Loading...
I �\� �k l I // � g�g�� S• yy� I y I �+ �+ :� I � l I A I v i t� FA TOWN OF AGAWAM ' 36 MAIN STREET AGAWAM, MASSACHUSETTS 01001 Tel. 413-786-0400 a PLANNING BOARD July 14, 1983 John Stone, Superintendant Department of Public Works Town of Agawam Agawam, MA 01001 Dear Mr. Stone: At a duly called meeting of the Agawam Planning Board held on July 7, 1983, the Preliminary Subdivision Plans entitled: "Preliminary Subdivision Plan Data", "Progressive Industrial Park", Suffield Street Agawam, Massachusetts, Scale: 1" = 401 , June 1983" were approved by a vote of 3 to 0. -V y truly ;--._ �� 4 2 Charles R. Calabrese, Chairman `�- Agawam Planning Board CRCjs je cc: Town Clerk File AGAWAM 36 MAIN STREET AGAWAM, MASSACHUSETTS 01001 D Tel. 413-1 86-0400 �p ATE0 Mph PLANNING BOARD May 10, 1983 Fair. Joseph Conte Zoning Officer 36 Main Street Agawam, MA 01001 Dear Mr. Conte: Please be advised that at a duly called Planning Board meeting the Board voted to issue tentative site plan approval for two buildings to be located in the Agawam Progressive Industrial Park, Suffield Street. We are requesting however, that before a final Certifcate of Occupancy is issued that a site plan is submitted to the Planning Board meeting all site plan requirements. --Si--acerely, Charles R. Calabrese, Cha AGAWAM PLANNING BOARD CRC/s _e cc : own Clerk File 41500 n' i TOWN OF AGAWAM INDUSTRIAL PARK IMPROVEMENT PROJECT AGAWAM REGIONAL 'INDUSTRIAL PARK APPLICATION FOR APPROVAL OF DEFINITIVE PLAN MAY 10, 1984 Jove P. Stone, Superintendent Michael G. Suprenant, Town Engineer • �^ KEYES ASSOCIATES TABLE OF CONTENTS Pale I PRELIMINARY PLAN OF SUBDIVISION 1 II ENVIRONMENTAL STUDY 1 III FINAL PLANS AND SPECIFICATION 1 IV SUBSURFACE INVESTIGATIONS 1 V TIME DEVELOPMENT SEQUENCE 1 V1 TOWN DEVELOPMENT RELATIONSHIP STUDY 1 VII SEDIMENTATION AND EROSION CONTROL AND 2 OTHER MITIGATION MEASURES APPENDICES . A. Appropriate Forms and Preliminary Design Approval B. Subsurface Investigation C. Final Plans D. Cross Sections E. Outline Specifications and Details i KEYES ASSOCIATES INDUSTRIAL PARK IMPROVEMENT PROJECT AGAWAM REGIONAL INDUSTRIAL PARK APPLICATION FOR APPROVAL OF DEFINITIVE PLAN I PRELIMINARY PLAN OF SUBDIVISION A Preliminary Plan of Subdivision was prepared by Keyes Associates and submitted by the Agawam Department of Public Works to the Planning Board for subsequent approval (see Appendix A). Also included in that Appendix are appropriate forms (State of Interest and Form B - Application for Approval of Definitive Plan) and other information as required under the "Rules and Regulations of the Planning Board." II ENVIRONMENTAL STUDY A comprehensive Draft Environmental Impact Report (EIR) was submitted to the Planning Board previously. The Final EIR was subsequently prepared in response to comments relating essentially to traffic data requests from EOEA and will be made available to the Planning Board through normal distribution of the Final EIR. No comments were received concerning the storm drainage concept or wetlands impacts in the Draft EIR. A Notice of Intent will be filed with the Conservation Commission concurrently with this application. III FINAL PLANS AND SPECIFICATIONS Roadway, drainage, grading and related plans and details accompany the Definitive Plan Submission (Appendices C, D, and E). IV SUBSURFACE INVESTIGATION Borings were undertaken for the subject project on two separate occassions with the logs included in Appendix B. V TIME DEVELOPMENT SEQUENCE A more detailed discussion of the proposed phasing of the Agawam Regional Industrial Park is contained in the Environmental Impact Report. The park is expected to be occupied at approximately 10% per year with a 10-year completion date anticipated. The Phase f roadways addressed herein will proceed to construction in the late summer of 1984 under a grant from the Public Works Economic Development Program. Phase II improvements will be sequenced before Phase I approaches full occpancy. VI TOWN DEVELOPMENT RELATIONSHIP STUDY Compatability with existing or planned utilities and related f infrastructure improvements are addressed in the Long Ran a Plan and Summary_of Impacts, Agawam Industrial Area; Keyes Associates 1983. 1 E KEYES ASSOCIATES VIII SEDIMENTATION AND EROSION CONTROL. AND OTHER MITIGATION MEASURES The Draft and Final Environmental Impact Reports addressed several concerns including wetland, watercourses, storm water management and traffic. A Notice of Intent has been filed as part of this project with the Town of Agawam Conservation Commission and DEQE as a result of impacting a small wetland area east of Shoemaker lane. Sedimentation control measures are proposed within the project area and while the exact locations have not been demonstrated on the plans, these items will. be incorporated prior to final submission to include: (See also detail sheet of Design Drawings) Silt Fence Type "B" Ersoion Check Type "C" Erosion Check Type "D" Erosion Check Sedimentation Trap 2 • i • • APPENDICES . APPROPRIATE FORMS AND PRELIMINARY DESIGN APPROVAL • APPENDIX A Agawam Planning; Board r STATEMENT OF INTEREST Date May 8, 1984 The petitioner hereby certifies that he is the owner of all lands contained within the description of the subject petition. Agawam Planning Hoard Case No. Donald A. Binns, President (Name) BayyBank Tower, Suite 1800 1500 Main Street (Address). Springfield, MA 01115 Note: Westmass Area .Development Corporation is the owner of all lands contained in the subject parcel. Title to land contained in the road right-of-way as designated on the Definitive Plan will be donated to the Town of Agawam. As a result, the Town DPW is the applicant for De fi n ib6ASAM fv�1,. MASSACHUSETTS HAMPDEN as Date May 8, 1984 There personally appeared before me, on the above date, to me known to be - the person de cribed in and who executed the foregoing document. 0 Notary FubW co= asion expires - i s , F0RM B APPLICATION FOR APPROVAL • F i Off' DEFINITIVE PLAN � 1984 MA'Y 10 F14 4 23 FILE ONE COMPLETED FORM WITH THE PL;UN. ING BOARD AND A-COPY WITH THE TIMM CLERK IN ACCORDANCE WITH REQUIREMENTS OF SECTION III A-�/-B AGAWAM • . • • � Y O,,• ww • . _ . • . . 1g. + . To the Plarming Board: { The tridersigned herewith submits the accampariingDefinitive Plan of propert located in the Town of Agawam for approval as a subdivision under the'regairemsnta of the Subdivision Control Law and the Rulas and rteg122tionas Cioverrdng the Subdivision of Land of the Planning Board in the Town of AgwAka. 1. Name of Applicant Address . . . . . . . .16.RIP.5-treft. :Aj90VV.,.M.4 .910601. .. . . . . _e d_ .. .. .. .. 2. Name of Engineer or Surveyor . . .Keye§.Assgci atgs .. .. .. . . . . .. .. . . . . .. . Address . . .. . . . .55 TgwrL �tne Rgad...Wethersfield�,.CT .06109. .. .. .. .. . . _ 3. Deed of Property Recorded in. . Hampdep.Cnunty. . _Registry, _. . SBook 6 . . . . . . . . . . . . . . . . . . . . . . . .Page . . . . . . . . . . . . . . . . . . . . . . .. .. .. . . 4. Location and Description of Property: (Attached sheet). 5. A list of the documents included in this application shall accompany notice to the Town Clerk. Documents required to be submitted with this notice: a. Notarized statement of interest in the land. b. Environmental study. c. Plans and specifications. d. Statement of time--development sequence. e. Plan of sequence of development. f. Town-Development relationship study. g. Reports of test borings, etc. Your attention is directed to Section M, B. 8 of the- Subdivision - Rules and Regulations requiring the posting of a bond or recording o:. a covenant BEFORE approval can be given. *Signature of owner . . . . . . Binns, resident Address .�lesta��ss. Ate.Developot .Cargoratiran. . . BayBank Tower,,Suite 1800 1500 Main Street Springfield, MA 01115 *See attached Form B: Addendum 1 Form B: Addendum. Westmass Area Development Corporation is the owner of all lands contained in the subject parcel. Title to land contained in the road right-of-way as designated on the Definitive Plan will be donated to the Town of Agawam. -Asa result, the Town DPW is the applicant for Definitive Plan approval . i PARC E L I DRAFT LEGAL DESCRIPTION A certain parcel of land situated on the southwesterly side of Garden Street in the Town of Agawam; County of Hampden , Commonwealth of Massachusetts being more particularly bounded and described as follows: Beginning at the northwesterly corner of said parcel at a point on the southwesterly side of Garden Street at land now or formerly of West Springfield Fish & Game ' Club, Inc. ; thence S 46-30 -48 E by said Garden Street two hundred five and 56/100 feet (205.56 ' ) to a point of curvature at proposed Bowles Road; thence; Running southerly by a curve to the right having a radius of thirty-five and. 00/100 feet (35 . 001 ) and an arc length of sixty-four and 15/100 feet (64 .15 ' ) to a point of tangency; thence S 58-29-55 W two hundred sixty-four and 92/100 feet ( 264 .92 ' ) to a point of curvature; thence Running southwesterly by a curve to the right having a radius of one thousand nine hundred sixty-seven and 00/100 feet (1967. 00" ) and an arc length of four hundred ten and 14/100 feet (410 . 14 ' ) to a point of tangency; thence - S 70-26--42 W two hundred seventy-seven and 11/100 feet (277 . 111 ) to a point of curvature ; thence Running southwesterly by a curve to the left having a radius of one thousand thirty-three and 00/100 feet ( 1033.00 ' ) and an arc length of six hundred twenty-six and 31/100 feet (6.26.3l ' ) to a point of tangency; thence S 35-42-24 W one hundred seventy-eight and 80/100 feet (178 .801 ) to a point . -Said last six ( 6 ) described courses being by the northwesterly sideline of said Bowles Road; thence N 53-53-09 W five hundred fifty-twb and 59/100 feet (552. 591 ) to a point; thence t Parcel 1 page 2 of 2 N 40-17-30 W two hundred sixty-three and 66/100 feet (263.66 ' )to a point at land now or formerly of Springfield Turnverein, Inc. Said• lash two (2 ) described courses being by other land now or formerly of Westmass Area Development Corporation; - thence N 83-40-10 E two hundred eight and 56/100 • feet ( 208 . 56 ' ) to a point; thence N 01-56-02 W four hundred fifty and 42/100 -feet (450.42 %) to a point; thence N 69-02-28 W sixteen and 42/100 feet (16.42 ' ) to a point at land nos4 or formerly of J. & R. Dyke . Said last three ( 3 ) described courses being by land of said Springfield Turnverein , Inc. ;- thence N 77-46-36 E by land of said Dyke, four hundred fifty-nine and 32/100 feet ( 459 . 32 ' ) to a point at land now or formerly of A. & L. Provost; thence S 89-17-33 E by land of said Provost, six hundred four and 83/100 feet ( 604 . 83 ) to a point at land of said West Springfield Fish & Game Club; Inc. ; thence N 87-59-43 E by land of said West Springfield Fish & Game Club, Inc. , six hundred ninety-seven and 37/100 feet ( 697 .37 ' ) to the point of beginning. Said described parcel of land contains an area of one million two hundred sixteen thousand seven hundred seventy--seven square feet more-or-less ( 1 ,216,777+ Sq.. F-t . ) or 27 .933 acres more-or-less and is shown as Parcel I. on a plan entitled , "Subdivision Plan of Land in Agawam, MA" , (Hampden County ) , scale : 1 " = 80 ' , May 7 , 1984 , prepared by Robinson & Fox, a division of Boston Survey Consultants, Inc : , owned by Westmass Area Development Corporation. Said parcel is subject to a proposed 30 ' wide drainage easement :across the northerly, northeasterly, southeasterly and southerly part of said parcel as shown on •said plan: 2 . 10 PARCEL II DRAFT LEGAL DESCRIPTION A certain parcel of land situated on the southwesterly side of Garden Street and the westerly side of Silver Street, in the Town- of Agawam, County of Hampden, Commonwealth of Massachusetts , being more particularly bounded and. described as follows: Beginning at the northeasterly corner of said parcel at a point on the southwesterly side of said Garden . Street at said Silver Street; thence Running southerly by- a curve to the right having a radius of , forty and 00/100 feet (40. 00 ' ) and an arc length of seventy-five and 64/100 feet (75.64 ' ) to a point of tangency; thence S 61-49-54 W one hundred ninety-nine and 77/100 feet (199 .77 ' ) to a point of curvature; thence Running southerly by a curve to the left having a radius of one thousand four hundred thirty- and 00/100 feet (1430 ..00 ' ) and an arc length of seven hundred ninety-nine and 11/100 feet (799. 1l ' ) to a point of tangency; thence S 29-48-50 W eight hundred twenty-one and 93/100 feet (821 .93 ' ) to a p-oint. of curvature; thence Running southerly by a curve to the left having a radius of two thousand thirty-two and 00/100 feet ( 2032.00 ' ) and . an arc length of one hundred ninety-seven and 21/100 feet ( 197. 2l ' ) to a point of reverse curvature at the intersection with the northeasterly line of the area reserved for Future Street.. Said last five ( 5) described courses being by the westerly sideline of said Silver Street; thence Running southwesterly by a curve to the right having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of fifty--two and 26/100 feet (52. 261 ) to a point of tangency; thence N 70-12-04 W two hundred fifty and 22/100 feet ( 250 . 22 ' ) to a point of curvature; thence f Parcel II • page 2 of 3 Running northwesterly by a curve to the right having a radius of one thousand two hundred thirty and 47/100 feet ( 1230.47 ' ) and an arc length of eight hundred eighteen and 83/100 feet ( 818 . 83 ' ) to a point of compound curvature ; thence Running northeasterly by a curve to the right having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc ' length of fifty-four and 72/100 feet ( 54 . 72 ' ) to a point of reverse curvature at the southeasterly sideline of proposed Bowles Road. Said last four ' (4 ) described courses being by said Future Street; thence Running northeasterly by a curve to the left having a radius of one thousand thirty-three and 00/100 feet ( 1033.00 ' ) and an arc length of three hundred ninety-two and 93/100 feet (392.931 ) to a point of tangency; thence N 35-42-24 E two hundred -sixty-eight and 65/100 feet (268 .65 ' ) to a point of curvature; thence Running northeasterly by a curve to the right having a radius of nine hundred sixty-seven and 00/100 feet (967 .00 ' ) and an arc length of five hundred eighty-six and 29/100 feet ( 586. 29 ' ) to' a paint of tangency; thence N 70-26-42 E two hundred- seventy-seven and 11/100 feet (277 . 11 ' ) to a point of curvature; thence Running northeasterly by a curve to the left having a radius of two thousand thirty-three and 00/100 feet (2033.00 ' ) and an arc length of four hundred twenty-three and 90/100 feet (423 .90 ' ) to a point of tangency; thence N 58-29-55 E three hundred one and 39/100 feet (301 . 39 ' ) to a ' point of curvature; thence Running easterly by a curve to the right having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of forty-five and 81/100 feet (45 .811 ) to a point on the southwesterly sideline of said Garden Street. Said last seven (7 ) described courses being by said . Bowles Road; thence ' S 46-30-48 E by said Garden Street , four hundred eleven and 41/100 feet (411 . 411 ) to the point of beginning. i Parcel; II page 3 of 3 Said described parcel of land contains an area of one million six hundred ninety-nine thousand three hundred thirty-three square feet more-or-less (1 ,699, 333+ Sq. Ft . ) or 39 .011 Acres more-or--less and is shown as Parcel II on a plan entitled , "Subdivision Plan of Land in Agawam , MA . " , (Hampden County ) , scale : 1 " = 80 ' , May 7 , 1984 , prepa.red ' by Robinson & Fox, a division of Boston Survey Consultants , Inc. , owned by Westmass Area Development Corporation. 4 Said parcel is subject to a proposed 30 ' wide drainage easement across the northwesterly part of said parcel as shown on said plan. Said parcel is subject to a 10 ' wide proposed drainage easement in the northeasterly "part of said parcel as shown on said plan. .Sa.id parcel is subject to a 20 ' wide proposed sewer easement across the center part of said parcel as shown on said plan. Said parcel is subject to a 30 ' wxde proposed drainage • easement across the center part of said parcel as shown on said plan. 2 . 13 i PARCEL III DRAFT LEGAL DESCRIPTION A certain .parcel of land situated on the westerly side of Silver Street and the northeasterly side of Shoemaker Lane, in the Town of Agawam, County of Hampden , Commonwealth of Massachusetts , being more particularly bounded and described as follows: Beginning at the southeasterly corner of said parcel at a point on the northeasterly zideline of Shoemaker Lane at said Silver Street.; thence N 67-44-55 W one hundred thirty-nine and 78/100 feet (139 . 781 ) to a point of curvature; thence Running westerly by a curve to the right having a radius of five hundred thirty-eight and 43/100 feet ( 538.43 ' ) and an arc length of two hundred fifteen and 67/100 feet (215.67 ' ) to a point of tangency; thence N 44-47-55 W five hundred eighty-eight and 62/100 feet (588.62 ' ) to a point of curvature; thence Running northwesterly by a curve to the right having a radius of five hundred and 00/100. feet (500 .00 ' ) and an arc length of seventy-eight and 43/100 feet (78 .43 ' ) to a point of tangency ; thence N 35-48-39 W three hundred and 38/100 feet (300 .38 ' ) to a point at other land of Westmass Area Development Corporation . Said last five (5 ) described courses being- by said Shoemaker Lane; thence N 38-46-55 E five hundred eighteen and 16/100 feet (518 . 16 ' ) to a point; thence N 83-46--55 E one hundred eighty-three and 35/100 feet (183 .85 ' ) to a point ; thence - N 38-46-55 E one thousand two hundred ninety-seven and 97/100 feet ( 1297.97 ' ) to a point on the southwesterly side of, the area reserved for Future Street . Said last three (3 ) described courses being by land of said Westmass Area Development Corporation; thence Running southeasterly by a curve to the left having a radius of one thousand two hundred ninety and 47/100 feet ( 1290 .47 ' ) and an arc length of three hundred thirty-two and 06/100 feet (332 .06 ' ) to a point 'of tangency; thence r Parcel III page 2 of 2 S 70-12-04 E two hundred forty-three and 26/100 feet ( 243 . 261 ) to a point of curvature ; thence Running southerly by a curve to the right having a radius of thirty-five and . 00/100 feet ( 35 . 00 ' ) sand an arc length of fifty--six and 55/100 feet (56 .55 ' ) ' to a point on the westerly sideline of Silver Street;. Said last three (3 ) described courses being by said Future Street ; thence S 22-22-20 W nine hundred eight and 42/100 feet (908 .42 ' ) !to a point of curvature; thence Running southerly by a curve to the right having a radius of five thousand nine hundred sixty-eight and 00/100 feet ( 5968.00 ' ) and an arc length of one hundred eighty-three and 30/100 feet (183. 30 ' ) to a point of tangency; thence - . S 24-07-55 W one thousand one hundred twenty-three and 07/100 feet ( 1123 .07 ' ) to a point of curvature; thence Running westerly by a curve to the right having a radius of twenty-nine and 66/100 feet ( 29 . 66 ' ) and an- are length of forty-five and 61/100 feet (45. 61 ' ) to the point of beginning. said last four (4 ) described courses being by said Silver Street . Said parcel of land contains an area of two million thirty-five thousand six hundred ninety-one square feet more-ar-less (2,035, 691 + Sq. Ft. ) or 46.733 Acres more-or-less and is shown as Parcel III on a plan entitled "Subdivision Plan of Land in Agawam, MA. " , (Hampden County) , scale: 1 " = 80 ' , May 7, 1984 , prepared by Robinson & Fox, a division of Boston Survey Consultants , Inc . , owned by Westmass Area Development Corporation. Said parcel is subject to a proposed 40 ' wide drainage easement across the northwesterly part of said parcel as shown on said plan. Said parcel is subject to a proposed detention area in the northwesterly part of said parcel as shown on said plan. Said parcel is subject to a proposed drainage easement across the southwesterly part of said parcel as shown on said plan. 2/14 OWLE B 5 ROAD DRAFT LEGAL DESCRIPTION A certain parcel of land situated on the southwesterly side of Garden Street in the Town of Agawam, County of Hampden , Commonwealth of Massachusetts being more particularly bounded and . described as follows: Beginning at the northwesterly corner of said parcel at a point on the southwesterly side of Garden Street , said point being S 46-30-48 E two hundred five and 56/100 feet: (205 . 56 ) from land now or formerly of West Springfield Fish & Game Club, Inc. ; thence S 46-30-48 E by said Garden Street one hundred ' forty and 81/100 feet ( 140. 8l ' ) to a point; thence Running westerly by a curve to the left having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of forty-five and 81/100 feet (45:8l ' ) to a point of tangency; thence S 58-29-55 W three hundred one and 39/100 feet ( 301 . 39 ' ) tq a point of curvature ; thence Running southwesterly by a curve to the right having a radius of two thousand thirty-three and 00/100 feet ' ( 2033.00 ' ) and an arc length of four hundred twenty-three and 90/100 feet (423. 90 ' ) to a point of tangency; thence S 70-26-42 W two hundred -seventy-seven and 11/100 feet ( 277. 1i ' ) to a point of curvature; thence Running southwesterly by a curve to the left having a radius of nine hundred sixty-seven and 00/100 feet (967.00 ' ) and an arc length of five hundred eighty-six and 29/100 feet ( 586. 29 ' ) to a point of tangen-cy; thence S 35-42-24 W two hundred sixty-eight and 65/100 feet (268. 65 ' ) to a point of curvature; thence Running southwesterly by a curve to the right having a radius of one thousand thirty-three and 00/100 feet ( 1033.00 ' ) and an arc length of four hudred eighty--seven and 19/100 feet (487. 191 ) to a point at other land of Westmass Area Development Corporation. Said last seven (7 ) courses being by Parcel II and the area reserved for. Future Street; thence Bowies Road page 2 of 2 N 27-16-16 W by land of said Westmass Area Development Corp-- oration , sixty--six and 00/100 feet ( 66 . 00 ' ) to a point of curvature ; thence Running northeasterly by a curve to the left having a radius of nine hundred sixty-seven and 00/100 feet (967.00 ' ) and an arc length of four hundred fifty-six and ' 06/100 feet (456 .061 ) to a point of tangency; thence N 35-42-24 E two hundred sixty-eight and 65/100 feet ( 268.65 ' } to a point of curvature; thence Running northeasterly by a curve to the right having a radius of one thousand thirty-three and 00/100 feet (1033 .00 ' ) and an arc length of six hundred twenty-six and 31/100 feet ( 626 . 311 ; ) to a point of tangency; thence N 70-26-42 E two hundred seventy-seven and 11/100 feet (277.11,' ) to a point of curvature; thence Running northeasterly by a curve to the left having a radius of one thousand nine hundred sixty-seven and 00/100 feet (1967 .00 ' ) and an are length of four hundred ten and 14/100 feet ` (410 . 14 ' ) to a point of tangency; thence N 58-29-55 E two hundred sixty-four. and 92/100 feet (264 .92 ') to a- point of curvature; thence Running northerly by a curve to the left having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of sixty-four and 15/100 feet (64 . 15 ' ) to the point of beginning. Said last eight (8 ) courses being by land of said Westmass Area Development Corporation and Parcel I . Said described parcel of land contains an area of one hundred fifty-six thousand three hundred seventy-eight square 'feet more-or-less (156, 378+ Sq. Ft . ) or 3 . 590 Acres more-or--less and is shown as Bowles Road on a plan entitled, "Subdivision Plan of Land in Agawam, MA. " , (Hampden County) , Scale 1" = 80 ' , May 7, 1984 , prepared by Robinson & Fox, a division of Boston Survey Consultants , Inc . , owned by Westmass Area Development Corporation. 2.25 i FUTURE STREET. DRAFT LEGAL DESCRIPTION A certain parcel of land situated on the westerly side of Silver Street , in the Town of Agawam, County of Hampden, Commonwealth of Massachusetts , being more , particularly bounded and described as follows : Beginning at the northeasterly corner of said parcel at a point on the westerly side of Silver Street at the southeasterly corner of Parcel, II ; thence Running southerly by a curve to the left having a radius of two thousand thirty-two and 00/100 feet ( 2032 .00 ' ) and an 'arc length of sixty-six and '71/100 feet (66.7l ' ) to a point of tangency; thence - S 22-22-20 W sixty-two and 34/100 feet ( 62 . 