have to be altered depending on the depth of the existing water main. The proposed roadway may have to be raised (depending on the drainage) for adequate cover over the drain pipes. 6.) The sewer lateral for lot 4 should enter downstream of the proposed sewer manhole. The sewer laterals for lots 5 and 6 will be required to be cast iron (encased in concrete) if they cross above the proposed water main. The correct minimum grade for the proposed'sewer line (last run) should be 0.6%. 0 s ` 7.) The proposed waterline should be labeled 8" and shown on the profile. A proposed gate valve should be included where the connection will be made to the existing water main in Barney Street. The proposed gate valve for the proposed hydrant should be included on the plans. The proposed water main should extend past the tee (for the hydrant) one length of pipe (18') with a restrained cap. The water services for lots 3 and 4 should be tapped at the end of proposed water main to eliminate stagnant water in the main. 8.) The Bituminous Concrete Curb Type 2 standard reveal is a 6 112". This should be changed in the Bituminous Concrete Curb Type 2 Detail and the Driveway Detail. 9.) In order to allow for the drainage of this subdivision to enter the system in Alhambra Circle North, a drainage study would be required to see if this system (in Alhambra Cirlce North) has the capacity for the additional flows being created. The calculations submitted do show that the post conditions are less than pre conditions but the drainage entering Alhambra Circle North should be considered as additional flow to this system. The drainage system can only enter Alhambra Circle North under the direct approval of the Department of Public Works. This subdivision should not be approved until drainage is accepted by the Department of Public Works. On Catch Basin Detail add a view showing rectangular base for clarity. 10.) The grading in the rear of lots 5 and 6 will cause ponding in the case of a 100 year storm. An overflow pipe from the graded area in the rear of lots 5 and 6 to the catch basins in the proposed roadway should be added (with an easement). 11.) Due to the location of the detention area, the houses on lots 1 and 2 should be raised because of the ponding elevation (61.1') for the 100 year storm, which is above the basement floor elevations for these lots. If you have any questions please do not hesitate to contact our division. Sincerely, r Sincerely, /J=esT. Daley, P.E. an Ka is Town Engineer Civil ngineer I h:lengineerlsubdMlangone 3.wpd Town of AAWam .y 36 Main Street -Agawam, :Massachusetts 01001-1837 c* ID M Tel. 413-786-0400 Fax 413-786-9927 PLANNING BOARD February 11, 2000 Attorney Thomas Locke 36 Main Street Agawam, MA 01001 Dear Attorney Locke: The Planning Board is in receipt of the Definitive Subdivision Plan for"River's Edge Estates", Barney Street, by Langone Realty Corp. and has scheduled a public hearing for Thursday, February 17, 2000. Please provide the Board with your legal opinion regarding the 400' long F strip which exists prior to this hearing. If you have any questions, please contact this office at 786-0400, extension 283. Sincerely, Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD DSD:prk 9 r 0 'own o.f Agawam 36 Main Street Agawam, Massachusetts 01001-1.837 zc� rED Mp Tei, 413-786-0400 Fax 413-786-9927 MEMO TO: AGAWAM PLANNING BOARD FROM: DEBORAH S. DACHOS, DIRECTOR OFFICE OF PLANNING AND COMMUNITY DEVELOPMENT SUBJECT: RIVERS EDGE ESTATES DATE: FEBRUARY 14, 2000 The Planning Office has reviewed the Rivers Edge Estates Definitive Subdivision Plan. The applicant has requested three (3) waivers. One of the waivers is to allow a 821' long dead-end street and another is to decrease the buffer from 30' to 10'. In considering these waivers, I would request that the Board consider the following elements of the plan. Lots#1 and#2 are close to the minimum required in the Residence A-2 District, 15,386 and 15,025 sq.ft. respectively. Two thousand, two hundred and seventy-one (2,271) sq.ft. of each lot consists of a detention basin. This basin is within 18' of the foundation on Lot #1 and 20' of the foundation on Lot#2. A chainlink fence will encircle the detention basin. The house on Lot #2 is within 32' of the rear property line to meet the setback requirements. The house on Lot #4 is 28' from the Route 57 right-of-way on one corner. Both Lots 5 and 6 have depressions in their rear yards which may retain water. As you are aware, in granting the waiver requests, the applicant must show how the requested waivers are in the best interest of the Town. It is the Planning Department's recommendation that the street be decreased in length, the number of lots be decreased thereby increasing their size and that a realistic buffer be provided adjacent to the existing residences. In so doing, the interests of the existing residents and the future home owners can be protected. • r 0 town of Agawam yy ti�r M/ i 36 Main Street Agawam, Massachusetts 01001-1837 arEQ Tel. 413-786-0400 Fax. 413-786-9927 PLANNING BOARD February 8, 2000 Dear Abutter: Lanonge Realty Corp. has submitted a Definitive Subdivision Plan to the Town of Agawam entitled Rivers Edge Estates. The proposed subdivision will consist of the creation of six (6) lots to be located at the end of Barney Street. The Assessors Office lists you as an abutter and therefore must be notified of the upcoming public hearing. The Planning Board will be holding a public hearing on this Plan at 7:00 PM, Thursday, February 17, 2000, in the Faolin Peirce Community Room, Agawam Police Station, 681 Springfield Street, Feeding Hills. You are encouraged to attend and comment. Sincerely, 152 Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD CRCIDSD:prk i •eer. �aees ' Use template for 5162° r Anthony& Rose Manua Ronald, Barry & Carolyn Telford 59 Barney Street 55 Barney Street Agawam, MA 01001 Agawam, MA 01001 Christopher& Claire Counos James& Geraldine Fogg 49 Barney Street 45 Barney Street Agawam, MA 01001 Agawam, MA 01001 Steven & Diane Palazzi Frederick& Diane Jeserski 35 Barney Street 1629 Suffield Street Agawam, MA 01001 Agawam, MA 01001 Peter& Maureen Hoffman Cynthia Hutcheson 16 White Birch Terrace 90 Alhambra Circle North Feeding Hills, MA 01030 Agawam, MA 01001 Huey& Shirley Plyler Richard& Florence Howe 86 Alhambra Circle North 80 Alhambra Circle north Agawam, MA 01001 Agawam, MA 01001 Denise Bickel 96 Glenwood Street Leo & Sandra Boucher Ludlow, MA 01056 52 Alhambra Circle North Agawam, MA 01001 Joel Cummings & Betty Bolton John & Eileen Field 58 Alhambra Circle North 62 Alhambra Circle North Agawam, MA 01001 Agawam. MA 01001 OAVIERYO Address Labels Laser 51620 slags] ssaippd 9A&J3Ad ®U 0 Marion Brindle Michael & Christine Mangano 48 Barney Street 38 Barney Street Agawam, MA 01001 Agawam, MA 01001 David Preston Matthew J. Bengle 1159 River Road 31 Sterling Road Agawam, MA 01001 Agawam, MA 01001 4 Kerry Frechette Joanne CIeveland 37 Sterling Road 43 Sterling Road Agawam, MA 01001 Agawam, MA 01001 John Scibelli Virgil & Sara Britt 26 Sterling Road 31 Alhambra Circle North Agawam, MA 0 100 1 Agawam, MA 0 100 1 Charles& Donna Johnson Mark& Maria Graveline 37 Alhambra Circle North 43 Alhambra Circle North Agawam, MA 0 100 1 Agawam, MA 01001 Cheryl Fennyery Harry& Beverly Fiedler 49 Alhambra Circle North 53 Alhambra Circle North Agawam, MA 01001 Agawam, MA 0 100 1 Douglas& Katherine Chevalier Mary R. Parkman 59 Alhambra Circle North 63 Alhambra Circle North Agawam, MA 01001 Agawam. MA 01001 OZ91:S aoj apidwal asn wlslaays Paaj 410ows ; slage1 ssaappb ®AU3AH D� Marie Grady Michael & Nancy Doura 69 Alhambra Circle North 75 Alhambra Circle North Agawam, MA 0 100 1 Agawam, MA 0I001 Rhea R. Tourville James& Martha DeFilippi 79 Alhambra Circle North 85 Alhambra Circle North -Agawam, MA 0I001 Agawam, MA 01001 Manuel & Raquel Gomez Richard & Mary Howe 86 Alhambra Circle South 80 Alhambra Circle South Agawam, Ma 0 100 1 Agawam, MA 01001 Bradley& Rebecca Heinbokel James& Mary Ann Fedier 74 Alhambra Circle South 70 Alhambra Circle South Agawam, MA 01001 Agawam, Ma 01001 Joseph& Margaret Pappaceno Virginia Donnelly P.O. Box 241 60 Alhambra Circle South Agawam, MA 01001-0241 Agawam, Ma 01001 Christopher& Michelle Craig Joan Keats 54 Alhambra Circle South 455 Corey Street Agawam, MA 01001 Agawam, MA 01001 Susan Pisano Massachusetts Highway Department 78 Sylvan Lane Ten Park Plaza Feeding Hills, MA 01030 Boston, MA 02116-3973 OZ91:S loj aleldwaa asp WlsaaayS paaj 410OWS easel slagej ssalppb ®AU3AH Joseph& Mary Dalmolin John Korvek 64 Barney Street 36 North Alhambra Circle Agawam, MA 01001 Agawam, MA 01001 ®Z9tS lol aleldwal asn wlSlaa4S PaaA 410OWS January 31 , 2000 No............................... • ..........................................................19............ To the Departmental Officer making the Payment: Received of.................D'i„ Beat'' Inc' ,the sum of .................................................................................................................................................... Three hundred ninety and 00/00 ...................................................................................................................................................................................................................................•-----..................... Dollars, Def. Plan Filing Fee forthe...................... ..... ........ending ................................................................................................................................for collections as per schedule of this date,filed in my office ................ ...... . ..................... ....................... r Town of .A. -awam y 36 Main Street -Agawam, .Massachusetts 01001-1837 yt, Ma Tel.. 413-786-0400 Fax 413-786-9927 MEMO TO: Engineering Dept., Building Inspector, Health Depart FROM: Planning Board DATE: January 31, 2000 SUBJECT: Definitive Plan- Rivers Edge Estates -Barney Street - Langone Please review and comment on the Rivers Edge Estates Definitive Plan prior to the Board's February 17' meeting. Thank you. ` DSD:prk • r Town of Agawam . y 36 Main Street Agawam, .Massachusetts 01001-1837 ar1a Tel. 413-786-0400 Fax 413-786-992,7 MEMO TO: Engineering Dept., Building Inspector, Health Department FROM: Planning Board DATE: January 31, 2000 SUBJECT: Definitive Plan - Rivers Edge Estates - Barney Street - Langone Please review and comment on the Rivers Edge Estates Definitive Plan prior to the Board's February 17' meeting. Thank you. DSD:prk t F by R AGAWAM PLANNING BOARD 1 The Agawam Planning Board will hold a public hearing on Thursday, February 17, 2000 at 7:00 PM in the Faolin Peirce Community Room, Agawam Police Station, 681 Springfield Street, Feeding Hills, MA. The purpose of this hearing will be to hear the petition of Langone Realty Corp. for a Definitive Subdivision Plan of Rivers Edge Estates, a proposed six (6) lot subdivision to be located on approximately 3.5 acres at the end of Barney Street. Per order of Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD To be run 2/3 & 2/17/00. LEGAL NOTICE $�(� LEGAL NOTICE TOWN OF AGAWAM AGAWAM PLANNING BOARD The Agawam Planning Board will hold a public hearing on Thursday, February 17,2000 at 7:00 PM in the Faolin Peirce Community Room, Agswam Police Station, 681 Springf laid Street. Xaeding Hills, MA. The purpose of this hearing will be to i hear the petition of Langone Realty Corp. for a i Deffinitig ubdivision Plan -of—Riversw-Edgg�0 1 Estates, a proposed six (8) lot subdivision to be located on approximately 3.5 acres at the end of i Barney Street. Per order of Charles R. Calabrese, Chairman AGAWAM PLANNING BOARD Published: February ro, 666 L. D. BEAN, INC. Land Consultants Forty School Street WESTFIELD, MASSACHUSETTS 01085 DATE JOB NO. (413) 562.7566 Januarx 31, 2000 FAX (413) 562-2091 ATTENTION James Dale , Town Engineer RE: TO Agawam Engineering Department "Rivers Ede Estates" 36 Main Street BarneyStreet - Subdivision for Richard Langone A awam MA 01001 WE ARE SENDING YOU IN Attached ❑ Under separate cover via the following items: ❑ Shop drawings IN Prints ❑ Plans ❑ Samples ❑ Specifications Copy of letter ❑ Change order ® Drainage Calculations COPIES DATE NO. DESCRIPTION 1 1-28-00 4 Definitive Set of Plans - "Rivers Ede Estates" 1 Jan. 2000 35 Storm Drain-Analysis & Design 1 1 1-28-00 10 Definitive Application with Storm Permit-Application THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints CX For review and comment ❑ ❑ FORBIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Jim: If you have any questions or concerns, please call us. .Thank you, S cerely, COPY TO Planning Department Richard Langone SIGNED: 1f enclosures are not as noted,kindly notify us at once. Davi Bean, President D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Fa Forty School Street . Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 January 28, 2000 ENGINEERS C> , Charles Calabrese, Chairman Agawam Planning Board 36 Main Street Agawam, MA 01001 1 c� RE; Definitive Subdivision - Barney Street -� "Rivers Edge Estates" Dear Board Members: Enclosed please find information pertinent to the above submittal . 1. Letter of Intent to City Clerk. 2. Form "B" Application for definitive subdivision plan and attached description. 3. Filing fee $390.00 D.L. Bean, Inc. check #5249 4. Request for waivers of the Subdivision Regulations 5 . Statement of Interest. 6 . Attested copy of deed. 7 . Environmental Study. 8 . Storm Drain Permit Application 9 . 5 sets of Blue Line Prints of Definitive plan. This information is submitted on behalf of our client Langone Realty Corp. We would appreciate the opportunity to present this proposal at the Boards earliest convenience. Thank you. Sinc ly, D. L B AN, INC. Marc/E. Shute, eni r Vice President Enclosures MES/ssc D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School Street Fax #413-562-2091 SURVEYORS Westfield, MASS. 01085 January 28, 2000 ENGINEERS Clerk's Office 36 Main Street Agawam, MA 01001 Dear Clerk, This is to serve notice that on this date we have filed a Definitive Subdivision Plan with the Planning Board. Enclosed is a Form "B" Application with pertinent details of 'location and owner. Sin ely, D. ean, V Mar E. Shute, Senio vice President Enclosure DLB/ssc FORM "8" APPLICATION FOR APPROVAL OF DEFINITIVE PLAN FILE ONE COMPLETED FORM WITH THE PLANNING BOARD AND A COPY WITH THE TOWN CLERK IN ACCORDANCE WITH REQUIREMENTS OF SECTION III-B AGAWAM January i28, 2000 To the Planning Board: The undersigned herewith submits the accompanying Definitive Plan of property located in the Town of Agawam for approval as a subdivision under the requirements of the Subdivision Control Law and the Rules and Regulations Governing the Subdivision of Land of the Planning Board in the Town of Agawam. 1. Name of Applicant. . . Richard Langone. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Address'. ,61. Mark Drive :.Agawam: MA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 . Name of Engineer or Surveyor. . . D;L. Aean: .Inc.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Address. . . . School.Street. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 . Deed of Property Recorded in. . . . . . Hampden.County. . . . . , . . . .Registry. . . . . . . . Book. . . . . .. . . . . . MV. . . . . . . . . . . . . . . . . . . . Page. . . . . . . . . . .14b.147. . . . . . . . . . . 4. Location and Description of Property: (Attached' sheet) . o ca 5 . A list of the documents included in this application shall acco�any - notice to the Town Clerk. = �' CJ ,..i- Documents required to be submitted with this notice: a. Notarized statement of interest in the land. " ' 1" b. Environmental study. r= c. Plans and specifications. -4 d. Statement of time-development sequence. e. Plan of sequence of development. f. Town-Development relationship study. g. Reports of test borings, etc. Your attention is directed to Section III, B. 8 of the Subdivision Rules and Regulations requiring the posting of a bond or recording of a covenant BEFORE approval can be given. r n Signature of owner. . . . . . . �.+. . ., ..�. . Address. . . . . . . . . .ark AY?, Agawam, . . . . . . . . . . . . . . . . ...... . . . . . . . . . . . . . . Supplement Sheet - Definitive Subdivision Form "B114. Location: Property is located on the northwesterly end of Barney Street about 500 feet northwesterly from it' s intersection with River Road. Property contains approximately 3. 5 acres and is to be subdivided into 6 building lots. LIST OF REQUESTED WAIVERS 1) . Waive Section 159 - 8 E. ( 1) to allow the street to be 821+/-long. 2) . Waive Section 159-31c. to allow a 10 ' wide buffer strip on south and west sides of the proposed submission. 3) . waive Section 159-7.c.8(a) to require test borings. Soil Maps indicate Agawam, Hadley. Agawam Planning Board STATEMENT OF INTEREST Date Januar 28 2000 The petitioner hereby certifies that he is the owner of all lands contained Within the description of the subject petition. Agawam Planning Hoard Case No. . (Nam) /•� LC 4 :(Address). [ 1 COMMONWEALTH OF MASSACHUSETTS HAMPDEN ss Date January 28, 2000 There personally appeared before me, on the above date, Richard Langone to me known to be - the person described in and Who executed the foregoing {document. 1 rim ti •.ir"� My_Commission Expires April i3l 2001 �"° S,Notai�''Publ�c ' My commission expires O'' 1JJ?1J r r4 ' ►'1 SC'RIVENERgS AFFIDAVIT !F )(NOW AIJ, MEN HY THESE PRESENTS, that I, Gary P. Shannon, Attorney at I.aw, with a unual place of business at 1 Monarch Place, Spring- field, 11aml3don CounLy,MassachusoLtR, do hereby depose and say s� under the pains and penalties of perjury, that a deed dated +�-�-777 rabr.uary 2G, 1999, in which Langone Plumbing and Heating Supply, Inc. was Uhc Grantor, and Langone Renity Corp. was the Grantee, was recorded in the Hampden County Registry of Deeds as Document No. 19200, at Hook 30G79, Parse 391, on March 9, 1999. In the witness paragraph and notary paragraph of said deed the President/Treasurer who signed on behalf of. f,angonc Plumbing and cleating Supply, Inc. is written as Elise L. 1,angono and the sig- nature is E1.1is I•. Langone, which is the correct spelling of her - name. I hereby certify that said Itlise L. Langone as written in s one and the sarac person as Ellis L. Langone, and her name was in- correctly written an Elise I.. Langone. I hereby request the Registrar of Doods for the County of Hampden to nlako a notation on the snid deed above stated, referring to this scrivener's _ affidavit. Witness my hand and seal this-L?—day of March, 1999. GaSr�+ S Fannon, Esquire Monarch Place T ice+ Springfield, MA 01103 COMMONWEALTH or MASSACHUSETTS Hamp(Ion, us. March f.), 2999 Then personally appeared the above-named Gary P. Shannon and - made oath that the foregoing statement is true to the best of his - knowledge and belief, before me ) 116I (( OL-6106 �,ie.1 t:►>x4x4 5M oto y P. c My commission expires r y��l Oqr a 4 � l� t. RECORDED IN RY OF DEEDS BOOK ATTEST; + REGISTER P4 - 3Sr/ �M.144CNVgrva gVtltLw+r ease■r GORsuaA�lt+w ItN011■►grlMl N• +¢ HArApOEN COUH7Y to MW AU DLitt' ItY Y711= 11IMSER S N[O I a T R Y OF D E E D ll A1CL1Vta a aEs:aanto (N %flat 1JIt1C M P!1)MI)1NG AN) MATING bUPPI,Y, 1NC. a ootporal(on duly eslablished under 1?,e laws of Otsintunwealtit of Massochusetts N L RL61/lIR and llayitsg its usual place of business At 07 sluNpmkor lane, Mj.lwam, P'f Muir-den County,Massachusetts 0 a for consideration paid, and In full considcsaliun of pee (�] ,u0) Do 1 jar grants la LAND 1tEA1.'1Y Mut. DONALD E.ABRE,REAlMR oof 61 Mark ;;favor Acjawtttn, MassaeltusctLs IIAlNPf1FM COUNTY IIEGI$TIdY Or-0lf0c 0 with qullflatut rouruauta o >U1rl, tlt A cort:ain estate oUttat.ed in Jvjawam, ilanIxlotl GburaL•y, MasnadtusetLa, aryl Lourded' and Y doscribod as follows: (Msulpllaq"W rnnat6s!aatl,if u,] m L)syinllflg at Ufa DlorUtnrly lire of SLerJirxl Roar] at: jls tormiltotion al Lho Easterly lien of lore] ixm or formerly of 101Ui L. Allen luhnson, et: als., and running thence SOMOterly aloaxj " aid of sterling Road and ]an) IIUw or fornerly of Trustees of Use Kirk Laltds %rust, five loatxlred fifty atxl 70/1D0 (550.70) feet to lard formerly or one hunt) Uiersoo WenL•erly along x>rid la►rl formerly of said llunt, six hurdred ninety- cuto arad 70/10D (691.711) feet W land Lelieved now or formerly of Ingham; thence NorUierly two hundred (200) feet to a pipe+ linos Ulettoe NorUteasterly along said pipe lisao, six hutrh•ed fifty tizd 7.9/1(10 (650.29) root to the lastrl of ttte t]imnonwealUt Of MassacrlruseLLsl an:1 00370u lioaterly, etc luurlrod twenty and 19/100 (120.19) feet' to lho point of beginnitxj. A portian.of which was taken by Clio Massaeliusetts Department of Public Works for a state highway by deed recorded in Book 2595, Page 93. MING Ute salvo pronises mnvoyod to grantor herein by deed of Francis M. Gbllins dated November 13, 19D7 and recorded in ;lantpden omfity Registry of Aseds in Book 6683, Page 566. This Lrfutafer does ttol oonsLiLuto a transfer of all or substantially all of the asseL:s of Ialtyorte Pluttbing Arc] tloatbig Supply, Inc. Y(l 1lIItllisifJi 101jerellf, thesaid 1ANC1pb- 11I11f+11J)NG AEU JILATJNG SUPPLY,•I?C. li Jigs caused its cor)wsate seal to be Leletu affixed and these presntts to be signed, acknowledged and delivered N /� rn i w In its name and belts;f by. •its l�rfvS./PyutS horde duty authorized, ;his 1G to day of A 67 in Itle year are tlwusaad nine hundecd and ninety-nitro Signed and sealed in presetce of .............f�f/E.•••�•• .... .......... ................................. ................................................ / • I'Y �a.N 4..�l ... '�.l�G.�i+z_............................ (]file QIuuuuunatrall() of 119l4aaaslludeffa Ilag:dene ss. // 14 -7 47 1999 IUD Pcrronr,lly appeared file+chore nalned j Gije and acknowledged'the fotegoing Instrument to be the free act and deed of the Z4 ' before roc • ' • 4,contmiuiw repLn_.._....../�...J._7_-......-.w___w'S.�oe` f GIAPTC>t aa3 SIIC.i AS AltrflN011D aY Ct1A1"1'L'a 4p7 OF a1t49 livery dyed pletenled for ra trd 16811 contain a have endo,+ed upon 11&t full name.Iteldtwe end pilaf olive addreu of the aranlre rtrllJ of Ihi aaurslf d the fu'I rantldenllen%hostel 6 daLua ar!!tr alum of the nthn sawlderellaq Ibetefof.0 not dellrerrd fee a tptdk+aastetaq con 'r'6,h4 4maideratko shall ham!hr asset licks,fa the totvtremt wM&A deduuloa for any liner or eneumbrs,ra t +panted N the+tmltr or rrvnabtin dhrtenn, All 1,Ah eudarsemenl+and ttdub 8611 he eecssAvd as part of Iht dead.pallree la camply wad i Ibu eerlloa,hall net+rtcrt Ihs■slur of any deed. No eegluer of detds(lull attrpt a deed for rtmiding unless a L M tomoleare with the i 0, r t�, EXISTING CONDITIONS: This property shown on the Definitive Plan is at present undeveloped. It is zoned RA-2 and residence B. The soil conservation service map' s indicate a mixture of Hadley, Agawam and Winooski soil at various slopes. The property located southerly and easterly has been developed. Route #57 abuts the locus on the north and west. Municipal water and sewer services are available to the site from the northwesterly end of Barney Street. There is no indication of historic nor archaeologic areas within this site. PROPOSED DEVELOPMENT: The proposal submitted herewith is to extend Barney Street northwesterly into this 3 acre parcel. A small retention area with an overflow is proposed to handle any on site roadway storm water. The municipal sanitary sewer will be utilized for these new proposed lots. CONCERNS: we have no major concerns on this site since the existing grades are relatively flat and will require no significant changes to accommodate these proposed lots. CONCLUSIONS: In conclusion, the proposal will allow dormant property to be developed. The extension of the existing dead-end street will allow for the design of a regulation turn-around of a 120 foot diameter culldelsac. This will greatly enhance the existing cumbersome maneuvering of vehicles within a 28 foot wide paved area. Once within the site the grading will not affect the siting of single family homes. aTQl M I)SAINAUE PERMIT APITICAT10NS To the Town of Agawam,Department of Public Works: The undersigned being the Owner of the property located (eg:Owner,Lessee,Tenant,Intended Purchaser,etc) at the northwestern^end of Barney Street, being a residential subdivision entitled . Ri rs Edde Estat does hereby request a permit to_increase impervious cover on site and to co�gert f�f ,run--o (eg:Connect to,Alter,Increase Runoff to,or increase Impervious Cover of an and detain the excess volume in a detention area which discharges area draining to) a storm drain,water course,channel or detention facility at into an existing storm drain which exists on Alhambra Circle North. 