Loading...
8599_SITE PLAN - SIX FLAGS N.E. WATER PARK SHADE STRUCTURES.pdf• • Town of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 March 20, 2009 Six Flags New England. 1623 Main Street P.O. Box 307 Agawam, MA 01001-0307 Dear Mr. Litton: . Tel. 413-786-0400 Fax 413.-786-9927 .. 0 <0 :x :;;,. ::>:J N 0 x:.. :Jr en w At its duly called meeting held on ·MarchI9, 2009, the Agawam Planning. Board approved the Site Plan entitled "Six Flags New England Proposed Shade Structures, 1623 Main Streei, Agawam, Massachusetts", prepared by Vanasse Hangen Brustlin, Inc.' and dated 2/13/2008 with the following conditions: there shall be bonding for both the metal structure and the lockers; and the canvas fabric· is to be fire rated. If you have any questions, please contact this office at 786~0400, extension 283. Sincerely, Travis Ward, Chairman AGA W AM PLANNING BOARD . TW/DSD:prk cc: Building Inspector Eng. Dept. Town Clerk, File .. ;:: .. C G") :Jo. :r-~2 ~r l>' .3: C? ~. ;> -'" :. c.. " .., U'l r r 03/19/2009 12 :42 FAX 4138210631 •"" ~\ III 002/002' •• .~~' •..... ,' ~ . .., .......... ..~ E.' .1L.r~ ...... ~ . ... ~; ~ TOWN OF AGAWAM Department of Public Works . , '. :;...';~" ~ . ..... ~' .... : ~;.. ... ............--. ,,_:::t .~~ ,: I:" •.. ' .~. ,.". A.. ..... ,~,-:-.. ~~ ,,·.n~~·" To: cc: From: Date: Planning File Engineering March 19. 2009 1000 Suffield Street· Agawam, MA 01001 Tel (413) 8:zt-0600 • Fax (413) 821·0631 John P. Stone -Superintendent MEMORANDUM Subject: SP 306 (09..03): Six Flags Water Park Shade Structures Per your request, Engineering has reviewed the plan entitled, "Six Flags New England Proposed Shade Structures, 1623 Main Street, Agawam, MA; Prepared by: VHB, inc, Springfield, MA; Dated: February 13, 2009," and we approve the plans. Please do not hesitate to contact our division with any questions or comments. Sincerely, ~CCL~ iCtlaeIC:Chase, P.E. Town Engineer • AGAWAM OFFICE OF PLANNING & COMMUNITY DEVELOPMENT SITE PLAN REVI EW REVIEWER: D. Dachos DATE: March 12, 2009 DATE RECEIVED: 2/27/09 DISTRIBUTION DATE: 3/4/09 PLANNING BOARD MEETING DATE: 3/19/09 APPLICANT INFORMATION 1. Name of Business: Six Flags New England Address: 1623 Main Street, Agawam. Ma 2. Owner: Same Address: Same Telephone: 786-9300. ext. 3202 3. Engineer: Vanasse Hangen Brustlin. Inc. Fax: Address: One Federal Street. Building 103-3N. Springfield. MA 01105 Telephone: 747-7113 Fax: PLAN REVIEW Scale: 1" = 20' Date: February 13. 2009 Title Block (Street Address. Applicant's Name. Address. Scale. Name of Preparer of Plan): O.K. Description of Project: Proposed construction of shade structures to protect electronic lockers in water park. Site Plan Review Page 2 • e· Description of Site: Site is currently fully developed and is not in any resource areas regulated under the Wetlands Protection Act. Provision for Traffic Flow: Unchanged. Parking: Unchanged. Drainage: See Engineering comments. Public Utilities: Unchanged. Landscaping/Screening and Buffers: Unchanged. Sign Location: Not applicable. Exterior Lighting: Unchanged. Rendering or Elevations: O.K. Dumpster Location: Not applicable. Other Comments or Concerns: During a team meeting on this project, the Inspector of Buildings has requested that both the structure and the canvas have the necessary professional stamps and approvals and that there be lightning protection provided. ".~ .•. v Town of Agawam . 36 Main Street . Agawam, Massachusetts '()lOOl-1837 . Tel. 413-786-0400 Fax 413-786-9927 MEMO TO: Engineering Dept., Fire D<::pt., Police qept., ADA Committee FROM: Planning Board SUBJECT:. Site Plan -Six Flags New England -Water Park Shade Structures DA TE: . March 4, 2009 Please review and comment onthe attached Site Plan for Water Park Shade Structures at Six Flags New England prior to the Board's March 191h meeting. Thank you. DSD:prk Please note: this item will appear on the Team Meeting agenda for March 10.'h. 2009-Feb~25 10:32. AM VHB INe 4137470916 TransportatioR iLand Development Environmental • Services • • 111 • Febl1lalY 25, 2009 l;;tnas~e Hangen Hrustlin [ric. Ref: 1077(..00 Dominic Urhanih l3uildiilg Official Town of Agawam 1000 Sulfield Street Agawam, MA 111 001 J{c: Applieatiun for Site Plan Approval Six Flags New England "W.ter Park Shade Struotures" D~ar Mr. Urbanai: On February 1B, 2009, Von.sse H,mgen iJmstlin, Inc (VHB) .ubmittcd as Site Plan Approval rackage {or your review (OJ' Six Plags New F.ng~and, known ZlS "Water Park Sl'ldde Struclures". Since thi5 submiUnl, it has been brought to our attention that the areHS for a few of the shade struclUfes are inn;rrcctly listed on plan C-3. 