34 ' ) to a point of curvature at the northeasterly corner of Parcel III . Said last two (2 ) described courses being by said Silver Street; thence Running westerly by a curve to the left having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of 'fifty-six and 55/100' feet (56 .55 ' ) to a point of tangency; thence N 70-12-04-W two` hundred forty-three and 26/1C0 feet (243.26 ' ) to a point of curvature; thence Running northwesterly by a curve td the right having a radius of one thousand two hundred ninety and 47/100 feet (1290.47 ' ) and an arc length of eight hundred ninety-seven -and 36/100 feet (897. 361 ) to a point at proposed Bowles Road. Said last three (3 ) described courses being by said Parcel III and other land of Westmass Area Development Corporation; thence Running northeasterly by said Bowles Road by a curve to the left having a radius of one thousand- thirty-three and 00/100 feet ( 1033 . 00 ' ) and an arc length of ninety-four and 26/100 feet (94.26 ' ) to a point at the southwesterly corner of said Parcel II ; thence Running southeasterly by a curve to the left having a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of fifty-four and 72/100 feet ( 54 .72 ' ) to a point of compound curvature; thence Future Street page 2 of 2 Running southeasterly by a curve to the left having a radius of one thousand two hundred thirty and 47/100 ( 1230 . 47 ' ) and an arc length oE- eight hundred eighteen and 83/100 feet ( 818 . 83 ' ) to a point of tangency; thence 5 70-12-04 E two hundred fifty and 22/100 feet ( 250 . 22 ' ) to a point of curvature, thence Running northeasterly by a curve to the left having . a radius of thirty-five and 00/100 feet ( 35 . 00 ' ) and an arc length of fifty-two and 26/100 feet (52. 26 ' ) to the point of beginning. Said last four, (4 ) described courses being by said Parcel II . Said parcel of land contains an area of seventy thousand one hundred seventy-five square feet more-or-less (70, 175+ 5q. Ft . ) or 1 . 611 Acres more-or-less and is shown as Reserved for Future Street on a plan entitled "Subdivision Plan of land in Agawam, MA. " , (Hampden County) , Scale: 1" =80 ' , May 7 , 1984, prepared by Robinson & Fox, a division of Boston Survey Consultants, Inc, , owned by Westmass Area Development Corporation. 2. 21 DRAINAGE EASEMENT DRAFT LEGAL DESCRIPTION A certain parcel of land situated southwesterly of Garden Street, in the Town of Agawam, County of Hampden, Commonwealth of Massachusetts, being more particularly bounded and described as follows : Beginning at the northeasterly corner of said parcel at the southeasterly corner of Parcel I , said corner being one thousand eighty hundred twenty-one and 43/100 feet (1821.431 ) southwesterly along the northwesterly side line of .proposed Bowles Road from the southwesterly line of said Garden Street; thence S 35-42-24 W by said Bowles Road , eighty-nine and 85/100 feet (89 .851 ) to a point of curvature, thence Running southerly by a' curve to the right having a radius of nine hundred sixty-seven and 00/100 feet ( 967.00 ' ) and an arc length of . four hundred fifty-six and 06/100 feet (456.061 ) to a point at other land of Westmass Area Development Corporation; thence N 27-16-16 W thirty and 00/100 feet ( 30 . 001 ) to a point of curvature ; thence Running northerly by a curve to the left having a radius of nine hundred thirty-seven and 00/100 feet (937 .00 ' ) and an arc- length of four hundred forty--one and 91/100 feet (441. 9l ' ) to a point of tangency; thence N 35-42-24 E ninety and 07/100 feet (90 .07 ' ) to a point on the southerly line of Parcel I . Said last three ( 3 ) described courses being by land of sa-id Westmass Area Development Corporaton; thence S 53--53-09 E by said Parcel I , thirty and 00/100 feet (30 .00 ' ) to the point of beginning. Said described parcel of land contains and area of sixteen thousand one hundred sixty-eight square feet more-or-less ( 16, 168+ Sq.Ft. ) or 0. 371' Acres more-or-less and is shown as a 30 ' Wide Drainage Easement on a plan entitled , "Subdivision Plan of Land in Agawam, MA. " , (Hampden County) , Scale : 1" = 80 ' , May 7 , 1984 , prepared by Robinson & Fox, a division of Boston Survey Consutlants, Inc . , owned by Westmass Area Development Corporation. 2. 26 s APR 10 1983 TOWN OF AGAWAM 36 MAIN STREET AGAWAM, MASSACHUSETTS 01001 y� 1� Tel. 413-786-0400 u day PLANNING BOARD April 9, 1984 WESTMASS Area Development Corporation Baybank Tower Suite 1800 1500 Main Street Springfield, MA 01115 Dear Gentlemen: At a duly called meeting held on April 5, 1984, the Agawam Planning Board voted to approve the Preliminary Subdivision Plan entitled "Preliminary Site Development Plan" prepared by Keys Associates and dated December 1983. �_Si cerely, R. Ca a red Chas AGAWAM PLANNING BOARD CRC/s j e cc: Town Clerk Supt. DPW Building Inspector Westlmass Area D*s*lopnt*nt Corgimo s BavSam Tower suite taw 1 500 Maul Street Sonrogtield. Massachusetts 01115 ' ! (413)734-3124 April 13, 1984 Planning Board Members Town of Agawam Town Hall 36 Main Street Agawam, MA 01001 Gentlemen: Thank you for your recent approval of the Preliminary Plan for the Agawam Regional Industrial Park as submitted by the Agawam Cepart- ment of Public Works. A project of this nature, size and quality requires many unique design characteristics ; which in turn require a very thorough and innovative approach to plan review. I commend you and your staff for your clear understanding in this regard, and for the careful consideration you have afforded us. Based upon your Preliminary Plan approval , the CP$d has initiated preparation of a Definitive Plan wnich should be submitted for your review within approximately 60 days. So development of the indus- trial park may proceed in a timely fashion Westmass and the CPW will make every effort to ensure that the "efinitive Plan is as con- sistent as possible with the comments and directives expressed by the Planning Board at your meeting an April S. Any misunderstanding of your requirements on our part, or substantial chanoes in policy by the Planning Board, may significantly delay the project and jeop- ardize the State Grant for road construction. To avoid such a critical misunderstanding, I have listed below the key comments and findings expressed by the Planning Board at the April 5 meeting. We assume that these comments are conditions of the Preliminary Plan approval and will use them as the basis for the Definitive Plan currently being prepared. Of course, we fully understand that all Preliminary actions of the Board are informa- tional only and may be rescinded during review of the Definitive Plan. I certainly hope that won't occur regarding a project of this magnitude. 1. Phasina - The Preliminary Plan addressed the entire industrial park site, to afford you a broad overview of the full project. However, the Definitive Plan which the DPW is now preparing will address Phase I road and drainage construction only. Such an approach will give the Planning Board greater ongoing control over the project, enhance market flexibility, and al- low proper planning of the possible future connection to Route 57. ° Planning Board Members Page 2 2. Lot Lines - To give you a greater understanding of the project, potential lot lines for individual fa- cilities in the park were sketched on the Preliminary Plan. The Definitive Plan, however, will only indi- cate those lot lines created by road layout. Lot lines created by the sale of individual parcels will be reviewed by the Planning Board under Form A pro- cedures prior to each sale in the Industrial Park. This apprpach will reduce administrative complexity for the Planning Board, allow greatest marketing flexibility and the timely completion of all transactions. 3. Sidewalks - By a 3-2 margin, the Planning Board gave preliminary approval to the requested waiver of sidewalk/treebelt requirements of the Subdivis- ion Control Regulations. Engineering currently undev-day for Phase I roads and drainage will be based uoon that decision. However, due to the con- cerns raised by dissenting Planning Board members , Westmass and the DPW will carefully review again the feasibility of constructing partial sidewalks in the Industrial Park. 'fie �di l l notify you imme- diately if we identify a means by which this might be accomplished. 4. Curb Cuts - We all agree that under optimal con- ditions all industrial site curb cuts should be concentrated an the project' s internal road. Due ` to parcel configuration and our development time- table such an approach is not totally possible. A few curb cuts must be located on Silver Street and Shoemaker Lane. It was generally agreed that firms buying parcels along these roads have the right of access to them in any event, and the Preliminary Parcelization Plan was approved as presented. At the same time, Westmass pledged its best efforts in attempting to concentrate development along in- ternal roads and to minimize curb cuts on external roads. 5. Turning Radii/Road Sections - It was pointed out that the turning requirements and weight of trucks would create some unique design conditions for in- dustrial park roadways. Westmass and the Town DPW pledged to design the internal road in a manner capable of supporting truck traffic. K Planning Board Members Page 3 Once again, thank you for your support of the Preliminary Plan for the Agawam Regional Industrial Park. Please feel free to contact me or Jack Stone if you have any questions, comments, -or- suggestions as we prepare for our final plan submission. I look forward to continu- ing to work with you on this important project. Sincerely, Kenneth C.. Tichacek Vice President KCT:fs cc: John P. Stone Deborah Jachos s SUBSURFACE INVESTIGATION • APPENDIX B C--- KEYES ASSOCIATES APPENDIX B SUBSURFACE INVESTIGATIONS Boring lags for subsurface investigations are included herein, with locations of borings taken shown on the Final Plans. Borings were undertaken on two separate occasions, November 29, 1983 and on April 30 and May 1, 1984. In addition considerable previous explorations were studied including: 1. Groundwater observation holes for development of Airport, 1940. 2. Borings for sewers at Shoemaker Lane, 1980. 3. Borings taken for potential KIDDER-STACY site between former grandstand and Shoemaker Lane. 4. Observation hole taken for Ainsworth Report, 1980. 5. Borings for Silver Street, Keyes Associates, 1983. AL CLARENCE WELT! ASSOCIATES INC. DRILLING' TEST BORINGS . ROCK EXPLORATION CONTRACTORS S WATER EXPLORATION • SOIL S ROCK ANCMORS December 5, 1983 Keyes Associates 55 Townline Road Wethersfield, CT. 06109 Att: Gary Fontanella Re: Bowles Airport Industrial Development Agawam, MA. Soils Investigation Dear Mr. Fontanella: Herewith are boring data on recent soils exploration at the subject site. In addition to these data, considerable previous explorations have been studied. These include : 1 . Groundwater overburden holes for development of Airport, 1940 2. Borings for sewers at Shoemaker Lane, 1980 • 3. Borings taken for potential KIDDER-STACY site between former grandstand and Shoemaker Lane 4. Observation hole taken for Ainsworth Report, 1980 5. Borings for Silver Street, Keyes Associates, 1983 In reviewing the recent borings , as well as previous data, the following soil cross-section can be assumed as pertaining to natural soil deposits. The upper 10 feet of soil is generally a Fine to Coarse Sand (with topsoil from 4" to 12" thick) _ The soil below 10 feet tends to have silt percentages ranging from 30% to 70%. This material has a significant influence on groundwater movements and groundwater tables. While the general groundwater movement is toward Shoemaker Lane, localized mounding occurs where the silt stratum is closer to ground surface. The general ground water level at the present time appears to be at Elev. 185 to 186 near Shoemaker Lane and from Elev. 186 to 188 at the Northeast extremity. Thus the water table is generally within 4 to 8 feet of grade over much of the area. in developing the site it is clear the water table will be the determining factor in depth of retention ponds. Realistically no retention is available below Elev. 185 unless there is significant groundwater lowering or retention pond drains at Shoemaker Lane. . w s.►v ins � � ��Tw►..�.av AAL►1 Lam/.Tf AIY n�nra ., i..wa• �.... awe Keyes Associates December 5 , 1983 page 2 Absent such drainage, the area would be designed with retention ponds as proposed and substantial swales placed generally above Elev. 187 to permit such swales to percolate water after a storm. Ths soils above Elev. 187 are well draining with permeability in excess of 50 feet/day and percolation rate of 0 .5 to 2 inches/minute. In addtion to the main Swale to the retention pond, individual site swales would provide additional retention ponds . The material from the retention pond will, in general, be Fine to Medium Sand. This material can be used for roadway embankments and site development. If pavement grades are above Elev. 190± the pavement would have a sand subbase. Thus no subbase would be required. However, Base must be adequate for typical industrial park Truck Traffic. If full Bituminous Concrete were placed on the compacted sand subbase the total depth would be about 8" . If 4 1/2" of this depth were replaced by Processed Stone Base, the depth of base would be 9". It is suggested that the base be about 7" and the Bituminous Concrete be 5" (2" on 3" of Binder or premix) . As regards building loading on the site normal industrial structures could be built with spread footings at an allowable loading of 2 TUNS/s. f. at columns and 1 . 0 TONS/s. f. at wall footings. The existing runways have about 2 1/2" of Bituminous Concrete on 4- 1/2" of Processed Stone Base . The pavement would require about 4" of overlay for future use as roadways. PETROMAT should be used prior to placing the overlayment. If you have any questions please call me. Very truly yours, C arence Welti, PhD, P.E. for: CLARENCE WELTI ASSOCIATES INC. CW:n Encs. Bowles Airport/Agawam.MA- CLARENCE WELT1 ASSOC.,INC. "BORING LOG" P.O.BOX 397 GLASTONBURY. CONN. 05033 CLUENT KEYES ASSOCIATES BORING NO. 1 BORING NO. 2 LINE a STA LINE A STA. OFFSET OFFSET GR. ELEV. 186i GR. ELEV. -- - BLOWS BLOWS A STRATUM DESCRIPTION PE 1* B A STRATUM DESCRIPTION PER fi_' B b ar.fine-med.sand, , some silt br.fine-crs.sand some organic material 1-3-5 6-8-8 br.fine-med.sand 11.0 6-12-20 11.0 5-9--25 gr.silt, layers of fine sand gr.sil.t, layers of fine sand 5-9-15 9-16-24 6-12-16 1 2i.5 12-28--30 **asphalt BOTTOM OF BORING 21. ***traprock,br. WATER AT 3' @ 0 hrs. fine-crs.sand DATE: 11/29/83 BOTTOM OF BORING 21. 5 DRILLER: GIGGEY WATER AT 4' @ 0 hrs. DRILLER: GIGGEY i. COL. A strata depth Trio Printers x 1127 2. COL. B 3. HAMMER 1401; FALL 30" AND -40 to SO% 4. SAMPLER = 0.D. SPLIT SPOON SOME - 10 to 40% 9 e'-WT m ftRnl 1 Ain WAM TRACE - 0 to 10% CLARENCE WELTI ASSOC.,INC. Bowles Airport/Agawam,MA. P.Q.BUX 397 '�BQ�'�� LOG" GLASTONBURY. CONN. 06033 CLIENT KEYE5 ASSOCIATES BORING NO. 3 BORING N0. 4 LINE 3 STA LINE & STA. OFFSET OFFSET GR. ELEV. 19b± GR. ELEV. - BLOWS �� BLOWS A STRATUM DESCRIPTION PER 6 B A STRATUM DESCRIPTION PER 6„ B br.fine-crs.sand br.fi.ne-crs.sand, tr.silt 4.0 4-8-12 3-6-9 br.fine-med.sand , little silt , tr. organic material 10. 10.0 5-6-7 16-34-42 br.fine-med.sand, little silt gr.fine sand, some silt 3-4-7 25-25-34 6-18-20 7-9-12 ** sand & silt BOTTOM OF BORING 21 . WATER AT 4' @ 0 hr . BOTTOM OF BORING 21 5 DATE: 11/29/83 DRILLER: GIGGEY DATE: 11/29/83 DRILLER: GIGGEY 1. COL. A _ strata-depth _ Trio Printers#t iv 2. COL. B 3. HAMMER = 140/; FALL 30" AND - 40 to 50% A. SAMPLER s O.D. SPLIT SPOON SOME - 10 to 40% 5. GWT= GROUND WATER TRACE - 0 to 10% CLARENCE WELTI ASSOC.,INC. _Bowles Airport/Agawam, MA. P.O.BOX 397 "BORING LOG" KEYES ASSOCIATES' GLASTONBURY. CONN. 06033 CLIENT BORING NO, 5 BORING NO. LINE & STA. LINE 6 STA. ► OFFSET OFFSET GR. ELEY. 188± GR. ELEY. BLOWSG' BLOWS STRATUM DESCRIPTION PER B A STRATUM DESCRIPTION PER B br.fine-ers.sand 12--9-b gr.fine sand, some silt 20-24-28 BOTTOM OF BORING 21. 0 WATER AT r DATE; 11/29/83 DRILLER: GIGGEY 1. COL. A _ strata depth Trio Printers x 1127 2. COL. B 3. HAMMER = 140t; FALL 30" AND - 40 to 50% 4. SAMPLER = O.D. SPLIT SPOON SOME - 10 to 40% 5 GW7 = GROUND WATER TRACE — 0 to 10% Htlx: •• : : • ,•t1•• , • �cv NORTH l • co .. • as no a A, 0, a 111 111 ■••soon *we a • a vim . ��� • "�. r.. >.... •-tea'- - • , • - - a F. s. 'Ilk `_" t!. • 4 i • ^aa 'J 2e • f d a t? Taylor , :pd �. ." ,h BORING LOCATION PLAN SCALE: 1' = 1200' KB"ESProvidence.R.t. ENVIRONMENTAL IMPACT REPORT '�n�'.�,�. �Vetl►er5lield,Ct. FIGURE "a-`'y"a•"-"• AGAWAM REGIONAL INDUSTRIAL PARK - Keyes Associates-ArchiteeWEngineemMlan"rs CLARENCE WELTI ASSOCIATES INC. DRILLING TEST BORINGS • ROCK EXPLORATION CONTRACTORS : WATER EXPLORATION • SOIL \ ROCK ANCHORS May 9, 1984 .Keyes Associates 55 Townline Road Wethersfield, CT. 06109 r Att: Gary Fontanella Re: Agawam Regional Industrial Park Soils Investigation II Dear Mr. Fontanella: "Herewith are boring data pertaining to the above. The soli beneath the topsoil to depths of 5 to 15 feet is a Fine to Coarse Sand. This stratum $s underlain by Silt and Fine Sand. Water table over the higher portion of the site is 10 to 12 feet below grade. The areas near the retention basin location has a water table at 3 to 5 feet depth. Topsoil varies considerably from 0 to about 12" . The existing airport runway has 2" to 3" of bituminous concrete with Orr to 5" of stone base. This material could be milled, scarified (stone base) and used as a part of the proposed stone base for future pavements. As regards use of material from retention ponds for embankments, the fine to coarse Sand is suitable, but the underlying Silt would not be satisfactory. Stone may be suitable for subbase. As regards the proposed roadway section, the section is adequate insofar as base and subbase are concerned. The depth of bituminous concrete is not sufficient for long term heavy truck usage. Even with a traffic number of 100 the minimum depth of Bituminous concrete should be 5". If you have any questions please call me. Very my yours, C4fa-rence Welti, PhD, P.E. for: CLARENCE WELTI ASSOCIATES INC. CW:n Encs. P.O.BOX 387 • GLASTONBURY. CONNECTICUT 06033 * 1203) 633»46x3 CLARENCE WELTI ASSOC. INC. Agawam Industrial Park P.O.BOx39r "'BORING LOG" GLASTONBURY, CONN.06033 CLIENT KEYES ASSOCIATES BORING NO. B-1 BORING NO. B-2 LINE & STA_ LINE & STA _ OFFSET OFFSET GR. ELEV. GR. ELEV. SLOWS BLOWS A STRATUM DESCRIPTION PER—K 8 A STRATUM DESCRIPTION PER-X B br.fine-cra.sand br.fine-crs.sand 7-10-10 6-8-9 gr/br.silt S. fine 15-18-14 sand 20-36-42 BOTTOM OF BORING 16.5 BOTTOM OF BORING 16. WATER AT 13' @ 0 hrs. NO WATER @ 0 hrs. DRILLER: FAULKNER DRILLER: FAULKNER 1. COL. A strata aepth Trio Printers 0 1127 2. COL. B 3. HAMMER 140l; FALL 30" AND -40 to 50% 4. SAMPLER*� O.D. SPLIT SPOON SOME - 10 to 40% 5. GWT- GROUND WATER TRACE - 0 to 10% Agawam Industrial Park CLARENCE WELTI ASSOC., INC. �,BORING LOG P.O-BOX 397 GLASTONBURY. CONK.08033 CLIENT KEYE5 ASSOCIATES i BORING N0. B-3 BORING NO. B-4 LINE & STA LINE & STA OFFSET OFFSET GR. ELEV GR. ELEV BLOWS BLOWS A STRATUM DESCRIPTION PER 6" B A STRATUM DESCRIPTION PER 6" B br-fine-crs.sand br.fine-cra.sand 9-11-10 _ 6-8-li 10--14-18 7-9-8 . gr/br.siit fine sand 16-26-26 8-15-21 BOTTOM OF BORING 21.5 BOTTOM OF BORING 21. 5 WATER AT 11.5' @ 0 hrs. WATER AT 12' @ 0 hrs DRILLER: FAULKNER DATE: DRILLER: FAULKNER 1. COL. A strata depth Tft Pfinh 01127 2. COL. 5 3. HAMMER 1400; FALL 30' AND - 40 to 50% 4. SAMPLER= O.D. SPLIT SPOON SOME - 10 to 40% 5. GWT- GROUND WATER TRACE - 0 to 10% CLARENCE WELTI ASSOC.,INC. Agawam Industrial Park P.O.5OX397 "BORING LOG" GLASTONBURY, CONN. 06033 LCLIRMT --KEYES ASSOCIATES BORING NO. B-5 BORING NO. B-6 LINE A STA. LINE & STA..-- OFFSET OFFSET GR. ELEV. - GR. ELEV BLOWS BLOWS A STRATUM DESCRIPTION PER._6" B A STRATUM DESCRIPTION PER—C B rbr. -crs.sand j7br.fine-crs.sand 7-9-11 6-7-6 11-12-11 9-10-12 J16.5 18-21-22 16-19-25 BOTTOM OF BORING 16.5 BOTTOM OF BORING 16.5 WATER AT 13' @ 0 hrs. WATER AT 14' @ 0 hrs. DRILLER: FAULKNER DRILLER: FAULKNER 1. COL. A strata depth Trio Printers x 1127 2. COL. 8 3. HAMMER 1400; FALL 30" AND -40 to 50% 4. SAMPLER- O.D. SPLIT SPOON SOME - 10 to 40% 5. GWT- GROUND WATER TRACE - 0 to 10% CLARENCE WELTI ASSOC.,INC. Agawam Industrial Park P.O.BOX 397 „BARING LOG" KEYES ASSOCIATES GLASTONBURY, CONN.08033 CLIENT BORING NO. B-7 BORING NO. B-8 LINE & STA. LINE IL STA OFFSET OFFSET GR. ELEV. GR. ELEV BLOWS� BLOY A STRATUM DESCRIPTION PER B A STRATUM DESCRIPTION PER B br.fine-crs.sand br.fine-crs.sand 8-6-7 8-16-16 9-15-16 BOTTOM OF BORING 11. Er . BOTTOM OF BORING 11 WATER AT 10' @ 0 hra - DATE: 5/2/84 DATE: b/2/84 DRILLER: •FAULKNER DRILLER: FAULKNER 1. COL. A strata depth Trio Pdnmm M 1127 2. COL. 3. HAMMER 1401; FALL 30" AND - 40 io 50% 4. SAMPLER @� O.D. SPLIT SPOON SOME - 10 no 40% 5. GWT- GROUND WATER TRACE - 0 f* 10% CLARENCE WELTI ASSOC.,INC. Agawam Industrial Park P.O.BOX 397 a'B O R I Id G. LOG" KEYES ASSOCIATES GLASTONBURY, CONN. 06033 CLIENT BORING NO. B-9 BORING NO. B-10 LINE & STA LINE & STA OFFSET OFFSET GR. ELEV. GR. ELEV. BLO BLOWS A STRATUM DESCRIPTION PERE B A STRATUM DESCRIPTION PERK 8 br.fine-crs.sand 7-9-10 6-10-15 br.fine-crs.sand 5-8-12 14-19-24 6-9-12 19-21-29 gr/br.silt & fine sand - 17-34-60 17-27-27 BOTTOM OF BORING 21. 5' WATER AT 11' @ 0 hrs BOTTOM OF BORING 24 WATER AT 11 @ 0 hrs DRILLER: FAULKNER DATE: 5/1/84 DRILLER: FAULKNER 1. COL. A strata deptfi Trio Printers N 1127 2. COL. 9 3. HAMMER- 1400; FALL 30" AND - 40 to 50% 4. SAMPLER - Q.D. SPLIT SPOON SOME - 10 to 40% 5. GWT- GROUND WATER TRACE - 0 to 10% Agawam Industrial Park CLARENCE WELTI ASSOC.,INC. "BORING LOG"' P.O.BO x 3107 GLASTONBURY, CONN.06033 CUENTKEYES ASSOCIATES BORING NO. B-11 BORING NO. B-12 LINE & STA LINE & STA. OFFSET OFFSET GR. ELEV. GR. ELEV. BLOWS BLOWS A STRATUM DESCRIPTION PER_.V B• A STRATUM DESCRIPTION PER--V B br.fine-crs.sand $-11-1b 6-8-7 br.fine-cro.sand 14-17-22 12-13-14 15, ** - 16-18-22 **gr/br.silt & BOTTOM OF BORING 16. 5 WATER AT 4' @ 0 hrs. BOTTOM OF BORING 16. WATER AT 111 @ 0 hr . DATE: 5 1 84 DRILLER: FAULKNER DATE: 5/I/84 DRILLER: FAULKNER 1. COL. A strata de th Trio Printers M 1127 2. COL. 8 3. HAMMER 140l; FALL 30" AND - 40 to 50% 4. SAMPLER = O.D. SPLIT SPOON SOME - 10 to 40% 5. GWT- GROUND WATER TRACE - 0 to 10% CLARENCE WELTI ASSOC.,INC. PRO.I. Agawam Industrial Park "BORING LOG"P.O.BOX 397 KEYES ASSOCIATES GLASTONBURY, CONN.06033 CLIENT' • BORING NO.� B-13 BORING NO. B-14 LINE A STA LINE & STA OFFSET OFFSET GR. ELEV. GR. ELEV. BLOWS BLOWS A STRATUM DESCRIPTION PER—WO B A STRATUM DESCRIPTION PER_!!!_ B br.fine-ers.sand br.fine-med.sand 6-11-13 br.si t, & fiow ne 7-10-15 gr sand 11-12-16 11-16-19 gr/br.silt 6 f ine land 19-28-30 19-21-34 BOTTOM OF BORING 16. 5 BOTTOM.OF BORING 16. WATER AT 3' @ 0 hrs. WATER AT 4.5' @ 0 hrs. DATE: 5/1/84 DATE: 5/1/84 DRILLER: FAULKNER DRILLER: FAULKNER 1. col. A Strata depth 'trio Printers 01127 2. COL. 11 3. HAMMER 1400; FALL 30" AND - 40 to 50% 4. SAMPLER - O.D. SPLIT SPOON SOME - 10 to 40% S. GWT- GROUND WATER TRACE - 0'to 1096 FINAL PLANS • APPENDIX C KEYES ASSOCIATES APPENDIX C FINAL PLANS The following plans, profiles and miscellaneous sheets have been submitted under separate package: INDEX TO DRAWINGS Description Sheet Number Title Sheet 1 Subdivision Plan of Land 2 - 4 General Information and Details 5 Roadway Plan & Profile 6 - 7 iSanitary Sewer Plan & Profile - 8 Drainage Swale Plan 9 Drainage Swale & Detention Area Plan 10 Details of Erosion & Sedimentation Control 11 Topographic Map 12 - 13 CROSS. SECTIONS • APPENDIX D �^ KEYES ASSOCIATES APPENDIX D • CROSS SECTION Cross sectional information follows this page and should be used in conjunction with review of the Final Plans. This cross section information will be provided as part of the contract specifications for use during the construction phase of this project. ROADWAY CROSS SECTIONS SCALE: 1 "- 10' • -+- c — - - - -u1 1 � J�j _ co J. -77 Al �-r-_.�----.-.�-.- ( I �. I , ! I � j..!.. 1 I f t.. .. ..;. �.. ... . .I , t _ r # , I t t filt , oq 1 { �; � � . jIF . ; } � k t.� � �. .. -�. _► �. � � ( � �:I�I . . r _IItI � � � � ir t !� ri, f � t -71 t-*_r -rt-� •.1--i�� ,- y- - .- - - - - -. __,_..'...t. '�_.f ' .�J11I_- �- -� � - rt-- - '- -`..�_.�._ ..1"_ -�._ _ _.�_ ...1 - --�-"�_ .- ._ -_ __.., 1_. I { i ( � i � kl !"} ' Ti ! 1 kli t iiI 1 i � rl1 tii ► 3 I } k 1 } � � ' lt � I i � .t � , � i , r {-�, k �. 4 , �r f' 1 I � � I � I 1 ! � I ; ! j i � � � � i � j ( � . � ' � r i � I r � t I ! � � j r 111 t k • f k -�-r-� '-�- .`�t�'r- '�`7' , "� I k �r ' .I� �� 1 :�_i �`- -�`-� �-rt-��-� T-F�-F•-+•-�• - - - .�� { �_r i�..' _7_�..r. � i �- Tr r ' I 1 !: f t k ].i..4 { E.1 t �. . .. . .. _ { .. 1 RppgqgqWAY , Rp (� TIT q� KIT { I N 'I �i k K I �IR ?llll1 1T, lIIi rP �11I I If � � � i � � I I I t 7*7 ........... ........ ...... T ..... ----- . .. ... 