TOWN 4F AGAWAM
CONSERVATION COMMISSION
36 MAIN ST-o AGAWAM, MA 01001
78�-o400, ext. 245
January 14, 2011
b
r~
Robert Levesque
R. Levesque Associates, Inc.
75 Broad Street, Suite C
P.O. Box 640
Westfield, MA 01085
Dear Mr. Levesque:
At its duly called meeting held on January-1.3, 2011, the Agawam Conservation
Commission voted to continue the public hearing for the Notice of Intent by Russo on
Garden Street for 30 days as requested.
If you have any questions, please contact this office at 786-0400, extension 245.
Sincerely,
-��'��//++I
r
Henry A. Kozloski, Chairm a
AGAWAM CONSERVATION COMMISSION
HAK:prk eA
br*�
Cc: T. Russo, Jr.
Town Clerk, File
o
r
v CA-/?7
_y
X-
. ern+ F f��riyy
Z�J lJ�
Massachusetts Department of Environmental Protection Provided by Mass
Bureau of Resource Protection -Wetlands 87-0576
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
Cityrrown
A. General Information
Important: Agawam _
When filling 1. From: Conservation Commission
out forms
on the 2. This issuance is for a. ®Order of Conditions b.❑Amended Order of Conditions
computer, (check one):
use only the
tab key to 3. To: Applicant:
move your
cursor-do Thomas Russo, Jr.
not use the a.First Name b.Last Name
return key. T. Russo Jr. Construction Co., Inc.
c.Organization
264 Suffield Street
d. Mailing Address
Agawam MA 01001
e.City/Town f.State g.Zip Code
4. Property Owner(if different from applicant):
same
a. First Name b.Last Name
c.Organization
d.Mailing Address
e.Cityfrown f.State g.Zip Code
5. Project Location:
Garden Street Agawam
a.Street Address b.Cityrrown
G8 113
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known: 42d3'm42"Ns 72d39'm19"Ws
d. Latitude e. Longitude
wparorm5.doc• rev.12123/09 Page 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDER
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c, 131, §40 eDEP Transaction#
Agawam
City/Town
A. General Information (cont.)
6. Property recorded at the Registry of Deeds for(attach additional information if more than
one parcel):
Hampden
a. County b.Certificate Number(if registered land)
358 114
C.Book d.Page
1/3/11 4/28111 4/28/11
7. Dates: a.Date Notice of Intent Filed b. Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references
as needed):
Site Grading, Drainage, Utilities and Erosion Control Plan (C-2)
Details Plan (D-4)
R.Levesque Associates Robert M. Levesque RLA, ASLA
b. Prepared By c_Signed and Stamped by
ALril_v, 2011 1" =20'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g. Date
B. Findings
9. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information
provided in this application and presented at the public hearing, this Commission finds that
the areas in which work is proposed is significant to the following interests of the Wetlands
Protection Act(the Act). Check all that apply:
a. ❑ Public Water Supply b. ❑ Land Containing Shellfish `' ® Prevention of
Pollution
d. ❑ Private Water Supply e. ❑ Fisheries f. ❑ Protection of
Wildlife
g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance
standards set forth in the wetlands regulations. This Commission orders that all work shall
be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent
that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, these conditions shall control,
wpaform5,doc- rev.12l =9 page 2 0112
1
Massachusetts Department of Environmental Protection Provided by MassDEP:
LlBureau of Resource Protection -Wetlands 87-0576
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
Cityfrown
B. Findings (cant.)
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth
in the wetland regulations. Therefore, work on this project may not go forward unless and
until a new Notice of Intent is submitted which provides measures which are adequate to
protect the interests of the Act, and a final Order of Conditions is issued. A description of
the performance standards which the proposed work cannot meet is attached to this
Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the
work, or the effect of the work on the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are
adequate to protect the Act's interests, and a final Order of Conditions is issued. A
description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ® Buffer Zone Impacts: Shortest distance between limit of project
a.linear feet
disturbance and Bank or Bordering Vegetated Wetland boundary (if
available)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linear feet b.linear feet c. linear feet d. linear feet
5. Bordering none none none none
Vegetated Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under
Waterbodies and a.square feet b.square feet c.square feet d.square feet
Waterways
e.cly dredged f.rly dredged
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet In.cubic feet
a. ❑ Isolated Land _
Subject to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
wpaforMEdoc• rev.12123M Page 3 of 12
Massachusetts Department of Environmental Protection Provided by MassDER
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
City/Town
B. Findings (coat.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
s. ® Riverfront Area none none
a,total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-
200 ft g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
10. ❑ Designated Port Indicate size under Land Under the Ocean, below
Areas
11. ❑ Land Under the
Ocean a_square feet b.square feet
c.cly dredged d. c/y dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes
below
13. ❑ Coastal Beaches cu yd cu yd_
a.square feet b.square feet c.nourishment d.nourishment
14. ❑ Coastal Dulles — cu yd cu yd
a.square feet b.square feet c.nourishment d.nourishment
15. ❑ Coastal Banks a.linear feet b. linear feet
is. ❑ Rocky Intertidal
Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt
Ponds a.square feet b.square feet
c.c/y dredged d.cly dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under
the Ocean, and/or inland Land Under Waterbodies and
Waterways, above
a.c/y dredged b.dy dredged
21. ❑ Land Subject to
Coastal Storm a.square feet b.square feet
Flowage
wpaform5.doc• rev.12/23/09 Page 4 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
LlBureau of Resource Protection - Wetlands 87-0576
WPA Form 5 — Order of Conditions MassDEPFile#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction#
Agawam
Cityrrown
B. Findings (cont.)
22. ❑ Restoration/Enhancement:
a.square feet of BVW b.square feet of salt marsh
23. ❑ Stream Crossing(s):
a.number of new stream crossings b. number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects.
1. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying
with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this
Order unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years,
but less than five years, from the date of issuance. If this Order is intended to be valid
for more than three years, the extension date and the special circumstances warranting
the extended time period are set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three
years each upon application to the issuing authority at least 30 days prior to the expiration
date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of
Conditions does not extend the issuance date of the original Final Order of Conditions and
the Order will expire on unless extended in writing by the Department.
7. Any till used in connection with this project shall be clean fill_Any fill shall contain no trash,
refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the
foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,
or if such an appeal has been taken, until all proceedings before the Department have
been completed.
wpaform5.doc• rev.12123M9 Page 5 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions ManDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam _
CityTTown
C. General Conditions Under Massachusetts Wetlands Protection Act (cant.)
9. No work shall be undertaken until the Order has become final and then has been recorded
in the Registry of Deeds or the Land Court for the district in which the land is located, within
the chain of title of the affected property. In the case of recorded land, the Final Order shall
also be noted in the Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of the registered land, the Final Order
shall also be noted on the Land Court Certificate of Title of the owner of the land upon
which the proposed work is done. The recording information shall be submitted to the
Conservation Commission on the form at the end of this Order, which form must be
stamped by the Registry of Deeds, prior to the commencement of work.
10. A sign shall be displayed at the site not less then two square feet or more than three
square feet in size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 87-0576
11. Where the Department of Environmental Protection is requested to issue a Superseding
Order, the Conservation Commission shall be a party to all agency proceedings and
hearings before MassDEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for
Certificate of Compliance(WPA Form 8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#12 above shall require the applicant to
inquire of the Conservation Commission in writing whether the change is significant enough
to require the filing of a new Notice of latent.
15. The Agent or members of the Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the area subject to this
Order at reasonable hours to evaluate compliance with the conditions stated in this Order,
and may require the submittal of any data deemed necessary by the Conservation
Commission or Department for that evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of
the property subject to this Order and to any contractor or other person performing work
conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated
Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be
marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall
be maintained until a Certificate of Compliance has been issued by the Conservation
Commission.
wpaform5.doc- rev-12123/09 Page 6 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
CitylTown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have
been fully stabilized with vegetation or other means. At no time shall sediments be
deposited in a wetland or water body. During construction, the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated
sediments as needed. The applicant shall immediately control any erosion problems that
occur at the site and shall also immediately notify the Conservation Commission, which
reserves the right to require additional erosion and/or damage prevention controls it may
deem necessary. Sedimentation barriers shall serve as the limit of work unless another
limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project") is (1) ❑ is not(2)®subject to the
Massachusetts Stormwater Standards. If the work is subject to the Stormwater
Standards,then the project is subject to the following conditions:
a) All work, including site preparation, land disturbance, construction and redevelopment,
shall be implemented in accordance with the construction period pollution prevention and
erosion and sedimentation control plan and, if applicable, the Stormwater Pollution
Prevention Plan required by the National Pollution Discharge Elimination System
Construction General Permit as required by Stormwater Condition 8. Construction period
erosion, sedimentation and pollution: control measures and best management practices
(BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs
unless and until a Registered Professional Engineer provides a Certification that:
i. all construction period BMPs have been removed or will be removed by a date certain
specified in the Certification. For any construction period BMPs intended to be converted
to post construction operation for stormwater attenuation, recharge, andlor treatment, the
conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that
the BMP has been properly cleaned or prepared for post construction operation, including
removal of all construction period sediment trapped in inlet and outlet control structures;
ii as-built final construction BMP plans are included, signed and stamped by a Registered
Professional Engineer, certifying the site is fully stabilized;
iii. any illicit discharges to the stormwater management system have been removed, as per
the requirements of Stormwater Standard 10;
iv, all post-construction stormwater BMPs are installed in accordance with the plans
(including all planting plans) approved by the issuing authority, and have been inspected to
ensure that they are not damaged and that they are in proper working condition;
v. any vegetation associated with post-construction BMPs is suitably established to
withstand erosion.