1. A plan of(lie property showing accurately all storm drains,water courses,channels or detention facilities now existing is attached hereunto as Exhibit"A". (Submit in Duplicate) 2. Plans and specifications covering any work proposed,inciudin soil erosion and sedimentation control,to be performed under this permit is attached hereunto as Exhibit '13". (Submit in Duplicate) 3. Calculations determining existing and proposed storm water runoff,capacity of existing facilities impacted by the planned work and the design of detention facilities are attached hereunto as Exhibit"C". (Submit in Duplicate) 4. The name and address of the engineer or firm who prepared(lie calculation,design plans and specifications covered by this permit is: D.L. Bean, .Inc. !^_ 40 School Street—We stfield, M 5. The.name and address of the person or firm who will perform the work covered by this permit is: IN CONSIDERAT10I101'T111E GRANTING OF THIS P RMIT THE UNDERSIGNED AGREES: I. To furnish any additional information relating to the installation of use of the storm drain for which(his permit is sought as may be requested by the Superintendent. 2. To Accept and abide by all the provisions of Section 175-1 througli 175-59 inclusive of[lie Ordinances of the Town of Agawam and of all other pertinent ordinance or regulations that may be adopted in the future. 3. To operate and maintain any storm drain and detention facilities,as may be required as a condition of the storm drainage permit in an efficient manner at all times,and at no expense to the Town. 4. To cooperate at all times with the Superintendent of Public Works and his representatives in-their inspection of storm drains,and any maintenance thereof. 5. To notify the Superintendent of Public Works immediately in the event of any accident negligence,or other ' occurrence that occasions discharge to the storm drain of any wastes or process waters not covered by this permit or allowed by Section 175 of[lie Ordinance of the Town of Agawam. 6. To indemnify the Town from loss or damage(lint may directly or indirectly be occasioned by the installation of the st drain and related facility or connection. n ; APPLICANT: DATE: 2 �S p 0 ADDRESS• ' 61 Mark Drive Agawam, MA 01001 CONDITIONS OF PERMIT: _ APPLICATION APPROVED AND PERMIT GRANTED PERMIT NO. DATE: SIGNED: SUPERINTENDENT STORM DRAIN ANALYSIS & DESIGN Agawam, Massachusetts "RIVERS EDGE ESTATES" for Richard Langoni January 2000 by: D. L. Bean, Inc. 40 School Street Westfield, MA 01085 I N D E X Description Pages SCS SOIL MAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 TR-55 EXISTING RUN-OFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 TR-55 PONDING DESIGN - LOT 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 TR-55 PROPOSED RUN-OFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 TR-55 EXISTING TO ALHAMBRA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 DETENTION BASIN DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 OUTLET & FAIL-SAVE DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 UH too Isl6bdJUH:. �a• tirr WO q� ■�'��•' i J,�^� .ti •j '� ~ ,,0.w �' �1�.�rf i-. .1�:r'.i.�• •',�ter:_• - kk WO i 'a l f Lk All rI ' UK `�� ����` K Su oil LOCUS ag8 -EnB rT Lk Lk Wo j lti " R '� , •' Ole. TER 7- -F rc Ub �. Wo VnB .. -Y' �.3'a,[•.a.• -} •'JCc �h�. '�' �a . L� n'r•����':�j:v/1��1.�:k ..� •`' 7�. Mr 141 16- 5C$ r� a SOILS MAP -- +.: ..� N• {•::..-X 7Y. yLk- _. Rivers Edge Estates, ,.% aa �t d Agawam tom, i.Y.w1. �• l �' 1 ,. TR-55 EXISTING RUN-OFF For comparison y�.e- G4. 4 '�P�C'�Olf�'/ ,G.Esasv►e..: rLr i'/Y/,t/f�5 17 G'OeF' _ ►P Euyf� � G .9. MA.euC.9 44 hop T Total Area 3. 50 Acres I Es 00 �1z W � A A``yy EXISTING DRAINAGE AREA FOR COMPARISON "Rivers Edge Estates'' Agawam, MA January 2000 1" = 50 ' n RUNOFF CURVE NUMBER COMPUTATION Version 2.00 �oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 runty HAMPDEN State: MA Checked: Date: ibtitle: EXISTING CONDITIONS kbarea : 3. 50 ------------------------------------------------------------------------------ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------ ILLY DEVELOPED URBAN AREAS (Veg Estab. ) )en space (Lawns,parks etc. ) Poor condition; grass cover < 50% 0. 36(68) 0. 17(79) - - Good condition; grass cover > 75% - 0.24(61) -- - PHER AGRICULTURAL LANDS -ush - brush, weed, grass mix poor 1. 81(48) 0. 66(67) - - fair 0 .05(35) 0. 10(56) - - aods good 0. 11(30) - - - ital Area (by Hydrologic Soil Group) 2.33 1. 17 ----------------------------------------------------------------------------- rBAREA: 3 . 50 TOTAL DRAINAGE AREA: 3.5 Acres WEIGHTED CURVE NUMBER: 56* ------------------------------------------------------------------------------ - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 -oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 )unty : HAMPDEN State: MA Checked: Date: ibtitle: EXISTING CONDITIONS ------------------------------------------------------------------------------ .ow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------ feet 3 120 0.005 H 0 . 745 callow Concent'd 50 0. 120 U 0.002 callow Concent'd 430 0. 186 U 0.017 Time of Concentration = 0.76* ---- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 ,unty : HAMPDEN State: MA Checked: Date: lbtitle: EXISTING CONDITIONS Data: Drainage Area 3. 5 * Acres Runoff Curve Number 56 * Time of Concentration: 0. 76 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number 11 1 ; 2 ; 3 11 4 i 5 i 6 i 7 11 --------------------- ------ ------ ------ ------ ------ � -_---- I I Frequency (yrs) ; 1 ; 2 5 ; 10 25 ; 50 { --100 24-Hr Rainfall (in) 2. 5 ; 3 4 ; 4.6 ; 5.3 ; 6 6.5 Ia/P Ratio i 0. 63 i 0.52 ; 0.39 0. 34 0. 30 i 0.26 i 0.24 I I I I I I i I Used ; 0.50 0. 50 ; 0. 39 0.34 ; 0. 30 ; 0. 26 ; 0.24 I I I I I I I I Runoff (in) ; 0. 10 0.22 ; 0. 57 i 0.84 1.20 ; 1. 60 1. 90 E I I I I 1 I I Unit Peak Discharge 10. 259 10. 259 10. 365 10. 411 10. 447 10. 462 10. 471 (cfs/acre/in) Pond and Swamp Factor; 1.00 i 1.00 ; 1.00 11 1.00 1 1.00 11 1.00 11 1.00 11 0.0% Ponds Used ---------------.w-___ I ---- ' ---- I -- --' ---- ' ---_ I ------ ---- ' Peak Discharge (cfs) ; 0 ; 0 ; 1 ; 1 ; 2 i 3 i 3 - Value(s) provided from TR-55 system routines PEAK FLOWS (CFS) 0.73 1.21 1.88 3. 13 VOLUME (A.F.) 0.17 0.25 0.35 0.55 I TR-55 PONDING DESIGN For Lot f rT k�e v.� i .�.Bo r�s�E.e. � -� �T.'FlE.t.o_ ' P�ot� � .s• ��-------- for Area for Detention �� 1 2.98 Acres Ilk W is - � i cs Area fo V. r yl Ponding = ,� 0 .52 Ac. l ct �Ap PROPOSED DRAINAGE AREAS FOR DESIGN "Rivers Edge Estates" 4� Agawam, MA January 2000 111 = 50 , RUNOFF CURVE NUMBER COMPUTATION Version 2.00 roject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 aunty HAMPDEN State: MA Checked: Date: ubtitle: PROPOSED CONDITIONS - AREA II FOR PONDING ibarea : 0.52 -------------------------------------------7---------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- ULLY DEVELOPED URBAN AREAS (Veg Estab. ) pen space (Lawns,parks etc. ) Good condition; grass cover > 75% 0.52(39) - -- - otal Area (by Hydrologic Soil Group) .52 ------------------------------------------------------------------------------ UBAREA: 0.52 TOTAL DRAINAGE AREA: .52 Acres WEIGHTED CURVE NUMBER: 39 TIME OF CONCENTRATION AND TRAVEL TIME Version 2 .00 oject : LANGONI -. BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: btitle: PROPOSED CONDITIONS - AREA II FOR PONDING ----------------------------------------------------------------------------- ow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----------------------------------------------------------------------------- eet 3 60 0.083 F 0. 092 allow Concent 'd 100 0.005 U 0.024 Time of Concentration = 0. 12* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: ibtitle: PROPOSED CONDITIONS - AREA II FOR PONDING Data: Drainage Area .52 * Acres Runoff Curve Number 40 Time of Concentration: 0. 12 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number ; 1 i 2 ; 3 ; 4 ; 5 11 6 11 7 11 ---------------------- ------i ------i ------ i ------i ------i ------ Frequency (yrs) 1 1 2 i 5 ; 10 ; 25 ; 50 ; 100 11 I r 1 r I I I I k I I 1 I 1 I 1 24-Hr Rainfall (in) i 2.5 1 3 i 4 4.6 5. 3 6 6.5 Ia/P Ratio ; 1 . 20 11 1.00 0.75 1 0. 65 0 . 57 0.50 0. 46 • I I I I I I 1 I Used 0.50 i 0.50 0.50 0 . 50 0.50 0,50 ; 0.46 I I I I 1 I I I Runoff (in) ; 0.00 ; 0.00 ; 0.06 ; 0. 15 ; 0. 31 ; 0. 50 ; 0.66 I I I I I i I •I I I 1 ! I I I I Unit Peak Discharge 110. 426 : 0.426 10.426 10.426 10 . 426 : 0 .426 10.507 (cfs/acre/in) 1 Pond and Swamp Factor; 1.00 ; 1. 00 1 1.00 1 1. 00 ; 1. 00 ; 1. 00 ; 1. 00 0 .0% Ponds Used 1 11 i 11 i 11 1 11 --------------------- I ---- I ---- 1 ---- 1 ---- I ---- I ---- ---- 1 I I I I t I E E Peak Discharge (cfs) ; 0 ; 0 ; 0 ; 0 ; 0 ; 0 ; 0 - Value(s) provided from TR-55 system routines TOTAL VOLUME OF RUN-OFF (C.F.) 113 283 585 1,246 Proposed Ponding Area Rear of Lot 6 - Contour 61 Total Area = 8,800 S.F. (in lot 6) Volume of Run-Off vs. Area = Depth 5 yr. = 113 CF (8, 800) = 0.01 , 10 yr. = 283 CF (8,800) = 0.031 25 yr. = 585 CF (8,800) = 0.07 ' 100 yr. = 1, 246 CF (8, 800) = 0. 141 or < 2 inches it TR-55 PROP05ED RUN-OFF for Design RUNOFF CURVE NUMBER COMPUTATION Version 2.00 >ject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 inty : HAMPDEN State: MA Checked: Date: )title: PROPOSED CONDITIONS )area : 2.98 ----------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------------------------------------------------- ZY DEVELOPED URBAN AREAS (Veg Estab. ) �n space (Lawns,parks etc. ) ;ood condition; grass cover > 75% 0. 98(39) 0 . 97(61) - - pervious Areas Paved parking lots, roofs, driveways 0. 59(98) 0. 10(98) - - HER AGRICULTURAL LANDS adow -cont. grass (non grazed) ---- 0.08(30) - - ush - brush, weed, grass mix good 0.05(30) 0. 10(48) - - ods good 0. 11(30) - - - tal Area (by Hydrologic Soil Group) 1 . 81 1. 17 ----------------------------------------------------------------------------- BAREA: 2. 98 TOTAL DRAINAGE AREA: 2. 98 Acres WEIGHTED CURVE NUMBER: 59* ----------------------------------------------------------------------------- - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 aunty HAMPDEN State: MA Checked: Date: 3btitle: PROPOSED CONDITIONS ------------------------------------------------------------------------------ low Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----------------------------------------------------------------------------- feet 3 120 0 .005 H 0. 745 ,allow Concent 'd 280 0.032 U 0.027 callow Concent'd 170 0.012 U 0.027 ,en Channel 120 1 0.033 Time of Concentration = 0.83* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: btitle: PROPOSED CONDITIONS Data: Drainage Area 2. 98 * Acres Runoff Curve Number 59 * Time of' Concentration: 0. 83 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number i 1 ; 2 1 3 1 4 i 5 i 6 i 7 --------------------- ----- ---- ---- ---- ---- -- ------ Frequency (yrs) ; 1 ; 2 5 i 10 i 25 ; 50 1 100 24-Hr Rainfall (in) ; 2.5 ; 3 ; 4 ; 4. 6 ; 5 . 3 ; 6 ; 6 . 5 Ia/P •Ratio ; 0. 56 0.46 ; 0.35 1 0.30 ; 0.26 ; 0.23 0 .21 Used ; 0. 50 0. 46 ; 0.35 ; 0.30 ; 0.26 0. 23 ; 0.21 Runoff (in) i 0. 15 0 . 30 ; 0. 71 ; 1 .01 ; 1.41 1 .84 ; 2. 17 Unit Peak Discharge 10.252 10.286 10.389 10. 426 10 . 443 10.456 10.463 (cfs/acre/in) Pond and Swamp Factor; 1 .00 ; 1.00 ; 1.00 ; 1.00 ; 1.00 ; 1.00 ; 1.00 0 .0% Ponds Used -------------------- ----- ---- ----- ------ ----- i ------ Peak Discharge (cfs) ; 0 ; 0 ; 1 ; 1 ; 2 i 2 i 3 -------------------------------- - Value(s) provided from TR-55 system routines PEAK FLOWS (CFS) 0.82 1.28 1.86 2.99 VOLUME (A.F.) 0. 18 0.25 0.35 0.54 'TR-55 EXISTING RUN-OFF To Alhambra Circle X01 "Rivers Edge Estates" fx Area To Alhambra circle 0. 41 Acres t t ff � EXISTING DRAINAGE AREA To Alhambra Circle "Rivers Edge Estates" Agawam, MA �� January 2000 40 , RUNOFF CURVE NUMBER COMPUTATION Version 2 .00 )ject .: LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 anty HAMPDEN State: MA Checked: Date: )title: EXISTING RUN-OFF TO ALHAMBRA CIRCLE Darea : 0. 41 ----------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------------------------------------------------- HER AGRICULTURAL LANDS ush - brush, weed, grass mix poor - 0. 31(67) - - fair - 0. 10(56) - - tal Area (by Hydrologic Soil Group) . 