4-7 I, . { t � � r � , 1 F lit i # qq1 � + i ' i � € � I � � � � ' � r- _-T T- 1 7 ir � � I + i � � � i1 � 1 � �-� � li � i � 11 I � ! l_k ( I j � � � � � 3Ii I i ' ii � ji � } ilrl ' r{ , ti � � 11 € � `fr { � 11i tii ; r � � �� 4, J, I i I ! � � � € I ; ! < _..., }_� -r j i i ,. i � . � .�.., -! I + r I +-, } ` � 1 j I."� .k.; 1 i I � I f i ,. I t i ir ' € � ' I - ` / E r � r � } Ii � y..; 1 � j :{ � .; I � � � # f ( ' i 1 , r r RI i .l. � �-� , � , } � , , , � � � � lf ! � if � , � ' 1 1�4 r .� ; � � � � � j � � � � � � � � ! � � � � ; � k ; I. Ili ' } .�. "� �:� � � I ir� 1 Cl 1) .� �YI � slI ��� I ". .l � 1�� P � �t � � i � � � � � � ( r RO 3 C', Ld -L6 Ar - - - �- t - -- _---- -- r ----------------- 41- IQL �^ i +�._yam--� -�- -�T�� — �-�--- - _ y ..�-.�.+--.•-�. ,.ri—g--- Ok _---fie---. -r-- ---+---�. -_ ----- t- 7-4 If -•-•• - ____ •,-T-r_a.—r—.r-- T_? _i'._._.^. _� —. . �� may-" _ �--` Cf- IT 41- 1 CO cz ----------- _r µ + ���`_-. 1 ^-"-�•"-'---r�� '-_�-.} ��`Lam.--���f--.__�_-- --- f _�� • I I � i ; r i r I I I I f � 'tt i � '' „ ' I ' I ' �� I t i �..[``[. � � 4. { i..l f � I 1 1 f I I i i I � � + � I � # I � i + I I, �_. i � + .I � I E ` i � � f � �._ I . - 1 ,. i � I ; , I .: II 1 .�. f �. # .� 1 � i �. ., I j + ( � ;_ If , I � � { I -T - 17.4 dN oo it f , � , i i � ; .1 {i{ ii1 � j{1 f illf # ; 1 I j t ( I I 11 1 �{ � r ! + ! r I � r t � F ! S , 1 I i r t j t i ! � + � : jj I " it +" i � ii } � � ifj � � � .. � � ! f ' ti � 4i I � II = �.� i � j � l � ; if i [ I � ; � II � I i { � Ifijil ! � � � jlrf ! I � 1 � f, } ' } Is I { � 111 � �" � i ! ll � r �" j I � � � � � I � I � � illlf { it; t � i [ � � � [ lf � � l s � � i � � r � t � [ i � il � ! ill r 1 � � I f � t ; .f -I �. I I � I � � I ; ; I � i � � � � I ; I J � j � lli I � � I111 t � 1" � I � � f.I � f � i ' Il I j � � � I r T rrr-,rTr fit pt � � ? I ! ; ' � i � i ; � ' i � 1{-; � �� � ; � � I j. ' � ! { { l � I. �.f f � f � l , . ;-tC , �" � # f � 11 � [ !" � � � TT -1 F-t7 T 4U(;TlC I 71 MAD F I fl-t 13 �T f �I '` �t ._t T_.�,_ —i-�. � .yam ..— .___.•—•--_�_ � -_��___�_._ �._,_r,r3 .tip... fr `.�.� _� .r...a..-��.-.yam—•—Tt _—.__—__.'__�i"___._=��_ _ 1 1—. - -- --�- - -T -- :- .�_ _1 �_....•—�� _•_.q--err ;�.N_....._. __.-r..�—_ — ._. � - - ' 1 —� lie 77t— y �._ Y---�-----� - r�--fir. � .....L..i_ ,—T�^� �-�'—w._ .._....._._«.�._-r—____�_!�-�. I •. �'/��_�._ , T -T-7T i- t+ PA I + t } # i ill r Ir I ; t . I [ � Ir 1 � � � I . � ! � I I I � � � ! 1 � � } � f , f ; � is il11, f f .. . _ � — � �:.: � ,._�_ 1 � Ii1 � 1 � 1 - . . � � � 1 � . { r { { 1� r1 � r. i t .� ..� .1 ., I. �,. .. .. ._ . , I. _ _I.. ...._ _ i ,.; l .l.. ,. _..�._ f_. .� f _. - _ .. � -1 . ... f_� � � ; ; f { � ( 1 { �. ., � _ .� �. _.� .I_ .. ,. .'. �_ _ lI L , fI . ,_ f.., --.�. I .� ;. i. l-, I . i.� I �- ..� �. k ff � � .� f _ .r � I r � � I I , I a: t � r , , III � � I i f I , f I i { , I ► I , I i � � { W9 41 I I r Tr- , , I I , i � I I1 � � I I , � f , � j({ , �{ {i�/�yy�,► .I , I � 11 , } , � -�._�. fi � I , , , � Ir .t_ 7-7 ; i , + � 1 +y{ r �i I fi 1 r i � i F ; F i l 't{ 1 i f � I I 1 ]« I � � f � I j F ' ` I � r � r � f I � I � ! j i ! I ! i r I , f � - - ----- U0, 0 w l ... . . .. } _ . - � � �. .f f f 1.. 11 >�. ! ;_ . . . � W -- - - - --- -� � �-�-=--'----T -�---••-.----------�_1--Tr�.� OJT- ^�'-�- _ice -----�--__.____..._. -��; -- `—.--�-�------.••-T--- - --�-;----, � � . T ---- _ _ _ - _- -- -.--- --- --------Ut- -�_ - IJ-4 UL I _ --- 1 —�__._._--�----ram �-•--------- --r � --r— -- — .J _tt_ mis .�—_�--�—«.__—•.. ---..__�—�_r._ T---�--�-.—_�--"'—"----��—...�_�___ I .M .._.ram—�—�—�—��,.,..W. LuT -`--�T _tom--�-~_-`�.` ��� --'1:.� �__..� _ -_.--*-.�.-;T,�---------j--�--• _ _.:..�___�. �U,- _ i -,----- ----- - - - --- --w-- 1. 7 I , ; � i a i„ � I III � ► I i {i I I -� -;-.� � } i t- —i �-}.. _ . � . ._ .�- -• � f t-'-- �..; _._i...#.� r -r � j-� e i � � .� � ..!....;--�-� - - !- .I . .�: .. _� _f 1.-.t . t..� - � j i 11 i I , � : I ' i i �� , 14 I � ► I(. P UP Tip'"64 �- ---=--t---fir �--- - ---t-�-� --�- --��--- � ;-------�•� '--'^�- --fit ---- -- --- -iT�- ---r---- _.� ;-r - _ ---- ---- -- t-.Y_ �166 CL; er ; - T.r.---.._ 1 -�.f-• �.-��. �._�= -_- -.w��4- is 1 _ ��. ar4 � �-.•��, CL ------- _ EEL--����.. ..-.--.----tU 71 AL A rr fj 77 .•--•--'ter-•�. _ ^--^-�-_�_� ����.._,«•.._,�-}�-,-� ' ._—..-.rt..._..« y—+�-- — .�— _ _-}T. � •_�.._.. _.._ _�—__-i��—.�___^�_ Tom_ _., _.7�r �T — - - — T� -- ---_- - - -- -- ------— — - — --- L' --*-- i C7- I - --- E - -T -- -+---� - -----w-- --- - ---- �--- --- :, jr --------------- ��� �--._tom.-'f� - �--•_�_•--•ter+�-�}..-��l--rt-�. SS .. _ �^ •L._-i w_ - �- y�.� L.�_.--....- _1_ �-��..._-ram - i-Y - -_ '{� _ cam- vinoaoinion!lEII!!!E1 1 01 MEN 0 lab Mason Islas a Nam n nil IN � �J E�l�' III : • ■ 1 1 1 DETENTION AREA CROSS SECTIONS SCALE: 1 "m20' • • IWO MINI b�4= Sr �1■NdN I■ _■■■!E ■ ��� OWNER! MORI. ■� q■HN111�q 3E� ■N/NS=N NgUR isIMMUNE AN ■URSS//W ���q ■/SEES ■URN/ �!IN :� ■ N■EwIE■■■>� Mill N IN i _ a ��■■■ �N U // N■■Aar■ ■■ N ■ MEN � � 1■ ■� IN ■E MEN 110011® 1■ ■ SE NEWSMEN IN ■1 IrNEIIMill MEMO 1111110=01 noME IE ■ ME MUMH 1 1 ■/■SURE ■ 1■ 1 f NNSN■■■ UR EI1■EEI['� >I:■ III•■E �� ,1i ■���r■ IIEI��N E� � .. ■1•■■ENI!//I�HNE■■■/S= E� I IEIE• ■ ■/■N■MOM Hq■■N■■i to 1� w■H 1 I�gE1�■■N■■■/■E�7f■■[i M/HERHWE , IN MEMBER[ �NN1�■■WN ORION isME � ENSURE■f 1■ ON SOMEONE i a 1 N■NSSIm �I ■EI■ ■■E■I IN w■/N■■■N■gHl■■■>t It I■ NI q■■NHH■1 IEHE■■III■■1■E ENSURE ■URE -maim I/■Vim■ onomN■URSons"�I■ gq■N1�E ■■ENE■■1■il■q■■ ■EN■■■■�UR�S■E■E�1■■■1•HSf1■IS ■■■EN■■NHq■■ ■i■■ • ■ ■EHN:M■■■■■�"�10 NN■■■N/�/1 i � m■/■NH■■■q� H ■NEN■■p■■■!■■E■■ICE NEI�■■q/M■■■/■■1111121111111� MEN MEN WISIM ■■■N■■11■■■Is' INS i Ni■/ 1/ • Y s MF!- I mow.�.�• �-.r-T'� ..� �.« �_+.�-�.+—�'r I --�--r *--�-mow,_._._--.-�r r—r"--�,._...«...-_Y'-����•��.-.r� ^' - I •—'LYif!--'• �I �. 4 I I -�_• ram.. _.�+.-� ^' _ - -..� T��r�.w._..-- } I cc t j l ..y.. �••-.-�•-r � •-- �--;--I--err'-•-• :--1--t--�- ---��«...- r .- �`+-+-----�--f-�"'�- .:.�._..;..� :--.-F r-• -r-- -i- rt L ` _ram _ 46 JQ -t-- -- �T---- i .-. ._ _ i •- - ---r--CL FEE F•'_i••f'-�.CO.- t � I I _ T r t 4 LZ r . ~ .. _ t . . . . _ r_. _. or - �T.--, i--- I ^-�-_ ... ._ L - �-- ri•---'— � —�--- •—ram 1 �_ •—�--F-� • _ _ .-. ^-_. • ± , : � I .. ..�. ry �. : ! .LLLLI t 4 - t-tf t r ( r r I j , J It , I } - I-T- Mt- fT +F +H-- I -H-1-f-r- fT r • I - _ ._.1 r--}._ .(-{-.j..�j._,r f t ._f � t , t , I �•� � i i.. r ! �-. t r .. ! � � I , i I i i r I-- { , f t j I ; , 1 1 , . + , 1 t i ;.' * , . } t , ( � { ( t r f 1 1 -*-»--r- , �-r rT-'�--r-T -j-,-�-r-•- r-r-+- -*-�-� r� r r r-1--�- �, ff TrT + -T- "t-rt-'--! � i �--r-.-j ter*• -�--*-�--'-- +-r - - i-t _I-t-f � �1 -} r' i I- � , 1 -� r l � $ ! r-r r _ J # 1.1 t.. � _ i , T , . r 1 r , r . . , • , t r -t- r-{ -} -1..7.,.+ i t I 1 r r i I l • � 1 , t t•?-; '-:�•- +.�:• r r 1 r `.. r t �. __... .. E - t 1 1 1111 (T.- j f k i bt rb4tidN _. . .. _ _ 5 CT�ONlS, _CALF }�{.. . ., t off.. !A RR i"r1 I.. DRAINAGE SWALE CROSS SECTIONS SCALE: 1 "�5' • ---r-. pt --�---fir W- r. - : �• -�-�-�� -.-_. _.._.,mot.__ -._.�.�......-� �.'_- __..Y.-���_.�..�� - __ -_--Y-_----�..--�_•�---` 47 _........���---"------�-'--•-ter- ^'-..'�-��1 - - - --"t._ � _. __ _�_..__--_.-.-�- _ _- - \ - --- ------+-- -�- _ -*-i- f t 4 } 11 l I � _ - 4 �€ I- I - I 1• 1 {� � I fi � I t ! i t � I ► � I 1 ' f # ' ' j i i 1 I 1 , i �.. � ��-- - ._�. �..I . : V _ . �i .t _ ! I I -�-� I � f � � i + , � � t ► 1 � I IF , I � ; , � I it � I . i it I I ! I t } ! I � llilf # IIi tr t l ; l ! ttl 11 , i � IIl I � I { - i + I � ( Itf ! 1 _ - --- — - - — - - -- -- -- — - - _--_-- _b An D ld -- I If - -�-- - -- �t LU f Ll _ .........................__Y- El —An- --T-� -, -^ ,-,�-.�,.�..�.� - -�" .-ice .__. ---, 3 -�_-•- ^-- -! - � r'�" ~� tj I a 5 i ---�-- �___� Ir -----#- -- -----�--r---- ta �; I�F- TVE c Ut fr ILA -�' -- -------- ek -77 r- - fl Fes- -__---- ,.-., k --.-._ _WET i Y_._._- -_�- -__� -r__ ` y-.ram-� � � - _- � ��._._�..�'__L..._.-�... � .....�� -~�_ -J'-.---'-^T--r""_--T Tyr- � -`�n I - - �- -_ -_`• ..._..}-r-._.._�__._..�_- ..--._-..mot.^.--�. _--'_-�_ --..tl-.._.»..._'-�__-+_�-rt„ �..-+�{w� -'r -=F - -_-=-- -- =- -41 Y 17 1: OUTLINE SPECIFICATIONS, AND DETAILS • APPENDIX E KEYES ASSOCIATES APPENDIX E OUTLINE SPECIFICATIONS AND DETAILS All specifications and details shall be in accordance with the Massachusetts Department of Public Works and Town of Agawam guidelines. Details are included herein. BITUMINOUS CONCRETE CURBS VINTICAL TACO OPTIONAL VLRTWAL [AtK ORTICMAL [10-1.-`w�[r —Mal o +* rI + Ia; 140 � I � * I 7 p a TYPE -1 TYPE —2 TYPE-3 will a o w o LTV[ TOP CYUlkil b R ���'♦�# mine[R •Ai[ M Q IY90A19 7 >1E '1 METHOD OF SETTING -TYPICAL FOR ALL TYPES NOTE; * SEE TYPICAL SECTIONS FOR PROJECT. SEE CONSTRUCTION STANDARD 106.1.0 FOR BITUMINOUS CONCRETE BERM. PRECAST CONCRETE CATCH BASIN FOR GRATE SEE: 201.T.0 -201.11.0 PON FR44rE SEE 201.4.0 ! 2A.♦1' G �sOYARE C9ENtNG!*� r&RICK$ r�'r BE USE* FOR GRAOC A04USTMENTS_ 4- MIN. ` FRAME TO 8f SET IN lVULI. BED OF MORTAR I G W l • a SEE 272.4.0 FOR JOINT DETAILS S fl! I < �t ^� 2 r a k—rORTAR ALL +DINTS A40VtDE `PrMIMGS WI ;n11� � �_wfCVr^,LE f �k I Wi - I J►iESIIi1G -0 SE PRECAST �I rni p I r RISER 3ECTtpN1 'UTSIDE OF P1►f k aI Wt4- I SEE NOTE '2 +2'CLEARAMCE I ak Wit > �t c �'CLEAR WJJI MIN. 0.12 SQ.IN. STEEL 'a =f oER WER ICAL ROOT, Pt.AC€D I ` ACCORDING TO A■SHTO �D Qi DESiGNATiON MISS I i g' MIN. � SEE 202.4.0 FOR EASE DETAILS .NOTES: I. DETAILS NOT INDICATED ABOVE ARE TO BE SIMILAR TO THOSE SHOWN ON 201.2.0,201.3.0 2.FACE OF PIPE FLUSH OR NOT TO PROJECT MORE THAN 4'* FROM FACE OF WALL ALONG CENTERLINE OF PIPE. 3.FOR DESCRIPTION, MATERIALS AND CONSTRUCTION METHOD, SEE SPECIFICATIONS. !F MIINIMUA: DEPTH OF SUMP TO BE 2' X X.WHEN A CURB INLET IS INSTALLED,THE OPENING IS TO BE 24" w I" X 27" t IM MASS. D.P.W. -- MARC" 19T7 ww� I A NA i 1 G —1 op— us- . 1 8611 Li i ��Illllllil'►1111111111 IIIiIlillll l� I!�� II 1�1 li Iliillll �pIIIIliI�1111illtllllilll�lilllll� � IIII��IiII�fIiIIIIIIIiI �- Q Q1 Q� Q Q oM0�,� -+ ~ � ��IIIl11!"1111�l111111illlllilill I� IIIiU�lllllllll Illlllli DOE] ■.. Q vs.�lliilliliflll�lllllilillilllill� � ~ iiii��llilllll! gilllll ' Q � � Q ❑ � ,. Alit,11}`;;E!�Illill11+11110111111yr- 111101111111111111111il L Ll s aal ! xl f ,va i .v/ i l,.We t ./A s � x fern �, • ; F t. • I ii 9,4X r i �1 is Q i f 1 ./A1 . • I 'mow• ` i vA �lJJf)JJf I'tipuj i= �!'••" + issee 1!r! rip 4, �/1/i ► f w ti [ { w! t i ��/.i ! //1 t 1 ,f4/� M to MLI cn {dt I -elm t . ■.�� .yr r • A�Igt. 4 g Zl is, ow ',m r7� !;!dam IP �r1 + ' I � �• Rr�rY....}+tyiYl�� � a ate';ys,Np =r 7A71M3 111W1/9NM3d0A301lfl9 �`swu�r�■�7 �aro .e Mir .A r r 16, *WA Faydd . a u l a ft es '" ■1 aPL i 77 CASCADE BAR DESIGN FOR MASSACHUSETTS CASCADE GRATE N 7 116 s ��Kf ,ems ♦ W r O m t Q ev r- "' o ?. r W J ♦ a U Q" Za 40 ti ♦ � tip W� +¢ N Z = •Nf O = 14 W0 d by = Z as N V o � z�"" W p 3Z O W In J p W dig 1 "- r(V 0 Z i MASS. D.P.W. - MARCH IOTT ; .. 201.8.0 FRAME FOR MASSACHUSETTS CASCADE GRATE B FLANGE (SEE NOTE) a» �--11/Ai GUTTER LINE i i L4 Y to 1r1 1 aC A Ain m z f /1 Q N !V U W a1w i N f EDGE OF GRATE 8 �--FRAME r PLAID . I<I,W(MIGHT KAM GRATE) SEE MOTE NQ i 3I4' 24 11N' 3J4" s r R II SECTION, A-A L rg MA33ACMAKTTS STANDARD FRAME IS TO BE USED, DETAILS AND DEMEW31ON! NOT SHOWN AMW ARE TO K THE SAYE AS THOM SNOMrN ON CONSTRUCTION STANDARD 201.6.0 2.A THRL91 t31FLAMM fUbK 5 TON USED WHEN A CURS INLET 13 REQUIRED S.MATE DETALS ARE 000" ON GONSMIMOM STANDARD 201.1.0 A.THE ORATE As FI AClD AMCAR tS POR WATER COWN 1 FROM THE RGHT. TURN THE Got ATE 160* FOR A V ATER FLOW FRW THE LL!'f, SEE NOTE NQ 2 ON CONSTNXTION STANDARD 2 01.7.0 L THE GRATE IS ONLY SHOWN SCHEMATICALLY 201 .9.0 I&AMs. D.P.W. - VARCH 1977 PRECAST CONCRETE MANHOLE 9 FEET OR LESS 1N DEPTH {3TANDARG MANHOLE FRAME AND COVER SEE202.4.0-202.5.0 !QCftT! RICKS MAY Ot USED I" G DIAMGNADE ADJUSTM#NTS. 1.. FRAME TO GE SET IN R'M ULL RED Of MORTAR SEE JOIN O u H t S• MORTAR ALL JOI11TS 42' ► ? HIM.O,I2 SO.iM. STEEL plarETER PER VERTICAL FOOT,PLACED 0- all ACCONQING TO AASHTO HI y a DESIGNATION MISS A • �'r1 • I s' MIN. I-03 RAN AROUND OPENINGS FOR Pi*ES 40'OIAM(TER 2'CLEAR ANO OVER. I'COVER FLOOR OF STRUCTURE TO GE 30' WAX. �HEADDIS LAID FLAY' DIANCTER PIP( RNICK CHIP= ANp MORTAR OR 9L X CEMENT CONCRETE CLASS'A' :A'�;. (IF HAND MIl1i0 $EE LATEST ask i' sPECIFICAT1ON1l$ IRQVtO['Y�OFfNHKi �iNVCMYED ARCH WITH PIPE OPENINGS TO BE GRICKS LAID ON EDGE PRECAST IN RISER SECTION NOTE:-FOR OESCRIPTIONS.MATERIALS,AND CONSTRUCTION METHODSI SEE LATEST SPECIFICATIONS I�CLEAR e soma. So HEM. « PRECAST UNIT w 011 GAR �r MIN. i i ,MIM. PRECAST SASE f I'CLEAR • _ s' HIM. � Y CAST!N PLACE BASE JOINT DETAILS BASE DETAILS MASS. D.P.W. -MARCH 1977 202.4.0 STANDARD SANITARY SEWER MANHOLE Standard Manholt From& and Corer see 202.6.0 S 202.8.0 (---- Adjust to grade with no more than 12" of t 24"s I" concrete brick masonry. Frame to be set in full bed of mortar. Diameter V� - 8t, M1°' Flat slab top for shallow v v Oa L _ monnales. v C � uN - - - 5"Mm• Seat all joints with approved - --- - -- preformed bituminous joint W filler. �� • �1 i Minimum 0.12 Sq.In. of steel per q o_ vertical fact. plated according M ' ` to ASTM Specification C 478. a a t!1 :•-- See Joint Details below e u 48"t l" Diameter f-- ci o � �- Shelf of structure to be headers n p (n 01 s laid flat. « E i O —T; , 1,,._ �" Min, Inverted arch with hard N clay bricx laid on edge. 1 CH 6, t C c / 6 BricK chips or crusned stone and a I c m0rtpr, �• afi� � E �� i �A Prime and coat I� =4D with biturnen t 8 \\ 5"Min. i ALUMINUM MANHOLE STEP ;✓ 13 "� I „ Drop front assign, cast in /16 I Clear wolf. „ Mon.� 3 3i4 SECTION S-8 �i I 3'-0" Mar. to 1 I'2 Min.—.+. 3 #Ain first joint 6,. / Seai pipe connections with _ approved rubber Boot system a ' Calt-in-plane concrete collar. 1 Y2 Min. �p 1 ; t 1 ' l 3"Min. i I "Clear 0.80 of pipeF7w .. diameter Joint Detaiiis. Section A-A 202.4.1 AGAWAM DPW - January 1984 INSIDE DROP MANHOLE Standard Sanitary Sewer Manhole ses 202.4.1 ' r Notch Drop Ripe to cone*et •� � a s snown. Ssai pipe connections �� r with approved rubber boot system 9 cost•in-place � Concrete collar f ' F+esible ;.. l oe tYtin_ Coupling i ' :'-C" Max. to Influent Line t first joint 6"1 r �--i Compacted Crushed I i Stone to undisturbed 6.� 4r� sail, width of pipe diameter o►us 16" eacn Flow t ` side of pipe. 1 • - i w_ Stainless Steel Straps i 2' O.C. (see Detail Al I 9G' Bend Stainless Steel Strap I"x I/ stock Stosnless • Steel t Expansion Baits H 318 Qa x 3"Long Detail A PLAN — Stainless Steel Strap AGAWAM DPW -- January 1984 y t MANHOLE FRAME AND COVER STANOARO COVER 1 FOR COVER DETAILS SEE 2Q2.a.0 I lie A A ss' 84 1rAC*Into SECTION A—A TYPE — A FRAME +. MIMlMW1 wcsomr-24S um. MATERIAL-CAST INOM s MARGM I>fTT MASS. D.P.M. - ens = n i f .t' ! T t Op � o w / cc Z L6 i o O w 49 F I. j Ow W d _ 44 � r a ` r o t +e O. dc IL Z MA93. D.P.W. — MARCH 1977 202. 8.0 CONCRETE AND FIELD STONE MASONRY ENDS FOR 8" TO 30" PIPE CULVERT L 1'CM11{FER-� 12' - t 3-103•AOS; *ROUND LINE �;E*•• �? * n !Y . a-V3BARS CLASS M w • . Td IrCLEAR : ; f'.� CEMENT CONCRETE FRONT ELEVATION END ELEVATION rRvra+� TRENCH E % ( DIPE 11 : I :LOPE 2: I !LONE sx AV DEPTH = DEPTH P.U. COME. STEEL f CON ii STZEL C Y. ■� IF T. D L C. f0s. LEs. � L 1p1/t LEI. I_ F T. 12 .21.60 9" 4-2" 0.77 15 5`-Kr I.09 1 21 27.40 L tei0RTLAMDCIE T MORTAR CAP r 23.91 l0" 4`-Id 092 20 6`-fl" 1.29 23 3035 26.23 12" 5'-6" 1 JU 21 7`-IC- IDU 1.49 29 33.25 & o 1 0 LINE 29.?5 15" 6`-6" 1.34 24 8`-9" 1.82 32 3763 _ 33.25 16" 7`-4" 1.61 30 lid-Cri 2.13 1 39 42S1Q =--- 37,35 21" a`-6" 1.95 34 I1`-6" 2.62 43 47.25 b HELD STORE IN4tDOCD 39.311 24" 9`-3- 2-16 35 12'-6" 2.97 50 50.75 IN MORTAR 43.75 30" 1" 2.63 44 15;0" 3.66 62 5930 4" FOR i : I SLOPE ° 4" FOR 2:1 SLOPE END ELEVATION CONCRETE CRADLE FOR PIPE CULVERTS MOTE: F I. FCA DESCRIPTIONS,MATERIALS AND CONSTRUCTION I METHODS, SEE LATEST SPECIFICATIONS. 2.ALL CONCRETE DIMENSIONS SHOWN ARE MINIMUM. iliE 3.PAYMENTS WILL BE BASED ON THE ACCOMPANYING # TABLE. CLASS'C'CEMENT CONCOCTS. 001LV To me USED w"tRE SPECIFlEO MASS. D.P.W. -ISARCH 1977 - 206. 4.0 CONCRETE AND FIELDSTONE MASONRY COMBINATION ENDS FOR PIPES UP TO 300 DIAMET 1"CNANFER CONCRETE ENDS rIZ G D ----- E 1 3 *3 TIE - '_ � �• � t ''�,s "-1 GROUND LIME ` �d sw R-s r �3@ 12" Min. C '•'� -, 11, �•.4 •.- 2 rrLEAR iv . . cLA3S'A"coO1cR+=TE FRONT ELE VAT ION END ELEVATION FIELD STONE MASONRY ENDS DIAMETER LlM6T1l3 YAAOS FOlA+105 CU. FT. . ! uzIC rOilT. cf M�MT` DESIGN I". i N c N E 3 TRENCH MORTAR CAP M0. A s c 0 E OF Of 'STEEL DEPTH" �12r� 1 1 Z" 12, 3'-9" 2'- 2" 3'- 9" 1.29 37 •0.15 2 12" 15' 1 4'-3" 2'- ♦" 4'-- 5" 227 1 42 45.50 12" Is- 4'-2- 2'- s'- 0" 2.96 4 s -49.96 4 12 21" S'-4" 2'-A" s'-s" 3.12 54 5 4,5 ItOIlI� 11 upw S 12" 24 5'--9" 2*--10" i�-3" 1 3.34 39 S&IN s 12" i 30" 6'- !" 3'-0" 7'- 4" 4.48 71 1 47.34 7 15" l s" a'-S" 2,-4 4'- 6~ 2.32 41 s 13" is 4'-11 2'- s" 5'-0" 2.72 4 S 51.03 ti Is 21" 3.-5' 2'-10" 5'-s" 3.14 54 S 5 72 10 15" 24" 5L-41 3r-0 6-3 3.60 60 40.10 0� 3� 11 15" 30" 6'-4i 3-2 7-i 4.54 72 "A3 FIELDS I2 14" Is" S'-O" 2�-i sue' 2.72 44 51.33 1#IsfDOED IN MORTAR 13 it' 21 5- 2�10� S=4r 3,17 52 SUB li Ii 24 i-O 3--O i-3 344 go 60 END ELEVATON 15 18 7-O 3-2 7-4 4.33 72 64.85 16 21' 21a 51-0a 3--0 s_s 3.20 53 37.19 17' 210 24" 6-t" ;f--4 4-3 3.49 61 67J3 is 210 3e 7=2� 3-i" T=ir 4.65 73 70.i0 19 24 24 3.67 41 42.40 20 24 30 7=3 3- 7-i 4.09 7 4 i4.47 21 3.0 30 7-4 4-0 7--i 1.76 7 5 7330 NOTE: 1. FOR DE'SMIPTIONS.NATER1ALS.AMO CONSTRUCTION METNOOs, SEE SPECIFICATIONS. 2. ALL CONCRETE DIMENSIONS SHOWN ARE MINIMUM. S. PAYMENTS, WILL BE BASED ON THE QUANTITIES SHOWN IN THE AOCOMPANYINS TAOLE. MA33. D.P.W. -MARCH 1977 206.5.0 r�r NoxE CONCRETE AND FIELD STONE MASONRY ENDS FOR. 30 " TO 84" PIPE ,I. FOR DESCRIPTION, MATERIALS. AND CONSTRUCTION C U LVE RTS METHODS, SEE SPECIACATIONS. !. ALL CONCRETE DIMENSIONS SHOWN ARE ii1NIM1IM. 3. PAYMENTS WILL BE BASED ON THE QUANTITIES SHOWN III AND 2:1 SLOPES 1Z:1 SLOPE 2;! SLOPE �� IN 'THE ACCOMPANYING TABLE. --" Asm#% _.....__. .. . __ ,, .. . .. D E G N J L N P F cu- �Rs F YDs, rope" _ — 3d` `4t-0' 4`4 4' 3=6" 0-6" 2=0 3`-3" 3-d 2.b 45 4-3 3.16 54 53.t6 BAC FACE 36" 4'-d 4-3' 6`-d' 4`-d' 11-8•` 21-3" 5*4i• 344 3.35 54 5`-d'4.15 64 64.35 42" 5`4 4'4' 6t Ei' 4=S" I IO" 21-6" 6`4' 4`-6' 420 59 54 5.25 70 73.70 48 54' 4-9 7-0 5-0' 2-d 2-9' 7-2 4-fi 5.19 63 6-4 6,30 83 83.96 54" 6t O' 5*O' 7'-05'-6" 2-f 3t O 7=t0 S`-d' 626 7 3 7=3" 7.8 8 93 94.46 9 4S� \ —FRONT FACE ` O 6d' (i-d" 0=!° 8'-d 6`�o" 2`-4" 3=S 8'-e' 5`!i' 7.43 65 8t-d' 9.37 106 105.30 t PLAN `,r, 72" 7'--6` 54 9*-d 7=d` 2'4* 3-9" 9-9" 6-G ta23 98 9`-6' ►299 128 128.92 • ,r 84" 8'-b' 6C3' 10`-0 8`-d' 3'O" 4'- " I I'-d' 7'6' I3.49 12 0 It d 17.32 13 4 Is3.86 CONCRETE ENDS FIELD STONE MASONRY ENDS /� �p • 8 C " N c) I"CHAMFER y CAP CEMENT AND -r 12 ►} GLASS"A" i 1 HELD STONE MASONRY CEM.CoNC, Y-L ' _ r - IwIMORT t'� Iii _ MORTAR �- _ _•3 BARS—., ARS o _ - 4- _ 'd `�OU NO [ o 43 a � l o LINE 13 21 �----L —4 L:8 L I6" w ELEV. A-A SECTION 8-8 FRONT ELEVATION SECTION C-C ELEV. D-D N N STONE PIPE ENDS (FOR PIPES 24" AND LESS IN DIAMETER ) A� R.C. PIfK -.- SECTION A—A SLOPE A N : PLAN y 30' MINIMUM RECOVERY AREA D EDG[ 0i TRAVELED WAY SHOULDER s�I SLOPE K f�4 v R.C. PIPE - I I SLOPE :_�z MElMu .I SIDE ELEVATION T NOTE : I. STONE TREATMENT OF PIPE ENDS SHALL NOT BE USED IN THE VEHICLE RECOVERY AREA (WITHIN 30 FEET OF THE TRAVELED WAY EDGE), 2. MINIMUM WEIGHT OF STONE■ 50 LBS;MAXIMUM WEIGHT= 125 LOS. 3. FOR DESCRIPTION, MATERIALS AND CONSTRUCTION METHODS, SEE SPECIFICATIONS. II, SEE TYPICAL SECTIONS. REINIFORCED CONCRETE PIPE -FLARED ENDS r T _ w1 !f Y ��- 7F WT Wi -TT- RE - G RE RE-T -LL i Y T •• r i PLAN PLAN i 1 Z SLOPE T— c ,. 3 - • • n.--- i' SECTION SECTION r'-w W" _ 1NL � OUTLET END rSEt—T1oN Y"-_r'1 A 111 A i C Dig SO [ L P 10-: RI R¢ 3 3 12 1 z" 4' f-d -Oj _i� ;W rd '•s} •sIf i3'uo} S i t 3:1 I6 x} s' V-S' tf-Id -I}'f-s ti w-ss s 74 j is III lit i jr 3:1 is 2f !' :=3'Y+o"Is'-1''3'-*'-w -sf =.f is +: H} w ♦' z} 3;, I Z! z 'i s' Ya- Y:` t-t Y.' ass �'-r zz'+s Is' . z ' 3:1 I4 3' s} S� rs' a-i a'-d as'a-off i=i ¢Y W1 .' 1 3 3:1 i FUR BELL 5 SPIGOT PIPE- 1 T r w� T w� I 1 _ *ZE I - -42 w tr — Y Y ■ w PLAN PLAN c— s-- '! T49 _ Ts RIB t r� SECTION •-, SEtfNlN Q TLET f�t1Z 1 29CT30 � SECTION Y-Y W A S C Q E P K Al R! S 3o s 13' i-C r-7f ',41 We sr- 3s s" it 77 1vT ST.R. yr 3 si a at Sr-? z'-s' s'-r •r n"s 3 3:i ' FDRt TONGUE 8 GR2QYE.P1PE Mona: ' 1.HE WCtPN:ATm m"FOR TN[ T►oq OF PNi TO OR Y3EO INELC SmOT OR '"Owc-R ittooY[1 s,OER sKCIFICATIoRs Pal INC IWE AsOL&Cxw or STEEL ■EWWONCINCOT' S.T09 MWTS AM TO K CMWATIOLE 11TN TOE *&III Rum OF PIPE MASS. D.P.W. MARCH 1977 t7 O O = W W > �- W < H a' i[ W .1 a > °a to 2 6 z z o ir tA ti a i u.w I ; - U3 . ! I Zz • � s is i f J co t 4" w EIN z R Q CONSTRUCTION STANDARD CHANNEL PAVING 21 1 .4 . 0 AGAWAM DPW - JUNE 1983 PVC PLUG i PVC BUILDING SEWER M _ _ - Ar 3 LONG w SWEEP �. 44' BEND _ t 46' WYE 3 t? 2 d J r 3 F O PLAN OIL s l EXIST. ARADE { LOCATION STAKE �6 1/4' PER FOOT LONG SWEEP 46" BEND (MINIMUM) 4E' WYE } .r PVC MAIN $Ewald lPrC oUILDING SEWER PVC PLUG SECTION NOTES: 1) BUILDING SEWERS .,SHALT. BE 4' DIA. EXCEPT AS DIRECTED BY THE ENGINEER. STANDARD DETAIL 2) LOCATIONS AND DEPTHS OF BUILDING SEWERS BUILDING SEWER TO BE DETERMINED IN THE FIELD BY THE ENGINEER. CONNECTION 254. 1 .0 TRENCH BACKFILL SHALL BE RISER PIPE i PLACED AND COMPACTED CONCURRENTLY TO SAME oa ELEVATION ON EACH SIDE OF CHIMNEY O Is rl CLASS "A" CONCRETE MASONRY OR PRECAST CONCRETE OPTION } PLAN BUILDING CONMECTION END PLUG- WHERE REQUIRED REFER TO STANDARD DETAIL 264. 1 .4 I Y BRANCH ► '' _ c o RISER PIPE ,•• i d • s < C SECOND BUILDING i •;+; it' ~ �y . CONNECTION ONLY WHEN SHOWN ON L� '� COMPACTED le O ` THE PLANS - i •p _ C O 0 to ==0 RANULAR W m o i- € / MATERIAL . } s AS REQUIRED FROM EXC. d ac = % 0 �eat TO ENCASE Y BRANCHES n °C AS SHOWN � -. a�:�=� ' -� � ! o RISER PIPE AS REQUIRED Df4 (B•MINJ 4 ' t z• T-BRANCH 0 COMPACTED 00 84MIN . CLASS 'A" CONCRETE ARCH ' CRUSHED STONE SHALL EXTEND TO SIDE OF EARTH TRENCH. IN ROCK. r UNDISTURBED ---'� EXTEND ARCH TO 441 FROM E MATERIAL / SIDE OF TRENCH t BACKFILL SECTION 4" SPACE WITH SAND V-S•MIN. 34'-S'MAX.-' _ (EARTH OR ROCK ) STANDARD DETAIL BUILDING CONNECTION f CHIMNEY 254 . 2 . 0 AGAWAM DPW — FEBRUARY 1891 .......... . � n ! lIVII'� C PAYN`1,17 ' - I Ar PIP- . A �.. � J t� 1 • '� Q COMT-ACT r1D j I �• c:E:15�� �Tan�� 7-.0 Ex P"N=l ki c r� �i�..1"�I ..�'��� 1�tT'� �r.._.'�"t i �■'v 3�"" �� t J i� w r•1� err 1� w+tir� ~YK,l v� i v � � I���rtl i(R : +.• I STANDARD DETAIL � I;. . MANHOLE f ^,A I u�„ CHIMNEY 254.3 .0 CCNC C f rr s � T„au:r DLocK jc— CAsr Istom Ttc. ' • THRUST BLOGK PLUG �\ -�� torrc:tr: CAST IRON Ti4 � Tm;LusT BLOCK •-- T!I Q_ e T •� • S7AgDARD D:.TA .? THRUST BLOCitC i 301 . 1 .0 PLACING JUTE NETTING I (Place on loose sell) A. Bury the top end of the jute strips in a trench 4 inches or more in depth. •�'` :� : ' ' B. Tamp the trench full of sail. Secure with row of staples. 10-inch spaciA=. ;�`:•;: •;i.; May 4 inches down from the trench. ;"�' •..�..' ..-: fit._ C. Overlap -- Bury upper end of lower strip as In "A" and "SO overlap r �C ,tw•:4 `.�, y�t�. ki . end of top strip ►, 4�Z ' E. Overfall '•. 4 inches and ;;x: •'�'• lee er+'r \t ' ' �• staple. ..•. :.•_. y, `[ \ .4► y :a•+i r �t Place D, Erosion stop--fold of jute buried �:y ' :'v ;.� staples \ ' in slit trench and tamped double X .�,�~' �' �. 1 to 6 :.r+,r R,•+':'•`.;:. ;• - .. ' feet apart row of staples. ' ' _ ••. • .r Used on steep '{_ a ,r�_� '�, - .-~ ' f: gas required to sandy slope%.,._- r.=_ - , • . keep the ,jute or gentle,; i: .•% = :% ::; ::':'• .r. - �� firmly pressed �, �= � '- '• ;•�'••�•;•�` into the soil. slopes - !' -- ;• •••.,�,�: - . ` '`•�;;..:�:: Staple channel subject . �:, ;'• :_ to seepage. center first. Staple Space from �_ �`•• ;, t; .� ?a'� strip middles 4 to •;• ,•,� •" .� 10 feet a art. � + p �S 300 feet. '•' Y,•;= '.,;' •�••'K'r= I A z - ,t? tNr, Y •a - �+:% TYPICAL STAPLES �•:4�•-tif` r;� �a�: :�;•:J; :- -:�r;J ��=E" �h'.; w 8 Gauge Wire ilk An oe C•Z`; r P. Press ends of jute 4 inches into the soil around structures and staple securely. REPORT TO THE TOWN OF AGAWAM: INDUSTRIAL DEVELOPMENT, BOWLES SITE 4 WESTMASS AREA DEVELOPMENT CORPORATION December, 1981 T A B L E O F C O N T E N T S PAGE DUMBER A. At A Glance . . . . . . . . . . . . . . . . . 3 B. Bowles Property Profile . . . . . . . . . . . 8 C. Comments on Development . . . . . . . . . . . 11 D. Comparative Analysis. . . . . . . . . . . . . 13 E. WADC Requirements for Participation . . . . . 18 F. Development Proforma. . . . . . . . . . . . . 19 G. Engineer 's Report . . . . . . . . . . . . . . 21 H. WADC History . . . . . . . . . . . . . . . . . 22 I. WADC Bylaws. . . . . . . . . . . . . . . . 30 J. WADC Officers, Directors . . . . . . . . . . 41 K. Sample Protective Restrictions . . . . . . . . 