wpaform5.doc• rev.12123f09 Page 7 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
LlBureau of Resource Protection - Wetlands 87-0576
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
Cityffown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
c) The landowner is responsible for BMP maintenance until the issuing authority is
notified that another party has legally assumed responsibility for BMP maintenance. Prior
to requesting a Certificate of Compliance, or Partial Certificate of Compliance,the
responsible party(defined in General Condition 18(e)) shall execute and submit to the
issuing authority an Operation and Maintenance Compliance Statement("O&M Statement)
for the Stormwater BMPs identifying the party responsible for implementing the stormwater
BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the
O&M Plan is complete and will be implemented upon receipt of the Certificate of
Compliance, and 6.) the future responsible parties shall be notified in writing of their
ongoing legal responsibility to operate and maintain the stormwater management BMPs
and implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in
accordance with the long-term pollution prevention plan section of the approved
Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by
the National Pollution Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any
drainage easement, assumes responsibility for maintaining each BMP. To overcome this
presumption, the landowner of the property must submit to the issuing authority a legally
binding agreement of record, acceptable to the issuing authority, evidencing that another
entity has accepted responsibility for maintaining the BMP, and that the proposed
responsible party shall be treated as a permittee for purposes of implementing the
requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 18(f)through
18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate
of Compliance. In the case of stormwater BMPs that are serving more than one lot, the
legally binding agreement shall also identify the lots that will be serviced by the stormwater
BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding
agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance
with the design plans, the O&M Plan, and the requirements of the Massachusetts
Stormwater Handbook.
wpaform5-doe• rev.12/23M Page 8 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L, c. 131, §40 eDEPTransaction#
Agawam
Cityrrown
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3)consecutive
calendar years of inspections, repairs, maintenance and/or replacement of the
stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation
Commission ("Commission") upon request; and
3. Allow members and agents of the MassDEP and the Commission to enter and
inspect the site to evaluate and ensure that the responsible party is in compliance
with the requirements for each BMP established in the O&M Plan approved by the
issuing authority.
h) All sediment or other contaminants removed from stormwater iBMPs shall be disposed
of in accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04
are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be
changed without the prior written approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site
Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1,
Low Impact Development Site Design Credits) shall not be altered without the prior written
approval of the issuing authority.
1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld.
Any fencing constructed around stormwater BMPs shall include access gates and shall be
at least six inches above grade to allow for wildlife passage.
Special Conditions(if you need more space for additional conditions, please attach a text
document):
SEE ATTACHED SPECIAL CONDITIONS
wpaform5.doc• rev.12J2=9 Page 9 of 12
TOWN OF AGAWAM, MASSACHUSETTS
Ali CONSERVATION COMMISSION
ORDER OF CONDITIONS
Russo - Garden Street - #87-0576
20. This Order supersedes all previous Orders of Conditions issued for this work.
21. The Order of Conditions applies only to the work permitted by this Order. Any other
work to be done within the area of statutory interests of Wetlands Protection shall require
the filing of a new Notice of Intent or Request for Determination.
22. During the construction phase, the applicant shall be responsible for maintaining a copy
of these Orders at the site. The applicant shall be responsible for compliance with the
conditions of these Orders.
23. Prior to the start of construction, adequate erosion and sedimentation control measures
shall be implemented, and shall be maintained throughout the entire construction phase
and until the site has become stabilized with permanent vegetative cover.
24. The Commission shall be notified at least seventy-two hours prior to the start of
construction and after erosion control measures are in place to enable the Commission to
ensure compliance with these Orders.
25. The erosion and sedimentation barrier shall serve as the alteration limit line. Said barrier
shall fully protect the adjacent wetland/resource area, and no work shall be permitted
beyond this limit line. No machinery shall be operated beyond this limit line.
26. There shall be no discharge or spillage of oil, fuel, any petroleum product or any other
pollutant into any area of statutory interest.
27. At no time shall any construction materials, soils, fills, sediments,dredging or any other
substances be stockpiled or stored in any area of statutory interest.
28. The construction site shall be left in a stable condition at the close of each day. Erosion
and sedimentation controls shall be continuously monitored to ensure proper operation.
29. If any alteration of the wetland/resource area does occur, the Commission shall impose
such measures as it finds necessary to protect and restore the areas of statutory interest.
30. Whether from on-site or off-site, any fill used in connection with this project shall be
clean fill as described here:
The fill material shall be clean coarse washed sand or other clean granular material
essentially free of clay, fines, dust, organic matter, large stones, masonry, sturrips, frozen
clumps of earth,wood tree branches and waste material. Before the fill is put in place, all
trees, brush and stumps shall be removed from the area to be filled. Topsoil,peat and
other impervious materials shall be removed from all areas to be filled prior to the
placement of the fill material.
31. No creosote shall be used in any areas of statutory interests. An Environmental Impact
Statement of any alternative preservative shall be submitted to the Commission prior to
the start of construction phase.
32. All disturbed areas of statutory interest shall be stabilized with permanent vegetative
cover. After proper grading,the area shall be loamed with not less than four(4) inches of
good quality loam, seeded with a cover appropriate to the area, (and fertilized with an
organic 10-6-4 or equivalent dry fertilizer at the rate of fifteen(15)pounds per one
thousand feet). A mulch of hay, straw or bark of at least two (2) inches in depth shall be
placed on newly seeded areas and all slopes capable of eroding into the areas of statutory
interest.