41 ----------------------------------------------------------------------------- BAREA: 0.41 TOTAL DRAINAGE AREA: .41 Acres WEIGHTED CURVE NUMBER: 64* ----------------------------------------------------------------------------- - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date; btitle: EXISTING RUN-OFF TO ALHAMBRA CIRCLE ------------------------------------------------------------------------------ ow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----------------------------------------------------------------------------- eet 3 55 0.022 H 0.221 allow Concent 'd 80 0.088 U 0.005 allow Concent 'd 190 0.026 U 0.020 Time of Concentration = 0.25* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short i Range, Natural - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: btitle: EXISTING RUN-OFF TO ALHAMBRA CIRCLE Data: Drainage Area . 41 * Acres Runoff Curve Number 64 Time of Concentration: 0. 25 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number ; 1 ; 2 ; 3 ; 4 11 5 ; 6 7`r ---------------------1 ----- I ----- I ---- I -----I -----1 - I 1 I - I - I - -I - I - 1 ---- - Frequency (yrs) ; 1 ; 2 ; 5 10 25 ; 50 100 1 24-Hr Rainfall (in) ; 2.5 i 3 ; 4 ; 4. 6 5 .3 6 . 5 Ia/P Ratio ; 0.45 ; 0. 38 ; 0.28 0.24 0. 21 0. 19 ; 0 17 Runoff (in) ! 0. 27 ! 0. 47 ! 0. 97 1. 33 1. 78 2. 26 2 . 63 ! I I I I I I I I Unit Peak Discharge 10. 446 10 . 594 : 0.720 10. 741 10.760 10 . 775 : 0 . 83 (cfs/acre/in) Pond and Swamp Factor; 1 .00 ; 1.00 ; 1.00 ; 1.00 ; 1.00 ; 1.00 1.00 0. 0% Ponds Used ----------------------1 - - - - ---- 1 ---- -1 ------ I ------1 ------1 ----- I - .. I III Peak Discharge (cfs) i 0 it 0 ; 0 ; 0 1 31 1 1 - Value(s) provided from TR-55 system routines p.8�CAS DETENTION BASIN DESIGN Detention Ponding Design Detention is proposed to control the rate and volume of run- off going into the existing storm sewer on Alhambra Circle North. Pre and Post analysis of the project site was calculated, and after surface ponding was designed in the rear of Lot 6, the difference in rate and volume was less in the Post condition. The surface ponding amounts to less than 2 inches of depth during a 100 year storm event, and this does not consider any percolation. (Soils in this area have a permeability rate of greater than 20 inches per hour. ) The current run-off flowing towards Alhambra Circle from this site is calculated at 0.84 CFS during a 100 year event. The detention basin will control the flow at the outlet with a 6 inch orifice in the cap of a 12 inch pipe. The maximum volume of storage and rate of outflow for the 100 year storm is 5, 780 C.F. and 1. 74 CFS. The depth of the ponding in this situation is 3 . 7 feet. This difference in elevation increases the capacity of the existing sewer in Alhambra Circle from 2. 11 CFS to more than 7 CFS. Other storm events were analyzed and the results of the greater storms are shown below. 25 Year - 1.86 CFS IN & 1. 48 CFS OUT: Vol. = 3,000 CF to elev. 61.0 ' 50 Year - 2.50 CFS IN & 1.62 CFS OUT: Vol. = 4, 300 CF to elev. 61. 5 ' 100 Year - 2. 99 CFS IN & 1.74 CFS OUT: Vol. = 5, 780 CF to elev. 62 .0 ' Results of these and other storm events are shown on the following calculations sheets. STORAGE VOLUME FOR DETENTION BASINS Version 2.00 -oject : LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 runty : HAMPDEN State: MA Checked: Date: Lbtitle: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 2 years Rainfall-Type: III Runoff: 0.3 inches Peak Inflow: . 2583416 cfs Peak Outflow: .2 cfs Detention Basin Storage Volume: 0.06 inches or 0.0 acre feet 649 CF STORAGE VOLUME FOR DETENTION BASINS Version 2. 00 _)ject •: LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: )title: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 5 years . Rainfall-Type: III Runoff: 0. 7 inches Peak Inflow: . 8268925 cfs Peak Outflow: . 5 cfs Detention Basin Storage Volume: 0. 17 inches or 0.0 acre feet 1,839 CF STORAGE VOLUME FOR DETENTION BASINS Version 2.00 oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty HAMPDEN State: MA Checked: Date: btitle: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 10 years Rainfall-Type: III Runoff: 1. 0 inches Peak Inflow: 1.286279 cfs Peak Outflow: 1.02 cfs Detention Basin Storage Volume: 0. 18 inches or 0 .0 acre feet 1,947 CF STORAGE VOLUME FOR DETENTION BASINS Version 2.00 oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: btitle: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 25 years Rainfall-Type: III Runoff: 1.4 inches Peak Inflow: 1. 858365 cfs Peak Outflow: 1. 48 cfs Detention Basin Storage Volume: 0.25 inches or 0. 1 acre feet 2,704 CF M1, R STORAGE VOLUME FOR DETENTION BASINS Version 2.00 )ject .: LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 inty : HAMPDEN State: MA Checked: Date: )title: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 50 years Rainfall-Type: III Runoff: 1. 8 inches Peak Inflow: 2 .49648 cfs Peak Outflow: 1. 62 cfs Detention Basin Storage Volume: 0.41 inches or 0. 1 acre feet 4,435 CF STORAGE VOLUME FOR DETENTION BASINS Version 2.00 oject LANGONI - BARNEY ST. , AGAWAM User: DLB Date: 12-31-99 unty : HAMPDEN State: MA Checked: Date: ntitle: PROPOSED CONDITIONS Drainage Area: 2. 98 Acres Rainfall Frequency: 100 years Rainfall-Type: III Runoff: 2.2 inches Peak Inflow: 2. 987939 cfs Peak Outflow: 1. 74 cfs Detention Basin Storage Volume: 0.53 inches or 0. 1 acre feet 5,733 CF DETENTION BASIN VOLUME Elev. S.F. Ave. (X)Interval Vol . (CF) 58. 3 0 302. 5 0.7 212 59 .0 605 1, 001.0 1.0 1,001 60 .0 1, 397 1, 829 .0 1.0 1, 829 61.0 2, 261 2, 740.0 1. 0 2, 740 62 . 0 3, 219 Total Volume = 5,782 C.F. TT R;�n OUTLET & FAIL-SAFE DESIGN 7 DETENTION OUTLET CONTROLS SIGN PARAMETERS: bankment Elevation: 63 .00 ximum Water Elevation: 58. 60 let Elevation: 58. 30 tlet Elevation: 58 . 26 ilwater Depth: 0. 00 ope in Percent: 0 . 5 ngth of Pipe : 8 . 0 ameter of Pipe ( in) . : 6 .0 pe of Pipe: PVC nning' s n: 0 .012 ad Loss Coefficient : 0 . 5 ow Type: Orifice Control LCULATION OUTPUTS scharge (cf s ) : 0, 2114 2 YEAR STORM pth of Flow: 0 . 3 locity ( fps ) : 1 . 0767 SIGN PARAMETERS : ,bankment Elevation: 63 . 00 ximum Water Elevation: 58 . 84 -let Elevation: 58 . 30 itlet Elevation_: 58 . 26 ilwater Depth : 0 . 00 ope in Percent : 0 . 5 ngth of Pipe : 8 . 0 ameter of Pipe ( in ) . : 6 . 0 rpe of Pipe : PVC nning ' s n: 0 . 012 ad Loss Coefficient : 0 . 5 ow Type : Orifice Control .LCULATION OUTPUTS scharge (cf s ) : 0 . 5091 5 YEAR STORM -pth of Flow: 0 . 54 -locity ( fps ) : 2 . 5929 DETENTION OUTLET CONTROLS (coa't. ) SIGN PARAMETERS: bankment Elevation: 63.00 ximum Water Elevation: 59 . 72 let Elevation: 58. 30 tlet Elevation: 58. 26 ilwater Depth: 0. 00 ope in Percent : 0. 5 ngth of Pipe: 8. 0 ameter of Pipe ( in) . : 6 .0 pe of Pipe: PVC nning' s n: 0 . 012 ad Loss Coefficient : 0. 5 ow Type : Orifice Control LCULATION OUTPUTS scharge (cf s ) : 1 . 0226 10 YEAR STORM pth of Flow: 1 . 42 locity ( fps ) : 5 . 2082 SIGN PARAMETERS : bankment Elevation: 63 . 00 ximum Water Elevation : 61 . 00 let Elevation: 58 . 30 tlet Elevation: 58 . 26 ilwater Depth: 0 . 00 ope in Percent : 0 . 5 ngth of Pipe : 8 . 0 ameter of Pipe ( in) . : 6 . 0 Pe of Pipe : PVC nning' s n: 0 . 012 ad Loss Coefficient : 0 . 5 ow Type : Orifice Control LCULATION OUTPUTS scharge (cfs ) : 1 . 4798 25 YEAR STORM pth of Flow: 2 . 7 locity (fps) : 7 . 5366 DETENTION OUTLET CONTROLS (con't. ) SIGN PARAMETERS: bankment Elevation: 63 . 00 ximum Water Elevation: 61 . 50 let Elevation: 58. 30 tlet Elevation: 58 . 26 ilwater Depth: 0 . 00 ope in Percent: 0. 5 • ngth of Pipe : 8.0 ameter of Pipe ( in) . : 6 . 0 pe of Pipe: PVC nning ' s n: 0. 012 ad Loss Coefficient : 0 . 5 ow Type: Orifice Control >LCULATION OUTPUTS scharge (cf s ) : 1 . 6238 50 YEAR STORM ,pth of Plow: 3 . 2 J ocity ( fps ) : 8. 27 :SIGN PARAMETERS : ibankment Elevation: 63 . 00 iximum Water Elevation: 62 . 00 filet Elevation: 58 . 30 atlet Elevation: 58 . 26 3ilwater Deot'r:: 0 . 00 lope in Percent . 0 . 5 angth of Pipe : 8 . 0 iameter of Pipe ( in) . : 6 . 0 ype of Pipe : PVC anning` s n: 0. 012 ead Loss Coefficient : 0 . 5 low Type : Orifice Control ALCULATION OUTPUTS ,ischarge (cf s ) : 1 . 756 100 YEAR STORM lepth of Flow: 3 . 7 elocity ( fps) : 8. 9434 FAIL SAFE OVERFLOW CAPACITIES ;SIGN PARAMETERS : ibankment Elevation: 63 . 00 ,ximum Water Elevation: 62 . 00 let Elevation: 58. 30 ,tlet Elevation: 57 . 54 ,ilwater Depth: 0 . 00 .ope in Percent: 0 . 5 !ngth of Pipe: 152 . 0 .ameter of Pipe ( in) . : 12 . 0 -pe of Pipe : PVC [nning ' s n: 0 . 012 !ad Loss Coefficient : 0 . 23 .ow Type : Pipe Control LLCULATION OUTPUTS .scharge (cfs ) : 7'. 0858 PROPOSED 12" PVC !nth of Flow: 3 . 7 FAIL - SAFE Jocity ( fps ) : 9 . 022 OVERFLOW PIPE ;SIGN PARAMETERS : ibankment Elevation: 63 . 00 iximum Water Elevation: 62 . 00 ,,let Elevation: 57 . 14 itlet Elevation : 56 . 54 1ilwater Depth: 0 . 00 Lope in Percent : 0 . 3 ?ngth of Pipe : 200 . 0 :ameter of Pipe ( in) . : 12 . 0 rpe of Pipe : PVC inning' s n: 0 . 012 ?ad Loss Coefficient : 0 . 23 .ow Type : Pipe Control �aCULATT_ON OUTPUTS Lscharge (cf s ) : 7 . 2929 EXISTING 12" PIPE IN :pth of Flow: 4 .86 ALHAMBRA CIRCLE WITH '.locity (fps ) : 9 . 2856 FULL DETENTION BASIN D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 January 28, 2000 ENGINEERS Charles Calabrese, Chairman Agawam Planning Board 36 Main Street o Agawam, MA 01001 c� RE: Definitive Subdivision - Barney Street .� "Rivers Edge Estates" : Dear Board Members: " Enclosed please find information pertinent to the above submittal. 1. Letter of Intent to City Clerk. 2. Form "B'l Application for definitive subdivision plan and attached description. 3 . Filing fee $390 .00 D.L. Bean, Inc. check #5249 4. Request for waivers of the Subdivision Regulations 5 . Statement of Interest. 6. Attested copy of deed. 7 . Environmental Study. 8 . Storm Drain Permit Application 9 . 5 sets of Blue Line Prints of Definitive plan. This information is submitted on behalf of our client Langone Realty Corp. We would appreciate the opportunity to present this proposal at the Boards earliest convenience. Thank you. Sinc ly, D.L B AN, INC4en Mar Shute, Vice President 4 Enclosures MES/ssc D. L. BEAN, INC. LAND CONSULTANTS 413-562-7566 Forty School Street Fax # 413-562-2091 SURVEYORS Westfield, Mass. 01085 January 28, 2000 ENGINEERS Clerk' s Office 36 Main Street Agawam, MA 01001 Dear Clerk, This is to serve notice that on this date we have filed a Definitive Subdivision Plan with the Planning Board. Enclosed is a Form "B" Application with pertinent details of location and owner. Sin ely, D. ean, In . Mar E. Shute, Senio vice President Enclosure DLB/ssc J FORM "B" APPLICATION FOR APPROVAL OF DEFINITIVE PLAN FILE ONE COMPLETED FORM WITH THE PLANNING BOARD AND A COPY WITH THE TOWN CLERK IN ACCORDANCE WITH REQUIREMENTS OF SECTION III-B AGAWAM January 28, _2000 -^ To the Planning Board: The undersigned herewith submits the accompanying Definitive Plan of property located in the Town of Agawam for approval as a subdivision under the requirements of the Subdivision Control Law and the Rules and Regulations Governing the Subdivision of Land of the Planning Board in the Town of Agawam. 1 . Name of Applicant. . • •Richard Langone. . . . . . . . Address. . 61•Mark Drive .Agawam: MA • . • . . • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . 2 . Name of Engineer or Surveyor. . . D.L. ,Bean._Inc.• . . . . . . . . . . . . . . . . . . . . . . . . . Address. . . 40• S Ool•Street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. Deed of Property Recorded in. . . . . . HamP.den•County, • • • • , . . .Registry. . . . . . c Book. . . . . . .. . . . NW. . . . . . . . . . . . . . . . . . . .. Page. . . . . .. . . . . .1!+�: 4. Location and Description of Property: (Attached' sheet) . c, 5 . A list of the documents included in this application shall accomp notice to the Town Clerk. Documents required to be submitted with this notice: a. Notarized statement of interest in the land. b. Environmental study. c. Plans and specifications. d. Statement of time-development sequence. e. Plan of sequence of development. f. Town-Development relationship study. g. Reports of test borings, etc. Your attention is directed to Section III, B. 8 of the Subdivision Rules and Regulations requiring the posting of a bond or recording of a covenant BEFORE approval can be given. Signature of owneA!i!L! . . . . :. . Address. . . . 