43 WestN/I TO: Agawam Economic & Industrial Development Corporation Agawam, Massachusetts FROM: Westmass Area Development Corporation DATE: December, 1981 The Westmass Area Development Corporation, formerly known as the Springfield Area Development Corporation, V.go approached by the mem- bers of Agawam' s AZIDC, selectmen and Chamber of Commerce to under- take a study of the Bowles site as to its potential for industrial development . Westmass undertook a preliminary study and found the significant potential of the site warranted further analysis. Rather than ask the town for some $25, 000 to pursue those studies, the Board of Di- rectors of the Westmass Area Development Corporation voted to spend those funds out of its own treasury. Subsequently, the firm of Gordon Ainsworth Associates was hired to produce a physical feasi- bility analysis of the site and WADC spent some $13,000. That analysis has revealed with certain improvements to the site, all moderate in nature and some now programmed and funded, the site could be marketed and developed as an industrial park and would en- joy a good position within the regional marketplace . VVIf improvements to Route 57 were to occur, either in close proximity to the park or through the park as now advocated by the town and state DPW, the tract of land would enjoy a superior position in the regional marketplace. Early this year, the Westmass Area Development Corporation and the public and private sectors of the Town of Agawam began a cooperative effort to find a way to more effectively bring industry and commerce to Agawam. With this in mind, WADC was asked for their direct and continuing participation in the development of the Bowles site. After consid- erable research and analyses, WADC is pleased to present its find- ings and its proposal to the Town of Agawam for a cooperative, Westmass Area Development Corporation Baystate West Plaza Suite 600 1500 Main Street Springfield, Massachusetts 01115 (413) 734-9060 tri-party relationship in the development of the Bowles site. The three parties involved in the administration and development of this project would be the public and private sectors of the Town of Aga- wam and WADC itself. The key element in WADC's proposal is involving the public and pri- vate sectors of the Town of Agawam along with the development cor- poration as investment partners. This strategy, as outlined in our report, has been successfully used by WADC with other communities. This strategy, if adopted in Agawam, could prove to yield a higher . return on municipal funds than has otherwise been obtained anywhere in the Commonwealth. It offers the town not only the opportunity to increase revenues but to also enjoy a significant development advantage in the competitive marketplace. This region is on the verge of unprecedented opportunities if new development strategies$ vehicles, methods and techniques are identi- fied and utilized. On the other hand, if opportunities are not seized within a relatively short time frame, the region and Agawam may find itself having those opportunities pass by. WADC believes the development of the Bowles tract would provide not only the largest single industrial development project in the region but one possessing the greatest opportunity for the region within the decade of the 80 ' s. The Town of Agawam could consider the de- velopment of the Bowles site as a single and unique project or could view it as the start of a very large Regional Industrial Center, one eventually involving up to an additional 500 acres of abutting/sur- rounding properties. If the project elements and documents can be put together expedi- tiously, WADC suggests a real estate closing and project implementa- tion during the first quarter of 1982. The Westmass Area Development Corporation stands ready to meet with all town officials to amplify and clarify any sections of the report. i 3 A. At a Glance 1 . ProRerty Gross 319 .38 Acres Saleable 281.6 Acres 2. Cost to Develop - $5.22 million Town of Agawam' s Investment Share $600,000 i Agawam Business Community's Loan $250,000 Westmass Area Development Corporation's Investment/Risk $4,6191020 3 . Project Life to Last Shces - 11 years 4 . Estimated Jobs Created or Retained - 4,000 + 5. Estimated Real Estate Tax Revenues at Project Completion- $1,357,486 per year to 4 r: LsI 4 0 � Z 1 .1 �n D74voAel d %5 Q ids CQ � �1 'NNO] OZ .1� 01 w co N 1210dblV J �. 7bNOI1VN1�311� �-� gm O O A 0 n 0 �� a�xnOs i j t s + �i • 1 I r R r ri t� A r 1 5 i . i d • ,��� ,,` "mow - . • J� $cy`t i �.� . I �i 414 on W y ` _ $ f r jill I . � I • ■ Qi • h - � S PRELIMINARY SITE DEVELOPMENT PLAN PROPOSED BOWLE.S AIRPORT SITE • WADC - WESTMASS AREA DEVELOPMENT CORPORATION 2 GORDON AINSWORTH & ASSOCIATES, INC. SITE ANALYSIS m LANDSCAPE ARCHITECTS, ENGINEERS, SURVEMR.S 7 i J Z o .. / R� \ -..�...� `+• A3 Al At SA •• )T%j . t •� 9 r X �• SIR t • o w ,. sue,% PRELIMINARY SITE DEVELOPMENT PLAN PROPOSED BOWLES AIRPORT SITE WADC - WESTMASS AREA DEVELOPMENT CORPORATION GORDON AINSWORTH & ASSOCIATES. INC. r^ LANDSCAPE ARCHITECTS, ENGINEERS, SURVEYORS O 8 B. Bowles Property - Profile 1. Property• a. Size: Parcel A (Bowles Airport ) 296.82 Acres Parcel B ( Fronting on Silver Street ) 22.56 Acres TOTAL 319. 38 Acres b. Zoning: Parcel A - Industrial A (Most restrictive) Parcel B - Industrial B c. Owner: Republican Publishing Co. d. Asking Price: $1,200, 000 e. Topoqraphy & Condition: Parcel A - generally triangular, flat, clear, several structures and runways; no known developmental or significant environmental problems. Parcel B - rectangular, topographically distressed. f. Existing Access: Via Silver Streets and Shoemaker Lane. Both streets need public improvements including widening, utilities and resurfacing. g. Airport: Utilizes and encumbers approximately 100 acres of Parcel A. Light aircraft - minimum traffic; reduced winter operations. 2. Development Potential of Land: Parcel A - excellent Parcel B - poor to nonexistant 9 3. Status of Road Improvement Program: a. Route 57 construction unresolved - State is endeavoring to proceed: - possible construction in 1986 with a 2 year construction period - potential right-of-way across northwestern corner of Parcel A - interchanges at or around Garden Street or Shoemaker Lane, or both. b. Silver Street & Shoemaker Lane Shoemaker Lane; scheduled improvements: - funding approved by Urban Systems. Program including installation of water, separated sewer systems and pave- ment widened to 32' paved width. - project approved for local bonding - project approved by State D.P.W. - project is in final design stages - construction starts Spring of 1982. Silver Street; scheduled/proposed improvements: project authorized by State D.P.W. - no construction design to date needs public hearing process 1983 construction probable • - needs Town bonding authorization or local share approval. 10 i 4. Airport Facility - occupies site under tenancy at will arrangement - owner can terminate lease at any time - facility is of no consequence to federal and state authorities - heliports and helipads are allowed anywhere on site 5. Existin2 occupancy_: Parcel A a. agricultural • b. Airport Merchandising Co. (former Restaurant Building) c. New England Aero Tech. (2 Hangers, Office Building and oil shed) d. Runways 6. Taxes Assessed value $956,000 Tax Rate $55.00 a. Existing Taxes 52,607.50 b. Estimated under Proposition 2 1/2 - 32,249 ZI i C. COMMENTS ON DEVELOPMENT 1. Accessibility Existing accessibility with certain improvements to Silver Street and Shoemaker Lane would provide suitable access. If and when Rte. 57 is constructed, no currently known developable site would have better access. Rte. 57 could provide direct multi- lane highways access to and through the Park, and interchanges on the northern and western perimeters. In addition, the Town is recommending a secondary road through a portion of the north- western corner of the site. Visibility would be direct from Rte. 57. Estimated traffic volume in 1990 is 12,O00 cars per day. Driving time along the proposed Rte. 57 relocation would be ap- proximately 5 minutes to Rte. 5 and the 91 southerly exchange, and approximately 7 minutes to Rte. 5 and the 91 north bound exchange. Access to Interstate 90 can be obtained by traveling north on 91 to West Springfield for west bound traffic. Access east bound on Interstate 90 can be obtained by traveling I-91 - I-291. Driving time for both east and west bound I-90 traffic is approximately 13 minutes from the site. Driving time to Bradley Airport via secondary roads through Suf- field is approximately 20 minutes. If access is desired along Interstate 91 for heavy trailers--driving time is approximately 25 minutes. 2. If industrial development is to take place on the Bowles site regardless of who the developer is, the following recommenda- tions are made to guide that process: (a) The Town of Agawam reverse the scheduled improvement plan to Silver Street and Shoemaker Lane and improve Silver Street first. If this proves impractical, then the im- provements to Silver Street and Shoemaker Lane should take place simultaneously. Street improvments should include separated storm and sanitary sewers, increased water capacity, and pavement width expanded to 32 feet. Certain intersection improvements to Silver and Suffield Streets should be made as well. This strategy for the improvement of both streets as quick- ly as possible will provide for a more rapid development schedule of the industrial park. . 3. The Bowies site should be made ready for marketing and develop- ment as rapidly as possible by: 12 (a) abandoning the airport facility as an operational airport. The land utilized and encumbered by the airport is exces- sive, to the overall size and developability of the site. The liability to owners and the cost of bringing the facil- ity up to current-day standards is prohibitive. No improvements to or demolition of the existing runways are proposed. (b) demolishing all existing structures. They are an insurance liability. They are a development and marketing liability. If they were to remain and real estate taxes were to be paid on these facilities, the rental figures are such that taxes paid are in excess of rents paid creating a $5,200 per year negative cash flow. WADC will make every attempt to accommodate existing busi- nesses now on site by offering relocation assistance, spe- cial financing and construction programs, etc. 4. Land lost to the potential construction of 57 and the proposed secondary access road connecting Garden Street and Shoemaker Lane is approximately 15 acres. The value of land taken will be reimbursed by the State, if and when the road is built . Some of the land on the northwestern side of the property along the pro- posed right-of-way of Rte. 57 fronting Shoemaker Lane could be sold as a smaller parcel(s) ; some of it may become isolated and unsalable. This land amounts to approximately 12 acres. 5. Developable Acreage Gross Acres 319.38 Less - Parcel B 22.56 acres Rte. 57 15. 00 " Drainage Area 25.00 Terrain 19. 00 Net Developable Acres 237.82 6. Salable (Taxable) Acreage 319.38 Gross Less 15.00 Rte. 57 Less 22.56 Parcel B 281.82 • Recommended Sale (Tax) Rate: 237. 82 at full value 44. 00 at 60% value 13 D. Comparative Analysis: Existing vs. Westmass Area Development Corporation/Town development. (1) Taxes a. Existing real estate taxes paid on the Bowles site: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$52,607.50 b. Projected real estate taxes under Chapter 580 (Proposition 2 1/2) and without the grand- stand: . . . . . . . . . . . . . . . . . . . . . . . . . . . : . .$32,250.00 c. Projected real estate taxes under Chapter 580 and Route 57 land taking in 1984. . . . . . . .$28,589.00 If Westmass Area Development Corporation and the town jointly developed the Bowles site and given WADC's no tax status, Agawam would lose the following taxes ($176,913) over a ten year period. 1982. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 32,250 1983, . . . . • � . . . . . . . . . . . . . . . . : . . . . . : : . .$ 29,025 1984. . . . . . . . . . .$ 25,731 (in- cludes loss of land taking for Route 57) 19$5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 22,506 1986. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 19,281 1987. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 16,056 1988. . . . . . . . . . . . . . . . . . . . . . . . . . . . . o , . . .$ 12,831 1989. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 9,636 1990. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 6,411 1991. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3,186 $176,913 If the Town invested in year 1, $600,000 of its original $1,200,000 commitment, its first year investment plus taxes lost would be $632,250 and its 10 year investment would be $776,913. This represents 6S8 of the town' s original commitment (does not include any town financing costs. ) (2) Existing _Development Schedule Land sold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .0 Acres per year New taxes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .0 Per year . New jobs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .0/Year 14 (3) WADiCtTown Estimated Development Schedule Land sold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28 Acres per year New taxes* (averaged at 12% coverage) . . . . .$135,800 (See attached es- timated tax generation) New jobs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .470 Per year (4 ) Estimated com osite schedules for total taxes paid at the end of ten years from project initiation. Existins Development - $293,220 WADC/Town Development @_12% Coverage - $6,605,746 (5) Estimated economic break even point for Agawam, for a community - WADC development. a. Expenditures & Tax Loss Year 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$632,250 Year 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 29,025 Year 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 25,731 Year 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 22,506 Year 5. . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . .$ 19, 281 Year 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . ease ,$ 16#056 TOTAL $744,849 * - It is estimated that under Chapter 580 the land would be taxed as follows : 237.8 acres at 100% sales value 44.0 acres at 60% sales value i 15 b. Income - Cumulative taxes ear (at 12% coverage Year 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 93,868 Year 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 194,996 Year 3. . . . . . . . . . . . . .. . . . . . . .. . . . . . .. . . . . . .$ 304,035 Year 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 421,697 Year 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 598,759 Year 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 6861067 TOTAL $2,249,422 c. Assuming no sales at all in the first year, and using the above estimates, it would take the town four years to recapture its investment and make at the end of the fourth year $305,084 in tax profit. From year 5 on, the development produces revenues on an increasing and consistent basis. (6) At the end of 10 years from today: (1) if the project were to experience existing trends. New land developed. . . . . . . . . . . . . . . . . . . . . . . . . .0 New tax revenues created. . . . . . . . . . . . . . . . . . . .0 Jobs created/retained. . . . . . . . . . . . . . . . . . 0 * 0060 (2) If the town and WADC combined in a community project. New land developed. . . . . . . . . . . . . . . . . . . . . . . .282 acres New cumulative tax revenues created. . . . . .$6,605,746 • i i • BOWLES INDUSTRIAL PARK ESTIMATED TAX GENERATION % of Project Estimated Construction % of Site Covered bX Buildin Year End Completed Cost per S uare Foot 0 15% 1981 0% 0 0 0 0 1982 10% $21 .90 $80,427 $93, 868 $114, 030 1983 20% 23 . 87 166,903 194, 996 237 , 134 1984 30% 26 .02 259, 972 304,035 370, 127 1985 40% 28.36 360,226 421, 697 513,913 1986 50% 30.91 468,314 548, 759 669 ,421 1987 60% 33.69 584,940 686,067 837, 750 1988 70% 36 . 73 710, 873 834,542 1 , 020,039 1989 80% 40 .03 846,950 995, 190 1, 217 , 505 1990 90% 43 .64 994,083 1, 169, 106 1,431, 636 1991 100% 47 .56 1, 153,269 1,357,486 1, 663, 805 TOTAL $5 ,625,927 $6,605 ,746 $8,075 , 360 September, 1981 *WADC' s average for all developments to date. rn 17 Estimated Employment Generation 237 fully developable acres X 20 lobs/acre 4,740 jobs Estimated Square Feet of New Construction 282 acres X 43,560 S.F. = 12,283, 920 S.F. 10% = 11228, 392 S.F. 12% - 1,474, 070 S.F. 15% - 1,842,588 S .F. 18 E. WADC REQUIREMENTS FOR PARTICIPATION (1) Upon assumption of title of the real estate, that real estate would immediately be taken off the tax roles. This is but- tressed primarily by WADC's no tax legislation but WADC pre- fers an agreement with the town as to this matter. On the day of closing, WADC would be granted a real estate tax abatement . (2) The town agree to accept title o approximately 35 acres of undevelopable land. C'7GtAa) At?-�t ) (3) All environmental matters be cleared through the town's Con- servation Commission and other appropriate bodies all at once so the development of the park can proceed in an orderly, timely and predictable fashion. Any additional properties ultimately deemed undevelopable by the above-named groups would also be deeded to the town. 0 4) A Steering Committee/Task Force be created within the town consisting of representatives from the public and private sec- tors, including but not limited to, members of the Chamber of Commerce and various town department heads, administrators and elected officials to work with WADC in the development of the park. (5) The Town of Agawam make the necessary improvements to silver iStreet, shoemaker Lane and the intersection of Silver and Suf- field Streets. (6) The Town of Agawam invest $600,000 toward the development of the park. (7) A minimum financial non-interest bearing commitment and loan of $250000 be made by the Agawam business community to WADC for project development purposes. (8) The Town of Agawam understands the WADC will place and enforce specific protective restrictions on the site which will take the form of deed covenants. These covenants will restrict the use of the land as described in the zoning ordinance of the town and will further provide additional prohibitions, provide for good housekeeping activities and design controls and spe- .cifically exclude any and all land speculation by purchasers of the property from WADC. y (9) A three party agreement be entered into prior to any transfer of title. The three party agreement would involve the current owners, WADC and the Town of Agawam, and would provide the specific framework for the development of the project area including performance agreements and time frames for action. 19 F. DEVELOPMENT PROFORMA Certain underlying assumptions on the project were made and they include: (1) An internal road will have to be developed in order to open up interior sites. WADC will be responsible for the design, construction and financing of that road subject to all local approval processes. (2) The town has exhibited a willingness in the past to expend up to 1.2 million dollars to bring about industrial development at this site. This willingness to invest in Industrial Development was carried forward in a reduced fashion to this project. (3) The four primary participants in the project would be the town of Agawam, the Westmass Area Development Corporation, the business community of the town of Agawam and the current owners of the property, The Republican Publishing Company. (4) The existing airport facility and operation of same must be abandoned. (5) WADC pays no real estate taxes on unimproved land while in its ownership. 20 BOWLES SITE DEVELOPMENT PROPORMA A. Estimated Income (1) Saleable land Total site 319.38 AC Net Saleable 281 .82 AC 237.82 AC @ $20,000/AC $4,756,400 44.00 AC @ $12,000/AC $ 528,000 5,284, 0 B. Estimated Expenses Land Purchase $1, 2000000 Less Town Investment $ 600,000 Net Purchase Cost $ 600,000 Internal Road Development $10257,500 Building Demolition $ 100,000 Brokerage Fees $ 300,000 Legal Fees $ 1601000 Engineering Fees Spent to date $ 13,000 Remaining $ 242,000 $ 255,000 Contingency @' 18% $ 951,190 Administration $ 800,000 Interest Expense $ 795,330 $51219t020 Net. Income over Expenses $65,380 k November, 1981 21 PR ELT'fINARY ENGI:,IEEPING PROJECT FEASIBILITY STUDY PROPOSED BOWLES AIRPORT SITE AGAWAXI, MASSACHLTSETTS Prepared for: WE'STMASS AREA DEVELOPMENT CORPORATION BA"STATE W EE T PLAZA - SUITE 600 1500 MAIN S TR FET SPRINGFIELD, MASSACHUSETTS 01115 Prepares} by: GORDON E. AINS`S'ORTH R: ASSOCIATES, 17NC. 20 SUGA.RLOAF STR EET SOUTH DEER FIELD, MASSACHUSETTS 01373 • TUNE 1981 i TABLE OF CONTENTS PAGE I. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 II. SITE LOCATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 III. SCOPE OF WORK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 IV. SITF ANALYSIS - THE NATURAL ENVIRONMENT • LANDS EAST OF SILVER STREET. . . . . . . . . . . . . . . . . . . . . . . 4 • LANDS WEST OF SILVER STREET - Topography, Soils, Prainage, Vegetation. Summary. . . . . . . . . . . . . . . 5 V. SITE ANALYSIS - THE BUILT ENVIRONMENT • UTILITIES - Water Sewer, Storm Drainage, Gas, Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 ROADS - Fxisting Off-Site Roads, Route 57. . . . . . . . . . . . . . . 10 • EXISTING BUILDINGS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 iAIRPORT-RUNWAYS . . . . . . .: . . . . . . . . . . . . . . . . . . . . . . . . . . 13 VI. PRELIMINARY DEVFLOPMENT SCHEMES • GENERAL - Proposed On-Site Roads, Traffic Projections, Proposed Utilities. . . . . . . . . . . . . . . . . • , . . 16 • SCHEME 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 . SCHEME 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 • SCHEME 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 • SCHEME 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 • CONSTRUCTION COST ESTIMATES. . . . . . . . . . . . . . . . . . . . . 26 APPENDIX F.A. A. MINIMUM AIR POR T R EQUIP EMENTS • BUILDING DEMOLITION LIST I. BACKGROUND In May, 1981, Gordon F. Ainsworth and Associates, Tnc. , was retained by Westmass Area Development Corporation (WADC), formerly Springfield Area Development Corporation (SADC), to provide recom- mendations for the development of 319. 36 acres in Agawam, Massachusetts for industrial purposes. The property, currently owned by the Springfield Newspapers, is com- prised of two parcels. Parcel A, on the west side of Silver Street, consists of 296. 82 acres and is zoned industrial A; Parcel B , on the east side of Silver Street, consists of 22. 56 acres and is zoned Industrial B. Parcel A, west of Silver Street, is the location of the Bowles-Agawam Airport, currently run by Lukas Aircraft Corporation. 1 II. SITE LOCATION The proposed site is located roughly in the geographical center of the Town of Agawam. It is situated slightly south and west of Springfield, the major city in southwestern Massachusetts. As mentioned, both parcels front on Silver Street. The main parcel is bounded by Silver Street to the east, Shoemaker Lane to the south and west and by a portion of Garden Street to the north. Main access to the park by most trucks and many vehicles could be expected to be from Interstate 91, west along Route 57 approximately 2. 5 miles to Suffield Street (Route 75) and then south to Silver Street. Approximate travel distance from I-91 is four miles. Future improvements to Silver Street under the Urban Systems Aid Project and possible future extension of Route 57 thru the park area will improve access to the site. Access improvements are discussed in greater detail further on in the report. i i z SCOPE OF WOPK In order to produce documents to guide WADC in the development of the Bowles-Agawam Airport Site, necessary data was collected, site analysis of each parcel performed and alternate development site layouts prepared. In adc;ition to the above, demolition estimates for each building pre- sently on the site and information regarding the existing airport facility have been provided. The following summarizes the data and site analysis findings, which form a basis for development of the schernes. A brief description of each alternate is outlined. Data on the developable and undevelopable acres and rough cost to accomplish each alternate is tabularized for easv comparison. The alternate development schemes are presented on mylar overlays, to accompany the base sheet containing the site analysis information. 3 TV. SITE ANALYSIS - THr NATURAL ENVIRONMENT LAND FAST OF SILVER STR EET Of the 22. 56 acres east of Silver Street, approximately one third of the area has slopes greater than eight percent. The pattern created by the area of 8% slopes breaks the remaining land into three pockets, each of approximately 4. 