11,. intent of this leUer is to provide the correct ar •• s for the affected shad. structures. Structure, #2 and #3 wer.labeled incorrectly. • Structure No.2 is 30' x 19' and is 570 sf in arca. • Strut.:.ture No.3 is 21' X 13' and is 273 sf in RIect. We apologi7.f:.' for this i.ncon·v~iencc. Please do not hesitate to call sho'uld you have questions or m~cd ndditiolU\l inf()1'mation. VeIY tl1l,ly yours, CC: Chuck Davis, SFNTI Onj ~dcraHtrcct t\uilding l03·3N 8 _ .. ~ C) ;:'R » = Q) i":: N 3: VI 3: ~ ;t> -.9 .z::- "-> Springlicld. MtIS~at:hu,~c~tL~ 0 110~ 413.747.7113 • FAX 41).747.0916 email: info@vhb.com www.vhh.t:lJIl1 :ol:: c,;) -0 rr] C""J ~ 0 2: . to. rr] ;0 <:: C'":l ,." U> Transportation Land Development Environmental • Services • • • • • • Imagination I Innoyatlon I energy Creating results for our clients and benefits for OUf communities February 18,2009 Ref: 10776.00 Dominic Urbaniti Building Official Town of Agawam 1000 Suffield Street Agawam, MA 01001 Re: Application for Site Plan Approval Six Flags New England "Water Park Shade Structures" Dear Mr. Urbaniti: _VanasseJiange.n....Brustlin,Jnc._ On behalf of our client, Six Flags New England, Vanasse Hangen Brustlin, Inc (VHB) submits for your review and use the following information as required by municipal regulation: • (lO)'<opies of Planning Board Form D, with attached narrative • (IO)-sets of project plans prepared by VHB, with attached reference drawings This application requests permission from the Town of Agawam to install new shade structures within the Water Park Area. Details of the shade structures are provided as reference drawings in the attached site plans. The project is located outside of jurisdictional area regulated by the Massachusetts Wetland Protection Act or Rivers Act, and the structures are lower that the maximum height allowed by zoning. . We respectfully request your review of the attached application and forwarding this application to the Planning Board for review at their next available meeting. Thank you for your assistance in this matter, and please do not hesitate to call should you have questions or need additional information. Very truly yours, CC: Chuck Davis, SFNE ~J:rr=l\n:D , INC. .. ". \l r.: . ,it' q 'Ii14 ·~r.ji,\v J\ q£ :\1::" a \ 9)3 bn~l ., t):lIl\'f3S "O\1~1clSh ; One Federal Street Building 103-3N M:\SLX FLAGS OIREOORY\2Q09\81 COYtr~lll'r·Tm\$.doc: Springfield, Massachusetts 01105 413.747.7113 • FA)( 413.747.0916 email: info®vhb.com www.vhb.com • • AGA WAM PLANNING BOARD FormD Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to: 1. 2, 3, Name of Business Address Agawam Building Department 1000 Suffield Street Agawam, MA 01001 Six Flags New England 1623 Main Street, Agawam, MA 01001 Name of Applicant/Owner Six Flags New England Address 1623 Main Street, Agawam, MA 01101 Telephone (413) 786·9300, ext, 3202 Name of Engineer! Architect Vanasse Hangen Brustlin, Inc, Address _______ --'O""n"'e..!.F""ed"'e"'ra"!I"'S""tre"'e"'t,"'B"'u"'ild'"in""g...,1",0",3·",3,-!N..." S""p",ri",ng""fi""el",d.." M",A"-"-01"",1,,,,,OS Telephone ______ -"(4""1""3)w7..:::4!";7·!.,.71w.1,,,.3 ---------- 4, Please give a brief description of the proposed project: See attached Project Narrative pn.;rlk.J"E D FEB 2 7 2009 • • Six Flags New England Description of Proposed Project in connection with Application for Site Plan Approval Water Park Shade Structures Six Flags New England ("Six Flags") is submitting an Application to the Town of Agawam for Site Plan Approval issued by the Agawam Planning Board. The Applicant is requesting permission to construct shade structures within the existing Water Park Area. The project is intended to provide an area of relief from the sun for park patrons experiencing the Water Park. No new amusement rides or attractions are proposed as part of th.is filing. The attached set of site plans provide details of the proposed improvements, which are generally described as follows: I) Installation of foundations for the shade structure frame work 2) Erection of the shade structure frame work and exterior covering 3) Performance of minor electrical work for lighting for the shade structures The area where the shade structures are to be constructed is previously developed. The area is also located outside of any resource areas regulated under the Wetlands Protection Act or the Massachusetts Rivers Protection Act. The structures are lower than the maximum structure height allowed by zoning. As such, we anticipate the only public approval required for this project to be received from the Agawam Planning Board. • / ~/ \ ... ... ~ u ) } 1 'j;;} \ I I I I I 60/Z/Z .