6I . . . •Drive,. Agawam, MA. . • • . • . . . . . . . . . . . M . . . ry f�fI ii 61 Supplement Sheet - Definitive Subdivision Form "B114. Location: Property is located on the northwesterly end of Barney Street about 500 feet northwesterly from it 's intersection with River Road. Property contains approximately 3 . 5 acres and is to be subdivided into 6 building lots. LIST OF REQUESTED WAIVERS 1 ) . Waive Section 159 - 8 E. ( 1 ) to allow the street to be 821+/-long. 2 ) . Waive Section 159-31c. to allow a 10 ' wide buffer strip on south and west sides of the proposed submission., 3) . Waive Section 159-7 .c. 8(a) to require test borings. Soil Maps indicate Agawam, Hadley. Agawam Planning Board STATEMENT OF INTEREST Date January_28, 2000 The petitioner hereby certifies that he is the owner of all lands contained within the description of the subject petition. Agawam Planning Hoard Case No. ! t (NAM ) -(Address). J COMMONWEALTH OF MASSACHUSETTS HAMPDEN s s Date January 28, 2000 There personally appeared before me, on the above date, Richard Langone to me known to be - the person described in and who executed the foregoing_document. ' My Commission Expires April 13R 2001 ��~.. Notary Public III' My commission expires >s� ' . Jim Y s SCRIVENERS AFFIDAVIT r w_ KNOW ALI. MLN BY THESL P1tCSLNTS, that I, Gary P. Shannon, Attorney t- at Law, with a usual pluce of husi.hess at 1 Monarch Place, Spring- field, llampdcn County,xaSSachusetts, do hereby depose and say 4z< under the JJai1Ls and penalties of perjury, that a deed dated , February 2G, 1999, in which Langone Plumbing and Heating Supply, ` 4- Inc. was the Grantor, and Langone Renity Corp. was the Grantee, was recorded in the Hampden County Reyistry of Deeds as Document No. 19200, at Hook 1O679, Facie 381, on March 9, 1999. Z In the witness paragrnph and notary paragraph of said deed the � Presi den t/Tr.easurer who signed on behalf of Langone Plumbing and Heating Supply, Inc. is written as Flise L. Langone and the sig- �- s— nature is HME; 1.. Langone, which in the correct spelling of, her name. 1 liereby certify that said Elise L. Langone as written 13 }— one and the same person as Ellis I.. Langone, and her name was in- � correctly written as Elise 1.. Langone. I hereby request the _ Itegiatrar of needs for the County of Hampden to make n notation on the said dead above stated, referring to this scrivener's — affidavit. 3 r Witness my hand and seal this,_�_day of March, 1999. Gar Shannon, Esquire -1--Monarch Place _ Springfield, MA 01103 COMMONWEALTH Or MASSACHUSF.TTS 11ampdon, at;. March 1.2, 1999 Then personally appeared the above-named Gary P. Shannon and made oath that the foregoing statement is true to the best of his knowledge and belief, before me C6",- nA P oLt�1UC- Je.f JC)J0(A5M6Reta y PublIc My commission expires: ;d r . II OF DEEDS t'.. .. 11 i.:' Am ATE:STrl ;REGlSttR } \. MAaeACwUeaha OUITCLAM DEEP■T C0II0-ORAT10A1 411HORT/oa Ml ee• • [HAMPOIN COUNTY X" ALL. J,V;:N nY '11LIM PICSl:hr1S a T R Y O f D EEDtieUTro a Rtroeuro 'Mat 1lttKXM 1'1�M lNG AN) ILLMING SUPPLY, INC. _a eotpotatlon duly established under 014 laws of CUItIlUnd'eftlLll of MAssachusctls 'C � r � liLOrYTIIi and 110411E Its usual place of 11VAIc53 at 917 Showokcr ltene, Atiawam, TH llaiij'tlen County.M133SC11PSCtt9 L�.LL for eOrlsidcr011011 Paid, and 1r1 full consideration of 0110 (01.00) dollar grants to 1AWMIdv 1tl•A3:Py Whit. DONALD F.ASHE, RE01STEq CT) of )IAJAPI)TH COUNTY AEGISTAY Of UrfO< 61 Mark llrivo, hcjsawrin, Mtlssal:llusetts ([I with qullrlalut rourelnnta � allttttetxdtltlt A Curtain cretnt.e situat.ed 11) lajawanl, IL:,rtlxlen County, Masrachusett:s, and lxxl"ed' aid Y doscribod as f01 lame S (Ocicrlpthxe and cacttmbramcs.If abt) m I)rvj1 u,itKj at Uics Nor0lrrly 11w elf sLrrlijV Road at. Jts tormirtation at the Laster.ly Tina of lame] rxw or for'nlerly of l:clltll 1.. Allen ,1o1iwwri, et a)a., aid runnitag thence Southerly aloud Uio ertd of Sterllrxj ltuod and lai,4 delve or fontorly of Trustees of U7e Kirk Lanni, 7Yust, fivo 11u17c)red f.if.Ly al-4 70/1.00 (550.70) feet to land formmrly of one Hunt) User= Wenterly alotelj said ]air] formerly of said hunt, six hurrlred nirpty- osita and 78/100 (691.70) feet to land Whoved now or fonterly of Inghalni thence Nort-Iml.y Lwo hundred 1200) feel Les a p1pe liner Uearx7e NorUtcast:orly along said Lrilxe Mho, six ftutdt-ed fifty hill 29/!00 (650.29) feet: to Lhe 1514 of Use (YlrtlTsorwealul of MossaUtusettsl aril Lbonoe Jiasterly, one Intralre_-d Lwelity nix) 19/100 (120.19) feet to the poJ nt of Laeg1rinJ txj. A porLion.of which was taken by die MissaclluseL•Le Department. of Public Works for a salts highway by deed recorded in Book 2595, Page 93. MING U1e same laresnises convoyed to grantor heroin by deed of Francis M. W11ins dates] November 13, 1907 and recorded in Ilattfden county Registry of Deeds in hook 6693, Page 566. This transfer- does not constitut:O a trnnsfer of all or sabstant:ially all of the assets of Itulyorle Plurtl.ring Arc) Ifoatirxj Supply, Inc. ' lit itiffaroo !l ilaref, tile said 1ANOOM PILM HC AEU ItL?AT1NC 9l1PPLY,-Iw. Ito caused its coil.urate seal 10 be herclo AfTtacd and Iltese lucscUrs to be signed, acknowledged anal delivered y in its acme and behalf by [i S [ L 7,.,� its j ws-174w-11, herclo duly nuthusi:ed, this (, Joy of ill the year esee thousand nhte htutdsed and nirgty-vino + r� Signed and sealed in ptcseucc of � ,I.Jett'.Olal:..BIl1MII1t1G,.ANA..1iEATING..St1PI'.J.Xa..1NC,t. �� y ,1�..............................tGk e................................ • t (glib Qltttuuututuralll) ro! Anaanfllureffs lirinIA09, ss. � 1999 Thal Personally,sppcatedtilte above shared. t�s� 6,7e►,_T___e r rA and acknowledged'!he fotego(ng instrument to be the free act and deed of the GQ�, before lilt "' » � rr PalIle-X1L(MMt wl i" vi Mt Cen,R.wi Capfrea C11AP1'Ca raa SIIC,6 AS AAl1:NDUL3 OY CIIAPI•la*)7 Of 1969 I Caeref deed pleltnted for let Ind shalt toalaM or hevr rndoned erpen L1 de full tenet,lta&wc and port o6re address of the grantee end *itlta ed live Onlount oI the(o'I roneldollIon tlwr.9(is double ar tlw nature of tl.r other conlIdrF*l" therdor,It hoe delivered Jot a 41411 it monelarr sum. ;;(ru wneldrialko e1.a11 mean 11-C told Islet nor dK con-crsnce wlehoot dedurrlon for ap Item er eanuabrowt* '1 arlvnwd by Itw rAnlee or rtmahCnl1lI Ilw.tora All,nth p.Jantnteoss anal«dede aha11 be rtrerdtel as pan of trw deed. FAllvre to eerplf with thia*action 6611 not Allen the v1dallt of env deed. No laRhler of dtrds lhsal uerpe a deed for recording unless It is In rompliswe with that ,r..rLrre„n wr rrJr wrlwn , f rr{111i U4�1 y�J,1r. 1.�_,�...J ►•1 L�f•,.}t .S 1' i'. EXISTING CONDITIONS: This property shown on the Definitive Plan is at present undeveloped. It is zoned RA-2 and residence B. The soil conservation service map' s indicate a mixture of Hadley, Agawam and Winooski soil at various slopes. The property located southerly and easterly has been developed. Route #57 abuts the locus on the north and west. Municipal water and sewer services are available to the site from the northwesterly end of Barney Street. There is no indication of historic nor archaeologic areas within this site. PROPOSED DEVELOPMENT: The proposal submitted herewith is to extend Barney Street northwesterly into this 3 acre parcel. A small retention area with an overflow is proposed to handle any on site roadway storm water. The municipal sanitary sewer will be utilized for these new proposed lots. CONCERNS : We have no major concerns on this site since the existing grades are relatively flat and will require no significant changes to accommodate these proposed lots. CONCLUSIONS: In conclusion, the proposal will allow dormant property to be developed. The extension of the existing dead-end street will allow for the design of a regulation turn-around of a 120 foot diameter cul 'de' sac. This will greatly enhance the existing cumbersome maneuvering of vehicles within a 28 foot wide paved area. Once within the site the grading will not affect the siting of single family homes. STORM 111"INAGE;PERMIT Al'PLICA'1•IONS To the Town of Agawam,Department of Public Works: The undersigned being the Owner of the property located (eg:Owner,Lessee,Tenant,Intended Purchaser,etc.) at the northwestern_ end of Barney Street, being a residential subdivision entitled increase im Ri��rs e E Estate. does hereby request a permit to pervious cover_on site and to co ecte ,run—o (eg:Connect to,Alter,Increase Runoff to,or increase Impervious Cover ofan and detain the excess volume in a detention areayhich discharees area draining to) -- a storm drain,water course,channel or detention facility at into an existing storm drain which exists on Alhambra Circle North. 1. A plan of the property showing accurately all storm drains,water courses,channels or detention facilities now existing is attached hereunto as Exhibit"A". (Submit in Duplicate) 2. Plans and specifications covering any work proposed,including soil erosion and sedimentation control,to be performed under this permit is attached hereunto as Exhibit '13". (Submit in Duplicate) 3. Calculatinns determining existing and proposed storm water runoff.capacity of existing facilities impacted by the planned work and the design of detention facilities are attached hereunto as LExhibit"C". (Submit in Duplicate) 4. The name and address of the engineer or firm who prepared the calculation,design plans and specifications covered by this permit is: D.L. Bean, Inc. 40 Sdhool Street, Westfield, MA 5. The name and address of the person or firm who will perform the work covered by this permit is: IN CONSIDERATION O1 J'1If:GRANTING OF THIS PERMIT TfIE UNDERSJs;i�yj?D AGREES: I. To famish any additional information relating to the installation of use of the storm drain for which this permit is sought as may be requested by the Superintendent. 2. To Accept and abide by all the provisions of Section 1 75-1 through 175-59 inclusive of the Ordinances of the Town of Agawam and of all other pertinent ordinance or regulations that may be adopted in the future. 3. To operate and maintain any storm drain and detention facilities,as may be required as a condition of the storm drainage permit in an efficient manner at all times,and at no expense to the Town. 4. To cooperate at all times with the Superintendent of Public Works and his representatives in their inspection of storm drains,and any maintenance thereof. 5. To notify the Superintendent of Public Works immediately in the event of any accident negligence,ar other occurrence that occasions discharge to the storm drain of any wastes or process waters not covered by this permit or allowed by Section 175 of the Ordinance of the Town of Agawam. 6. To indemnify the Town from loss or damage that may directly or indirectly be occasioned by the installation of the sto drain and related facility or connection. APPLICANT: Z X 1 DATE: 2 ADDRESS ' 61 Mark Drive Agawam, MA 01001 CONDITIONS OF PERMIT:, APPLICATION APPROVED AND PERMIT GRANTED PERMIT NO. DATE: SIGNED: SUPERINTENDENT c D# a(o�yoo� s LOG # $ox # y PAGE N l�J y K a c� ��'� ,,,/� ti W �/,� .�//� �v/F .Y/�- �/,� .ram/�- •r//�- .v/,�- � ,�/F t7 ,�a,eYE2 ire �A,ci�dt-�'.�c�C,C� � c1-�ovcffE'� J-Ca.�i�f/.Gy�`s cT��LO �iS�dcJ4h��icJ S- f owE.�S � J--,C��v�L�y �' �'• /�ow� �J �'yL6.�i r 0 k 3 itJ7S ell- "If/v_ G6o327-drX/� ' - 5RI oo ' ;' /7/• O o' �"` �'"'— /s' wrote- Bv.��G,e 3 7-dl- 3z ' o � Q q� �'!• a � f 3z33S �5'F � N G � y js 6' 3 o 1P ` 'i s 1 I T7 1408-3AI 4- tIT a y. Q IO y '� o N ti h � fp W o : o z6, -446z sf o �8 yzo sue• h 0 5 �G .Loy' .�'. Iq� A 0 0 4eO 80 /20 160 _ FED r 26 / O Lla .ZONE —2 a COX-7"- Z !v /' le6Z' P . MAY 1 7 2 000 G9 s .P.��JU .. f,G9•v.�/svc�.B014.�- 7r.�t.�.�,v o� ry6vc� � e��/�'� � , �G�gL[JA/�1� /y9ss�c�l �'�� ror,�.v e�,��,�w,p,Y,��r .yc'•vus�r s I CERTIFY THAT I HAVE CONFORMED SvB�o�Y�`Sio.c/ o eZ_;p ,eT y ?_ eC�-.c WITH THE RULES & REGULATIONS rsAC'.yC/SETTs OF THE GISTER OF DEEDS fob: C•yAi�ygv: ,[�vr-/c'Cax".Q�P,eo��.� drr�is PG.vc%8y IN PREP R G H LAN ++�,�N o �,��f' ��c.�/.9•�.a L.9NGo�44E' DA L� r��PGdv.�/.c•�,6d�,eJ � s1v.�CivC� BEAN �4GAwAM /`�•9ss- .Q.vd.eLt'�o2,l�Cta �r-r.�is oicFi���.c.ro r��r~ 8280 y DATE: SCALE: SUR ��% �i4�Z8 ZOOO CHECKED: �vizic�� 7"���ic��"�/�i✓�-.c-��rif�.