5 to 5 acres, that could be developed for in- dustries. Most of this development area averages 3-8% slopes, limit- ing the marketability of these lots to industries with smaller or more flexible building and parking requirements. in addition, approximately 900 feet of road and utilities would be required to gain access to the developable lot furthest to the east on this 22. 5 acre parcel. The topographic constraints, limited marketability and great length of road per developable acre indicate that this parcel might be a difficult and expensive area to develop, on a cost per acre basis. The possibility exists of utilizing a portion of this site for storm water retention, with the remainder for public conservation use. The remain- ing discussion concentrates on lands west of Silver Street. 4 • IV. SITE ANALYSIS - THF: NATURAL ENVIRONMENT LAND WEST OF SILVER STREFT Topography Slopes under 3010 prevail over most of the site. The only steep slopes that would prohibit development are confined to a band along the northern boundary of the park and total approximately 19 acres. This area of steep slopes is outlined on the site analysis base sheet. Soils According to Soil Conservation Service (SCS) Maps, Merrimac soils, which are sandy, well-drained soils, occupy most of the site west of Silver Street. These impose no constraints on development. An area from Shoemaker Lane northward around the holding pond is the only area on site with soils posing any real concern. This general area contains Scarboro soils, which are characterized by a constant high water table. Other than providing fill to raise the building level sufficiently above the high water table, providing subsurface drainage systems or a pumping system, this high water table situation cannot be easily remedied. Were the existing or proposed drainagg ditch along Shoemaker Lane suffi- ciently below the elevation of this area, this might also alleviate the high water table situation. Due to the minimum elevation change in this area, this is not expected to be a possibility. Therefore, with the presence of a constant high water table, the existance of the pond, and apparent drainage pattern revealed on the topographic plan, this area is seen as an extension of the drainage system and wetlands area along Shoemaker Lane and has been included in the "non-developable" drainage/wetlands area along this road. Two additional soils , Ninigret, which extends beyond the pocket of Scarboro soil mentioned above and Amostown, which starts at Silver Street and runs in a strip along Shoemaker Lane, both have seasonal high water tables according to the SCS maps and may prohibit use of these areas for reten- tion basins. No further constraints should result. These two areas are indicated by a lighter line on the site analysis sheet, but are not included in the acreage considered to be "non-developable". They have been out- lined to indicate that industries locating here may require further soils investigation in order to determine building foundation requirements. 5 • Soils (Cont'd. ) Earlier investigations shed some light on the on-site soils conditions. Soil borings were taken in an area between the former grandstand and Shoemaker Lane. in 1980 as a possible location for Kidder-Stacy. These borings indicate ground water depths between 3 and one-half feet and five feet. Other soil borings taken along Shoemaker Lame in 1971 for the sewer construction indicate grot_::d water depths from 4 feet, at the Silver Street/Shoemaker Lane intersection, to 8 feet, near the proposed Route 57 crossing. Finally, ground water observation holes dug on the site in 1940, for the purpose of planning the development of the airport, indicate a ground water depth ranging from 3.. 5 to 6 feet along Shoemaker Lane, increasing to 12 feet in the eastern part of the site. The shallower depths to the high water table along Shoemaker Lane indicate that indus- tries locating here would require further soils investigation and may necessitate the use of slab foundations or berthed foundations. This is seen as no real constraint. A preliminary investigation conducted by our staff to determine the feasibility of on-site leaching catch basins indicates that soils on the eastern half of the site may be suitable for this purpose. The location of the observation pits dug for this investigation are indicated on the site analysis base plan. Water was encountered only in hole #1 (at 6-1/2 feet). No water was encountered in any of the other holes, where depths averaging 10 feet were obtained. Draina`g e The site analysis base sheet outlines on-site drainage divides. With the exception of one small pocket towards the north of the property that drains internally, on-site drainage patterns appear to be fairly well established despite the gentle grades. The majority of the surface water is travelling towards either Shoemaker Lane or Silver Street, with the drainage ditch along Shoemaker Lane carrying the majority of the water away from the site. Water travelling towards the Silver Lakes watershed is limited primarily to the area of steep slopes along the northern property boundary. Silver Lakes is located north and east of the site and provides important recreational activities to the area. Any potential drainage concerns are mitigated by the well drained soils predominating over the site. The drainage way paralleling Shoemaker Lane comes under wetland classification. in order for drainage to function properly here, periodic cleaning of the ditch is necessary. 6 • Vegetation The Bowles Airport site is essentially an open field. There are,however, trees Bowing at the perimeter of the park area which provide a natural buffer. There also exist tree plantings around the restaurant and former grandstand area. Summary The following summarizes the developable and non-developable acres resulting from natural topographic and drainage/wetlands constraints. Total Acres West of Silver St. 296. 8 At Acres Fxciuded from Development 19. A due to steep slopes (lands concentrated along northern perimeter of park) Acres excluded from Development due z4. 5 A* to Drainage/Wetlands considerations (strip along Shoemaker Lane) Developable Acres Subtotal 253. 3At 7 V. SITE ANALYSIS - THE BUILT ENVIRON"MEN" , UTILITIES Water Existing water mains in the area include a 12" main along Garden Street and an 8" main along Shoemaker Lane, which will be supple- mented by a 12" main under the Urban Systems Project. Silver Street has a 16" main east of Garden Street. From this 16" main at Garden Street, a 6" main runs south along Silver Street changing to an 8" main, which runs along the airport tract to Shoemaker Lane. Under the Urban Systems Project, a 12" water main running along Silver Street for the length of the tract is currently planned. Adequate fire flows exist to service the proposed industrial park. A hydrant flow test was performed by the town DPW in May 1981 at the corner of Franklin and Silver Streets, just north of the proposed park. Available fire flossy at this location is 5625 gpm at 20 psi residual. On-site there is a 6" water main running from Silver Street near the former Airport Administration Building (Building #4) to the grand- stand area. Hydrants are located off of this main. A second 6" water main runs into the site from Silver Street east of the hangar. The condition and capacity of these existing on-site water mains would be insufficient to serve industrial needs. Sewer Shoemaker Lane contains a 27 ' sanitary sewer that was constructed in 1973. A 10" sewer is currently planned for Silver Street, under the Urban Systems Project. The existing 27" sewer was designee{ to handle 2900 gallons per acre per day for the proposed industrial park. This should be sufficient for the proposed use. Storm Drainage Present drainage along the airport tract consists of a storm drainage system in the easterly portion of the Silver Street frontage and a series of ditches and cross-culverts on Shoemaker Lane. Under- the Urban Systems project, drainage improvements for Shoemaker Lane have been planned to accommodate the proposed industrial development of the tract. In addition, storm drainage improvements to Silver Street are proposed. 8 S tor_ m rrainag e (Cont".. .. ) To avoid the addition of storm water into critical watersheds, such as the Silver Lake watershed, individual tenants,based on the size of their develop- ment, will have to take appropriate measures where necessary. Though complete information is unavailable, the racetrack operations evi- dently relied on subsurface disposal for drainage and sanitary systems. Exposers rectangular concrete swales leading to these systems are evident in the former grandstand area. With development of this area, investigation of these systems for industrial use should be conducted. Gas Gas lines in the area include a 2" high pressure main on Garden Street. From Garden Street, a Z" intermediate pressure main runs along Silver Street to a point roughly 200 feet south of Doane Avenue. From this point, the line branches. A 4" intermediate pressure main continues south along Silver Street approximately 700 feet further before terminating. A second main branches into the former grandstand area. Bay State Gas Company, which services the area, has indicated this latter gas main (2" high pres- sure) is not in use. A 6" gas main exists approximately one mile from the site. The possibility • of extending this line to meet the needs of larger industrial users may exist. The Bay State Gas Company has expressed an interest in discussing this in more detail, plus providing an estimate, once plans for the area develop further. Flectric Flectricity is currently available at the site, including a line which rums into the grandstand area. Western Massachusetts Electric Company has stated that providing electricity to potential industrial users at this site is Aefinitely possible. Should there be very large industrial useage, the existing system may need to be upgraAed. This is seen as no problem by the company, as there exists a sub-station close by. 9 ROADS Existing Off-Site Roads y Both Silver Street-and Shoemaker Lane abutting the airport tract are narrow, with Shoemaker Lane averaging a 22 foot width and Silver Street varying from 22 to Z4 feet wide. Under the Urban Systems Project, the proposed cross -section of Shoemaker Lane would consist of two 12 foot paved traveled lanes, two 4 foot paved shoulders and two 4 foot grass shoulders. Total pavement width would be 32 feet. The existing right- of-way for this street is approximately 50 feet. Under the Urban Systenns Project design, the right-of-way would be widened approximately 10 feet on the north side towards the airport property. This widened right-of-way would accommodate the road improvements, while still maintaining exist- ing trees on private properties to the south of Shoemaker Lane. In addition to the widened right-of-way, a 30 foot wide easement for ditch maintenance is proposed for specified stretches along the north side of Shoemaker Lane. Road improvements for Silver Street have not yet been designed. Program needs for the design of this road should be based on traffic projections re -, sulting from full development of the park. These traffic projections are discussed further on in the report. Route 57 ' Another access improvement proposed for this area is Route 57. Design work on this project is now at the 25% stage. The Town is currently reviewing these plans and a preliminary response to the ZYN plans should go to the State DPW in mid-June 1981. The review process of the 25% plan will continue for six to seven months. 75p7o plans are expected to start in the fall, 1981. As currently planned. Route 57 would pass through the northwest corner of the airport tract. An alternate proposal which had been considered reveals a town frontage wav paralleling Route 57, running from Shoemaker Lane north through the property to Garden Street, with an interchange on Garden Street. The 25% plans show neither a town road nor an interchange at Garden Street, leaving an interchange only at Westfield Road (Route 187) west of the proposed park area. The possibility may still exist of providing the additional interchange and town road. Another alternate proposal for this area included having a full interchange at Shoemaker Lane. This option has been ruled out by the DPW, due to inadequate distance from the Westfield Road interchange. Another proposal would provide a west-bound exit at Garden Street and east-bound exit at Shoemaker Lane. This plan is still an option, but, according to the Town of Agawam Engineer, is not seen as the favored alternative by the DPVI'. 10 iR oute 57 (Cont'd. ) In discussions with the IPPW, the department seemed to emphasize the need to know the Town's desires for this area and possible willingness to follow its wishes. There are indications that if the airport site were to be a main attraction, particularly if there were firm commitments for industrial development, the DPW would include the town frontage road and Garden Street interchange in their plans. Another option would be to make the land takings now and build later. An additional item that may affect the options for Route 57 in this area is a study underway by Storch Fngineers of Boston. They have been asked to look into the various interchange options, their feasibility and their impact on area side streets. The majority of the develapment schemes prepared by Gordon E. Ainsworth and Associates, Inc. take the attitude that Route 57 is inevitable and plan for it. Whether the town frontage road an,4 Garden Street interchange are built may depend largely on the development at the airport site, as well as a consensus during the 2556 review process. At this writing, the Metropolitan Planning Organization is to be the coordinating Agency regarding a policy decision on Route 57. i i 11 EXISTING BUII-rENGS A number of buildings exist on site. These buildings are arbitrarily numbered on the base plan for easy reference. The following table lists the size, type of construction, current use and cost to demolish each building. Costs to demolish include dumping fees at West Springfield landfill and filling cellar holes with gravel. These estimates have been furnished by a contractor and are to be considered "not to exceed" costs. The costs for demolition do not include salvage of steel or brick, which could reduce the overall costs. Building .Dimensions Construction Current Use Cost to Number (in feet) Demolish 1. 72 X 72 Wood (ISt. ) Not occupied $ ll, 000. 00 Z. 30 X 70 Wood (lSt. ) Warehouse $ 5, 000. 00 (furnitur e) 3. 110 X 132 Concrete $ 18, 000. 00 Block (2St. ) Storage (Agriculture Equip). 4. 41 X 50 Brick (3St. ) Not occupied $ 12, 000. 00 5. 3 Trailers Unknown $ 1, 300. 00 6. 16 X 26 Wood (lSt. ) Airport Tower $ 1, 000. 00 7. 10 X 10 Wood (ISt. ) Airport Facility $ 400. 00 8. 110 X 300 Brick (1St. ) Hangar $ 34,000. 00 9. 280 X 34 Concrete Hangar $ 6, 000. 00 Block (lSt. ) 10. 22 X 22 Wood Unknown $ 1, 000. 00 Total $ 84, 700. 00 (*Building # keyed to base plan) 12 AIRPORT The existing airport on the 296 acre parcel is a privately run air facility. Currently, the airport is used primarily by small pleasure aircraft. Between 50 and 60 aircraft were noted during a site visit in May 1981. There are presently two runways, one approximately 2800 feet long, run- ning in a northeast to southwest direction, the other runway, approximately 2300 feet long, is situated in a east-west orientation. Both runways are approximately 27 feet wide. The runway pavement consists of a concrete base with a bituminous concrete surface. An in-depth market feasibility of the airport was not conducted as part of this study. Information from such a study would be valuable in planning an industrial park around an air facility, primarily due to the fact that the length of runway is based on the type of aircraft utilizing theaairfield. The kinds of industries most interested in executive planes, as well as the types of planes most often purchased for executive use would be useful information to have, particularly when coupled with the types of indus- tries expected or hoped to locate here. In general, the greater the length of the rupway, the greater the capacity • to handle a variety of aircraft. A runway length of 6000 feet would accommo- date the larger jets and basically would exclude no one. A runway of this length is impossible on the Bowles-Agawam site. In addition, a shorter length would meet the requirements of a range of aircraft. If the runway length is reduced too much, on the other hand, to a point where safety is a threat, the usefulness of the airport is reduced. In such cases, aircraft may choose the larger airports close by (Bradley, Barnes, Westover) and drive the extra minutes to get to the site. Some industries have company policies regarding the minimum runway length they can utilize. Development schemes have been prepared with and without incorporating an airport. One scheme has been prepared with two runways each of 2000 feet length. A list of the aircraft that could be handled by this runway is contained in the discussion of the scheme. Alterations to or deactivation of any civil airport requires that the Federal Aviation Administration (FAA) and Massachusetts Aeronautics Commission (MAC) be notified, according to Chapter 26 Paragraph 240 of FAA'S"Advisory Circular, Utility Airports" and M. A. C. 'S'Aeronautical Regulations" , paragraph V A. 13 • AIR POR T (Cont`d. ) Further information on aircraft and air industrial parks can be obtained from the Aircraft Owner's and Pilots Association (AOPA) and the National Business Aircraft Association (NSAA), both in Washington, D. C. , as well as aircraft sales companies. Runways The paved carriage way of the northeast-southwest runway is 27 feet and the east-west runway is 27 feet. Visual inspection indicates that three to four inches of asphaltic concrete were apparently overlaid on the original Portland cement concrete runway. The pavement surface shows reflective cracks at approxi- mately 25 foot intervals, probably at expansion Joints in the underlying Portland cement concrete pavement. Most of these cracks extend the width of the runway and vary in width, roughly averaging one inch vide. These reflective cracks do not seem to be a constraining factor on the present use of the runways. Some minor "alligatering" of the pavement surface is also evident at the edges of the runway surface due to lack of use. Several options are available for the use of the existing runways as outlined below in order of increasing cost. . 1. No-action option. Advantages: No initial out-of-pocket expense and no constraint on use of runways. Disadvantages: Pavement will continue to deteriorate, requiring future remedial action. 2. Clean ane, fill cracks. Advantages: Will prolong useful life of runway at a low cost. Disadvantages: Will interrupt use of runway(s) during construction. Also, because this option only addresses the symptons, the basic cause of the cracking will not be eliminated. Future remedial action would then be re- quired. 3. Clean and fill cracks, and apply a "maintenance overlay" of 2 inches of asphaltic concr'ete. . Advantages: Will provide a smoother, serviceable runway at a moderate cost for the short term. Disadvantages: Because this option only addresses the sympton, the basic cause of the cracking will remain, and cracks may re-occur requiring remedial action. 4. Remove existing asphaltic concrete overlay by grinding device and re-apply ground material as sub-base for new asphalt paving and surface courses. Advantages: Could be a cost-effective method to implement long term improvement. Disadvantages: New technology involved is not readily available in the paving industry and may be . difficult to implement. 14 • R unway s (Cont'd. } 5. Clean and fill cracks. and build up new surface with a crack- relief layer of approximately 3. 5 inches, a dense graded asphaltic Concrete leveling course of approximately Z inches, and a dense graded asphaltic concrete surface course of approximately 1. 5 inches. Advantages: Is a long-term measure that would significantly reduce or eliminate reflective cracking and provide exceptionally high bearing capacity. Disadvantages: High initial cost for asphalt and build-up of runway shoulders. Runway(s) out of service during construction. The preceeding five options indicate that the use and/or rehabilitation of the runway may be accomplished on either a short-term or long-term basis. Implementation of the short-term solutions will not physically prevent later implementation of long term solutions. The uncertainty of prices and avail- ability of petroleum - related products. must, however, be weighted in the timing of implementation. 15 VI. PRELIMINARY DEVELOPMENT SCHFMES OVER VIEW The preliminary development schemes prepared for the Bowles -Agawam Airport site fall broadly into three categories. The three development concepts presented are as follows: A, utilize existing town roads (Silver Street and Shoemaker Lane)for lot frontage B. provide an internal park road with lot access off of this road and C, maintain the airport and work industry around the run- ways; in this concept, existing roads would be utilized for frontage, as in the first concept A. In arriving at the development schemes the following objectives were established: 1) to obtain maximum development flexibility 2) to obtain maximum net developable land and 3) to create the potential for both small and large lots. At the client's request, one lot of 100 developable acres and two lots of 50 developable acres were part of the program. In addition, the option of dividing one of these 50 acre lots into two to eight acre lots is possible. This option is indicated in all the schemes, except the airport scheme. Flexibility with the parcel that might be taken for construction of Route 57 and the associated town frontage road was seen as an important program element, as well, and is reflected in the plans. Proposed On-Site Roads Due to the strategic location of the Bowles Airport site, fronting on two existing town roads, coupled with the client's request for large (50 and 100 acre) lots, the need for internal park roads becomes an option rather than a requirement. Preliminary development schemes with and without internal park roads are presented. Where internal roads are involved, portions of the existing road into the grandstand,area and/or portions of the air runways have been utilized whers- feasible in order to save road construction costs. Construction costs have been prepared assuming a 32 foot wide pavement (2-12' lanes, 2-4' paved shoulders, 2-2' grass shoulders) in a 60 foot right-of-way. Since the existing runways are only 27 feet wide, some widening, as well as resurfacing, would be necessary. i 16 Traffic Projections It has been estimated that once the park is fully developed the Average Daily Traffic (ADT) might be 19, 300 vehicles per day on an average weekday. Projections for the A.M. peak hour total 6, Z00 vehicles/hour and for the P. M. peak hour, 6, 300 vehicles /hour. With the traffic volume anticipated, improvements to the existing transportation net- work will be necessary, if the project is to be developed to its full extent. These improvements could include widening of Silver Street, planned under the Urban Systems Aid Project and construction of the town frontage road with its associated interchange to Route 57 at Garden Streetsproposed at one time in conjunction with plans for Route 57. It is recommended that the agencies preparing plans for the proposed road improvements be'advised of these traffic projections. Proposed Utilities Off-site utilities, either those existing or those proposed under the Urban Systems Project, will be.adequate for the proposed industrial park. Proposed on-site utilities are indicated graphically on the development scheme overlays. Costs for these on-site utilities are tabularized following discussions of the schemes. 