33. Any stockpiles of soil are to be seeded or covered within twenty-one (21) days.
34. The slope at the rear of the site is to be hydra-seeded and a two-tiered erosion control is to
be placed on the slope as well as the erosion control blanket.
35. The Long-Term Stormwater Maintenance Program dated 4/28/11 and received by the
Commission on 4-28-11 is to be adhered to.
36. This parcel shall carry the following restrictions, and a covenant so noted on its deed:
"This lot contains certain areas or abuts areas protected by Chapter 131, Section 40 of the
General Laws of Massachusetts known as the Wetlands Protection Act and comes under
the jurisdiction of the Agawam Conservation Commission. No cutting of trees, clearing
of brush, digging, filling in with soil or debris, or the building of bridges is permitted
within one hundred (100) feet of the designated wetland areas or within 200' of any
designated river without specific approval granted by the Conservation Commission."
37. The Commission reserves the right to impose additional conditions on any or all portions
of this work to minimize the impact of potential site erosion or noticeable degradation of
water quality discharging from the site at any time.
38. Members and Agents of the Agawam Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the construction site to
evaluate compliance with the order and to require the submittal of any additional
information deemed necessary.
39. This order shall apply to all successor or assignee in interest or control of the subject
property. Any conveyance of interest or control in the subject property shall make
reference to this order by stating that the conveyance is subject to the provisions of an
Order of Conditions under the Wetlands Protection Act, M.G.L. Chapter 131, Section 40,
and by giving the book and page reference in the Hampden County Registry of Deeds
where this order is recorded.
40. The petitioner shall have recorded in the Hampden County Registry of Deeds an "Order
of Conditions Form" provided by this Commission. The Commission will not allow
work to begin until proof of recording is provided the Conservation Commission.
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 — Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
CityTrown
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ❑ No
2. The _ hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a
municipal ordinance or bylaw, specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
b. ❑ that the following additional conditions are necessary to comply with a municipal
ordinance or bylaw:
1.Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following
conditions and with the Notice of Intent referenced above. To the extent that the following
conditions modify or differ from the plans, specifications, or other proposals submitted with
the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need
more space for additional conditions, attach a text document):
wpowm5.doc•rev.i=3m Page 10 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEPFile#
` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam
Citylrown
E. Signatures
This Order is valid for three years, unless otherwise specified as a special 4-28-11
condition pursuant to General Conditions#4, from the date of issuance. 1.Date of Issuance
Please indicate the number of members who will sign this form.
This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electrons ,'and the property own ,if different
from applicant.
Signatures:
% —r IL _-,a +-- ,1 0 4.4-d
❑ by hand delivery on ® by certified mail, return receipt
requested, on
April 29, 2011
Date Date
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions. The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act(M.G.L, c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
wpaform5.doc- rev.121231D9 Page 11 of 12
LlMassachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands 87-0576
WPA Form 5 - Order of Conditions MassDEP File#
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction#
Agawam _
cityrrown
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the
district in which the land is located, within the chain of title of the affected property. In the case
of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the
name of the owner of the land subject to the Order. In the case of registered land, this Order
shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the
Order of Conditions. The recording information on this page shall be submitted to the
Conservation Commission listed below.
Agawam
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation
Commission.
To:
Agawam
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Garden Street 87-0576
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Hampden
County Book Page
for: Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaforrn5.don• rev.12123= Page 12 of 12
�USSopn vu C+4of 1
4
. - �r4
Ac1i
Massachusetts Department of Environmental Protection Provided by MassDE -
Bureau of Resource Protection- Wetlands MassDEP File#:087- 83
WPA Form 5-Order of Conditions eDEP Transaction#:428594
City/Town:AGAWAM
Massachusetts Wetlands Protection Act M.G.L.c, 131,§40
A. General Information
1.Conservation Commission AGAWAM
2.Issuance a. r OOC b.♦— Amended OOC
3.Applicant Details
a.First Name THOMAS b.Last Name RUSSO
c.Organization T RUSSO JR CONSTRUCTION CORP.
d.Mailing Address 204 SUFFIELD STREET
C.City/Town AGAWAM f.State MA g.Zip Code
4. Property Owner
a.First Name THOMAS b_Last Name RUSSO
c,Organization T RUSSO JR CONSTRUCTION CORP.
d.Mailing Address 204 SUFFIELD STREET
e.City/Town AGAWAM f.State MA g.Zip Code
5.Project Location
a.Street Address 232 GARDEN STREET
b.Cityflbwn AGAWAM c.Zip Code 01001
d.Assessors Map/Plat#G8 e.Parcel/Lot# 1/3
f Latitude 42.06194N g.Longitude 72.65181 W
6.Property recorded at the Registry of Deed for:
a.County b.Certificate c.Book d.Page
HAMPDEN 358 114
7.Dates
a.Date NOI Filed: 9/1/2011 b.Date Public Hearing Closed: 10/27/2011 c.Date Of Issuance: 10/27/2011
8.Final Approved Plans and Other Documents
a.Plan Title: b.Plan Prepared by: c.Plan Signed/Stamped by: d.Revised Final Date: e.Scale:
PROPOSED MAPLE
VIEW COMMONS,
G8 13 -PARCEL ROBERT M. GARY WEINER,PE 10-12-11
"A",232 GARDEN LEVESQUE,RLA
STREET,AGAWAM,
MA SITE PLANS
Page 1 of 9* ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection- Wetlands MassDEP File#:087-4583
WPA Form 5 - Order of Conditions eDEP Transaction#:428594
Massachusetts Wetlands Protection Act M.G.G. c. 131, §40 City/Iown:AGAWAM
B. Findings
1.Findings pursuant to the Massachusetts Wetlands Protection Act
Following the review of the the above-referenced Notice of Intent and based on the information provided in this application and
presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of
the Wetlands Protection Act.