�"�2 M. � , v• ode SUL.y� -Go�j . S%ado PLAN NO. SHEET NO. D . LBEAN, INC. SURVEYORS & ONE PARKSIDE AVENUE ENGINEERS WESTFIELD, MASSACHUSETTS tT fta2 VE2 l,,4,tJ 4.�-�',ec%o' • $DUcyE,� --G'l/r�!/y/��iS �7:r F/ELO �/yd.�Ji�/�i�i� j �OWE.PS ! T /Sw/ vuay.�rU BBC .sr �,¢ --7 iy �� 3 ti y POO op VA g ay Rif Von 1 � �' A \\ .BA.�/yE' ST.eEET �o yd p 6� / b AN ® Z a >7,l0w4cc, 5 .w � cp,r.,ru_ — 6 �'O CONTO[��S Cad C _ � / f � O -- S•9N/TAB /✓Ji�il�,yoGE o 63 6 +.� ` Q �- - rvydJ2.giv7 .aEs�cwW,9 T'"O�Y I CO g AG l5U.3� Ti�LL O G� V t /U oT�: �4�f'E.4 Df �3CJFiCl� �r�ej o wryer 4'Aeo,Gtj6e57 lq�4A-J-- �.s 6Z 14C6 r� Z > �9p,Sa/L "Tys4 GaosE P.5-r9tio 4 �ooSE uD Alo _STo.✓ES /a Gu aR PeESEti r uJ. 6.e f "�:..r_ 07 APRRO V.94 44V/JE'.e %Sv�.o/V1&10' ,1/ P,4,9NiVii16 00,4e?,e,o -- 7orvN o r"' AGE ��/�! �ASSACy�/SE 7~T,s ,,40,,Vol�=A.4 .Zal"N Of °iVID �N,` . gG.vl�Y•9�l M.Q,ss. LEnOa► Ric"A BEAN Cu *29280 % DATE: SCALE: Aa ! � � 9-e,40o CHECKED \, /STE. maoq PLAN NO. SHEET NO. ids�_ D . L . BEAN, INC. SURVEYORS & ONE PARKSIDE AVENUE ENGINEERS WESTFIELD, MASSACHUSETTS PRIME GRAPHICS 4 ���T 4:::f4:5_(S ZA40041c> �C s " 4 sS SS SS r SAN-17-.4,ey -re-LVE.G : ,'A-E' 1��,'_,LpCA.) � -1, w w W _ ' 4JA rE� ,[,i1,F �-�-1 - . SMH Q = ,S~';7-A,e,�,1 .y.9Av.41c4E — - _-- � 14=/.Cry C'CDT//ro mac_aisr�✓eZ&�:> �- = :&'i e,5 .vya,�.9�.T- /fe v�f l;r,0,1 4f�. •cam ar . c� 7 W $ = v T1Z17r W PaG,S ,,�,, - w .S/>- Con-G. .9�.�M roles A:�I-`1a�i v U,vr�Gc esiy��r ' . ,°f z «vTE.e.eiiavE /0_Q.9•b sr.9rid vs ��r�ra-u DF'Suiac� �N�- . 'k n P,fj� ,(�) = toT �E�iGN.9rio.V ,Car" • Ie 14:W,s o�6_�,�•O G (�°wrp 4 ���C.u) ( ) ❑ = coNC. BpUNb TD$E SET LEACHING CELL/BASIN DETAYL 4 - /.eo�v .�i 7a 8i� S -T - ( ) ITYPICAL BASIN "APRQN N/!` / I Ls �`�/' --- _`_ - lzrw /�/'ow �U/VIJ MASS. STD. CAM BASIN a + ,- a o --- =E�,,-c., �L, f' c.T. Y. l FRS. AM GRAZE - ,- I 7 J_yj 0Ir• co/Jc. 9r y4 \ Y/ �t 6' 'eM 24 RCP OR � J I 1� �. / MASO!� HLOCIC . �gtl, FILTER CLOTH TO BE :wOl��iOVEN I l A. n, POLYPROPYLENE DUPONT TY_-AR, 3/8 WASHED I �4�,v�h � l h v FILTER CLOT& ��� MORTAR 2DI0 z uIAAFI I40 OR E�QC�* d PEASTONE I f 1 r/ COp Cc, - i (TYP.} C6 OVER I '� I 5r y d /� 1" Square Galy. :i GRATE BURLAP . i7ire I7estt (Typ. �j n� 0' 7.;'p, T 1" Square Ga1v. N ( V PRECAST CONCRETE � , /- - •oa �� ` :_r6 o O / LEACHING CHAMBER vire !ie:� (1y�.) 9 W_ O'.. A ar d/r. C'a. . wA 0-' 2 // 5F ' +/- �'X/1T .____.. - Q-' � O ,� ;a 3'Z*Sax`4�TasSed H-10 LOADING 3Z`, (u°Sh ) PLAN ,V'�. Sr ss ss s5 w ss _����A-1_ `I B"Pv �vl Y - 4 j 1 v ��e sMf�,i y O' Stone stone y � rl E"h'isT. .dr�vEIfEn�os � , QltJ-' ��-- • �/ TOPOGRTEW w w�w w w— w �, - - - - -_ w Z Deep 3" Min. WaIL lls ' ABOVF. F.G. Sum OF PEASTONE ii 2 3/8" WASHED PEASTO*N �lti -j CC�C. rEL. c7,V. - /o ~- .+C/S T OA/G. W.4 L O c- .S/ EW,9/ � to 1 `" r BURLAP SHEET �y9 ,l � 3 ` npe,0w Co__ACTED SC9GaaD.. 1Y / 10' SQUARE LEACHING CHAMBER j � A � o ,4�ly,4%'�, �, J r 8 Sri ,3 h q, ( ) l/AL!/C'A7�x7 '� �L� ) � � - ,A�1OR O Y.qL UNo E2 S v� p /Y/S/o N A•Gi9/V e �.eo�'iL E'Z.4E'T�9/LS � /'Zg1iVTf�/i_y /D " ,5Ei09 7-16W COJV T20L e_�GCI� AS �E LIII//R E40 - AGAG✓AM /�i9►55AG�,�vSETT.S ti Div UT/Z/Tf' L��7�eAl, C ''1�> ap e ti* ,o.1a4!.9.e0 z,9,v6,0wE � � /dL�/V/V//V6 :6 o y.eo - 7"o C!//V of �` al Nv : /.44 i+ k cmA G� ry; AG19 M MASS. .vvT� sa,J1r.4,e�i�s �e L�r��'� /° r EGA Gv,4til, �J�ss.,9Cyli Ste' 7-Ts C[ A ".S 'Z yo : C'��sr Z-/2r��-4.vr- />p/; /O f�/pC rax5le Js le-3s o2 i ' ,cor�s 1t��'W�C'/,(,) 6'D.c)626-r� ,[01 E/C�J�/E"�' �.S�lJr4 •/�12f� t"yO�cl/` scAeEs .• tio2iz: / " ,�o' .4.�9T�•" ��` ,c,�KE>t�� ,�,4•c1 z8 Zo�v �r���x��: If3 ,L,2� Cy,�'a-�5 r'/(ie Cv.Q rye ��4/x), !�2S.P-T., / y4 Z/ , �-- ,��'13�-moo CHA/.e/J�9 ' ,CCr�_5, joal� PLAN NO. 1 ,3 EST NO. dd4O.� i I I 1 i i ' ! . : : : __ - ... - -- - - - - . _._. __ .. ... - ._ �.1. _.+ _. -- + -- -— i. �- -- +-- _ _. ._ _ - - r - - - - 1 - t . � � I t ! � - t . - .. ,- I I { I 'k �V4 VT I .: ­ _ ... .. - ______­_.__ ------- __ 1 L B �'i J __-�­ - ;- ,-. -� -�----_-- - i �1 I I ,'I . . ____ -..-- _. .. I . ; I ! , , : -- 1 1 I I I 11 : : I I i I I ! I I I I 1 i i , ! I 1 i I . . I ! i N PARKSi'�E rt � V NUE - _ - ._ . . .- _.. -- ._ .-. . . _ - : - - - - d Al { - + - i _ T- - -- - - -� --- I -� +-- - - - - � �- - -+- }_ice. + ! j i I , - --- -_L t MA S C4?�UETT ! s I I I I I I t i' I i I ^WESTIFIEL.D. S _-H i_i7 ! 1 I I I I i I j ; i 1 - , I ', I: i ; i , : I _ , . .. _ _ _ - - - - - - - -- - - - - - ; i -.. __ �__._.�_. _.. ._. _._ -<- - 1- - - - - - �- - - - ..- �_ - - _ _.. - -. __. . ._. _ - I I I i I I . . : I I i - I , - , ; 1 , I } i i I I I t ; I : : : - I + I I I 1 i I I }.- + , t _ I• ._'.. t.. ... ...*_ �- + t r I € I 1 j t- - - it i - - - - -- t - - - -r t �' - - - - i - -+_ __ _ _-1_- 'f- r - - - + . { I I - 1 '\ , : (Y •4 - - I i - ----- -- - - - --- -. - t - 1 I ; i I I I I I i �I i - f - -- - - .. .- - _ .._ _ _ _.. -. - _ - --._- , I 1 t f -. - _ �. _ L I .- - i I _ I i 'J - I I (/Z(+l0 �� I i I . . -}- i j I j 1 I j V I I i , , - ------ --- - .. .--- _.._. - _.- --- --. _._ .. __ _ - - - -$-- -- -- - _ _._..._._. ... _ --- - -- - - - __. .._._. ._._. _ __ : --- 4 -_ . - '---�---- --._.�_.._T--...T--...__ w - T } W--r- t `I�I`'�--/1 -�Frf' r� I 1 - t- - + * - - r r -*- 'r - - - - - } - -- - - +----. _-- - _ __.. __ --_ -__ _ ---.�� __ -.- t 1 1 1 "`-•" ILY4' l' I r '� I t--t.v t I r t _ —'`_r- _. _ _ _1T_ _t._ ._-+-t- - - -�' _ - -_.- _ I ;- I I I + 1 I 1 I I ; ; j { 1 i I I -t I 1 1 I I I I i i I I I _ _ I } I i I i I + - - _ . , 1 - - - I 1 , : ; y L I ' { I i , I , , I , S I -i I I I ' 1 I I - ' i I i) I I I I i , Ii j I i �� I I I - I . I I I I I i I ' I I i # 7 I I i 1 I I I { I I i 1 I I I I I I I I I I - : - I 1 € 1 I - - I I I I I 1 I i I . I* I 1 I % 1 1 AV y� I I 11 _.. . - - - - .- _ - - _ - - _ _ - - - - - ----- - -- - --- - - - - - --- -. --- - - - . _ _ - - -- - _ y�� - . T -r- rt , + �5.]}[1 7 -r �- _- - __ .�-. - t - _/rye t._ �_ - } , 1 : i ; . - - - , I I � V , � I , , 'T � � �� -V-�I - .K/�.-V. !v •�.'!'' �I �~ f � I E i i v i i I 1 i l i ,vt� , S / C 'V - - - - _._-_ _ _ _ _ - _. - - - - -- - - - - - - - - - -- - , , I I _ t t ' I i f7/. T'i r �� '�I y I i , . : , , I i L i : I i�p I I I I I I �1 I 1 I I i V 4 I ,o. r , + : I T L_. -. -� + % r r r— T ,.- - ---+- - -7- - -r-- _...+-- - - -1- - ---- .-.-..; --• OOG.- - - - - r ---�� - - _ ._ _ - =r1*._ - - — - - - p i Ff�G'��'�ram; $Dr�•y..s7�•c� �3 .� y�' I I k I V I I t I Ili , i I �y , : ; , I _,___�___--- - -- ---- - - II- -- - - ----.._ __ _. _. _--11--- - -- - -----. _.- - -- - - -- : I r r � . - � :� � -i- � �- - -ter- � -✓`• ---�-- --� - - - - f -<-- --�-- -� - -� -- .. :---4-.-. - - �� - - - - - - -'t- -T - - - - - - ' -* - A- r -`,, �-� +- -� - - t 1 T I W i f 1 i I : I { i . . i , . '� i t I I y 1 I I r � - .. _� -._ __ -- -� - - - 1 - - + +— + - - I , 1 t -, , t , W , ; j -� - ; �- it I ` ' { � I I : , I : . I I I ; : : I ,. : � : I ; i I 1 t 1 , I r I , I 1 I ; I I I I / i j i a i r /�' j \ � I ._. ._ _. _. ._._. - -- ' - - -- ._ - - .. . -- - - - - _ _.-_. 1 - - - - _ t - -- - /�J ¢! r- - t - T..;._ - I - - U/may - - -I — l� +-- _I t , T -f : _ I I ��+ I /•'L f 1 t - __ _ _ IL - -- L �f'1 _ - _ �- + _ II +._ , I I I I i ! i -*� '\1 I '�� ..�� -'+� #I -- \ I Ij 1 i i .y } 0 1 I �f- C I I i i ; - _._ - - - -__ -- - -._.. __- _.__._ --_- -__ _._._- .. -: a ..._. .. _. -.. __ r - - - - - -.1..-_� _. __ _._..__ -. ... .. _- .-_ _.. __ -.a�- + T ,, i I i i I ! : : i 'i •I :O I 1 1, I i I i - - } �- _ I I I 17�. I I I I I I - -- - __ - -- - . . - --- -. - 1 I I I I i ' i 'r I I { i '1 I �~ 1 1 1 ! I j I I I 1 + i I i I i . I I I I I i I I i I I 1 I t I 1 I t Ii { - i i U� I [ I i 4 i I I I I 1 I i I { I ! I 1 . i I 1 I i ' 1 � E i i I r1. I - i ! 1 I I I i I i 9 1 0 II i I ! I i I i ; i i1 + fl C/y ✓' D - - i I 4 I i ; E I I I I I ; I I I I i I I C I I I - Ir i { : ; ; , -- -- ��-- - ---�-- � �- ---4 _ -r -i- = - — t - - - - - - - - . � -� �� � I I I , 1 I I 1 I I I I I i , •, i I 1 ] I _ i i I 1 I f I O ,• I s tr 4 O I - _ _ ,uNS '3 r I I . , . - �_ I dl'c' - - -- . _ -I _ _ -� --- - — - - - _ -- - -- - -- i I I ! Z 1 I i { I I I .\r I I i I i # i 1 I I - ;__t .Ixr� I a 3 I c,4/c' I { \ 3 I I x v i i I , _ I j i 1 - -. ...-_.. .. . . .._. _ a - -_ - �_.. -- —r — - -� - - - - - - - -- - ea,- - �- � j-f- ! I --� I I I �� i i I �r � y 4 d a f I o• °r1' I i t i i I i i i I I I i h �' { i '~J I i i 'i I I i I I I { \ . I i I //AA _I V` I I i I I , , - �l - - -- �_ -_-i_ _ � - - - - - -.,--I-. - - - - - -_ - - : ; I r T{] —1 i I I I T I I i J,}i.�{ 1 , — I I I - , I i I I I I # , \ + I i h I-. ; I ' } I . ! i' I I I 1 ; I f I i I _ I I /1/v # i f : I . : I - - --._ �� - - - - - -- - 1 I I I i i I � I I I _ ' i 1 ! I I ' I O y I I I I j I - 4 I I i + I I 1 i ', I J I ; I I I IVj- 1i I - r T I I I , . I - ( , ---- -- -- - +` - 1 , , , I /! �I I t ! I ; I i i E t FI I 1 ' t ` # i i 1 , I i I 1 I i I I I I I ! # I x I I I I I I _ _ i I. _I I : . . _.�P/�C'o : : 2 - , 1 1 � 1 : � - , . . . - I - I i I j ' - - -_ .. _..--- - - _ .. .. . . 1 . ' ' 1) - I I : I $ ; i I 1 I _ _ i _ I! ! , { ; l ,1 __ - �__ .--.-- - 1 I 1 1 i I i � I i I i .. __ I { i ; __ zwv IF �^ y g� I � N ��7,�'c I C/ ,' /' .c7 I i I f I � I I I i i I I 1 I r I I h i ``v1l// I I / �/ �., i I 1 ! I I I 1 l �� ; I ; a! . . - - � I 11 I ! I I I I ! 11 ; 1 . i I Q(J I i i I �� I I i I ; ! i I 4 I � I 1 I I i I I : i I I I I -.- - -- ----.- -- -- I . - - - ---- .- - . _ � -�-- - � - - - - -. -- - - - i-- I - j 1 I 4 w #/i - i I ? I I e - ; I � i I # I I � i 1 i I I i I i 1 I C I I , ; I ; i I , I i � I � � t I I � I # 1 % f � � I I { I I I .I � 1 I --JJ---------- I�� 1�� I { i I I i I ; I I I f �' I 1 k o f { I 1 I ; I I 1 I + i ; -- I - I T L - + + - - ! -+- - - - - - - - - - _ -- - - - - - r _ I . _ i . ; - - { i i .I- �- r-3'i-�- + # I '-I t. ._I I I'. I i -!�-'-� �f I `,�-_ I w.L. i I i I I 1 j j i i I : I I I I - I ; 0 i j I I - - v{ �w���\ i - 1 I i j I , % . I I I a I i I ! I I r1 : _ ; I t I 1- I I I 1,/ � I i I i I 1 i � i I .i I I I I ; i i I : . I _' L c) i —I I ! I l� I I :"k I i i I I ! I 1 I I , I 1 r - - - - - I i I ! ; I I I I I f i B91 1 I 1 i I I { I I I I i i + ! I i I `( ' I i ' I I I 1 I I �- r _ f I 1 I : I i I I i -' ---., �� wit! �.. ; I : 1' i , i ' I g I I 1 i I I I I I I 4 I �I. I 1 I I p l 4� I I # I 1 f� *�f ; -- -' - + -i- +---- -- - = - - - --� 1 - - - - - - +� .. � - ______L �—t�+ _ _ 11 T _ _. t ; I 71A � i 1 1 j I ! 1`�`` ` ( ' i i �Q ,`) i t I 1 I i i i # i # 'I # ; �1 i { I I '1 I I ! V I W I + I i I �i 1 `+ _ � I 1I i ' I I I _ I 1 _ 1 I . . : I I ' , _ _ s __ - -- - - -- - II - --- -- - - - - --....,- — _— - - - - -- p - - - ( + : . - j ! - 1 i i I I # } �; I� +I I �i i I i 1 � 4 I i - i i I I i I i I , J 1 1 I I _ i i I 1 I � t r- —T....-, - + ___--____ ___ -LL - _- .-,. . - __-... :-. __ _ -_ ..__ . _ - - -- - ��— - - - - — +._._.. - - - `-- t- - - - - I + T �- +- — .} �- 4 { 1 } i I I t } I 1 I I - I I f i # i i I I 1 I _ € i ' t t t i ! I 1 . . I + I I , I �4 I ! I I i 1 ! C, I I i I i I I i _5"re4 .I Pao 7,AdD �i�ld4 (/DSO />~DO /�sli z� p ' z,tSv H001 3HT OT OS X A �y! OyAD H0141 3HT OT OS X A y}�� .O3 F13223 A J3'q3U3H ,--, N f►/_�J .03 g3223 d >3g9U311 3-- R 00soav .A.e a "I 03TVlis19 ,E �r -SG< .A-'.0 HI 03T"IA9 TYPE "C' CATCH BASIN TOP SHOWN BENDS r- Tees 1TDJX TEES BONDS L LENDS KWS L low L ROW f'A'xs' 18' r LrKlrxv 4• a WKIrKi' 7' Ir•KIe'KIe' ar r 6• 11 1/4 r r s• to IR 4• r 6. 43' r r r 90• IMP a rxrKc' Lr r ,rKlrxr It' r IrKIZ IT r r U 1/4 r r r a ue s' r r I7 r r 90• e4' r CONST. rKrKr era tax,aKlr Mx' r IrKlrxlr err 1a a v4 r r Ir to ue 4' r Ir r tr 9r es r a•.w vw arm�r ar r Orr a�a.t.r w as IL' It 1/4 7 r Le eE L/e 7' r Ir 4S 14' r Ir 99' 74' r A A ♦ r• 5'-0" 4'-9' 1 2 TRAVELWAY 1 2 TRAVELWAY - ANY A ,•�-..�.�.....� SIDEWALK _ = L• *W_ _ 3' vxvx4• err IrxlrxL' 1r r yLrta uw a.wt a r w�•�K.'M w BIT. CONC. BERM L L / TYPE-2 f " CATCH BASIN !N FT 3 T —1/4" IN/FT 1/4" IN/FT, 6" LOAM IN/4T (6' 0 DRIVEWCAYYSj SIDEWALK 2" PROCESSED GRAVEL REDUCERS 6' COMPACTED GRAVEL BASE PIPE RIEDUCTMN SIZE L --�- C C ELECT., TEL.. GAS MAIN BAN Ia TO r 2V °' ® rOATC VA rtTRAnrt deer do CAN CONDUIT NOTM " LM 30" MITI COVER 10 MIN. ' °' TOP n' °' u 30 MIN. COVER 1TE AMlV[ CBeITInMs AW BNLsu!