17 S CHE�1E F Lots The first development scheme relies on existing roads - Silver Street and Shoemaker Lane - for industrial frontage (concept A). One lot of approximately 100 developable acres runs through the center of the parcel. Two lots, each with roughly 50 developable acres, one at the corner of Garden and Silver Streets, the other at the corner of Silver Street and Shoemaker Lane, are indicated. A 28 acre developable lot along Shoemaker Lane and a 22 acre developable lot in the area of the proposed state highway Route 57 remain. This last parcel, could be reduced to a 14 acre lot (12 acres developable) if and when Route 57 and the town road are built, but configuration of the parcels remaining will make development difficult. The potential exists of subdividing larger lots through the use of a spur road(s) to provide th- needs of smaller land users. Tn Scheme 1, this option is indicated for lot 1 with a lighter line. Access The three largest lots have direct access to Silver Street, which may, at least initially, be the main travel route to and from the park. As shown in the plan, the 100 acre parcel could have access to Shoemaker Lane as well, in the vicinity of the proposed town frontage road. In the event that the Town frontage road is constructed at some later c?ate, the large 100 acre lot would have frontage along this road. The two smaller lots would have direct access to Shoemaker Lane. Utilities Utilities for this scheme would be provided by direct tenant connections to the sewer and water lines (existing or proposed) on Silver Street and Shoemaker Lane. In the event that one parcel is subdivided further, as indicated schematically for Lot 1, construction of an internal road and utilities would be required. In the scheme shown, approximately 1100 feet of road construction, water, sewer and drainage would be required. Costs for these items are tabularized following the discussion of the schemes. Summary In this scheme, no initial road or utility construction costs would be necessary. Direct use of the land by industries is maximized, as no land is taken for roads or air runways. Lot requirements of one 100 acre and two 50 acre developable parcels can be met, with the areas considered "undevelopable" split fairly evenly amongst the lots. The area speculated to be used for Route 57 and the town frontage road can function independently of the remaining land, providing greater flexibility with this area. Direct access to Silver Street is possible for the three largest lots. Further sub-division of the larger lots is possible through the use of spur roads. 18 • SCHFME I (Cont'd. ) Summary (Cont'ci. ) The main disadvantage of this scheme is that if and when the town frontage road is constructed, tots I ant' 3 would not have direct access onto this road. Therefore, travel on Shoemaker Lane would be necessary to obtain access to this road. 19 SCHEME 2 Park Road The second ane third development schemes provide an internal park road with lot access off of this road. In scheme 2, this park road enters the site from Silver Street roughly 250 feet north of Doane Avenue. It joins the existing air- port runway approximately 500 feet into the site and utilizes approximately 1600 feet of this runway before veering southwest to meet Shoemaker Lane at a location where sight lines are initially felt to be adequate. Total length of internal park roads is approximately 3750 feet. With a 60 foot right-of-way, this takes just over 5 acres. Total developable acres, subtracting the roadway, would be around 248 acres. Lots Access Three large lots would have access off of this main park thru-street. A lot with nearly 110 developable acres with frontage on Silver Street and Shoemaker Lane would result. Two lots of 55 developable acres, one along Silver Street, the other with frontage onto Shoemaker Lane are indicated. A fourth lot in the northwest corner of the property carves out the area planned for Route 57 and the townway. This lot would have access to Shoemaker Lane. As shown, it has approximately 22 developable acres. VWith the construction of Route 57, this idevelopable area would be reduced to approximately 1Z acres. Again, configura- tion of the parcel(s) in the northwest corner remaining with the construction of Route 57, would lend difficulty in developing this area. Lot 1 of this scheme has been subdivided into smaller lots to represent the potential for this option. Lots here would have access onto the cul-de-sac road, except for one parcel, which would have access onto the main park road. Access onto Silver Street should be discouraged in order to avoid numerous curb cuts and resultant traffic concerns here. Utilities Utilities for this scheme include water, sewer and drainage along the main park road. The water main would be looped from Silver Street to Shoemaker Lane, thereby providing higher fire flows. In the event that one parcel is subdivided further, as indicated schematically for lot 1, construction of a spur road and utilities would be required. In the scheme shown, approximately 1100 feet of road construction, water, sewer and drainage would be required. Summary In this scheme, one lot of 110 developable acres and two lots of 50 plus acres are provided. As in scheme 1, the undevelopable acreage is fairly evenly dis - tributed amongst the three larger lots. A fourth lot comprises the area specu- lated to be the Route 57/town frontage road and can develop independently of the 20 s SCHEME 2 (Cont'd. ) summary (Copt'd. ) remaining development. The larger lots can be sub�'ivided further, either through the use of spur roads) or with direct access to the park thru-street. Flexibility to subdivide the parcel into smaller lots is maximized with the road or road right-of-way running through the parcel. A disadvantage of this scheme is that, in providing a park road, approximately 5 acres are taken away from direct use by industry. in addition, utilities ex- tensions into the park would be required in order to service all of the lots. Costs to construct the road and utilities follow discussion of the schemes. s . 21 SCHEME 3 Park Road As in scheme 2, scheme 3 provides an internal park road. This main park road enters the site from Silver Street in roughly the same location as in scheme Z. It utilizes approximately 900 feet of the existing airport runway, then proceeds towards the west end of this park, where it joins at .right anles the corridor pro- posed for the town frontage road. There is approximately 800 feet of park road from this point to gain access to Shoemaker Lane. Total length of park roads, including the stretch within the area of the proposed town road, is approximately 4800 feet. With a 60 foot right-of-way for most of this length, this takes about 7 acres of land. Total developable acres, subtracting the roadway, Mould be around 246 acres. Lots. Access As shown in the plan, four lots, totalling approximately 100, 55, 50 and 20 developable acres, would have access to the park road. In addition, three of these four lots could have access onto either Shoemaker Dane :>r Silver Street. A fifth lot (20 developable acres) carves out the majority of the area planned for Route 57 and the town road. If Route 57 is not built, this lot could have its access onto the park road,:.as well. ' Lot 1 of this scheme has been subdivided into smaller lots to represent the potential for this option. Lots here would have access onto the spur road or main park road. Direct access onto Silver Street should be discouraged. U tilities Utilities for this scheme include a looped water main from Silver Street to Shoemaker Lane, with higher resultant fire flows; drainage along the majority of the park road and. sanitary sewer to provide service to those lots that cannot connect directly to the public system. In the event that one larger parcel is subdivided, construction of a spur road and utilities would be required. In scheme 3, approximately 1250 feet of road construction, water, sewer and drainage would be required. Sum In this scheme, program demands for one 100 acre and two 50 acre developable parcels can be met. In addition, two lots of approximately 20 developable acres are available. With the exception of the two latter lots, the undevelopable areas are fairly evenly divided amongst the lots. Lot 5, in the northwestern corner, can function independently of the remaining park area, maintaining flexibility for the possible construction of Route 57. At least four of the five lots shown would he,ve access onto the proposed park road. Additionally, the proposed • park road connects with the area proposed as a town frontage road. In the event that the town frontage road is built, the entire park will have easy access to Route 57. As in scheme 2', further subdivision of larger lots is- possible Through the use of a spur road. 22 SCHEME 3 (Cont'd. ) Curnmary (Cont'd. ) In providing a park road, approximately 7 acres would be taken out of direct use by industry. An additional 1. 7 acres is shown taken out, of direct industrial use, with the option of the spur road. Also, in order to service all lots, utilities would need to be extended into the park. 7-3 • SCHEME 4 Airport In scheme 4, the airport is maintained and lots for industry are situated around the airfield. The existing runways would be utilized, with improvements to the pavement. Two runways, each of 2000 feet length are represented. This repre- sents a shortening of the existing runways. This length runway should accommo- date aircraft including the following: Cessna Skyhawk-172, Cessna Skylane-182 and Cessna 210. A list of additional aircraft that could utilize this runway are listed in the appendix under the Basic Utility, Stage I column of F. A. A. `S "Airplane Models Accommodated by Airport Types" Two runways provide a distinct advantage over one runway to the safety and usefulness of the airport. This is particularly true during inclement weather and when prevailing winds have shifted. As business planes may require operation during inclement weather, flexibility in direction of approach and departure is helpful. Additionally, the smaller the airplane, the more it is affected by wind, particularly crosswind components. As smaller aircraft could be expected to utilize this airfield, due to the runway length, flexibility in runwav direction is helpful. Also represented in this scheme is a 250 foot setback from either side of the centerline of the runway. This is an F,A.A. recommended dimensional standard for a building setback and property line on the side of the taxiway. Other than . airport parking and a taxiway, no obstacles are permitted in this zone. As shown, the airport occupies approximately 70 acres. The building setback and property line could possibly be reduced to 200 feet along certain sides of the runways, depending on taxiway location in the final plan for the airport. It appears that M. A. C. requirements may be as little as 150 feet either side of the runway centerline. Either of these setbacks would reduce the amount of land taken by the airport to approximately 60 acres and 50 acres, respec- tively. Further study of airports and discussions with relevant government agencies would be necessary to determine the specific requirements for this airpo rt. Lots, Access, Utilities One lot of 73 developable acres and two lots of 30 developable acres are shown. In addition, an area of 14 acres is shown along Silver Street. This area could be. subdivided to meet the needs of industries requiring smaller parcels. A fifth lot in the northwestern corner of the parcel would provide 22 developable acres until such time as Route 57 is built. No internal park roads would be involved, as� all lots would gain access off of existing roads. In addition, all Iota would provide . their own utility connections to the public system. 24 Summary This scheme maintains the airport with two runways of 2000 feet length and would require no road construction or utilities. The airport as shown requires approximately 70 acres. As mentioned, this could possibly be reduced to as little as 50 acres. This acreage would be taken out of the developable acreage available for direct use by industry. Program demands for one 100 acre and two 50 acre parcels, while still maintaining flexibility with the lot in the northwestern corner of the parcel, cannot be met with this scheme. In addition, configuration of the lots resulting from the runway layout may not allow maximum efficient use of the remaining developable acreage, with the exception of lot 3, further subdivision of parcels is made difficult, due to minimum frontage of most lots onto existing streets. 25 CONSTRUCTION COST F—gTLMATES ENR INDEX 5/21/81 3466. 50 U U U U I T rM I. Building Demolition $ 84, 700. $ 84, 700. $ 84, 700. $ 84, 700. 2. Sewer 0 $ 6 1, 800. , $ 56, 500. 0 3. Water 0 $ 113, 000. $ 116, 500. 0 4. Roads 0 $ 196, 470. $ 254, 880. 0 r 5. Drainage 0 $ 95,430 $ 139, 000. 0 6. Other - Runway Improvements 0 0 0 0* 7. Fngineering & Contingency 0 $ 116, 600. $ 141,420. 0 8. TOTAL $ 85, 000. $668 , 000. $ 793 000. $ 85, 000. U tili±e as is for initial phas e i 26 CONSTRUCTION COST ESTLMATES FNR INDEX 5/21/81 3466. 50 y V � V V TTEM OPTIONAL SPUR ROAD 1. Sewer $ 31, 800. $ 31, 800. $ 34, 950. Z. Water $ 38, 500. $ 38, 500. $ 42, 250. 3. F cads $ 58,410. , $ 58,410. $ 66, 375. 4. Drainage $ 21, 660. $ 21. 660. $ 26, 880. 5. Engineering & Contingency $ 37,630. $ 37,630. $ 42,545. 6. TOTAL $ 188, 000. $188, 000. $213, 000. • 27 aFzj a � �• 0 r1n d IIASIC UTILITY IIASIC 11.1•II•ITV .+'I'Aill: 1 1'l Alil: 11 GENlI AI. 11TILI'I'1� �n pi H Actuate (:9cdun) 15:1{7 A1vu IV,mlalun Is-0 NMI�ricl Ib cell (F%ju-ditrr) iH Koricv Avru (C1launaad,•r) 5111); crici 1i1 r•1 h (.'15;Uriei y W 'LI "w,1' ik•et-h (I111n1i11R1►) :15 tirries Aenl (81sla•r-1'uu1) fiNll tirril•x 111.1-1•)1 ('1•wia huuau>;u! I i 541 a rA (I+•rcil ((jucca Air 80) 81) p Ce9+ne IAll Ilef-Ch lit+ur,ll) A-156 ill:crh (King Air) 100 t`yi1 r4r Ccx-411a (5kyllewk-172) 170 ticries It+erik (14-6anair) A-31.4 13cccil (Airliner) 9:1 P Cl-.4.111a (15kylaileA812) 180 Serie" ilevell (• faveleir) It-9 eA u_ra. {`I•s•nu (till [`rs un 402, 410, i It (•essna. 195A E:r,ans (Skyw•eguu) :.'ill, 2011 ('c,.nn 620 l c�y:lu ,110 1'-021s16e 1 IU A r r`1 Cewrnu (Twill Cessna) :110 Scricy 111. 1144villuad (Dowl.) lilt (('rwiauir) 1.1--19 leKsue (tikyklught) :!'.W1+cric:l UOw'i1L'r (Ilcllpuea) llilwr (C111111 lift 11010 VA 21 "180" 'i Ercoul1u (Forney) 415 Series )'iprr ('1,1614 �-1 P 1'uw11ut1uchel 1'A--30,;it R Moloney (Mile) At 14)(11 Pilwr (Nevujo) VA-:15 .r e�' �111unry Mark IN) 1.1mr-4011►tte (Sih•1Hre) A ticricy `4 w Urlivcrsei {nfj-;t a M Navion (liaogclnaall:r) "A" 1 1'i111•r (§u1x-r Cruiser) PA-12 j a l'ilwr (tlulx-r("llis) PA -18 Al-to nccnaluurdalcd nre lilt airplane raudvis Pilur (Pacer) PA-20 Piller (A/�l/arlic) 1'A-'23 5arir1l listed uadcr Iia'ia Utility MILIes 1 eull 11, 0 1'i1wr (Tripacer) 11A-'212"IW* filler (Cherllkce) VA r 28 rl Pil►cr (Trillucer) PA-'dl 136" •y fnylorcrat6 it ;ierirs `� 1O (iuivcrxa) ION-I � H Ilniversal (U8--2 � rwr p Also areonimndated arc the airplane mudrls �l h:eted vender liasic Utility atugl! I. kn 10 The reconnlended runway length required to acconrllodate all the airplanes grouped under a o specific airport type to obtained from Figure 4-1. LAS FIGURE 2-1. EX MPLES OF AIRPLANE MODELS ACCOI'iM(1UATED BY AIRPORT TYPE d to r r .�Rjr�rr.w�sa�smrsArr.r.w,r.er�� .... rwrurrw�rwri*wwaiw�www.sr:���rloi, irRasusR/wRwwixw�rarrr.iprJ�i,�wR�rR�w iswa rJ�i rAvi■w/wi1 >1�MA�,�./ww AIRPORT .RUNWAY LENGTH: swwwawwi>r*Rwr�rrwarawirsrw■w �`AIJiLYA4 �wr'�ii�w JrRww+irJ�irsyrw arawr�w+�r�w■ 22009 .' lwiiRi�.!]RR�ii _- IA�■�A�JARaIIr■ AR ,wow rwliw awArwr�■Mw 00 d - 1wwR rt, Mwrwa! .!.g IC STAGE 11 Z #Adis/■ 11�1M►1 !1■[A�iw•Iw E! 32001 !w Af1�/w■ wIRA 1RR�i/ JI qI/iisJRwwA A1�iAww� iiAM�M► ,�/M�,Mw■wAA�mJit�AMi� Rlli��ilwA/�iilA/R�'.wr.�I�R/rwiAiZAf w�1w/R� wwwwwwwwrsi�w�r/rwr ■w�s;�w mwrwawi� il�w #/►IR��1�'1// � J�wi�R�l1■1'�/ � �� ■Qw/ �iii�/R _ A�Iwl1/li1 R wwww9w�J�RAwRwr�Iwf� Aw.R �_ � i!s-R� NwAO�w�AM! ilww�wwfJrlwr�w���iwf/iwi�� ■NMr rwAf lIMAM lliR�.i l lisAAJ�#�RJr a /RwR - e IR=.�mmws /AI,wR� wtiwww "w/pifJwwil�A JAR�iRfwt/■r,w��JwR�lXa ■o�w '.ram•sir. rer��/wwiwwrrs�'rrass�lfwRwil wow ar�wwa .�oRwawwwiaw�wwiar'rw�lrr,►rww��w ■iwi�wirr�wiir� r ,ww��wRwRrrw awr /rwrwrwwwJnr,:rs,rwnw�rw�s:arrs Jrw:�w>nwwwwrr ww'rrrv�nwwwr�r�r sir: r � �w wrrr�ararA aww°a .4rwww Anm mar `Jiver'/ wwr i wwsi Wmmm ■wwww �wwwwanw•wrrw► �irrrv�rrrww;�ir�i: wwwr �ww�aw.�wiww.ww�ir�wr.+rww.swrwr►.w.�awrwww �i�w�rrwawr�rr�wt�.���w�iwr r:rJwarowr�wroorr wrs*�wi��arrw�rsw��asv�wwwriw�rrwwrMir� dr�a�■ ww'��11wwl�/ iwwriwA/ - !� ■wr.■rrwrrw�ar rlli! Jwrw�wwwa/w• �rrwww �rrR�mmmamr ■ �liN■ MR` rir ,� I/w'AAwMM! w� wwlweAMWMWM R� ■wM�' Awl/.s � NRl1/�wMiR//�a!ASA�Mww wMlwr .�M/I.wA��Iw/M ■ wrBI.MA/mow IAA/RRwi*O�OIA�i�/a■li�Mi!'��R �M lwillMt"itirV�AO I% NAiArT MtK. 2� KE ILI / �/i �iilGwi1w'1N/J �`ailr ..A ./� �wiTilS ./w'3 A/► �/ w�Aifiw�l �i !!/W ww�f■f�!/wRRJ� � �R wR/wCJw!'` aw�w/wArR�2/wl../wIMRl��wwA'.Ar � I�►/i►i!� I �iyYAwiAfr!FAR N#il/fir � ' r` � [�V MMCaA! INsar�w r �. wwwr� rr+�/warloipi■./r mmrA w �i� � awK��s� • .wwwwwaas � �'�� ..! ! # �./w�,w�aii3' ti` A//ARwwrtl[I!" ►AAw wWA rAmw,' .wR arlAwAsw.w -d� w.a.ws �• � wwwi�I . /�w1Ae��ll�' IRrw� ww�s' psi �r �,� Iaa w�wrrwrrr/wwN. w1r-a�?�iw� i' !IUi/r�Aw�Rryww ww�r�,r �■ a�v�wa rwww�rpcAirw.�r+� ww+ar ay`�arwwrr�ar.�-.: �awyr�r�wra� sR� ! .. w.r.AA,Np: . _�riR6�iR'�r./�Aww■#w�t�.Na�,�+sw/�w� rrsdolp"i�wrrerw,wwwrwaa�wwrtw RN�,A- .wsr/re�riwrdr��.�srww�Nw�r.�,r w,rr►.■r�r-..war�R`�rno-.w�.�+tu.w.�are.waws.r�rw�s w��:�,�- .�ww►.�wr�awriwis�rwww� �ww ■wrt./►�wsw�.wM d+wNr�ww�rw�wr �sawrwwww� ��s.�a.�!�weswwi�r�++w��wwawws�wwwsrrwa�rR ���wr��.Mr..iwr■wiwirw..ww+w�+wl�w�ia�arr�.nr..r.....ar.w+w.w..ai..�+ Naw-.s�. a�,ar ►�.rrws ■ww�.l.wwa�ww��wsw� ■.v.. + vetwiA��wliw�rwNNis#N�aatwarw�w��w Pop .. .. . • . • n s ■ M 6/24/.5 AC 150/5300-4B -�COhI LCED S LmL*.DS L'OR =1''1-= AZR?0a'=S Dom. Ii l STAGE I STAGE II A Runway Length J6gure 4-1 Fizure 4-1. Fio re 4-' B r-,=way Width 50 60 75 C Runway Safety Area Width 100 120 1�a 0 taxi way "Width 20 30. 40 E ?jw$y CL to ':a sway CL i5J 150 200 F ="ay CL to Bu;•, Restriction Line and Prapertj Lime (nontaxiway 3:i.de) 00 24 Gil C -:1=way CL to Building Eestrict_o3 Line (taxikay szde) 250 250 3,30 H Taxiway Cr to Airplane 'I'iedown Area 75 75 75 J Taxiway CL to Fixed or Mxvable Obstacle 50 50 50 K R-=way CL to Fixed or Movable Obstacle 125 125 125 M -Runway CL to Tiedo= Area 22.5 225 275 *Letters are keyed to those shown for d;.mmwlar.s of Figure 7-2 .,.3: 1. See Appendix 1, Variables in Design, for discussion of design factors. 2. The above dimensions meet the m== aIrporr desiga standards for rmways with straight-in aooprecisi.on iastr=ent approach proce&.4res. 3. Ibe rf"n = separatian between centerlines of parallel ranways is "00 feet for sicraltaneous M. landings or take- offs if the airplanes involved are single engine and 500 feet if the airplanes are twin engine. FIGURE 7-1. RECOMMENDED DIMNSIONAL STANDARDS From Dept. of Transportation, Federal Aviation Administration, Advisory Circular No. 150/5300-43, "Utility Airports". June 1975 & 1977. wif R#FR OR#So I#eq an -u SUNDERLAND. MASSACHU5ETfS 01375 + TEL AREA CODE 413 6694051 June 2, 1981 Gordon E. Ainsworth S Associates, Inc. 20 Sugarloaf Street South Deerfield, :Massachusetts 01373 Attention: Lawrence Smith Gentlemen. Below is an estimate of the cost to demolish the buildings at the Bowles Airport, Agawam, Mass. The price includes removal of the refuse and transporting it to the Bondi Island Landfill. Wood Structures 10' x 10' $ 400 22' x 22' 1,000 16' x 26' 1,000 30' x 70' 5,000 72' x 72' 11,000 Trailers - 3 1,300 Brick Buildings 110' x 300' 34,000 41' x 50' 12,000 Concrete Block Building 280' x 34' 6,000 132' x 110' 13,000 Total $84,700 Very truly yours WARNER BROS. INC. David H. Stone Project Engineer DIMS:h 22 HISTORY AND ACTIVITIES of the WESTMASS AREA DEVELOPMENT CORPORATION BACKGROUND: The Westmass Area Development Corporation, WADC, (formerly known as the Springfield Area Development Corporation) is a non- profit, private development organization established in 1960 under Chapter 192 of the General Laws of the Commonwealth of Massachusetts. OBJECTIVES • The Corporation' s objective is to upgrade the economy of the region, specifically through the creation of jobs. WADC' s primary activities are in industrial development through the creation, man- agement and marketing of industrial parks. WADC does not limit its activities to industrial parks nor does it limit its activities to its own industrial parks and programs. SERVICES: The Corporation assists companies interested in locating or relocating to, or expanding in the region, regardless of desired location. The Corporation also serves communities within the region acting as technical advisor on specific projects, marketing and fi- nancing programs. Other corporate services include the sale of land, financing, participation in Small Business Administration 502 and 503 programs, facility construction and leaseback with option- to-buy agreements; and working with the Private Industry Council, manpower planning and training. CAPITALIZATION• WADC's initial capitalization came from a $300,000 gift in- vestment from fifteen area businesses. These funds were utilized to purchase and develop industrial lands. WADC has grown to a multi- million dollar corporation and borrows money for its projects at the prime or below market interest rates. Its operations are now self- sustaining and excess revenues over expenses are invested back into the region through new projects. 23 ENTERPRISE• The Corporation is managed as a regionally responsible busi- ness enterprise; decisions are based on economic feasibility and actions are taken on value to the business client and community. There are no grants or give-away programs. All activities of the corporation are based on fundamental economic principles. COMPOSITION: As a corporation, WADC has stockholders, a Board of Directors and a Steering Committee which oversee and direct all corporate ac- tivities. Staff is provided through the Greater Springfield Chamber of Commerce through its 20 member Economic Development Division. Stockholders meet annually, directors quarterly and the Steering Committee weekly. PHILOSOPHY• WADC's philosophy is one of regional and project partnership. WADC will not enter into any project unilaterally. Working commit- ments and partnerships must be reached in communities between the local public and private sectors and the corporation for a project to move forward. Without these partnerships, the chances of success are severely diminished and WADC will not, nor can it participate, without the advise, consent and local decision making inherent in the cooperative and partnership roles. PROJECTS TO DATE: Working closely with the region' s city and town administra- tions and business communities, WADC has been engaged in industrial development for over 20 years. Below are some of the highlights of the activities during the last two decades: Memorial Industrial Park : The Memorial Industrial Park was formerly an 18-hole municipal golf course. It was determined there was a need for prime industri- al land in Springfield. The best location was the former Memorial Golf Course. In order to obtain that land a special corporation i 24 called MIP, Inc. , comprised of city residents, was formed. MIP, Inc. , was a single purpose corporation with the objective to develop the golf course into an industrial park and once completed, excess revenues over expenses would be given to the City of Springfield. Before the golf course was titled to MIP, Inc. , a new golf course was built and financed for by MIP, Inc. , and then deeded to the City. The City sold the old golf course to the corporation for $1. 00, and industrial development commenced on Memorial Industrial Park. The 140-acre tract is now filled; there are over 4, 000 employees and yearly real estate taxes paid to the city are in excess of $600, 000. WADC was the financing agent and provided the staff for the development and completion of this project . Progress Industrial Park : WADC purchased approximately 80 acres and developed the inter- nal roads and utilities. The development of the park has been completed . Today there are over 400 employees and yearly taxes paid to the city are some $220,000. Industr East : Industry East is an 80-acre tract which was purchased and de- veloped by WADC. To date, there are seven occupants in the park, and approximately 25 remain for sale. Food Distribution Center : When Interstate Route 291 construction and local urban renewal activities were at their peak, many wholesale food distributors in Springfield were forced to relocate. Because of the problems in finding existing space, most were faced with either going out of buiness or moving to Connecticut. WADC and the U.S. Department of Agriculture conducted a fea- sibility study for the establishment of a new regional wholesale food distribution center . The study concentrated on an area of Springfield adjacent to the Connecticut River and rail freight fa- cilities in the former Pynchon Park. This forty-acre tract was pur- chased by WADC and developed along the same lines as other industri- al parks. 