• 100 \ r 'I ,", ~ "'-.) (f;~\ ~-t • Six Flags · New England CANOPY I 50' x 37' C:ANOPl' :I 30" s 19" C:A~OPl' 3 21" s 13" TOP VIEW AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD. SUITE 2~ CHERRY HILL. NJ 08034 800.227.4233 • • l'EIlSPECTIVt: v .. :w C/\NOPY I SIDE VIEW c::=~ '" SQ. STEEL TUBING y," RD. STEEL TUBING GENERAL NOTES & SPECIFICATIONS · This set of drawings is only intended to define the work that comprises the awning structure assembties for the site at: · All work shall comply with the latest edilion of the following standards or codes. · B.O.C.A. Current revision · American Institute for Steel Construction: 'Speafications for the design, fabrication, and erection of structural steel for building." 'Code of standard practice for steel buildings & bridges" · Industrial Fabrics Assoc. Int'I -"Awning Design Manual" · American Welding Soaety Structural Building Code AWS D1.1 B.2 · All supporting framework shall be made in such a manner as to develop the full strength of the members. · Anchorage of frame to structure shall be done by 3/B" X3 )\" lag screws into wood and 3/B" X 1}1" lag bolts with 5/8' shields into concrete. · The strudure has been loaded as follows: Live load 30 pounds/square foot norrnallN Wind load 30 pounds/square foot normal OUT · Fabric shall be Brite-Awn polyester coated vinyl. Weight: 16 ozisquare yard Width: 61'. Single sided color coded. Flame retardant. Califomia Fire Marshall Title 19/1273.2 and 1237B. NFPA 701. NFPAClass AUCB Class 1. 1" SQ. STEEL TUBING y," RD. STEEL TUBING TENSION BAR ... I 4 li'--.. 1/ '~/ .........,1/ ""'-.: 1/ ........., 1 .,;"I ........., l/n 11·~ --II 3" 0.0. STEEL POST -------~I I 37' - " TENSION BAR 00' ·~I FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD, SUITE 2~ CHERRY HILL, NJ 08034 800.227.4233 • • PllliSPIlCTlVIl VlllW ~.,"""OP" 2 SIDE VIEW C -~. 1" SQ. STEEL TUBING Yo" RD. STEEL TUBING TENSION BAR y I I 4 .~ l}-... 1/ ~./' '""-.. I ./' ~ 1/ '""-.. 1......-'""-.. I /n U II I b 3" O'1 'g;,EEL POST '!L I l=r 11' I viS 1 21S 1 21S 1 ?IS I Zly 1 ?IS 1 21$1 21$ I 21S 1 21S 1 21S 1 in 12" I k--3• 0.0. STEEL POST ]. "Ti-T~:rE~2J~[7ISl2I~~ TENSIONBAR 30' ------------------...... '-1 I GENERAL NOTES & SPECIFICATIONS · This sel of drawings is only inlended to define Ihe wor1< that comprises the awning structure assemblies for the site at: · All wor1< shall comply with the latest edilion of Ihe following slandards or codes. · B.O.C.A. Currenl revision · American Inslilule for Sleel Conslruclion: "Specificalions for the design. fabricalion, and erection of slructural sleel for building." "Code of slandard pracUce for sleel buildings & bridges" · Industrial FabricsAssoc.lnl'l· "Awning Design Manuar · American Welding Society Structural Building Code AWS 01 .1 8.2 · All supporting framewor1< shall be made in such a manner as 10 develop the full strenglh of Ihe members. · Anchorage of frame 10 slructure shall be done by 3/8" X3 Y,"lag screws inlo wood and 3/8" Xl)\" lag bolls with 5/8" shields inlo concrele. · The structure has been loaded as follows: FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING • • Uve load 30 pounds/square fool normal IN Wind load 30 pounds/square fool normal OUT AIR SHIELD AWNINGS & SIGNS · Fabric shall be Brile·Awn polyesler coaled vinyl. Weight 16 ozlsquare yard Widlh: 61". Single sided color coded. Flame relardant. Califomia Fire Marshall lille 19/1273.2 and 12378. NFPA 701 . NFPA Class AUCB Class 1. 219P BERLIN ROAD, SUITE 2~ CHERRY HILL, NJ 08034 800.227.4233 Plmspt;crIVt; VIEW C,'NOPY 3 SIDE VIEW c==~ '" sa. STEEL TUBING X' RD. STEEL TUBING 4' 1:----3" 0,0. STEEL POST GENERAL NOTES & SPECIFICATIONS · This set of drawings is only intended to define the work that comprises the awning structure assemblies for the site at: · All work shall comply with the latest edition of the following standards or codes. · B.O.CA Current revision · American Institute for Steel Construction: ·Specifications for the design, fabrication, and erection of structural steel lor building." ·Code of standard practice for steel buildings & bridges· · Industrial Fabrics Assoc. Inl'l-"Awning DeSign Manual" · American Welding Society Structural Building Code AWS 01.1 B.2 · All supporting framework shall be made in such a manner as to develop the full strength of the members. · Anchorage of frame to structure shall be done by 3/8" X3 Y,"lag screws into wood and 3/B" X 1y,"lag bolts with 51B" shields into concrete. · The structure has been loaded as follows: live load 30 pounds/square foot normaltN Wind load 30 pounds/square fool normat OUT · Fabric shall be Brite-Awn polyester coated vinyl. Weight: 16 ozlsquare yard Width: 61". Single sided color coded. Flame retardant. Califomia Fire Marshall litie 19/1273.2 and 1237B. NFPA 701. NFPAClass AUCB Class 1. 