>FI THE IOLLovufS Mwt«UUIN ATTsuMPTLQIs. ••+r.....wu.ne err . I IF C*=TMNS D"M CufTACT TOWN DOOM IEFaK PROCEDM Y , A. ED" PrEt IS GREE/ATTER {THW�I��Olt EGIU L TOE 3 nXT. I L � 4 N aM L Al�}e I.EFIG7T S ASSWI "Sr&aiTN 7.s FM Ta CMATM .r.COMe Wan. - 1 MIN. C. LAYM I ITIONS AND SmI„ SIMILAR TO THE rMLO'VIMG (TTYYU , TAMR PAM 10 CdlLrt RCP CLASS 111 8" DI O 41 Aa Ions. WA .a �� PLAN STORM DRAIN �� am�osr {SEE PLAN/PROFILE} WATERMAIN 8" PVC sly slwL x tiF� sB,Ts OF UIEn1uI r0 Lily PLASTICITI vmN SANS OR GRAVEL ..�- LL< as es - x x MMK PARTICLES 5' MIN. COVER SANITARY SEWER �XSA e, oe,e , aKKK THRUST RESTRAINTS - FIELD LOK GASKETS , ,M H T,;� {SEE PLAN/PROFILE} Kra. CATCH 11As" sk R3 CONCRETE COLLARS TYPE OF 51REET PA ENT WIDI[d TUMIN DJ US CONCRETE GRAVEL BASE GRAVEL SUBBASE PLACE 46 FT 26 FT 1.r - SURFACE; 3" - BASE 4" DENSE GRADE 8" LANE 50 FT 30 FT 1.5' - SURFACE; 3" - BASE 4" DENSE GRADE 8" N•,�.. ?.,SON a a TYPICAL ROADWAY SECTION w •,�, r v ttft A'�•• 1.7M\�'�p"'�IrtO n nt 4Y TOPr�'gl/'Y�w.trf�R1n•�+ � N.T.S. ' + r C .e.e LLtiti r a' DRAINAGE SWALEC. � N.T.S. 1 secnoN II-a SF.SItf1L'L.A—A LOAM 6 SEED PER PRECAST CATCH BASIN PVC MAN SEINER CONCRETE omim HYDRANT PLANTING SCHEDULE SI:LI>; TYP a C' PVC PL1JG SEE SPEC STANDAIfO MANMIOLE PRAMr AM taus PVC SUILDW SEMER \ I PLACE AROUND�LVEDOX PRIOR TO _ ® • s>' NT+ AM zoza+ PAVING. SEE OONC !1 COLLAR DUALS � "Developer must lace bounds prior to paving driveways MIN. Ao,iesr ro GRADE eTH u0 It75 � COLLAR DETAILS b. •� ���� / �\,�`�/�/ P P P P 9 Y aLMNETTx A=THAN e•o no MORE NO L Ir I i�,` 31 i wherever driveways surround any street bound and approved OF corlaeerE Useloc UMAsxNtY. SILT �� bound box is to be placed with bound." v PRAK TD TIE SET IN A PJU , LONG SWEEP 48'e1M „ a m 1 80 OF MORTAR. J - s re SALLOW S 4S' WYE ASPH T PAVEMENT ill J I SAL ALL JOINTS" APPROVED I I SEE DETAIL ��� ,\\��/i-; ��\�//' PREFORMED rr. JdMT,1LLLIR � � j VALVE e0ot \ 5PflC2!"ICA?IflN FM mlls'nlLIL-rIRe oc er>yarr L'OlMC1tB.'l'>~ SI7]OiALIIS The concrete used for the sidewalks shall have a th of 4000 psi.., a WA M at2 W K OF Sim AN PTacE ,/2'e.Y. � wxi-m on agbragate size of 3/4' and shall contain Tf Nntraitwd air. P Ot v[1RTRCAt FOCI, PLACID ACf g1ONG JAL7MNATC °' VALVE YIN' p1ro AVE SPECIi1CATION c 47E L PROPERTr UK "M JaNT °ROUND STONE 5 0' rY4N1'A+• TO JoerT Ass slow1. f AROl1FID HYDRANT , concre slips snail be preserved to the 2bwn lards-"iriIver ind=n=ag thatsha the DRAMNconcxete beirVg used aontoem9 to the above srwi�*•*�. The mneretr shall sSEED PLANTING SCHEDULE be placed in alternate slabs 20 feet in length to a depth of 4 inches INVO ED ARCH ITTH MIARIs ! r.^-. the depth shall be 6 inches. The CLAY 9RXx LAID O"EDGE E705T TEE ITYE `.. ` " (D r a 1^aye Swale) except tinder driveways where required., rF'z sections shall be separated by a 1/2 inch thick promoided asphalt expansion s+ns of sTRucTURE ro MIE o I• MWV O EST FLAT i :-?`x:, joint. 'iris eU ate shall be pcvtacted irola lame of ustery the we ;. L IRMoc CPIs de aNu9 n S,OP[ LOCATION STAR 0 MK COypR nELDLOK FMILOK I Ttwand t�fiwric or at least 3 days titer pairing by a Uaatt+od approved by the AND i10RTAR LESS THAN MIN. MUST °E I '� a� Xodif ied permanent seeding r%.1xtu.e n,•. L ; from Massachusetts Id APPROVED BY CITY ENGINEER LpNG snE1rP 46'er�Nl aroRANT UL'°J ' Erosion And Sediment C o ZS t r 1 Guidelines - 2 9 9 7) in the following Zfie sU rrtaMC! of the eallcs ate walk aMsali be Radioa=ly scored into block ,>f►itsl >•+*+ d 4• 4s• PE K ratio sL15e r s i n I b s/acre) ' Red Fescue -10, Canada Bluegrass - 1 C, of areas not .ors than 25 square feet. ?he &R)d of scoring shall be at om a< { -M2 43•THE �Lp T,HE7RE TRo1RIQNG SPACE RS LR111ED. (� t•ara/R PIPE Dut OR EQUAL ° ( 'M ; PVC MATH LOKREQUIRED �GASK� °aA ��HERE Perennial R y'e g r a s s - 15 ( increase) , and n e d Top - 1 , i s :e t c^r e n d e d least One quarter of the thickness of the s iNi.,+allc. i►!ur troweling,, the 1 J Ifsurface of the Valk snail be brushed to produce • nonslip Surface. ° � r Cr OF PIPE ARE fCr planting t` e ware: Q�alit.� S.d1ES to p::.�'_de a c irk, dense cover T , sru I L r V ( TO 'a:r d t o suppress w oc d y C=Cw'=h• The Contractor ghall provide all lights and barticedw which rimy be rA*ftd a� � • Dew be T aspired by the Town Ibla_inder to protect the +Mork,, UMUMN PVC psdestrians,I or way HYDRANT DETAIL and traffic. , McMU �N R-9 CC/+�/1 I ,�-fTTON_A—A MANHOLE e',es yTyL 1 V� N.T.S, •F' GRAVEL MW M9s>^e in the opinion of the TbrtMIT 1b+ginser or his reUpreeellbtive the sub- a" r� NOTM �a I.eL11LDR4C SET�l3 SNA11 °E 4' CIA. EXCEPT grade under the existing sidewalk is not suitable or the elevation of the T. STANDARD SANITARY AS DRRECTED BY TAE °aaNmM SEWER MANHOLE 2 LOCATION ARNQ 1IaTHS aF eu1LDR4e SETiens RIP' RAP SEDIMENT TRAP walk neeeu, to i e r the lava entoo .nail excavate exist"grave material plus to JONTT OE'[AlS N.T.S. TO BE DEIEIlfw 0 N THE FIELD 8Y iFE ENOaNE>OR a depth sufficient to allow l below of 6 inch, compacted brawl base plus 2 inches of processed brawl below the new walk. Gravel banes shall 17e BUILDING SEWER CONNECTIION wider by Three 31 inches on each side than, spat ied sidewalk width. m:al Cc�action shall be by omens of vibration plate compactor or 2 ton roller. N.T.S DRAINAGE Rip-Rap — Aytrtree aeroots encountered in the area of the work shallns be te.oved by tins. PIPE 25 LB. SIONF. MIN. , 12" DEEP LEVEL y FINMH GRADE 111111110 Mom" 12" � \\� \�� ALL SEWER MANHOLES MUST PASS A VACUMN TEST, AS ENTe'i.r-NCH MI`. ` APPROVED BY THE TOWN ENGINEER. END 0F `E�"IR:NCH bL L� / ^ B•DF Before any sanitary sewer will be accepted by the Board, it must pass M,: /��,fi�// ��� V DEEP an infiltration or exfiltration test. at the discretion of the Town Engineer. COMPACTED GRANULAR p fu A 9 C ML`ACTED SL'3G.:UDE 3URLA- BACKFILL AS APPROVED � L, � LI;�zR made in accordance with the Department of Public Works SpeCifiCa- BY THE ENGINEER z - 12" 8R 12 tions. Said test will be made at the developers expense and shall be UJ :4I`i. :iI'l. made under the direction of the Town Engineer, INITIAL BACKFILL WJ C s.oP[ s M>!E soEnAtx C aeIUw�rorr lam r naH uTrou�� 4 a Na1IRs REIFLON SiD? VIEW GENERAL CONSTRUCTION ROM: NON-VOVEN GEOTEXTILE a a d d � a0' ,E T91tJ410 (SEE NOTE 2) 4 ^ 5� «a /a2" I ,sIN,IlAt,o STREET LIGHTS SHALL BE INSTALLED IN ACCORDAME WTIS D/2 W 1- A B �'ML L•'°:'~ j THE ACAitAM DEPAR'XHEKf Of PUBLIC IiORIG4 REQUIRIIE1fTS. SPRING LINE OF PIPE y--- ------- ---- I.- 30" MANHOLE COVER D/2 W IMa UPPAIm.CONCRETE TYPE 'A' do 'B' THE DEVELOPER SHALL WrrIFT THE ACAWAl1 DEPARTMENT OF HAU(SEE NOTE a rn CONTIe1pllSl�rYnw" I »:M PUBLIC WORKS AT LEAST 48' HOURS IN ADVANCE OF THE (SEE NOTE 3) ; a" OIeVEMgY. " FINISH FINISH GRADE 12"� TIME WHEN HE PLANS TO BEGIN OR RESUME ANY WORK. BEDDING 61 L`' t CONCRETE U10°TROLL �?CURB r f (SEE NOTE 3) 1% \/ M�AIa1MiIM A�o/MRtaa ALL hEATERIALS AND CONSTRUCTION I�THODS TO COMPLY WE OF 3/4' A►� CRUSHED STONE AS ORDERED BY yyuy �AJM SECTION A-A N ENTRENCH ��� ENTRENCH WITH THE STANDARDS' OF THE AGAWAM DEPARTMENT OF FOUNDATION THE ENGINEER IF7s ENTRAINED AIR I' LIPEND OF 1��tea,°ON eBALL END OFe e BURLAP 6" DEEP `�i �� 1; BURLAP PUBLIC WORKS. NOTES: MITM A rMaMLRM 1)F SECTION B-B �, 1}B �` _�,/=�R� 6a' DEEP e• IIETNEATH DUavEwAYs . Cp 'r ' /� S DRIVEWAY {CURB CUT) LOCATIONS TO BE DETERMINED IN !. THE DVSTALlATIDNI 11C PVC S'EVQM PIPE SHALL CI7�FOtM 70 If THE REOUIREFENTS OF ASTH STANDARD D-23M 'ACT BURLAP THE FIELD. A PERMIT FROG! TgE AGAWAM DEPARTMENT OF LT►E EMBEDMENT MATERIAL Sw►LL BE 3/41 ED STOW ° 4'DROP LINER PUBLIC WORKS WILL BE REQQIRED. AMID SMALL BE WRAPPED IN A NON-VpVEN G rpEpTEOT EXTTLE , APPROVED BY THE ENGDDEEIL >r 3. USE HAND OR MECHAMCAL TAPPING TO COWACT TIE SECTION VIELT TWO SHADE TREES SHALL BE PROVIDED WITHIN 20 FEET OF BEDDING AND HALINCHING SECTION C-C THE STREET LINE ON EACH LOT. TRENCH SECTION STANDARD DRIVEWAY M.T:s NT-i ALL CLAY A SILT IN ROADWAY AREA MUST BE REPLACED WITH 161 . A SUITABLE MATERIAL TO A DEPTH SPECIFIED BY THE TOWN • ENGINEER. TL:3 Le" SECTION PI-P i �P .�•� 8'� ..�..�". TOP COURSE QA g 3e MANHOLE FRAME 1 C'�•vr2aG LA6v /s ,e�7l/%r�C�c� BINDER couasE 9" BITUMINOUS CONCRETE y r� CURB TYPE-2 ������� �,� aF � $o DAL ID `c / is�/t�R'_" Z,6 vim o f1101r BEAN ? RICHARD ti CLIMx H �#29260P DATE: SCALE: ,e-ZQ CIVIL �' (a D s Yi��� L7�9.U�B e040 CHECKED: 3 /2ovv Ftr� t sdly PLAN NO. SHEET NO. J [� ' Er a D . L . BEAN, INC. SURVEYORS & - 40 SCHOOL STREET ENGINEERS WESTFIELD, MASSACHUSETTS �3+ 36 ' SEE .�C/-�•r/ .Soo. ///-�G� S� yC.� c•a� 4 0 73> IN W� Z iT koZYE,� h ��.C/ D.t, ",�C�,G f�avcyE.e -C�i. /i iT�/�LO ,PiyD.cl�iS���cJ `S. ,dowE.es I f-,c l�/CE F .�• /�oGc�� �y�E,C� ` W 3 iU7S D�i�- 'y9Gv--� G6o32"rdr.�,c. ,� i7/ a o' --'' �s• wrote~ �sU,���,e 3 9�. 3.� ' ,� .� � � � h 3�.00 f �� wy' B �Oµ C/ .� � tip" • ! � � � O j' 23 o � o M r cc 0. 3 •Q `� � i .ter �" —�'0�==___.�-�v1 �__. 0 �/ t ti� ��►�' 20 dW1.&9E E.9sEirlF"vT � � � • l Qj X a I� W Do $ eI CONDITION OF APPROVAL No further subdividing of this property so as to create additional lots can occur without amending this • -��7-3SSZE ti subdivision plan in conformance with MGL Chapter 41, Section 81-U. j' WAIVERS APPROVED 1 . Section 159-8E1 which states that dead-end streets shall not be longer than five hundred (500 ) feet to allow for a street length of approximately 800 , S - 1 2 . Section 159 31C which requires DOTS / HiJ� 6 ��E ���� a 30 ' buffer strip to allow for a r (/ 15 ' buffer strip planted according to the approved plan, 00 �q / buffer strip as shown ond the l0 r 8• ���07' .G./4� Qi� /eL��,�,y'r G�die�. approved plan. ■ �Td,[��',QOl1-r/l�FOU-fid �1 2b O 20 �{O i OCT 1 9 .2000 PLANNINU ;.X COA17"- z z4 &a-oelzeez;� .�4��°�o�L v Eye sr�•sa yis o�v PG9•[�.v/ti6 .BoA•GD- �7c�,v o 7roLvc� � e�•�ic'� 4045 10C iviTi1I" "t?Ggal'OI� ��9Ssf�Cyl �' -� ory v e 'er , �.q �c'�c zs�r s• 1 CERTIFY THAT I HAVE CONFORMED S 8� o.c� o, .eO�E.e 7- . y .�.qTE. �G�C�� ( ? ��a 'Z' '.0 oi� rrf� r�dl�icJ WITH THE RULES & REGULATIONS A '9�Yi9/�J �As-SACflC/..SE Ts E ,�r .may y r.�•¢rr �" OF THE GISTER OF DEEDS M X-oe: C.vAi,C.rygv.• Ih PREP R G H LAN µtri of *Sr /Cs/.9,�.d LAA/GON6' '/c'Car�"Af�f�.e �,� o.�rHis �L•o�-may o+ DAVID u 9EAM � �4GAl.�A/y i4.C/b *29280 `° DATE: SCALE: /•+—!�� (/ SUN L740Z8 CHECKED: PLAN NO. SHEET NO. Svc//�E"��i.�r~�9� •���a2.4�,ti/_ ax' D . L . BEAN, INC. SURVEYORS & 40 SCHOOL STREET ENGINEERS WESTFIELD, MASSACHUSETTS �,cHA•�i�3� c/.ecc�-.vo,�r� N/F /S//�' N/ E2 , a , $0�/C,f�E.� - T. F/�L17 �/�1d.�Ji9/�i4.CJ ' �S- f OWE.�S ,T' [T fSa2 V f� " f �'Cl/r�lly/.t/ S�� I I y I o � /Sui vua/.�rvc B�•c� sr yin b 7 nor�icLe. k3 60 , Iz G� Cob / AWC f I�� you �� 0� I 842iy�`ur- w 13 W c Q, ► LIP / 4A.ewz� ST.eEeT a kip 6 E.O CO OV TO t4P•T i U �- = h'ya�•gv T G� tiorG�- � � .S WIC/ /� 7-0 625 C'Cf,_64tp Dr- 1��62/si4.c���3,et tom. A 41, Ck CX� wirx-�oUr �1 K L \ T �a �S -5ro•r.�s GeosE .SAti loosE.�'-ul> A16 STo.✓ES 'A/d NQ W6 77T---tioi V.9L UrVo d=_ .00T 1 9 2000 Co/v7;IL L,gw is •2�9vir��,a . AX,9tiiVIivo ?o&vN o,&- PLA N N 1 N 6 f i 0 7`T,s 7vao ,,o�icq.� ,al�4N U ,�w os ���� H or r C/7iq/2�IA�. o DAVID �c CEIWCD s� # L. �. �Gi9lY�9/yJ /JiQSS. RC I �, " #m80 Z (DATE: SCALE- � CHECKED_4Z!R 1A94T4 1STE. 42!Y / 0011 PLAN NO. SHEET NO. Od0 leµ E l G✓f� D . L . BEAN, INC. URVEYORS & C. _ 40 SCHOOL STREET ENGINEERS WESTFIELD, MASSACHUSETTS PRIME GRAPHICS - d6Ss = Y,9N i7-A.ey SEcd6.e GirY� COLD ee� W V1/ kI - WA rE� .L/,OVr SMH Q � 1�� x �dv7E.�•CiivE 2a.�,a .Sr.9ridilvs GC��"�Ariov'O�`.Su�.vc�,��-���C1 � ' �� R r° O eoT aFSi�.�rioN G °Pi A ► ❑ = c011C. e041AID 77$-c' SET LEACHING CELL/BASIN DETAIL TYPICAL '"BASIN APRON i MASS. STD. CATCH BASIN _ V�•V p�>-I i-�c�#�I iIII-!IIIS!�,:I E!I'' --•-��dT,���*IiiIIII I'i, ."-�};—-'ri,I i�!I'Ij'I o-+I I I';!tII I�ii os•�i-�Y'-�_2__9}+{�Ii I �I�I III{ii1 i��,r r�o1�I I1#IlIIIlI?II`��1-e,O'��L�.v.���'!��rIW,�i Mri� C L�.s')T•'��M/rL.r!L��/�k;1'I i!1i o_'SIYIE�2Ar�i`'III1�jrII .---T��/Z;I<I}I'E._—,_��• -Q--__-��I3f!fiI'---T—�•- ,IiII!iiE��I �--�I'I�.. _�U-.•-AI;iII'iI - 'iIIII{II' -I=II!IIII EfiIIIiII'Z-c c°I T---���rii�I L�.,I �-�-'1*!Ii+IiIIII �C--- G rtTI;II�II��II 'C,,-Y, i _J x^_J 'IIIiI 1'C�,�♦T III���i,y—�� 1 L �Z.A gV--,�fiG•.�irIFII'I1IIIR-A-T?�.M-A_ E A.—T-f-JQ7I#iI i!r' ..T�- V_9-G MR'I� AC�Y /1JA.eC/Cf9 „J 24" RCP QRB'T' MASON BLOCK FIL/'-T..•a�E iI��rI1J+ji'" R-=�pB ,!I OT-.