25 . To bring the Food Center to reality and to initiate private investment, WADC obtained a second mortgage on the park ' s first building, an 80, 000 square foot multi-purpose facility which today houses 15 different wholesalers. WADC also financed the Farmers Cooperative Market in order to assure their location in the park. Today, there are over 600 employees and annual real estate taxes are approximately $260,000 . Other Projects: 1. The F. A. Bassette Company was located in an urban re- newal project area of Springfield; their building was taken and demolished as part of the development. WADC created a financial package including the construction of a new building on a long-term lease with guarantees on partial financing of new equipment for the F. A. Bassette Company. The Bassette Company has been in its new head- quarters for eight years, employing 90 people with real estate taxes to the city exceeding $20, 000 per year. 2. WADC purchased a building from the Bosch Machine Tool Company. Later the Moore Company needed expansion space and the Bosch building was sold to the Moore Company. 3 . WADC spent $10,000 for a special re-use study of the Federal Square property when the General Electric Company phased out its local operation. The property was sub- sequently sold to the Milton Bradley Company and Digital Equipment Corporation is a tenant in several of the buildings. 4. At the request of the Mayor of Springfield, WADC under- took a site feasibility and engineering study which has paved the way for further activity on the Rifle Range site, hopefully culminating in a future industrial park located in Chicopee and Springfield. 5. The U.S. Small Business Administration sponsors several programs requiring participation of a certified and qual- ified Local Development Corporation. WADC is eligible to participate on the basis of a strong track record, qual- ified professional staff and its non-profit development status. These programs are generically known as the SBA-502 Direct Loan and Loan Guaranty Programs and the 503 Mortgage Debenture Guaranty Program. 26 • WADC has sponsored fifteen 502 loans amounting to 6. 3 million dollars and over 800 jobs, has processed six 503 loan applications for 1. 3 million dollars and 135 jobs, and is preparing ten 503 loan applications for 1. 7 million dollars and 150 jobs. Total SBA pro- grams amount to 9.2 million dollars and over 1, 000 jobs. THE PHILOSOPHY OF WADC IS REGIONAL DEVELOPMENT East Longmeadow: In 1972 WADC, acting at the town administration and Chamber of Commerce' s request, purchased 120 acres of industrially zoned land in East Longmeadow. This was the culmination of many months of work with the citizens of East Longmeadow ensuring the project was com- munity supported. A proposal was made to the town in which WADC would purchase the property only if the business community in East Longmeadow in- vested a minimum of $150, 000 interest free, no-term money and the town construct, at its expense, 2,100 feet of road into the park. The local Chamber of Commerce, through its membership, raised $190, 000 of interest-free money, and it was unanimously voted at the . annual town meeting to bond for the road which has subsequently been built. Today some 100 acres have been developed and 20 remain for sale. West Springfield: In 1973, WADC was asked by the town' s Industrial Development Commission and Chamber of Commerce to take over an existing private- ly owned and managed 150 acre industrial park. WADC approached the project in the same manner as in East Longmeadow; total community support and financial commitments by both the public and private sectors, and participation on a daily basis in the decision-making process had to be guaranteed. The Town of West Springfield, prior to WADC' s involvement, had spent some $250, 000 on providing a water tank to service the park. With WADC involvement in the development of the tract, the town then spent an additional $92,000 to complete the construction of an interior road. 27 . The Private Sector invested $200,000 in interest free, no maturity loans to WADC for overall development purposes. WADC purchased the park in August, 1977. Working with the community in a full scale marketing and development program, the park has been developed. No land remains for sale; the loans from the Private Sector have been repaid in full. North Centre• In 1979, the Memorial Development Corporation, a non-profit quasi-public industrial development group headquartered in Spring- field, began development of a 120-acre tract of inner-City land known as the North Centre Industrial Park in a cooperative project with the City of Springfield. WADC has provided staff and technical services for the development of that land and has become a financing agent pledging some $600, 000 on its line of credit funds for the development of land. This money will be loaned to the project on an interest-free basis. Agawam• In mid 1980, WADC was approached by representatives from the public and private sectors of Agawam to investigate what, if any, potential there was in developing a 320-acre tract of land known as the Bowles Airport site and if there was any potential what, if any, interest WADC had in participating in that project . WADC has begun work and has shared with the town preliminary findings indicating good potential for development. Most recently, WADC has taken the project further by paying out of its treasury for an engineering study of the site. The results of this study and WADC' s findings will be made available to the town, and there may well be a significant opportunity for a cooperative project between the corporation and the town. High Technology Program: The most far-reaching regional project of the corporation involved the attraction of high technology industries to Western Massachusetts. Based on nine months of research, WADC is participating in a region-wide high technology program under the auspices of the Great- er Springfield Chamber of Commerce' s High Technology Task Force. 28 This program has identified and assembled resources attractive to high technology industries throughout the United States. Resources include, real estate, new construction, machinery and equipment, special training programs through the Regional Skills Center, and inventory owners by the corporation, or otherwise available in the region. WADC has the lead role in the marketing of Western Massachu- setts and in the overall administration of the program. To date, WADC has pledged some $37,500 to administrative costs. WADC has and will continue to show, market and assist any com- munity or any client in locating anywhere in the Western Massachu- setts region. Many properties, other than those owned by the cor- poration, have been shown with one sale resulting in West Spring- field to Prime Computer. Name Change- . Given the fact the philosophy of WADC is regional development, in 1981 the stockholders and directors of the corporation voted to change its name, bylaws and membership composition to reflect its regional philosophy and approach. By a unanimous vote, the Spring- field Area Development Corporation has become the Westmass Area De- velopment Corporation. The change of corporate structure and membership is signifi- cant. The changes are a reaffirmation and strengthening of the re- gional development attitude, willingness and ability to help in the overall economic development process of the Western Massachusetts area. Corporate Accomplishments_ to Date for All Activities: JOBS: 16, 500 TAXES: Over 2.5 million dollars added to the annual real estate tax rolls of the communities in which the corporation has been active. WESTMASS AREA DEVELOPMENT CORPORATION SSBA, INC. r (SUBSIDIARY C PORATION MEMB STOCKHOLDERS] f EXECUTIVE COMMITTEE BOARD OF DIRECTORS CTUMTP, =EXECUiIV�*E ECONOMIC DEVELOPMENT DIRECTOR, WADC/SSBA, INC. ADMINI5TRATIVE ASSISTANT BOOKKEEPER LEGAL. DEVELOPMENT RRWENR RESEARCH SPECIAL PROJECTS ACCOUNTING .Brooks, Mulcahy Manager Executive Director, .Research Director .Director, High Technology .Coopers � do Sanborn .Project Director Private Industry .Consultants (1) Lybrand .Loan Packager Council Administrative Assistant .Economic Development .Program Planner Planner .Program Planner .Administrative Assis- .Program Planner tant Administrative .Administrative Assis- , Assistant tant .3 Engineering Firms .Manager, Hispanic Employment Program .Placement Specialist .Placement Specialist .Administrative Assistant ^' .a 30 BY-LAWS ARTICLE I-NAME The Corporation shall be known by the name of: WESTMASS AREA DEVELOPMENT CORPORATION and shall have a Corporation seal bearing the name of the Corporation and such other device or inscription as the Executive Committee shall determine. The Executive Committee may change the seal and the in- scription thereon at any time. ARTICLE II-OFFICERS The officers of the Westmass Area Development Corporation shall be a president, first vice president, second vice president, such other vice presidents who may be elected from time to time to carry out spe- ciAl projects of the corporation, a treasurer and a clerk. The number of directors of the corporation shall be set from time to time by action of the stockholders but shall not exceed twenty-four in number. All of the above officers , together with the directors , shall serve and be known as the executive committee. . All officers and directors of this corporation shall be stockhold- ers of the corporation. The president, first vice president, second vice president, treasur- er and clerk and the directors shall be elected at the annual meeting of the stockholders of the corporation or at any special meeting of the stockholders called for that purpose. Upon a vacancy occurring in any of the above-named offices by reason of death, resignation, removal, or by reason of a specific vacancy being left by vote of the stockholders , such vacancy may be filled by vote of the executive committee, and the officer or director so elected shall hold office until his successor is elected or qualified. The president, first vice president, second vice president, treasur- er and clerk shall retain their offices for one year from the date of their election or until their successors are elected and qualified. The directors shall hold office for a term of three years , except that, insofar as possible, the terms of office of the directors shall be so arranged that only one-third thereof expire in any one year. The executive committee may from time to time elect additional vice presidents to carry out special projects of the corporation. The persons so elected shall be members of and serve on the executive com- mittee, and their duties shall be as prescribed by the executive com- mittee. The' term of office of any vice president elected by the execu- tive committee shall -automatically expire at the next annual meeting of the stockholders. 31 WADC BY-LAWS In addition, the executive committee may appoint other officers and agents of the corporation, prescribe their duties and terms of office; however, such persons shall not be members of the executive committee. No officer or director shall be entitled to a salary or fee for his services. AMrwLE In - EXECUTIVE COMNI TI TEE The Executive Committee shall have the entire management and control of the property, business and affairs of this Corporation and shall be vested with all of the powers of the Corporation as set forth in Chapter 192 of the Acts passed by the Gen- eral Court of Massachusetts for the year 1960 to the extent not inconsistent with the provisions of said Chapter and with the Laws of the Commonwealth of Massachusetts. In the exercise of the foregoing powers the Executive Committee shall be em- powered to authorize one or more officers of the Corporation to execute any written instrument and affix the corporate seal thereto in the name of the Corporation. There shall be no contracts or other business transactions between this Cor- poration and any other corporation or company in which any member of this Executive Committee may have an interest by reason of his employment or his substantial own- ership thereof unless such contract or business transaction be ratified or approved by the affirmative vote of at least ten (10) members of this Executive Committee who have no such interest in the corporation or company in question. ARTICLE IV - MEETINGS OF THE EXECUTIVE COMMITTEE The Executive Committee shall meet at least four times a year, such meetings to be called by the Clerk at the request of the President, First Vice President, or any three or mare members of the Executive Committee. Notice of each meeting shall be sent to each member of the Executive Committee at least seventy-two hours in ad- vance of the time appointed and such notice shall specify the time, place and purpose of the meeting. All meetings of the Executive Committee shall be held in Springfield, Massachusetts, or in the communities contiguous thereto. Eight members of the Executive Committee represented in person shall consti- tute a quorum for the transaction of business at a meeting of the Executive Committee. When a quorum is present at such a meeting, a majority vote of the members present thereat shall decide any question brought before it. ARTICLE V - PRES ENE The President shall be the Chief Executive Officer of this Corporation and when present shall preside at all meetings of the Stockholders and Executive Committee. The President shall sign all certificates of stocks, bonds, deeds, and contracts of this . Corporation as authorized by the Executive Committee and shall perform all duties com- monly incident to this office and as required by the Statutes of the Commonwealth of Massachusetts. 32 WADC BY-LAWS ARTICLE VI - VICE PRESIDENTS There shall be two Vice-Presidents and they shall be designated by the title First Vice-President and Second Vice-President. The First Vice-President- shall perform the duties and have the powers of the President during the absence or disability of the President and shall have the power to sign all certificates of stock, bonds, deeds and contracts of the Corporation as authorized by the Executive Committee and shall perfonn such other duties and have such other powers as the Executive Committee may from time to time designate. The Second Vice-President shall perform the duties and have the powers of the President during the absence or disability of the President and the First Vice- President and shall have the power to sign all certificates of stock, bonds, deeds and contracts of the Corporation as authorized by the Executive Committee and shall perform such other duties and have such other powers as the Executive Committee may from time to time designate. ARTICLE VII - CLERK The Clerk shall keep correct minutes of all meetings of the Stockholders and of the Executive Committee and of all other Committees and shall perform all duties commonly incident to his office. The Clerk shall be sworn to a faithful performance of his duties and shall have care and custody of the stock register book and keep the same in order. The Clerk shall, with the approval of the Executive Committee, appoint an Assistant Cleric who shall hold office at the pleasure of the Executive Committee. =CLE VIII - ASSISTANT CLEU The Assistant Clerk shall perform the duties of the Clerk in the absence of the Clerk, and shall perfaam such other duties as the Executive Committee shall from time to time designate, The Assistant Clerk shall be sworn to the faithful perform- ance of his duties. „ ARTIQU IIK - MSURER The Treasurer shall have the care and custody of the money, funds, valuable papers and documents of this Corporation (other than his own bond which shall be in the custody of the President and the stock register book which shall be in the Cus- tody of the Clerk), and he shall have and exercise under the supervision of the Exec- utive Committee all the powers and duties commonly incident to his office and shall give bond in such form and with such sureties as may be required by the Executive Committee, 33 WADC BY-LAWS ARTICLE IX - TREASURER (gantinued) The Treasurer shall prepare a report on the financial condition of the Corpora- tion for presentation at the annual meeting and shall prepare similar reports for each meeting of the Executive Committee except as the latter may otherwise order. The Treasurer shall with the approval of the Executive Committee appoint an Assistant Treasurer who shall hold office during the pleasure of the Executive Commit- tee. MNCLE X - ASSIS'LANT TMSURER The Assistant Treasurer shall perform the duties and have the powers of the Treasurer during the absence or disability of the Treasurer, and shall perform such other duties and have such other powers as the Executive Committee shall from time to time designate. He shall give bond in such form and with such sureties as may be required by the Executive Committee. AR y EISCAL YEAR The fiscal year of the corporation shall be from the first day of February to the thirty-first day of January. At the close of each fiscal year and at such other times as the Executive Com- mittee may order, the books of the Corporation shall be audited by a certified public accountant and the report of the accountant shall be presented to the stockholders at the next following meeting of the stockholders. ARTICj"I -_ST_QC =,ER�EETINGS All meetings of the Stockholders shall be held in Springfield, Massachusetts, or in communities contiguous thereto, at-a place designated by the Executive Commit- tee and so stated in the call. ARTICLE XUI - ANN= MEETING The Annual Meeting of the Stockholders of this Corporation shall be held dur- ing the month of March in each year, exclusive of Sundays. The day and hour of the meeting shall be set by the stockholders or the executive committee, or in lieu there- of, by the president. ARTICLE = - SPECIAL-MEETIN-G§ OF-THE gjQCQOLDERg Special meetings of the Stockholders of this Corporation shall be held when- ever the President or First Vice President, the Executive Committee or the holders of 1/20th of the voting Capital Stock issued and outstanding shall make application therefore to the Clerk. 34 WADC BY-LAWS . ARTICLA XV UOTIC,,E OF STQCrrLOLDgRS'_MEETL QS Notice of all Stockholders' Meetings stating the time and place and the ob- ject for which such meetings are called shall be given by the Clerk by mail to each Stockholder of record at his registered address at least seven days prior to the date of the meeting and the person giving such notice shall make affidavit in relation thereto. ARTICLE XVI - QUORTJM AT STOCKHOLDERS' MEETINGS At any meeting of the Stockholders 30 registered holders of voting Capital Stock or the holders of fifty per cent (50%) of the outstanding voting capital stock, represented in person or by written proxy shall constitute a quorum. When a quorum Is present at any meeting a majority of the voting capital stock represented thereat in person or by proxy shall decide any question brought before such meeting, unless the question is one upon which, by express provision of law or by Chapter 192 of the Acts passed by the General Court of Massachusetts for the year 1960 or by these By-laws, a larger or different vote is required, in which case such express provisions shall govern and control the decision of such question. The Executive Committee shall determine the validity of all proxies. ARTICLE XVII - VOTES At all meetings of the Stockholders each Stockholder of Common Capital Class A Stock shall be entitled to one vote for each share held by him or her. This shall in- clude stock owned by Corporations and voted by their agent or stock owned by estates and voted by the Executor or Administrator or stock owned by a trust and voted by the DUstee, provided said stock is duly registered in the name of the Corporation or in the name of the Estate with the Executor or Administrator designated or in the name of the trust with the Trustee named. TICLE XVIII - CLASSES 9F STQQKK There shall be two classes of Common Capital Stock. Class A - Par Value $5 Class B - Par Value $5 Class A - An individual, corporation, estate or trust, company or partnership shall be entitled to hold or own not more than five hundred shares of Class A common capital stock, and such individual, corporation, estate or trust, company or partnership, may purchase the same from the corporation from time to time as long as the above amount of five hundred shares is not exceeded and the corporation has in its treasury authorized Class A common capital stock not distributed. Such stock may also be purchased from • other individuals, corporations, estates, trusts, companies or partnerships; provided, the amount purchased shall not exceed five hundred shares in the aggregate. If such 35 WADC BY-LAWS ClassA- {Continued} individual, corporation, estate, trust, company or partnership holds in the aggregate more than five huridred shares, it shall be required to turn in the excess of five hun- dred shares to the corporation and to receive back therefor in exchange Class $ com- mon stock on a share for share basis. QlAAj B- An individual, corporation, estate or trust, company or partnership, shall not be limited as to holdings or purchases in Class B common capital stock and shall be entitled to purchase the same from the corporation from time to time so long as the latter has in its treasury authorized Class B common capital stock not distributed. Such stock may also be purchased from other individuals, corporations, estate, trusts, companies or partnerships. Class B common capital stock shall be non-voting. None of the earnings of the corporation shall accrue to or be paid to the stock- holders of common capital stock as dividends or profits. ,ARTICLE = - TRANSFER OF STOCK Shares of Common Capital Stock Class A or Class B may be transferred by de- livery of the certificate accompanied either by an assignment in writing on the back of the certificate or by a written power of attorney to sell, assign, and transfer the same on the books of this Corporation, signed by the person appearing by the certificate to . be the owner of the shares thereby and shall be transferable on the books of the Cor- poration upon surrender thereof as assigned or endorsed. It shall be the duty of every Stockholder to notify this Corporation of the Stock- holder's correct mailing address. ARTICLE KX - TRANSFER BOOKS The Stock Register Books of the stock of this Corporation may be closed for such period from time to time in anticipation of stockholders meetings as the Execu- tive Committee from time to time may determine. ARTICLE Mg - LO§$ OF-ERTIFICATE In case of loss, mutilation, or destruction of a certificate of stock, a duplicate certificate may be issued upon such terms consistent with the laws of the Common- wealth of Massachusetts as the Executive Committee shall prescribe. ARTICLE XM__ - Q=MITTEES The Executive Committee may appoint from their number or frown the Stockholders other Committees from time to time. The powers conferred upon the same to be deter- mined by the vote of the Executive Committee. • 36 WADC BY-LAWS ARTICLE XKIII - NOMINATION OF F E The President shall, with the approval of the Executive Committee, and from among the stockholders, appoint a Nominating Committee consisting of five members. The Nominating Committee shall nominate a proposed slate of Officers and Directors for election at the next Annual Meeting of the Stockholders. The names of those so nominated shall be sent to each Stockholder with the notice of the Annual Meeting. Additional candidates for office may be nominated from the floor at the Annual Meeting. ARC =V - &HEN,_,D These By-Laws may be amended, added to, altered, or repealed in full cc in part, at any Annual or Special Meeting of the Stockholders provided written notice, setting forth substantially the proposed changes, shall have been filed with the Clerk at least thirty days before such meeting, and a printed copy thereof sent to each Stockholder at least ten days before such meeting. Then, if a majority of the stock represented and voting in person or by proxy shall vote in favor of the proposed changes, the same shall be adopted. The Clerk shall not be required to give the necessary notice to the Stockhol- ders of a proposed amendment, repeal or other change in these By-Laws unless the same shall have received the written endorsement of either the President, the First Vice-President, the Executive Committee or the holders of one-twentieth (1/20) of the outstanding voting capital stock at the time such proposed amendment, repeal or other change is submitted to the Clerk. ARTICLE M - 12IASOLUTION This Corporation shall dissolve at such time and, in such manner as is set forth In the Corporate Charter contained in Chapter 192 of the Acts passed by the General Court of Massachusetts for the year 1960. 