1" SQ. STEEL TUBING Y:." RD. STEEL TUBING TENSION BAR ... I 4 Ii'-... 1/ ............. "1/ """-.. 1 / ""'" 1/ .......... 1.,...-'1 .......... l/n " 11 3" 0'1' 3;EEL POST 'i I TENSION BAR 21' ~ll FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD, SUITE 2~ CHERRY HILL, NJ 08034 800.227.4233 • • + -.L Model Final Drawing '_6'_ "1 I I I Hounting Post [SCI to supply! Cement Pod Detoils: I.' Single ro~ lockers pod dil:lensions-4' high. 23' ~ide • length 01 lo~ker bon~. 2. 80ck to bock loc~ers-4' high x 36' ~ide • length of locker bonL 2012 24' -5-5/8' : g!iliL*~*13131313t~ Hi ,,, .. I I I I.............. h d Line I ~ Dos e ts Canopy I Represen t-.-, : ~ ~ r 44 I 3'-8-7/8"[ 4 4 22' -5-1/4' I 5 4 4 5 I 5 4 4 I 4 4 I 44 II (BUilding 18'-,. n J;I6' r-"-4' --I 4 4 I _.~~~~~~"~~~~~~~~~~~~~~~~~II 4 4 I r . 4 '4 I I 31'131'1'i' !J!!.3J31313i'1 3131313131313003131 3i'1 31 l ; : : ;;: ~ ___________________________ U 5 5 4 4 5 5 I 32' _ 3' ________ -'1 55 44 55 J ,-r--D I l I 3 65' [typical) 0' I ~ J ~----- ~ -66' ~"" [~'4'4 "" "" I .J. 3,:: 3,:: tt tt 1+ 1+ 1+ 1+ ~ ++ ++ +~ ~~ 3 ~~ ~~ ~~ ~~ 3 ~.~ ~~ ~.~ Pl'1>:l' 16'-I-I"" 1....-Concrete Expansion Joint 3 3 ..l 3 I 3 I I 24' minimum canopy overhang at got/Ie end of strudure. J )1 I 16'-1-112' 3 ; 1\ <\ 22 _ 5-1/4"f4f"4 '44 tt~ 3 ++ r,-rt ++ fili-i ++ ~~ 3,::3,:: ~~ i ++ ++ ++ ~+ ~ ~~ ~~ ~~ ~~ _rr.J '44 '4'4 144 '4-1-4' .-----r-."'" .... I rt r,-rt + r,-IT Tl "" I I f 3 44 li-rt fT-i-~fT 7· S' I i rr~ tti;!.;~ i;!.;\t lil:tL I I -i ~ C!:: t4r4 r' It'it' i41"'t' f'-. I ~ 77 rtrt 77 r.7 I '----1----1--35' Minimum canopy overhang. t J 3 TT ~ti-7T r.rr.r 6'-7" I (4) 3,:: 3,:: ~ 3,:: 1+ 1+ ~ r,-I ~..!... 1\ 1\ ~...!. 4 t-4 I!~ Concrete Expansion Joint line J[ 40'-2' (Distance to e~ponsjon joint) f 45'-3" [Canopy 'Iidill) INFa.,.,"'TtON CONTAI~~D ((:!!lfJf)11P7~~rrnn;r(}fID' RFID X. oin~ arcade Barcode AC Outlet Requirements S b I ~~~~T~SJX~~~~ECARIE. ;;Y/JuuUJiU (JU;;~\WU LL~ oniiQurotlon oors X olumns I. O".SI.~d~.dGru"dld ym 0 S INC. THIS DRAWING ()Q ANY 5 2 St t 8 5 2 Add' 24 t.E~ S-!5R Dup'u Outllt PART H£ROf. IS S' FIN E I 4'2Sor ers x ers Rcq"inciotlndinledlecotionJ. CONFtOENT[ALANOPROPERTY IX ogs ew ng and x torters 20 x2 Adders 80 1. Lader Slatter C~rr.nt Dr •• : llOV Do I AND IS NOT TO BE , . 3x2 Sfa~te~s 7 3xZ Adders 32 ~:~:='~/::;;. Starter Adder Olltle~ ex ~~~~~~D~\~~:'::~~·~· Water Park Locker Lacar Ion Total Sror,ers 3. BC!IDClcfQuteISllcutdb.lnllot!ld7a 00 CD CD DISCLOSED TOOTI-£R PlRTIE 1354 Ito_ Gtoun'. E WITHOUT TI-£ EXPRESSED SIZ LOCKER SIZE SCALE Oal.. REV~ Total Doors 4. A~tEle'ttj,al.or1'loCoepl, WRrnENCQNSENTOF THE 1 1 II 21 091A' .,tll Lo~ol Codn. O\o'NER. sMARTE CARTE. INC. A / / >-:- • • -.L Issued for: Municipal Review Date Issued: February 13, 2009 Latest Issue: February 13, 2009 , , ! Index i ' ! 1-> No. C-l C-2 C-3 ---- Sv-l Drawing Title Legend and General Notes Overall Plan Layout Plan Reference Drawings Existing Conditions Plan Reference Drawings (2) Latest Issue 2/13/2008 2113/2008 2113/2008 2113/2008 2113/2008 • IX ose rue ures 1623 Main Street Agawam, Massachusetts /-' AGAW ~" Site Location Map VHB Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services One Federal Street, Bulding 103-3N Springfield, Massachusetts 01105 413-747-71131 FAX 413-747-0916 o 1000 2000 Foet Property Information Owner: Premier Parks & Stuart Amusement Company 1623 Main Street P.O. Box 307 J\gawarn,Massachusetts J\pplicant: Six Flags New England 1623 Main Street P.O. Box 307 J\gawarn, Massachusetts Assessor's Plat: K3-3 Lot: 1 .P.:\.1.07.7_5_.00.\.C.Od_\.'d_\~p.'o_ns_e.t\.C_on_O.P~0.L_G._dW.9~ .................................................................................................................................................. ________ ............ __ .... __ .. ----...... ----.. --.. ----.. --.. --.. --............................................ --111111111111111 Exist. Prop. ---- 1 (;+(}::-i 10+00 ~.-.. -..... -... -.. .,.....~" -., .. --I ---------- ------~A~·-------- ----8B'LSF----- ----<lBZ:----- ---'--... NOZ----- ----2OO"RA----- BB = 8C " ---~ CG ,WiC • ... --~'.--.-~-"" .. ------ /'-', ~ .• :-;-.. __ •• _ •..• _ .. y-... _. -c--., -'---.'-~'--"'­... -.-_.--~~ .... --- ! ,-.-. l '.0,-: H • • • '.++++++-1 -)(-)(- --4-- -20- @ @ 0\\ SL 1111111111111 £1 6 6 ". Legend Exist. Prop. I "'" I :. -... : .... ;,~. .. -.", . CONCRETE PROPERTY LINt: i::;;P;:S'JJ HEAVY DUTY PAVEMENT ~ RIPRAP PROJECT UMIT LtlE RlCHT-OF-WAY/PROPERTY LINE EASEMENT __________ ~~~~~~ __ ~C=OO=S=TR=UClI_O_N _EN_TR_~ __ E ______ _ BUILDING SETBACK BASELINE CONSTRUClION lAYOUT ZONING LINE TOWN UNE UMIT or DISTURBANCE wrRAN[} llN[ WlH RAG flOODPLAIN BORDERING LAND SUBJECT TO flOODING WETLAND BUFFER ZONE NO DISTURB ZONE 200' RIVERFRONT AREA GRAVEL ROAD EDGE or PAVEMENT BITUMINWS BERM BITUMINOUS aJRB CONCRETE CURB ----- CURB AND GUTIER EXTRUDED CONCRETE CURB MONOll111IC CONCRETE CURB PRECAST CONC. CURB SLOPED GRAN. EDGING VERT. GRAN. CURB UMIT or CURB TYPE SAWaJT BUILDING BUilDING ENTRANCE LOADING DOCK BOLLARD DUMPSTER PAD SIGN DOUBLE SIGN STEEL GUARDRAIL WOOD GUARDRAil PAlH TREE LINE VIlRE FENCE FENCE STOCKADE FENCE STONE WALL RETAINING WALL STREAM / POND / WATER COURSE DETENTION BASIN HAY BALES SILT FENCE MINOR CONTOUR MAJOR CONTOUR PARI(JNG COUNT COMPACT PARKING STALLS DOUBLE YELLOW LINE STa' LINE CROSSWALK ACCESSIBLE CURB RAMP ACCESSIBUE PARKING VAN-ACCESSIBLE PARKING --·········uo -~. --- It'D ~~'.:~Xl' 12~S .--~-.. CAT'/··- ".> • ,", ,""' c ,/-. ".-. -:::.:' El 27.35 TCx 26,85 BCx 132.75 x 1,1,0 TWx 3&58W ~ ~ ,. MY! 102,50 x 12·S --- FM --- -OHW - -6·W- -~.fI'- -2·DW- --G-- --E-- -STM- TOP OF CURB ElEVA liON BOTTOM OF CURB ElEVA llON SPOT EUEVATION TOP & BOTTOM OF WALL ELEVATION BORING LOCA llON TEST PIT LOCA llON MONITORING WElL SPOT GRADE ON OECK UNDERDRAIN DRAIN ROOF DRAIN SEWER FORCE MAIN OVERHEAD WIRE WATER FIRE PROTECTION OOMESlIC WATER GAS ELECTRIC STEAM --T--TELEPHONE --FA-FIRE ALARM -CATV- l1li -.. • • cs @ '1/'1 @ TS' - .EMH EM 8 * .1Itlt IT] J. HH 8 PB III CABLE TV CATCH BASIN DOUBLE CATCH BASIN GUffiR INLET DRAIN MANHOLE TRENCH DRAIN PLUG OR CAP CLEANOUT FLARED END SECTION HEADWALL SEWER MANHOLE CURB STa' & BOX WATER VALVE .I: BOX TAPPING SLEEVE, VALVE & BOX SIAMESE CONNECllON FlRE HYDRANT WATER METER POST INDICA TOR VALVE WATER WELL GAS GATE GAS METER ELECTRIC MANHOLE ELECTRIC METER LIGHT POLE TELEPHONE MANHOLE TRANSFORMER PAD UTILITY POLE GUY POLE GUY WIRE & ANCHOR HAND HOLE PULL BOX xxxxxxxxxxxxxx · MATCHUNE REMOVE Abbreviations General ABAN ABANDON ACR ACCESSIBLE CURB RAMP ADJ ADJUST APPROX APPROXIMATE BIT BITUMINOUS BS BOTTOM OF SLOPE BWLL BROKEN WHITE LANE LINE CONC CONCRETE DYCL DOUBLE YELLOW CENTER LINE EL ELEVATION ELEV ELEVATION EXIST EXISTING FDN FOUNDATION FFE GRAN GTD LA LOD MAX MIN NIC NTS PERF PROP FIRST FLOOR ELEVATION GRANITE GRADE TO DRAIN LANDSCAPE AREA LIMIT OF DISTURBANCE MAXIMUM MINIMUM NOT IN CONTRACT NOT TO SCALE PERfORAl'ED PROPOSED REM REMOVE RET RETAIN R&D REMOVE AND DISPOSE R&R REMOVE AND RESET SWEL SOLID WHITE EDGE LINE SWLL SOLID WHITE LANE LINE TS TOP OF SLOPE TYP TYPICAL Utility CB CA TCH BASIN CMP CORRUGA TED METAL PIPE CO CLEANOUT DCB DOUBLE CATCH BASIN DMH DRAIN MANHOLE CIP CAST IRON PIPE COND CONDUIT DIP FES FM F&G F&C GI GT HDPE HH HW HYD INV 1= LP MES PWW PVC RCP R= DUCTILE IRON PIPE FLARED END SECTION FORCE MAIN FRAME AND GRATE fRAME AND COVER GUTTER INLET GREASE TRAP HIGH DENSITY POLYETHYLENE PIPE HANDHOLE HEADWALL HYDRANT INVERT ELEVATION INVERT ELEVATION LIGHT POLE METAL END SECTION PAVED WATER WAY POL Y~NYLCHlORIDE PIPE REINFORCED CONCRETE PIPE RIM ELEVATION SMH SEWER MANHOLE TSV TAPPING SLEEVE, VALVE AND BOX UG UP UNDERGROUND UTILITY POLE Notes: General 1. CONTRACTOR SHALL NOllFY 'DIG-SAfE" (1-888-:144-7233) AT LEAST 72 HOURS BEFORE EXCAVATING. 2. CONTRACTOR SHALL BE RESPONSIBLE FDR SITE SECURITY AND JOB SAFETY. CONSTRUCllON ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS AND LOCAL REQUIREMENTS. J. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, S[)EWALKS AND WAIJ<WA YS SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE FEDERAL AMERICANS WITH DISABILll1ES ACT AND WITH STATE AND LOCAL LAWS AND REGULATIONS (1'1!iICHEVtR ARE MORE STRINGENT). 4. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WllH IMPERVIOUS SURFACES (BUILDINGS, PAVEMENTS, WALKS, ETC.) SHALL RECEIVE 6 INCHES LOAM AND SEED. 5. WITHIN THE LIMITS OF THE BUILDING FOOTPRINT, THE SITE CONTRACTOR SHALL PERFORM EARTHWORK OPERAllONS REQUIRED UP TO SUBGRADE ELEVATIONS, 6. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. 7. IN THE EVENT 111AT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OlHER MEOlA ARE r<:J'JCOI.IPlJTtQg'\ OUDltJC ,,"Vf'A.\lAllOM At.JO CO~TRUCllCW ACl1\Anr~ 9A~ £»J \A~UAL. OL~ACTORY. OR OTHER EVIDENCE, THE CONTRACTOR SHAUL STOP WORK IN THE VICINITY or THE SUSPECT MATERIAL TO AVOID fURTHER SPREADING OF THE MAR:RlAL, AND SHALL NOTIFY THE OWNER IMMEDIATELY SO THAT THE APPROPRIATE TESllNG AND SUBSEQUENT ACllON CAN BE TAKEN. 8. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTlW ACTION If SUCH OCCURS. 9. DAMAGE RESUL llNG FROM CONSTRUCTION LOAOS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDIllON AL COST TO OWNER. 10. CONTRACTOR SHALL CONTROL STORMWATER RUNOff DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPON~)lBLE TO REPAIR RESULllNG DAMAGES, If ANY, AT NO COST TO OWNER. 11. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS \\1THIN THE NPOES CONSTRUCllON GENERAL PERMIT (COP) PROGRAM AND EPA JURISDICllON, PRIOR TO THE START OF CONSTRUCllON CONTRACTOR IS TO flUE A CGP NeTlCr: Of INTENT \11TH THE EPA AND PREPARE A STORMWATER POULUTION PREVENTION PLAN IN ACCORDANCE IIIlH THE NPDES REGULATIONS. CONTRACTOR SHAUl CONFIRM THE OWNER HAS ALSO fUD A NOllCE OF INTENT WITH THE EPA. 12. PRIOR TO THE INSTAlIlATION OF ANY SEWER OR WATER LINES, 111E CONTRACTOR SHAUL CONTACT THE TOWN Of AGAWAM ENGINEERING DEPARllMENT. NO PIPING SHAUL BE BAa(FIULED \\I1110UT THE PERMISSION Of 111E DEPARllMENT. Utilities 1. THE LOCATIONS, SIZES. AND TYPES OF EXISllNG UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. THE OWNER OR Irs REPRESENTATlVE(S) HAVE NOT INDEPENDENllLY VERIFIED THIS INFORMATION AS SHOWN ON THE PLANS. 111E UWTY INfORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERViCEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY TfIAT ADDITIONAL UTILIllES MAY BE PRESENT THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, THE CONTRIICTOR SHALL VERifY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS Of 111E POlNTS OF CONNECTIONS TO EXISllNG UllllllES AND, SHALL CONFIRM THAT THERE ARE NO INTERFERENCES II1TH EXISTING UIUTIES AND THE PROPOSED UllllTY ROUTES, INCLUDING ROUTES WITHIN 111E PUBLIC RIGHTS OF WAY. 2. WHERE AN EXISTING UTILITY IS fOUND TO CONfliCT \11TH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM 1110SE SHOIIN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, 111E LOCAllON, ELEVAllON, AND SIZE OF THE UllUTY SHALL BE ACCURATELY DETERMINED Wl1110UT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED IN WRITING TO 111E OWNER'S REPRESENTAllVE FOR THE RESOLUTION OF THE CONFLICT AND CONTRIICTOR'S FAILURE TO NOllfY PRIOR TO PERFORMING ADDITIONAL WORK REUEASES OIlNER FROM OBLIGA llONS FOR ADDITIONAL PAYMENTS 'MilCH 0111ERlllSE MAY BE WAf:RANTED TO RESOLVE 111£ CONfliCT. 3. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, DRAINS, AND DITCHES IN ACCORDANCE WITH EUEVA TlONS ON 111E GRADING liND UTILITY PLANS. 4. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TEUEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWS: A. PAVEMENTS AND CONCRETE SURFACES: FLUSH B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH C. LANDSCAPE, LOAM AND SEED, AND 0111ER EARTH SURfACE AREAS: ONE INCH ABOVE SURROUNDING AREA AND TAPER EAR111 TO 111E RIM ELEVAllON. 5. lHE LOCATION, SIZE, OEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PROPOSED PRIVATE UllllTY SERVICES SHAUL BE INSTALLED ACCORDING TO THE REQUIREMENTS PROViDED BY, AND APPROVED BY, THE RESPECTIVE UTILITY COMPANY (GAS, TELEPHONE, ELECTRIC, FIRE ALARM, ETC.). FINAL DESIGN LOADS AND LOCATIONS TO BE COORDINATED 'MTH OWNER AND ARCHITECT. 6. THE CONTRACTOR SHAUl MAKE ARRANGEMENTS FOR PHD SHAUL BE RESPONSIBUE fOR PAYING FEES FOR POllE RELOCATION AND fOR 111E AL TERA TlON ANt> ADJUSTMENT Of GAS, ELECTRIC, TELEPHONE, FIRE ALARM, AND ANY OTHER PRIVATE UllUTlES, I'1!iETHER WORK IS PERFORMED BY CONTRACTOR OR BY THE UTILIllES COMPANY. 7. UllllTY PIPE MATERIALS SHALL BE AS FOlLOWS, UNLE5S OTHERYASE NOTED ON 111E PLAN: -STORM DRAINAGE PIPES SHAUl BE HIGH DENSITY POL YETHEL YNE (HOPE) 8. SITE CONTRACTOR SHALL COORDINATE YATH ELECTRICAL CONTRACTOR AND SHALL FURNISH EXCAVAllON, INSTALLATION, AND BACKFILL OF aECTRICAL FURNISHED SITEWORK RELATED ITEMS SUCH AS PULL BOXES, CONDUITS, DUCT BANKS, lIGHl POLE BASES, AND CONCRETE PADS. SITE CONTRACTOR SHALL FURNISH CONCRETE ENCASEMENT Of DUCT BANKS IF REQUIRED BY THE UTILITY COMPANY AND AS INDICATED ON THE DRAWINGS. 