►-H T►_9Ee�S��0O vBvA. E}�� �. tIiIi- a#LZa0 -0"AND MORTAR 2', � POL1PROMENS DiPONT TT-DAR,vII!"4d/�ap�O•�e.S� _ LQIb E a "3 �- I �- �•III,j'!1�iII! 3_/- -8 " I_.o-.d sA �I- S-£•�H to FILTER CLOTH DI". ' I 140 OR EkQCAs PEATNE (Ty?. G OVER 7 E1 Square Galv. BURLAP Wire Mesh (Typ. q0 SquarlCaly PRECAST CONCRETE Wirt Mesa (TYp.)G CHAMBER LEACHIN 0 , D H-10 LOADING PLAN 3 %Ltx. w d 3 Max. oWashed � pa 60 Stone e e OP GRATE 3" Min. Walls ABOVE F.G. W Spw w r - ^ w 1 w um OFPEASTONE i'� C. 7 V D 2" � OMC. ':,C 9C 12, 3/8" WASHEDP BURLAP SHEETCflN2ACTED SL3GRADE LEACHING CHAMBERGupy14/� 10' SQUARE SECTION T0,s7 4(C1Ar� eA Z .g1=11O o C/N4 E2 S C�4g O /Y/S/O N Co.v 7-R0L G A Iw Xs- 2E 9[�/2 Eo ON UT/L%Tf' Lf7M,,VX C7`�i�> ,eiC�,ge0 / 451'O o4O/dL.9A, Ao0`/ LE a 9 i9GA Cv.9tiJ, //�qS.SgCy!� e� T ZS Ct� ko , >OT� DATA SCALE ✓ow. 1srt , CHECxED: ,L,eLZP72 ! E N NO. SMELT NO.7-74f V,4 r� /7VIA) I-{— L�L MA S � - + - �__ —*- _ —1 r i r + { I I Jr. N. Wit Ire ! i 4 N I — IV B 'S ;T- -e _- _± .f � �i na I I /.4 %kov00 dp / s H�V11 3HT OT OS X A HOW 3HT OT OS X .O, 93aa3 A J3aaU3H3.07 A223 6 >39�U3r 00soov A.R.0 NI Q3TNIA9 .A.l.0 NE Q3TNIA9 + _-- -- =--'.- - -_- {1f- _ �-ACT 7 V 2000 { PLANNI[vw e3 v'l rii r60 f `• BENDS TEES TEES L. TEEi ras sass L SENDS MENU L sE�ss L . ROW v>aE•.s• 1s• r w•xto•,a• 4• r 1e•xlrme 7• It'r11rRIP SS r s• 11 1/4 e' r s• Lt ve 4• r s• 4s' r r s• so• Ie' r e xrXG. tr r WKWwe• 16• r 1e•�fu•tfe• 1r r r 11 1/4 r r r ue s' r r 4r Ir r r so• t4 r CONST. rxrkr ar r 1 KWXIr n' r 1e•xte•,ar err 1r 11 L/4 r r Ir ee ve s• r tr 47' Ir r far tY r �' y.a rwr s+� a�rr w r r• Ir 11 L/4 7 r Ir U 1/e 7' r Ir 4r 14' r Ie' 10• 74 r 5'-0" 4'-9" 1 2 TRAVELWAY 1 2 TRAVELWAY T - HYDRANT f `•y~- �'� A A + SIDEWALK rriEs L TEES L, TEES 3" L•Ks'Kt' ar r WXW.A. Ir r IZ•rIrW 1r r r,fr"s' 17' r \ BIT. CONC. BERM •�a�rrr�uwww�r�s��rr TYPE-2 L .,w f 1/4' 3/8 IN FT IN FT _�1/4" IN/FT 1/4' iN/FT—,� 6" LOAM /IN/FT 4* CEMENT WAYS)SIDEWALK PLAN I I CATCH BASrN x- PROCESSED GRAVEL REDUCERS e' COMPACTED GRAVEL BASE PVC REMXTUN SIZE L c C ® THRUST RES'"khm L D GAS MAIN P-� ID' To a' M• D. r ac CAN CONDUIT 10' MIN. lSQIES! a• ro s• a• r GATE VALVE „ � A s . I etas 30" MIN, COVER t r 30" MI1 COVER THE AXI E CMMTNM AM &%=oM THE nXLMAM NOMA ASswTn1S `-"'"��"'•"' I • , �J 6 CM=TMNS DEFER rOITACT TOWN DIMMER XFORE PROCED M(� Ir A OF PIPE IS GREATER THAN OR EQUAL TO 5 FEET, ��,L I " B I �LEMGT}i I� TO CalEAT7 TIAk/TEOIY L Tfl 11 i EET1 7 3 FEET, 1W C I, ET.CDrIC s y _ +s z+r 1 ' MIN. C. LAYING cbtmtTtONS AND S= SDULAR TO THE rM-LOwmc (Type 3} TARIght PAPOt T�faxArs RCP CLASS III $" DI O 41 r�Ud #p4 PLM I PLO! STORM DRAIN WAT'ERMAIN sea. S1M1.L WE aF, SILTS OF HEDILN M LAW PLASTICITY VITH SAW tP GRAVEIIIN ' {SEE PLAN/PROFILE} 8" PVC LL ( 94 es - sa X COARSE PARTICLES '� wttu �" 5' MIN. COVER SANITARY SEWER THRUST RESTRAINTS - FIELD LOK GASKETS A WT,t:ete {SEE PLAN/PROFILE} SECTM ,a COUNK �C� ArQI ... 1LTX GYof eASKI I TYPE OF STREET BIGHT OF WAY WIDTH (FT) PAVEMENT WIDTH BITUMINUQUy5CONCRETE GRAVEL BASE CONCRETE COLLARS RY.1 Y PLACE 46 FT 26 FT 1.5* -- SURFACE; 3" -- BASE 4" DENSE GRADE 8" ' Y LANE 50 FT 30 FT 1.5" - SURFACE; 3" - BASE 4" DENSE GRADE 8" p, fa I TYPICAL ROADWAY SECTION •"--....,<.A� N.T.S, a• , nor.us .w.midn�0.X+ � s,srr,p'�W"+at�Or+� T-r r DRAINAGE: SWALL N.T.S. f '' SEGTIOM w-A LOAM b SEED PER PRECAST CATCH BASIN PVC PLUG PVC MAIN SEVER PLANTING SCHF.:1L'LE 81:LOW 'TYPE C' AR SEE SPEC STANDARD KAte=FRAME AND COVER PVC BULLDD4 5lWER I ' PLACEAROCONCRETE UND VALVE PE SEE 2aL?.1 AND smat \ ' I BOX PRIOR TG FRIISH — 0 TO INCLUDE "$'AEA^ PAYING. SEE CONC. M„. ADJUST To GRADE"HoEns ---�" -- --� ^ COLLAR OETANS r �•\�,�V/i� "Developer must place bounds prior to paving driveways 011'Ef°t THAN E �MASONRY ASPHALT �11 3 I wherever driveways surround any street bound and approved 1 bound box is to be placed with bound.* s O is R SET N A FGLL L S1lEEP 4b'BETUD �i SALT \ �1� DEb OF M01lTAR I _ / IFLAT MAN TUP FOR i SHALLOW KANHOIES i ♦3• � AW ETTAIIP.AVDNXTSEE 11 �I I l.AL ALL JOINTS"APPROM i { SPECIFICATICH FM �lICN OF CENWI El6 SIDEMIRLI(S R tsalw ,a or sTm ' AN �I IST. JOINT FILLER vALYE BOX ---T[�'c.Y \\V/ �'% The mete used for the sidewalks shall have a th of 4000 psi., a PER %013MCAL FOOT, PLACED ACC�1G L- TY LINE i e' VALVE j * +' OR BROIqDt5 0, mmxL un aggregate size of 3/4` and shall contain 71 entrained air. TO AS11t SPEGtrlCATIDN c 470 1 IYZON JOINT I AROUND MYORANT be De.livery slips 4rv, DNA SEE JorrT oETArs DELorr I I , DRAIN ` ti-; Concrete being aUsed lconform toethe above lsta•+drds. The concretet shall � ALTDaATE ` SEED PLANTING SCHEDULE be placed in alternate slabs 20 feet in length to a depth of 4 inches IN+EIrTEa ARpt rTH NAIlD -. T� +j• Cur elaac LAD ON [DOE #EOMMO GRADE TEE wTE , (Drai age S:/ale) except under driveways where required., the depth shall be 6 inches. The ,,w-_'t.MAx SME1F Or STRIlG71JRE TO e[ sections shall be separated by a 1/2 inch thick PE: Lded asphalt expansion r HEADER$LAID Mr -'r ` joint. The concrete shall be protected frost loss of water. the weather wN IO OR CWJVHED STOW ION STun 4' Mt, ppy� and traffic for at least 3 days after pelting by + >•ethod approved by the LESS ,® xodified perrlanent seeding mixture nL•. y GASSIW 'from Massachusetts �"' �i"~r' 1I j 13 CITY D1oINETR ' SVW W W Nr HYDRANT Pe a aPftE Erosion And Sediment Control Guide 1 i r.e s - 19 9 7) in the following The suctsc: of the concrete walk shall be uniformly moored into block units r MK ado Cr 1 4• TI PS 45'`� ��N Fescue -10 r �h scoring SILL / 4S'�rY[ DEO_ 111,FAE WORKD40 !PACE Ts L W"M ratio 41 D ( 1:.I lb e r s 1 n 1 b s/d c r e) Fed d Canada Bluegrass - 1 C OL areas Hot nDre than 25 .glare feet. The of scot shall be at '•aim ' 01L ZEE EDuuAL B 1e (w M /I PVC MART WAft_ �L AWII�o OBY+Cs u , Perennial R ye g r a s s - 1 S ( i r.c r e a s e) , a:1 d Red Top - 1, is :e c c^1'e n d e d !east one quarter of the thickness of the s i detCalk. After trowel 11eq ti the J J t+' o- of ON ME UNTIL PIPE ARE f c r planting the 'water Q L a 1 i t 5 w a 1-e s t o p r G v i d e a c e_tic, dense cover surEREf ace of the walk Mull be brushed to produce a Nonslip sI>rface. B As(fD (PRIOR To -a n d to suppress w o c d y g,c w t h. The contractor shall provide all lights BEd berricedas which .ay be E►ee I cT NN I V �s Pv+: ERR)) or Way be required by the Town Enoineec to protect the wale, psdestrianati rr P� SECTION HYDRANT DETAIL and traffic- _ , , WIN sFcneN I1-e ORo► 50F�vOr NOTES: H.T.S MAD'1EI, IILW Wisre in the opinion of the limn Cngimer or his espessentative the sub- 11 CLEAR CAST N WALL 1.BMDMG SEW= SHALL BE 4' DLk EXCEPT grade under the existing sidewalk i, not suitable or the elevetiCln of the STANDARD SANITARY AS DIRECTED BY THE ENS SEWER MANHOLE 2-U=TICN AM OVIM OF BUILDING SCVEIes RIP RAP SEDIMENT TRAP wile Heals to be raised the tCx shall h compactedcavate existing �vel mw p to JaNY OETAIIs N.T.S. To BE DEMNI ED IN TINE FIELD BY THE ENGelIM 2 inches offpra�� graveplacement below the nowiwalk biases stall ewe cote., ". wider by three (3) inches on each side than specified sidewalk width. BUILDING SEWER CONNECT110N Compaction shall be by etaena of vibration plate compactor or 2 tan roller. N T.S DRAINAGE Rip-Rap — Any tree roots enaalnt*E: in the area of the rack shall be rmmE:I by the PIPE 25 LB. STONE MIN. , 12" DEEP contractor. lrrele ttr�e LEVEL y FINISH GRADE 12 ' �\�� ALL SEWER MANHOLES MUST PASS A VACUMN TEST, AS EN=_ICH MIN. *- APPROVED BY THE TOWN ENGINEER. END OF ENTR:.vCH BURLA_ID �� �! % END OF BU .D Before any sanitary sewer will be accepted by the Board, it must pass b DEEP /�r/"MR , /lC� l I!.A6" DEED an infiltration or exfiltration test, at the discretion of the Town Engineer, COMPACTED GRANULAR a M A B C `>PACTED SG3GRADE BACKFILL AS APPROVED BURLA-V LINER made in accordance with the Department of Public Works Specifica- � W BY THE ENGINEER - 12" 81 12" tionS. Said test will be made at the developer's expense and shall be INITIAL BACKFILL 0o�`^ WI MTN• .rlx• made under the direction of the Town Engineer. a `^ aw�I w�irns�tlwfr a St,OFlC n lEDEwAtx C s C ea ►a,nerd ♦ r T ww wYtou — SIDE VIEW NON-WOVEN GEOTEXTiLE a a a a4 6, �, � aa1>tre 1 1REEeELT GENERAL CONSTRUCTION NOTES: (SEE NOTE 2) , * La 62 culls _ � STREET LIGHTS SRALL BE INnALLED IN ACCORDANCE WITH D/2 �F A B 'aA '�ec'r SPRING LINE OF PIPE --- ------ ---- r 1- .� THE AGAWAM DEPARTMENT OF PUBLIC WORKS RZQUIRElMtg. 30" MANHOLE COVER D/2 y= I•C , TrIE1tE rea mom, C1DNd1ETE TYPE 'A' & 'B' HAUNCHING a H SIDEWALK Is TO RUN ,� THE DEVELOPER SMALL NOTIFY TSE AGAWAM DEPARTMENT OF (SEE NOTE 31 COF11wotllLY ham' �6' ' v CONTINUO " f0s" .PUBLIC WORKS AT LEAST 48- HOURS IN ADVANCE OF THE 61 _ F FINISH FINISH BEDDING : ��DSO L�am o GRADE w a (SEE NOTE 3) v..' WE 4000AMM �� 12 '` TIME WHEltI HE PLANS TO BEGIN OR RESUME ANY WORK. AS ORDERED BY SIZE OF 3/4' ME> ALL SECTION A-A N END OF WITH TI3TE STLANDARDSC�STHECACAWAM�DEPARTMENT LY CRUSHED STONE s+Au�"" ENTRENCH ' " �' ENTRENCH FOUNDATION THE ENGINEER 5-7%exmAINED AM ,•LIP - �� °EPTH 1 BE A WON" 4•* � B e BURLAP 6" DEEP \��'� � �r�' BURLAP PUBLIC WORKS. - of a- BDRATH ORIVM" SECTION B-B C b" DEEP L THE DVSTALLATIDI OF PVC SEVER PIPE SHALL CT WnW 7D 0, \ 5 DRIVEWAY (CURE CUT) LOCATIONS TO BE DETERMIm IN THE REBEDPII4£NTs OF ASrN STANDARD D-2321 •qt'1's' B�,AP THE FIELD. A PERMIT FROM THE AGAWAM DEPARTMENT OF 2. THE EN)lEDhENT MATETtIAL SHALL BE 3/4• CRUSFED STONE 13 <'OROP "+l! AND SHILL BE VRAPPED IN A NON-•WOVEN GEOTEXTILE ' LINER PUBLIC WORKS W11Z BE REQUIRED. APPROVED BY THE ENGINEER Lt a USEDD�n HNPn1 SECTION C-C r* c TO carwAcr THE SECTION VIEW AND TWO SRADE TREES SHALL RE PROVIDED WITHIN 20 FEET OF TRENCH SECTION STANDARD DRIVEWAY THE STREET LINE ON EACS LOT. ' ' N.T.S. ALL CLAY 6 SILT IN ROADWAY AREA DUST BE REPLACED WITH A SUITABLE MATERIAL TO A DEPTH SPECIFIED BY THE TOWN I ElIG I):fEER. Ar SECTION 9-B (CP ` h ; TOP COURSE �� 4 30' MANHOLE FRAME ' TYPE B W 1111 OCT 1 9 2000 C'ovy-,�oG LAB% /s .��7U%reC�� BINDER couRSE g" rL,i C�i4•�.. .11G�TAP/ S PLANNIN 7—s r�,cl BITUMINOUS CONCRETE user-ram CURB TYPE_ ����p ss4 /2'��-.s%4•e� �,�ov�- 2 G �M OF o aAVIDy o _E110Y y\ CD � BEAN s NC NK9s39 H ��( f1292$0P DATE: SCALE: ,(/�iQ ko.t tlr+L 9 0 S VE'��� L7-�4.[.��8 2app CHECKED: '2 ,C/� �CL�l1' 3-/-2oOv PLAN NO. SHEET NO. S- -tealo f s D . L . BEAN, ISURVEYORS & a m 40 SCHOOL STREET ENGINEERS WESTFIELD, MASSACHUSETTS �3, 348' BOUND POINT TIES I EXIS71NG 20' WIDE � BARNEY STREET EASEMENT ! I T'4 T IC,N CFFSLT F r 6+68.82 25.00' LT. S 12002'26" W I ! f ! 7+28.55 42.43' RT. N 32057'34" W 7+39. 13 50.79' LT. S 32'57'34" E N/F N/F I N/F N/F NjF N/F N/F I NjF N/F NlF J KORVEK LAM J. TRUONG J BOUCHER J CLMMINGS ! .,.FIELD P.MONAHAN S. POWERS SULLIVAN R- HC-WE ' 15' WIDE BU,FER r'���- 15' WIDE BUFFER I I ' 1 30' WIDE STORM � 4 DRAIN EASEMENT h `ti LOT 3 � LOT 2 !I LOT 1 co 73 �1 L 1 N/F � ' �' � �� o ?0 00, A. MARLtvA �� R�0,0 ! I 0' 242 6-7 ` t 1V � I NOTE G r— 0+00 EQUALS / CENTER LINE BARNEY STREET WITH CENTER LINE RIVER ROAD Q r C, %/ L �0 O 7* 1.07 0 1 10.00' 21.96' \' y()' I � ! T N 7T57'34" W nL L LOT 4 BARNEY o o coo �� BARNEY o ?� s�,s a �� 'STREET N ? 5734 W En S 77'57'34' E % W 110 108.34' j n I '� I L=1.68' I 20' WIDE 1 STORM DRAIN EASEMENT i LOT 5 LOT 6 C6 ! 84 N iz O co � . N a l �---� z i ! � 1 // ui co � � l LEGEND i • o = IRON PIPE SET ❑ = CONCRETE BOUND SET • = IRON PIPE FOUND b� ■ = STONE BOUND FOUND j i 12 = HOUSE NUMBER Of PIC �c 3NUTIE 1 10-2-02 — ADDED 0+00 _ T,IA COMMONWEALTH OF MASSACHUSETTS isaato i 2 �- -- 10-2--02� ADDED BEARING TO � BASELINE T,.t,4 . TOWN OF AGAWAM ` � $124 3 10-3-02 ADDED NOTE FOR 0+00 TJA TOWN OF AGAWAM f. PLANNING BOARD REPORT OFFICE OF THE TOWN CLERK —7 �� / . I I THIS PLAN HAS BEEN REFERRED TO THE fir, DATE REVI�IGN THIS SURVEY & PLAN WERE AGAWAM PLANNING BOARD IN ACCORDANCE PREPARED IN ACCORDANCE WITH CHAPTER 41 , SECTION 81 1 of THE I HEREWITH CERTIFY FROM RECORDS IN MY CUSTODY AS TOWN WITH THE PROCEDURAL & TOWN OF AGAWAM GENERAL LAWS, AND SAID BOARD HAS CLERK THAT THIS IS A TRUE COPY OF THE PLAN, SHOWING THE TECHNICAL STANDARDS FOR M A S S A C H U S E T T S SUBMITTED ITS REPORT THEREON TO THE THE PRACTICE OF LAND TOWN COUNCIL. BOUNDARIES AND MEASUREMENTS OF THE WAY, AS LAP'-),OUT suRVE G IN T DEPARTMENT OF PUBLIC WORKS a— CHAIRMAN BY THE ORDER OF THE AGAWAM TOWN COUNCIL, PUR UA T COM N EALTH F ASP. DATE: TO THE SECTIONS 155-24 THRU 155�--27 H TOWN C E, ON a' 40' 80, 120' BARNEY STREET 2a 6a Mimi ACCEPTANCE PLAN OA 1 CERTIFY THAT I HAVE DATE: I D M. HEROUX SCALE: 1 "-40' CONFORMED WITH THE RULES TOWN CLERK & REGULATIONS OF THE REGISTE OF DEED AT 10- 1 -2002 F ELD BK N . PACE 1 OF 1 PREP IN THIS T.J.A. CHECKED M.E.S, APPROVED PLAN NO. i