Check all that apply:
a. 1— Public Water Supply b. r Land Containing Shellfish c.1✓ Prevention of Pollution
d. r Private Water Supply e. r Fisheries f. r Protection of Wildlife Habitat
g r Ground Wafer Supply h. I✓ Storm Damage Prevention i. (— Flood Control
2.Commission hereby finds the project,as proposed,is:
Approved subject to:
a. r The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.
This Commission orders that all work shall be performed in accordance with the Notice of hitent referenced above,the following
General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions modify or
differ from the plans,specifications,or other proposals submitted with the Notice of Intent,these conditions shall control.
Denied because:
b.rr The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations.Therefore,
work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are
adequate to protect interests of the Act,and a final Order of Conditions is issued_A description of the performance standards
which the proposed work cannot meet is attached to this Order.
c. F The information submitted by the applicant is not sufficient to describe the site,the work or the effect of the work on the interests
identified in the Wetlands Protection Act.Therefore,work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the
Act,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c).
3.r Buffer Zone Impacts:Shortest distance between limit of project disturbance and the wetland resource 0
area specified in 314CMR10.02(1)(a). a linear feet
Inland Resource Area Im pacts:(For Approvals Only):
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. F Bank
a.linear feet b.linear feet c.linear feet d.linear feet
5.I— Bordering Vegetated Wetland
a.square feet b.square feet c.square feet d.square feet
6. r Land under Waterbodies and Waterways
a.square feet b.square feet c.square feet d.square feet
Page 2 of 9* ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided byMassDEP:
`�-- Bureau of Resource Protection- Wetlands MassDEP File#:087-0583
WPA Form 5 - Order of Conditions eDEP Transaction#:428594
Massachusetts Wetlands Protection Act M,G.L.c. 131,§40 CAyfFown:AGAWAM
e.c/y dredged f.c/y dredged
T r Bordering Land Subject to Flooding
a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8.r Isolated Land Subject to Flooding
a square feet b.square feet
Cubic Feet Flood Storage
c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9.r-Riverfront Area
a.total sq.feet b.total sq.feet
Sq ft within 100 ft
c.square feet d,square feet e.square feet f.square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts:
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
10.r Designated Port Areas Indicate size under Land Under the Ocean,below
11.r-band Under the Ocean
a square feet b_square feet
c.c/y dredged d.c/y dredged
12.r Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13.r Coastal Beaches
a.square feet b.square feet c.c/y nourisluncnt d.c/y nourishment
14,r Coastal Dunes
a square feet b.square feet c.c/y nourishment d.c/y nourishment
15.r Coastal Banks
a.linear feet b.linear feet
16.r Rocky Intertidal Shores
a.square feet b.square feet
17.l—Salt Marshes
a.square feet b.square feet c.square feet d,square feet
18.r Land Under Salt Ponds
a.square feet b.square feet
c.c/y dredged d.c/y dredged
Page 3 of 9*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection -Wetlands MassDl P File#:087-0583
WPA Form 5 - Order of Conditions eDEP Transaction##:428594
Cityffown_AGAWAM
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
19.1—Land Containing Shellfish
a.square feet b.square feet c.square feet d.square feet
Indicate size under Coastal Banks,inland Bank,Land Under the
20.1—Fish Runs Ocean,and/or inland Land Under Waterbodies and Waterways,
above
c.c/y dredged d.c/y dredged
21.F Land Subject to Coastal Storm Flowage
a.square feet b.square feet
22.
r- Restoration/Enhancement(For Approvals Only)
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.5.c&d or B.17.c&d above,please entered the additional amount here.
a.square feet of BVW b.square feet of Salt Marsh
23_
r Streams Crossing(s)
If the project involves Stream Crossings,please enter the number of new stream crossings/number of replacement stream crossings.
a.number of new stream crossings b.number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects
1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures,shall be deemed
cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges;it does not authorize any injury to private property or
invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,
state,or local statutes,ordinances,bylaws,or regulations.
4. The work authorized hereunder shalt be completed within three years from the date of this Order unless either of the following
apply.
a.the work is a maintenance dredging project as provided for in the Act;or
b.the time for completion has been extended to a specified date more than three years,but less than five
years,from the date of issuance.If this Order is intended to be valid for more than three years,the
extension date and the special circumstances warranting the extended time period are set forth as a
special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the
issuing authority at least 30 days prior to the expiration date of the Order.