37 THE COMMONWEALTH OF MASSACHUSETTS . ERNEST A. LUCCI Commissioner of Commerce Federal Identification Leverett Saltonstall Office Building No. 04-6057343 Boston, Mass. and MICHAEL JOSEPH CONNOLLY Secretary of the Commonwealth State House, Boston, Mass. ARTICLES OF AMENDMENT Section 9 of Chapter 192 of the Acts of 1960 This certificate is being submitted for approval to the Commissioner of Commerce within thirty days of the vote of the stockholders adopting the amendment, and thereupon, after such approval is certified and endorsed hereon, these articles of amendment shall be fled in the Office of the Secretary of the Commonwealth, all as prescribed by Section 9 of Chapter 192 of the Acts of 1960. We, the undersigned, being the duly elected President, Treasurer and majority of the Directors of SPRINGFIELD AREA DEVELOPMENT CORPORATION created by Chapter 192 of the Acts of 1960 and located at 1500 Main Street, Springfield. Mass. 01115. do hereby certify that the following amendments to the Charter of the corporation were duly adopted at a meeting of the stockholders held on Monday, March 30, 1981, by vote of 2051 shares of Class A common capital stock out of 2065 shares of said Glass A common capital stock outstanding 38 being more than two-thirds of all stock entitled to vote thereon. 1. That the name of the corporation be changed to WESTMASS AREA DEVELOPMENT CORPORATION and to this end, that the second paragraph of Section 2 of Chapter 192 of the Acts of 1960, as enacted, be stricken and in puce thereof the following paragraph be inserted: "Corporation, " the Westmass Area Development Corporation created by Section Three of this Act and, that reference to "Springfield Area Development Corporation" .in Section 3 of said Chapter 192 of the Acts of 1960, as enacted. be stricken and that the words "Westmass Area Development Corporation" be inserted in place thereof. 2. That the Board of Directors of the corporation be increased to not more than twenty-seven (27) members, and to this end, that the word "fifteen" as appearing in the first paragraph of Section 10 of Chapter 192 of the Acts of 1960, as enacted, be stricken, and in place thereof be inserted the word "twenty-seven"; 3. That the period of duration of the corporation be increased to one hundred years, and to this end, that the word "fifty" appearing in Section 16 of Chapter 192 of the Acts of 1960, as enacted, be stricken, and in place thereof be inserted the word "one hundred".. 39 The foregoing charter amendments shall take effect when the Secretary of the Commonwealth. following approval hereof by the Commissioner of Commerce, certified and endorsed hereon, shall cause these Articles of Amendment to be filed in his office pursuant to Section 9 of Chapter 192 of the Acts of 1960 and Chapter 155, Section 10 of the General Laws. IN WITNESS WEE REQF AND UNDE R THE PENALTIES 4F PE RJURY, we have hereto signed our names this 2 7 th day of April 1981. Herbert P. Almi n. Prbsident Wulian% A. Jals, Treasurer Majority of Directors* * � t r 5 1 ice e i 40 9 E CEIVED Jl, N _ 5 1981 "I find that these Articles of Amendment, which were timely submitted to the Commissioner of Commerce, con- ,CRETARy OF STATE form to the requirements of Chapter 192 of the Acts of RPORATION DIVISION 1960 and I hereby approve the same." ate rnest . Lucci Acting Commissioner Tilli C 0 ,6,'!•9ti]NAPE}`UTH OF NoNSISSA4104WS'i tS ,kWaCLES 01- AlP,feAEW.MliT Corporation Created by Special C3laxter Chap ter 192, Acts of 1960 I Kc.-rehy oFprwe iho wi:s;n artkies of �r ndmani and, th a fling tee to the amount of $ hunting been paid. said :ti CY a,= T- hv!n been tiled with me this Jey of UMI& 19 $�� * No fee required 1I ICI IAI:L JOSE_1'Ii CONNOLL,Y t�''•htrl.,�Slafc `TO stv, FILLED IN BY CORKIRATIOND ' ..�. t J %.:jJ Y Or AiaLt�Ujvu. i i 40, at 's iV i. Philip A. Brooks, Esq. ACt6biiy foi'SAW.... ....... ....... ... Brooks, Mulcahy & Sanborn Third'if-RaBiliv Sank.faimaing' ......Springfield,..... 41143.................. Telephone .......................................... Copy Mailed 41 WESTMASS AREA DEVELOPMENT CORPORATION BOARD OF DIRECTORS 1981-1982 PRESIDENT. . . . . . . . . . . . . HERBERT P . ALMGREN EXECUTIVE VICE PRESIDENT. . . . . . . . . . . . . . . .. . . .GORDON N. OAKES, Jr. FIRST VICE PRESIDENT. . . . . . . . . . . . . . . . . . . . . . . . CLARK E. GOEBEL SECOND VICE PRESIDENT . . . . . . . . . . . . . . . . . . . . . LAWRENCE H. SHAY SECOND VICE PRESIDENT . . . . . . . . . . . . . . . . . . . . . ROGER WHITEHILL TREASURER , . . . WILLIAM A. JAMES CLERK. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .DONALD A. BINNS OFFICERS HERBERT P. ALMGREN, Chrmn. of Board ROGER WHITBHML, General Manager Shawmut First Bank & Trust Company Bay State Gas Company 127 State Street 2025 Roosevelt Avenue Springfield, MA 01103 (737-4321) Springfield, MA 01101 (781-9200) GORDON N. OAKES, Jr. WILLIAM A. JAMES, President President/Chief Executive Officer Springfield Institution for Savings BayBank Valley Trust Company 35 Willow St. , P. O. Box 3034 1500 Main Street Springfield, MA 01101 (781-8000) Springfield, MA 01115 (781-7575) DONALD A. BINNS, C.1.D. CLARK E. GOEBEL, Vice President Vice President, Area & Economic Devel. Real Estate & Mortgages Greater Springfield Chamber of Commerce Monarch Life Insurance Company 1500 Main Street, Suite 600 1250 State Street Springfield, MA 01115 (734-5671) Springfield, MA 01133 (785-5811) LAWRENCE H. SHAY, V.P./Chief Adm. Officer Northeast Utilities , Western Mass . Region 174 Brush Hill Avenue West Springfield, MA 01089 (785-5871) DIRECTORS 1982 JOHN W. FRIDLINGTON, Vice President WILLIAM C. GILES, Jr. Commercial Loan Department Chairman of the Board BayBank Valley Trust Company Monarch Life Insurance Company 1500 Main Street 1250 State Street Springfield, MA 01115 (781-7575) Springfield, MA 01133 (785-5811) RICHARD C. GARVEY, Editor RONNIE PAYNE, Plant Manager Springfield Daily News Digital Equipment Corporation 1860 Main Street, P. O. Box 2499 1 Federal Street Springfield, MA 01101 (788-1311) Springfield, MA 01105 (788-7211) WESTMASS AREA DEVELOPMENT CORPORATION 42 1982 (continued) ROY A. SCOTT, President PAUL WINSLOW, District Manager Community Savings Bank International Ladies' Garment Workers' 200 Main Street Union Holyoke, MA 01040 (536-7220) 133 State Street Springfield, MA 01103 (732-3940) JOHN H. SOUTHWORTH, President Southworth Company 1984 Front Street West Springfield, MA 01089 (732-5141) WALLACE M. BURNETT, President Security National Bank ALBERT E. STEIGER, Jr. , President 1666 Main Street - P. O. Box 1489 Albert Steiger Company Springfield, MA 01101 (739-7201) 1477 Main Street, P. O. Box 585 Springfield, MA 01101 (781-4211) WILLIAM A. FRANKS, Jr. , Chrmn. of board Park West Bank & Trust Company 1983 11 Central Street West Springfield, MA 01089 (781-7500) JOHN J. BENOIT Commissioner of Community Development CORNELIUS D. HARRINGTON, Jr. , Pres . City of Springfield Third National Bank of Hampden Count;- Municipal Building 1391 Main Street - P. O. Box 711 36 Court Street Springfield , MA 01101 (733-1141) Springfield, MA 01103 (787-6109) GREGORY R. LENOX, Senior Vice President JOSEPH F. DILK, President Real Estate Division Connecticut Valley Artesian Well Co. , Inc. Massachusetts Mutual Life Insurance Go. 138 Shaker Road 1295 State Street East Longmeadow, MA 01028 (525-7656) Springfield, MA 01111 (788-8411) HENRY J. FULLER, Jr. VICTOR E. QUILLARD, President Vice President - General Manager Hampden Savings Bank American Bosch 19 Harrison Avenue - P. O. Box 2048 3664 Main Street Springfield, MA 01101 (736-1812) Springfield, MA 01107 (781-2200) LEONARD A. WILSON, President RICHARD E. HICKEY Shawmut First Bank & Trust Company Vice President of Investments 127 State Street Monarch Life Insurance Company Springfield, MA 01103 (737-4321) 1250 State Street Springfield, MA 01133 (785-5811) STEERING COMMITTEE DONALD J. MEADOR, President HERBERT P. ALMGREN 737-4321 Titeflex Div. , Atlas Corp. WILLIAM A. PRANKS, Jr. 781-7500 603 Hendee Street CLARK E. GOEBEL 785-5811 Springfield, MA 01104 (739-5631) CORNELIUS J. HARRINGTON 733-1141 JOHN W. O'DONNELL WILLIAM A. JAMES 781-8000 President - General Manager GORDON N. OAKES, Jr. 781-7575 Milton Bradley Company LAWRENCE H. SHAY 785-5871 443 Shaker Road JOHN H. SOUTHWORTH 732-5141 East Longmeadow, MA 01028 (525-6411) ROGER WHITEHILL 781-9200 7/7/81/50/fs 43 PROTECTIVE RESTRICTIONS FOR WEST SPRINGFIELD INDUSTRIAL PARK SECTION 1. IMPOSITION AND PURPOSE The premises herein described are conveyed subject to the following covenants, conditions and restrictions (hereinafter called "Protective Restrictions" ) which shall run with the land and be binding upon the grantee herein (which term shall include all grantees to whom this conveyance is made) and grantee 's heirs, successors and assigns. The purpose of these Protective Restrictions is to insure that the premises herein conveyed and the other lands within the common scheme of these Protective Restrictions, as hereinafter described, shall be developed for industrial, manufacturing, research and other similar uses in an attractive and durable manner; that such development shall be well and neatly maintained; and that such development shall occur under provisions which will promote its compatibility with other adjacent developments in the area to be benefited by these Protective Restrictions. SECTION 2. SCOPE A. TERM. These Protective Restrictions shall run with the land herein conveyed and be binding thereon for the period of time up to and including October 1, 2007 , unless extended as= hereinafter provided. • B. COMMON SCHEME. SPRINGFIELD AREA DEVELOPMENT CORPORATION, a Massachusetts corporation created under Chapter 192 of the Acts of 1960 of the Massachusetts General Court (hereinafter called "SADC" for purposes of these Protective Restrictions) , does hereby declare its intention, pursuant to a common scheme, to impose similar Protective Restrictions upon all of the land owned by it in the Town of West Springfield and the City of Holyoke, both in Hampden County, Massa- chusetts, acquired by it under deed dated August 26 , 1977, from Bradford R. Collins, Wilfrid Bourque and Raymond W. Gamble, co-partners of the Bradford Company, and Park West Bank and Trust Company and Ronald B. Collins as co-trustees of the Bradford R. Collins Irrevocable Trust, recorded in Hampden County Registry of Deeds in Book 4473, Page 250, excepting therefrom so much of said land as has already been con- veyed by SADC to William P. Heffernan and Paul. S. Doherty, co-trustees of Heffernan Realty Trust, by deed dated September 15 , 1977, and recorded in Hampden County Registry of Deeds in Book , Page , and also excepting, at the option of SADC , so much of said land as may be reserved, used or granted for public ways, public easements, easements for railroads or public utility lines and drainage easements (said land, excluding the foregoing exceptions, being hereinafter referred to as the "SADC Benefited Land") . SADC will impose these Protective Restrictions upon each parcel or subdivision of the SADC Benefited Land at the time of conveyance by SADC. i 44 C. BENEFITED LAND: In addition to the SADC Benefited Land as defined above, the land to be benefited by these Protective Restrictions shall also include any land adjoining any portion of the SADC Benefited Land or land forming a subdivision of a larger parcel of land which does so adjoin whenever restrictions substantially similar to these Protective Restrictions have been imposed on such land. For purposes hereof, land shall be deemed adjoining if separated by only a public or private way or a railroad or utility right of way: SECTION 3. APPLICATION OF TOWN OF WEST SPRINGFIELD ZONING BY-LAWS The provisions of the August 7, 1977, edition of the Town of West Springfield Zoning By-Laws as they apply to the SADC Benefited Land are hereby incorporated into and form a part of these Protective Restrictions as if set forth herein in their entirety, regardless, of any repeal, amendment or addition made to said By-Laws after August 7, 1977, with the following exceptions only: A. Any amendment or addition to said By-Laws after August 7, 1977, which shall be more restrictive than the provisions contained therein on August 7, 1977, shall be controlling as required by law. B. The minimum size of any parcel or lot of land, excepting any land which is added to an adjacent parcel or lot under common ownership, shall be governed by the provisions of Section 4 (G) hereof rather than the provisions of the August 7, 1977, edition of the Town of West Springfield Zoning By-Laws, unless the applicable Zoning . By-Laws at the time of conveyance require a larger minimum lot size. C. With respect to any Benefited Land located within the City of Holyoke the Zoning By-Laws of that city as they shall lawfully apply to such land are more restrictive than these Protective Restric- tions and the August 7, 1977, edition of the Town of West Springfield Zoning By-Laws as aforesaid, shall prevail, but otherwise, these Pro- tective Restrictions and the August 7, 1977, edition of the Town of West Springfield Zoning By-Laws, modified as in B above, shall apply to such Benefited Land. SECTION 4. ADDITIONAL PROHIBITIONS AND REQUIREMENTS In addition to the prohibitions and requirements incorporated herein by operation of Section 3 above, and by way of further limiting the use of the premises granted herein, the following restrictions shall apply: A. PROHIBITED ACTIVITIES. i. Asphalt manufacturing or refining. ii. Building material manufacturing and distribution where outside storage or manufacturing operations are required. iii. Commercial coal yard or outside storage of said products. 45 iv. Creosote manufacturing. v. Distillation of coal, wood or bones. vi. Fertilizer or potash manufacturing or refining. vii. Gypsum, cement, plaster or plaster of Paris manufacturing. viii. Tar roof manufacturing. ix. Storage, sale of motor vehicles , trailers or other vehicles. B. OUTSIDE STORAGE. There shall be no outside storage of materials except where such storage is accessory to the principal use of the main facility. In all cases materials stored outside shall be adequately screened from view with an opaque fence not to exceed six feet in height and to be constructed of durable materials. At no time shall the materials stored within the fence be greater in height than the fence itself. The outside perimeter of the fence shall be suitably landscaped with shrubs or trees. C. SIGNS. i. There shall be no illuminated flashing, animated or intermittent signs. ii. There shall be no freestanding signs except directional or entrance signs not exceeding four square feet in size. iii. There shall be no rooftop mounted signs or signs extending above the roof level. iv. There shall be no neon or other exposed illuminary bulb signs. D. PARKING. There shall be no employee parking on the side of a bu�.ld'dii-ng facing the street, or in the case of a corner lot, on the front or main entrance side of a building. E. LOADING AND UNLOADING. Adequate area shall be maintained on the granted premises For all load-i-rlg and unloading which is part of or incidental to the activities conducted thereon so that such loading or unloading shall be done with parking completely off any public way. There shall be no loading or unloading of vehicles, nor any docks or doors for said purpose, located on the side of a building facing a street, or in the case of a corner lot, on the front or main entrance side of a building. F. SET BACKS. The minimum depth of yards as defined in the West Springfield Zoning Ordinances shall be as follows : Front yard - 50 feet Side yard - 45 feet Rear yard - 45 feet 46 G. MINIMUM LOT SIZE. Except where a larger minimum lot size is required by applicable zoning ordinances, no subdivision of the granted premises shall be permitted which would leave any parcel thereof with an area of less than 75 ,000 square feet except that, where permitted by applicable zoning by-laws, a smaller parcel may be conveyed to an adjoining parcel owner to be added to and form a part of said adjoining parcel in common ownership and for a common use. 'In the event of any subdivision of the granted premises, these Protective Restrictions shall run with each separate parcel of land created by the subdivision. Each provision hereof shall be applicable to each such parcel except that, where a parcel is conveyed to an adjacent parcel owner to be held under common ownership and for com- mon use with said adjacent parcel, these Protective Restrictions shall apply to the resulting combined parcel of said owner so long as the adjacent parcel is already subject to these Protective Restrictions at the time the additional parcel is conveyed. H. BUILDINGS. All buildings, additions and alterations on the granted premises shall be of substantial design, materials and construction according to accepted practices of the building construc- tion industry at the time of such construction, it being the intention hereof to exclude construction of buildings having a useful life of less than thirty-five (35) years. The side of any building facing on a street, whether said street be actually constructed or proposed, shall be of suitable architectural materials and aesthetic appearances as determined by SADC. SECTION 5. REPURCHASE OPTION: LAND NOT DEVELOPED WITHIN THREE YEARS FROM SALE If, within three (3) years following the executiion and delivery of the deed to these premises from SADC to its grantee, said grantee or its successors and assigns shall not have completed, on some part of the granted premises, construction of a building in conformity with these Protective Restrictions, SADC shall have the option to repurchase the granted premises at a purchase price payable in cash equal to the sale price originally paid to SADC for said premises with no addition to said price on account of the value of any partially completed building or other improvement to the premises or on account of any costs or expenses paid or incurred since the date of the original sale by SADC. Such option shall be exercisable within a period of ninety (90) days following the expiration of said three-year period by notice in writing to the then record owner or owners of these premises addressed to said premises or other known address of said owner or owners, and by filing in the Registry District of Hampden County an affidavit of such notice containing a copy thereof. Upon the exercise of this option, SADC shall be entitled on the date thirty (30) days following such exercise to a conveyance of these premises from the then owner or owners thereof, free of all liens or encumbrances , except those existing on the date of the first conveyance by SADC to its grantee, and it shall be the obligation of the then record owner or owners of these premises to discharge and satisfy any mortgages or liens thereon. If, however, a bona fide mortgage with fo any recognized lending institution is outstanding at the time of such reconveyances, on the exercise of this option, and it is not satisfied . 47 and discharged at or prior to the close of such transaction of reconveyance, then SADC shall acquire these premises subject to the lien of said mortgage and shall not be entitled to any discharge thereof, except in accordance with its terms and the terms of the note or notes which it secures; in such event, however, the amount of the debt then secured by such mortgage shall be deducted from the purchase price otherwise payable by SADC, and if the amount of such debt is in• excess of such price, then the conveyance shall be made without payment by SADC (but subject to said mortgage) , and the amount of such excess shall be an obligation due and owing to SADC from the record owner or owners of these premises. The repurchase option described in this section may be amended, modified or extended by written agreement between SADC and the owner of the premises, however, the same shall not be binding upon any other party without actual notice of such amendment, modifi- cation or extension unless said written agreement is recorded in the Hampden County Registry of Deeds. Any person may rely upon a writing signed by a purported officer of SADC declaring that SADC has waived its repurchase option under this section regardless of whether said writing is recorded in the Hampden County Registry of Deeds, unless the party shall have actual knowledge that said writing was not authentic. SECTION 6. REPURCHASE OPTION: UNIMPROVED LAND OFFERED FOR SALE If the owner of these premises (which term shall include any portion or subdivision thereof) which is not occupied by a building or buildings as herein defined wishes to sell the same or offer it for sale at any time while these Protective Restrictions are in force, he shall first offer said premises for sale to SADC in the following manner: A. Said premises shall be offered for sale in writing to SADC or its nominee at (1) the same price and terms at which it is to be offered for sale to others (or at which purchase offer is to be accepted) , or (2) at the price originally paid for said premises when first sold by SADC (or, in case of subdivision, a pro rats part thereof, based on relative land areas) , whichever of (1) or (2) is the lower price. B. SADC shall have a period of thirty (307 days within which to accept said offer, and acceptance shall be in writing and shall set forth a date for conveyance not more than twenty (20) days after such acceptance. C. If SADC shall not accept said offer to purchase, then the owner shall be free to sell said premises at a price equal to or exceeding the price at which it was so offered, but before making a sale at any lower price, or more than six (6) months following the last prior offer hereunder, said premises shall again be offered for sale to SADC in the manner hereinunder described. 48 D. Any of the time periods specified in this section may be amended to be shorter or longer in writing signed by SADC and the owner of the premises offering the same for sale, but such amendment shall not be binding upon any other party without actual notice thereof, unless said writing is recorded in the Hampden County Registry of Deeds. Any party may rely upon a writing signed by a purported officer of SADC indicating that SADC has elected not to exercise the option granted under this section, which election may be conditioned upon the sale of the property to a particular owner and/or the use of the property for a particular purpose, and such writing need not be recorded in the Hampden County Registry of Deeds. SECTION 7. ENFORCEMENT These Protective Restrictions may be enforced through appropriate legal or equitable proceedings by any owner of the interest of the land to be benefited hereby as defined in Section 2 (C) hereof. Where title to land subject to these Protective Restrictions is held in the name of more than one owner, each owner shall be jointly and severally liable for any non-compliance with these Protective Restrictions. For purposes of enforcement or liability for non-com- pliance, any tenant under a lease having an initial term of nineteen (19) years or more, or a lease which by exercise of options then has an unexpired term of fifteen (15) years or more , may be considered as the owner. Also, a receivor, assignee for the benefit of creditors or a trustee, including a trustee in bankruptcy, insofar as he shall have succeeded to the legal title to the premises, shall be considered as the owner thereof. SECTION 8. EXTENSION OF DURATION OF THESE PROTECTIVE RESTRICTIONS At any time within three (3) years before October 1, 2007, or within three (3) years prior to the expiration of any extended period, the then owners of the majority of the square feet of the Benefited Land which is subject to these Protective Restrictions may, by written declaration, duly signed and acknowledged and filed in the Land Court, Registry District of Hampden County, extend the time within which the foregoing Restrictions may be enforced for an additional period of not more than ten (10) years, and this right to so extend for additional periods of not more than ten (10) years shall exist so long as the then owners of the majority of square feet, as referred to above, desire to continue these Restrictions. SECTION 9. WAIVER OF RESTRICTIONS Under no circumstances can there be any waiver of compliance with these Protective Restrictions through failure to institute enforce- ment action or otherwise unless such waiver is reduced to writing, executed by SADC and all owners of the land to be benefited hereby and recorded in the Hampden County Registry of Deeds. 49 SECTION 10 . PROVISIONS SHALL BE SEPARABLE If any provision of this agreement is held to be invalid or unenforceable, all other provisions shall nevertheless remain in full force and effect.