6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuance
date of the original Final Order of Conditions.
7. Any fill used in connection with this project shall be clean fill.Any fill shall contain no trash,refuse,rubbish or debris,including
but not limited to lumber,bricks,plaster,wire,lath,paper,cardboard,pipe,tires,ashes,refrigerators,motor vehicles,or parts of
any of the foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed,or if such an appeal has been taken,
Page 4 of 9* ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Ll
Bureau of Resource Protection- Wetlands MassDEP File#:087-0583
WPA Form S - Order of Conditions eDEP Transaction#:428594
Massachusetts Wetlands Protection Act M.G.L.c. 131, §40
Crtyffown:AGAWAM
until all proceedings before the Department have been completed.
9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located,within the chain of title of the affected property.In the case of recorded land,
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done.In the case of the registered land,the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds,
prior to the commencement of work_,
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
"Massachusetts Department of Environmental Protection"
[or'MassDEP"]
File Number:"087-0583"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DER
12. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance(WPA Form
8A)to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition#13 above shall require the applicant to inquire of the Conservation Commission
in writing whether the change is significant enough to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order,and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start ofwork,and if the project involves work adjacent to a Bordering Vegetated Wetland,the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging.Once in place,the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fiilly stabilized with vegetation or
other means.At no time shall sediments be deposited in a wetland or water body.During construction,the applicant or hislher
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the"Project")is(1) I— is not(2)ro subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards,then the project is subject to the following conditions;
a) All work,including site preparation,land disturbance,construction and redevelopment,shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and,if applicable,the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Pen-nit as required by Stormwater Standard 8.Construction period erosion,sedimentation and pollution control measures and
best management practices(BMPs)shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that:i.all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification.For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation,recharge;and/or treatment,the conversion is allowed by the MassDEP Stormwater
Page 5 of 9 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File#:087-0583
WPA Form 5 - Order of Conditions eDEP Transaction 4:428594
ti Massachusetts Wetlands Protection Act M.G.L.c. 131, §40 Cjty/Iown:AGAWAM
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures;W.as-built final construction
BMP plans are included,signed and stamped by a Registered Professional Engineer,certifying the site is fully stabilized;iii.
any illicit discharges to the stormwater management system have been removed,as per the requirements of Stormwater
Standard 10;iv. all post-construction stormwater BMPs are installed in accordance with the plans(including all planting
plans)approved by the issuing authority,and have been inspected to ensure that they are not damaged and that they are in
proper working condition;v. any vegetation associated with post-construction BMPs is suitably established to withstand
erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed
responsibility for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the
responsible party(defined in Genera[Condition 19(e))shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement("O&M Statement")for the Stormwater BMPs identifying the party responsible for
implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following:i.)the 0&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance,and ii,)the future responsible parties
shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution
prevention plan section of approved Stormwater Report and,if applicable,the Stormwater Pollution Prevention Plan
required by the National Pollutant Discharge Elimination System Multi-Sector General Permit.
e) Unless and until another party accepts responsibility,the landowner,or owner of any drainage easement,assumes
n-sponsibility for maintaining each BMP.To overcome this presumption,the landowner of the property must submit to the
issuing authority a legally binding agreement of record,acceptable to the issuing authority,evidencing that another entity has
accepted responsibility for maintaining the BMP,and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 19(t)through 19(k)with respect to that BMP.Any failure of the
proposed responsible party to implement the requirements of Conditions 19(t)through 19(k)with respect to that BMP shall
be a violation of the Order of Conditions or Certificate of Compliance.In the case of stormwater BMPs that are serving more
than one lot,the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs.A plan and
easement deed that grants the responsible parry access to perform the required operation and maintenance must be submitted
along with the legally binding agreement.
0 The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan,
and the requirements of the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1.Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections,repairs,
maintenance and/or replacement of the stormwater management system or any part thereof,and disposal(for disposal the
log shall indicate the type of material and the disposal location);
2.Make the maintenance log available to MassDEP and the Conservation Commission("Commission")upon request and
3.Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by
the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable
federal,state,and local laws and regulations.
r) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written
approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the
MassDEP Stormwater Handbook,Volume 3,Chapter.1,Low Impact Development Site Design Credits)shall not be altered
without the prior written approval of the issuing authority.
1) Access for maintenance,repair,and/or replacement of BMPs shall not be withheld.Any fencing constructed around
Page 6 of 9*ELECTRONIC COPY
TOWN OF AGAWAM, MASSACHUSETTS
CONSERVATION COMMISSION
ORDER OF CONDITIONS
#87-0583 - Garden Street- Russo
20. This Order supersedes all previous Orders of Conditions issued for this work.
21. The Order of Conditions applies only to the work permitted by this Order. Any other
work to be done within the area of statutory interests of Wetlands Protection shall require
the filing of a new Notice of Intent or Request for Determination.
22. During the construction phase, the applicant shall be responsible for maintaining a copy
of these Orders at the site. The applicant shall be responsible for compliance with the
conditions of these Orders.
23. In advance of any work on this project, the applicant shall contact the Conservation
Commission and arrange a conference between the Commission, contractor,
designer/engineer, and applicant. The purpose of this conference is to insure that all of
the Orders are understood. This conference shall take place at,a regularly scheduled
Commission meeting.
24. Prior to the start of construction, adequate erosion and sedimentation control measures
shall be implemented, and shall be maintained throughout the entire construction phase
and until the site has become stabilized with permanent vegetative cover.
25. The Commission shall be notified at least seventy-two hours prior to the start of
construction and after erosion control measures are in place to enable the Commission to
ensure compliance with these Orders.
26. The project engineer/designer shall be held responsible and accountable for the true and
accurate implementation and construction of his/her design or plan. Should any
accidental deviation from the approved plan occur, the engineer/designer shall notify the
Commission immediately to determine if a new Notice of Intent is required. If any
changes to the approved plan are anticipated, the engineer/designer shall likewise notify
the Commission to determine if a new Notice of Intent is required. In any case the
Commission may deny any deviation, accidental or intended, from the approved plan.
27. The erosion and sedimentation barrier shall serve as the alteration limit line. Said barrier
shall fully protect the adjacent wetland(resource area, and no work shall be.permitted
beyond this limit line. No machinery shall be operated beyond this limit line.
28. There shall be no discharge or spillage of oil, fuel, any petroleum product or any other
pollutant into any area of statutory interest.
29. At no time shall any construction materials, soils, fills, sediments, dredging or any other
substances be stockpiled or stored in any area of statutory interest.
34. All work within the area of statutory interest shall be performed so as to create minimum
disturbance to the existing vegetative cover and contours.
31. The construction site shall be left in a stable condition at the close of each day. Erosion
and sedimentation controls shall be continuously monitored to ensure proper operation.
32. If any alteration of the wetland/resource area does occur, the Commission shall impose
such measures as it finds necessary to protect and restore the areas of statutory interest.
33. Whether from on-site or off-site, any fill used in connection with this project shall be
clean fill as described here:
The fill material shall be clean coarse washed sand or other clean granular material
essentially free of clay,fines, dust, organic matter,large stones,masonry, stumps, frozen
clumps of earth, wood tree branches and waste material. Before the fill is put in place, all
trees, brush and stumps shall be removed from the area to be filled. Topsoil,peat and
other impervious materials shall be removed from all areas to be filled prior to the
placement of the fill material.
34. No creosote shall be used in any areas of statutory interests. An Environmental Impact
Statement of any alternative preservative shall be submitted to the Commission prior to
the start of construction phase.
35. All disturbed areas of statutory interest shall be stabilized with permanent vegetative
cover. After proper grading,the area shall be loamed with not less than four(4) inches of
good quality loam, seeded with a cover appropriate to the area, (and fertilized with an
organic 10-6-4 or equivalent dry fertilizer at the rate of fifteen(15)pounds per one
thousand feet) or equivalent. A mulch of hay, straw or bark of at least two (2) inches in
depth shall be placed on newly seeded areas and all slopes capable of eroding into the
areas of statutory interest.
36. Riprap specifications per plan.
37. Periodic maintenance/cleaning of the catch basins shall be conducted by the owner and all
successors in interest or control of the property. (All catch basins shall contain oil/grease
traps. These traps shall be cleaned routinely, but at least once every six months.) The
applicant,his successors or assignee, shall have the continuing responsibility of this
maintenance.
38. An as-built plan of the project shall be submitted to the Commission prior to the issuance
of the Certificate of Compliance.
39. This parcel shall carry the following restrictions, and a covenant so noted on its deed:
"This lot contains certain areas or abuts areas protected by Chapter 131, Section 40 of the
General Laws of Massachusetts known as the Wetlands Protection Act and comes under
the jurisdiction of the Agawam Conservation Commission. No cutting of trees,clearing
of brush, digging, filling in with soil or debris,or the building of bridges is permitted
within one hundred(100) feet of the designated wetland areas or within 200' of any
designated river without specific approval granted by the Conservation Commission."
40. The Commission reserves the right to impose additional conditions on any or all portions
of this work to minimize the impact of potential site erosion or noticeable degradation of
water quality discharging from the site at any time.
41. Members and Agents of the Agawam Conservation Commission and the Department of
Environmental Protection shall have the right to enter and inspect the construction site to
evaluate compliance with the order and to require the submittal of any additional
information deemed necessary.
42. This order shall apply to all successor or assignee in interest or control of the subject
property. Any conveyance of interest or control in the subject property shall make
reference to this order by stating that the conveyance is subject to the provisions of an
Order of Conditions under the Wetlands Protection Act, M.G.L. Chapter 131, Section 40,
and by giving the book and page reference in the Hampden County Registry of Deeds
where this order is recorded.
43. The petitioner shall have recorded in the Hampden County Registry of Deeds an "Order
of Conditions Form" provided by this Commission. The Commission will not allow
work to begin until proof of recording is provided the Conservation Commission.
44. Construction to be conducted as per Phasing Plan. Any deviation from Plan shall require
approval by the Conservation Commission.
Massachusetts Department of Environmental Protection Provided byMassDEP:
Bureau of Resource Protection- Wetlands MassDEP File 4:097-0583
WPA Form S - Order of Conditions eDEP Transaction#:428594
` !ti
Massachusetts Wetlands Protection Act M.G.L.c. 131,§40 Cityaown:AGAWAM
stormwater BMPs shall include access gates and shall be at least six'inches above grade to allow for wildlife passage.
Special Conditions:
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable?r Yes r No
2. The Conservation Commission herebycheck one that applies:
a. r DENIES the proposed work which cannot be conditioned to
meet the standards set forth in a municipal ordinance or bylaw
specifically:
1.Municipal Ordinance or Bylaw 2.Citation
Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides
measures which are adequate to meet these standards,and a final Order or Conditions is issued.Which are necessary to
comply with a municipal ordinance or bylaw:
b.
r- APPROVES the proposed work,subject to the following
additional conditions.
1.Municipal Ordinance or Bylaw 2.Citation
3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of
Intent referenced above.To the extent that the following conditions modify or differ from the plans,specifications,or other
proposals submitted with the Notice of Intent,the conditions shall control,
The special conditions relating to municipal ordinance or bylaw are as follows:
Page 7 of 9*ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands 7 ', �
LI
WPA Form 5 - Order of Conditions MassDEP File#
c. - . -"?,- C-/
-
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP ransaction#
cityq ri
E. Signatures
This Order is valid for three years, unless otherwise specified as a special
condition pursuant to General Conditions#4,from the date of issuance. 1.Date of Issuanoe
Please indicate the number of members who will sign this form.
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail(return receipt requested) or hand delivered to the applicant.A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatur
;i
❑ by hand delivery on VI by certified mail, return receipt
f
requested, on
bate Date
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the
land subject to this Order, or any ten residents of the city or town in which such land is located,
are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a
Superseding Order of Conditions, The request must be made by certified mail or hand delivery
to the Department, with the appropriate filing fee and a completed Request of Departmental
Action Fee Transmittal Form, as provided in 310 CMR 10,03(7)within ten business days from
the date of issuance of this Order. A copy of the request shall at the same time be sent by
certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is
not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal
will be required to demonstrate prior participation in the review of this project. Previous participation
in the permit proceeding means the submission of written information to the Conservation
Commission prior to the close of the public hearing, requesting a Superseding Order, or
providing written information to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being
appealed and how the Order does not contribute to the protection of the interests identified in
the Massachusetts Wetlands Protection Act (M.G.L. c. 131, §40), and is inconsistent with the
wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal
ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the
Department has no appellate jurisdiction.
%paform5.dor- rev.12l23M Page A 1 of 12
Massachusetts Department of Environmental Protection Provided by MassDEP:
,.;--- Bureau of Resource Protection- Wetlands
MassDEP File 4:087-0583
WPA Form S - Order of Conditions eDEP Transaction#:428594
CityfToun:AUAWAM
i Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected property.In the case of recorded land,the Final Order"I also be noted in the Registry's
Grantor Index under the name of the owner of the land subject to the Order.in the case of registered land,this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions.The recording information on
this page shall be submitted to the Conservation Commission listed below.
AGAWAM
Conservation Commission
Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission.
........................................ ................................................. ..
To:
AGAWAM
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
232 GARDEN STREET 087-0583
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of;
County Book Page
for.
Property Owner'rHOMAS RUSSO
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land,the instrument number identifying this transaction is:
Instrument Number
If registered land,the document number identifying this transaction is:
Document Number
Signature of Applicant Rev.411/2010
Page 9 of 9*ELECTRONIC COPY
F
Town Of f away ,t
1" }� 36 Main Street Agawam, Massachusetts 016b1"837
Tel. 413-786-0400 Fax 413-786-9927
FORM A
Application for Endorsement of Plan Not Believed to Require Approval
FILE ONE COMPLETED FORM WITH THE PLANNING BOARD AND ONE COPY WITH
THE TOWN CLERK IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 11-B
Agawam, MA _-Tu -ff 20_LQ
TO THE PLANNING BOARD:
The undersigned, believing that the accompanying plan of his property in the Town of
Agawam does not constitute a subdivision within the meaning of the Subdivision Control
Law, herewith submits said plan for a determination and endorsement that Planning
Board approval under the Subdivision Control Law is not required.
1. Name of Applicant
Address 2-04k --,- C JEF lE�cAJ ear , l&(,,ALy 1 4-, <!2-10 3 O
2. Name of Surveyor t-A N l L b S50 d�T1�5,
Address 6 nx /,A 0 W TLIELO L-4k� 610 k
3. Deed of Property Recorded in Hjkjk V tw 4oytt -N g=jz isT1z� tj/Z D)tffv-�
Book I Z? O _ Paged(®
4. Location of Property
5. Describe the proposal in this submission: �c�3 L-OT CSF-P
& ram -6T;1 PA-V.&V-L
ATTACHMENTS - Two originals and three copies of plan by certified land
surveyor. Filing e - $150. 0 plus $20.00 per lot.
Signature of O Address �'D