9. SITE CONTRACTOR SHALL EXCAVATE AND BACKFILL TRENCHES FOR GAS IN ACCORDANCE 111111 GAS COMPANYS REQUIREMENTS. 10. ALL DRAINAGE AND SANITARY STRUCTURE INTERIOR DI~METERS (4' MIN.) SHALL BE DETERMINEO BY THE MANUFACTURER BASED ON lHE PIPE CONFIGURA 1\ONS SHOWN ON 111ESE PlANS. FOR MANHOLES THAT ARE 20 FEET IN DEPTH AND GREA TEll, THE MINIMUM DIAMETER SHALL BE 5 FEET. Layout and Materials 1. DIMENSIONS ARE FROM THE FACE OF CURB, FACE OF BUILDING, FACE OF WALL, AND CENTER LINE OF PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED. 2. CURB RADII ARE 5 FEET UNLESS OTHERII1SE NOTED. 3. CURBING SHALL BE BITUMINOUS CONCRETE CURB WITHIN THE SITE UNLESS OTHERWISE INDICA TEO ON THE PLANS. 4. SEE ARCHITECTURAL DRAII1NGS fOR EXACT BUILDING DIMENSIONS AND DETAILS CONTIGUOUS TO THE BUILDING, INCLUDING SIDEWALKS, RAMPS, BUILDING ENTRANCES, STAIRWAYS, UllllTY PENETRATIONS, CONCRETE DOOR PADS, COMPACTOR PAD, lDADING DOCKS, BOLLARDS, ETC. 5. PROPOSED GRANITE BOUNDS AND ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHAUL BE SET OR RESET BY A PROFESSIONAL LICENSED SURVEYOR. 6. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING PAVEMENT ELEVAllONS AT INTERFACE WITH PROPOSED PAVEMENTS, AND EXISTING GROUND ELEVATIONS ADJACENT TO DRAINAGE OUTLETS TO ASSURE PROPER TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILIllES. 7. SYMBOLS AND LEGENDS or PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT NECESSARilY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCA llONS ON THE DRAWINGS, THE CONTQACTOR S~ALl 1;:;:rt:.R: TO ll-IG: O~TAIL SJ.I[t;;:T OJUOJSJONS, IJANU~AC1URILRS' Un:RAiURI;;, £I-IOP ORAYANGS AND FIELD MEASUREMENTS (f" SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES. 8. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED fROM 111E DESIGNERS, BUT SHALL VERIFY LOCAllON OF PROJECT fEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS AND SPECIFICAllONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS. Demolition 1. 111E CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES Wl111IN THE LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVEMENTS, SLABS, CURBING, FENCES, unLiTY POLES, SIGNS, ETC. UNLESS INDICA TED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF EXISTINC UTiLIllES, FOUNDATIONS. AND UNSUITABLE MATERIAL WITHIN THE PROPOSED BUILDING fOOTPRINT AND TEN FEET BEYOND AND BENEA111 PROPOSED EXTERIOR COLUMNS, PER DRAWINGS AND SPECIfiCATIONS. 2. EXISTING UTIlITIES SHALL BE TERMINATED, UNLESS OTHERWISE NDTEO, IN CONFORMANCE WITH LOCAL, STATE, AND INDIVIDUAL UTILITY COMPANIES STANDARDS SPECIFICAllONS, AND DETAilS. lHE CONTRACTOR SHALL COORDINATE UTILITY SERViCE DISCONNECTS WITH THE UllllTY REPRESENTATIVES. 3. CONTRACTOR SHALL DISPOSE OF DEMOLIllON DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL STATE, AND LOCAL REGULATIONS, ORDINANCES, AND STATUTES. Erosion Control 1. PRIOR TO STARllNC ANY OTHER WORK ON THE SITE, 111E CONTRACTOR SHALL NOTIFY APPROPRIATE AGENaES AND SHALL INSTAUL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED IN FEDERAL, STATE, AND lOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT. 2. CONTIRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES, AND REMOVE SEDI~ENT THEREfROM ON A WEEKLY BASIS AND YATHIN TWELVE HOURS AFTER EACH STORM EVENT AND DISPDSE OF SEDIMENTS IN AN UPLAND AREA SUCH 111AT THEY DO NOT ENaJMBER 0111ER DRAINAGE STRUCTURES AND PROTECTED AREAS. 3. CONTRACTOR SHALL BE fULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH 111AT SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, 'MiETHER SUCH SEDIMENTAllON IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT. 4. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED fOR A MINIMUM OF llME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION. 5. UPON COMPLETION Of CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER, CONTRACTOR SHALL REMOVE AND DISPOSE Of EROSION CONTROL MEASURES AND CUEAN SEDIMENT AND DEBRIS FROM ENllRE DRAINAGE AND SEWER SYSTEMS, Existing Conditions Infonnation 1. BASE PLAN: THE EXISllNG CONDITIONS SHOWN WERE DETERMINED BY AN AClIJAL FlaD SURVEY PERFORMED BY HERITAGE SURVEYS IN 2000 AND FROM DESIGN PLANS FOR THE 'DARK KNIGHT COASTER' PROJECT, DESIGNED, PERMlffiD, AND PARTIALLY CONSTRUCTED IN 2007-2008. 2. TOPOGRAPHY: EUEVA llONS ARE BASED ON NGVD DATUM. Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services One Federal Street Building ID3-3N Springfield, Massachusetts 01105 413-747-7113 § FAX 413-747.Q916 No. ReY;iion Datu ppvd. Oe31gned by JE C T"'''o by JEC TChOCkOd by JJF CAD checked by Approved by Scol. None Oote February 13, 2009 Pro~et TItle Six Flags New England Proposed Shade Structure 1623 Main Street (Route 159) Agawam, Massachusetts IS$\,Iod tor Municipal Review Not Approved for Construction Drawing Title Legend, Abbreviations and General Notes Oro wing Number C-l Sheet of I 3 Pro jeel Number 10775 LG.DWG p ,-, <l f~ ! « {,.~ f (') , j .. , r- I , , , \ , o ;:-, -.~ -(<~~"" -, ~7 I I I , (' "--'- ,-, : . , ". '> > 91: r --"'"""'~~ "' , "~M~ .. -:I~"" '¥. X'lJ'i / :]' . . , ", " '. " ".1 I .+ r) , , '. ,'g , I c, , 1 '" ,I I c· / / , I , / , r , • -. .. / ~. -- \ \ \.. ," , l , • ",,', ., \ • \ . , ... x .~ G , " "I H/t" E PEAR'>:-j N 'k J.\Hf5 \,l;\Ni\'!t ,G • I I r~ . !..._-' N/r .OI'iGO " , ----- ~<J3.1 HiF L)OWi~~tCl';' J Pl''::;CO X t.il.~ , • . , .' ~ ~, _" ____ --""1 ..... · I J V ,'. , , .. I ' -,/ , f " I vi';; J I " 1 , ---+/ / f / i '(91h -1 , , " I ", "---J------+- \ )'7" 7 /, ,~. r , I I i I I \1 } ) . \ I.,\. ... I BO{)1., '. P,.AI\. '~'UK ,I I o '~K 367.J"f -,,-. .. 1 .. -0/ ;:L\j , .;)t-} r ... t •• ") " pn()){' 1 ;'::' nf.!l" i.'" X;f.l,:; \ xH< i I i , '? ! , , ! i , . , i I ,I I i , i , , , , , .' ! 1 J n-:. I' -) I " ", Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services One Federal Street Building 103-3N Springfield, Massachusetts OlIOS 413-747-7113' FAX 413-747-0916 N I , SCALE IN FEET No Revision Dota rep"" Dcslqned 'y JEC !Drown by JEC I Checked by JJF CAD checked by Appf<)ved by Scole 111=60' Dole February 13,2009 ProJCct Title Six Flags New England Proposed Shade Structure 1623 Main Street i\gavvarn,~assachusetts Issued ror Miliiicipal R~iew Not Approved for Construction Overall Plan DrOWU'l9 Number C-2 $t,cet or 2 3 PIOject Number 10775.00 LA YOUr PLAN,OWG P: \10775.00\cod\ld\Plonset\Conopy\Loyout Plon.dwg ~--~~~~~~~-------------------------------------------------------------------------------------------------------------------------------------------............... CATCH BASIN GRllTE--, SlLTSACK Plan View CATCH BASIN GRA SILTSACK '--E'XPiINSION RESTRAINT 3n:Uvu VkTt' Notes: ,. INSTALL SlLTSACK IN ALL CATCH BASINS WHERE INDICATED ON THE PLAN BEFORE COMMENCING WORK OR IN PAVED AREAS AFTER BINDER COURSE IS PLACED AND HAY BALES HAVE BEEN REMOVED. 2. GRATE TO BE PLACED OVER SILTSACK. J. SILTSACK SHALL BE INSPECTED PERIODICALLY AND AFTER . ALL STORM EVENTS AND CLEANING OR REPLACEMENT SHALL BE PERFORMED PROMPTLY AS NEEDEC. MAINTAIN UN'llL UPSTREAM AREAS HAVE BEEN PERMANENTLY STABIUZED Siltsack Sediment Trap N.T.S. Souru: VH8 6/08 __ NOTE: ... -~ ~ .. . . . ,_ ..•... ,.---., . f ••••• __ "'. _..:c-_' \ -. , '-, I '3 1.1 X ~)P -7 ,~)'-_~, X X87.:3 ~t39,1 88.3X -~-•. -i~" - .1 .\ I ---.. '''. ! en ? ;lv .. _ I X i 1 .,. .. -.-... -.-.... d, '"I ._-,._-.-" "'''.'~''-'-'-- ---~ -.. -.~.---- -~ .. ~ .. -..•.••.. ., --""."._,.---'-'~"~~-'" f~~. __ _ \. \ .. \ • \ \ \. \ \ , \ , \ \ , • \ \. \ .. \~·-·B·-I ,'. I .. , \ \ \ '\ \. \ \ \ \.,----~. .. \ \. \ \ '-\ ~ .... _---.. \ \ \, \. ~---, ... , .... -_.,-. - --LV -,---.... __ 11 " "t ~='f \/(' " '-" / i ".'IllLl. ____ ,________ _ _______ ._._ I I , i , / I . -_. ' .. ----8 0 '. \. \ ! i i ~ . I .. " \, I i .. , i , .' / , , " .' " .•...•... '. ~( . , / t ! I I , , , I /1 I ' ; r , i -, ,I , / ! , , ./ I , , / \ /Z> I f I ;' / ;' I , f \ , / / \ \ \ Vanasse Hangen Brustlin, Inc . Transportation Land Development Environmental Services One Federal Street Building 103-3N Springfield, Massachusetts 01105 413-747-7113· FAX 413-747-0916 N I 20 o 20 SCALE IN FEET No. Rollision 40 Oot. pp,," Dosigned by JEC I Drown by JE C --ICnCCkCd by JJF CAD checked by Approved by 5¢ale 111.-20' Doh: February 13, 2009 Six Flags New England Proposed Shade Structure 1623 Main Street Agawam, Massachusetts Issued for Municipal Review Not Approved for Construction Orowjng Title Layout Plan C-3 Shret of 3 3 Pro jccl Number 10775.00 LA YOUr PLAN.OWG x 92.2 <8 8.1 X91.2 ---.-.. ~ ... -.. -. , 8650 91.1 X 887 X X89.1 X87,3 87,6 X< 88,9 o X86,3 ~89.1 .' .. --_. -- = .=== ~ II II \\ iC'% :~ 8650 RI M nn-,r r"' ~,.. """ ~f .. ,. \ \ \ \ \. LV --. -. D04 RIM B3bO " ,... D03 o IX) _.-.-.. ""'- 4" PVC"IM 82b,.v;_:,,,, _~""'-.t: SDR-35 ,'C' 0 ' ) ,"' :..-;' ; X79.5 X 79,5 -, o X79,6 / 5 X7 8,9 X 78.7 DMH 18 o X76.3 PLAN BOOK 7 8,3 X DMH 19 x 78.3 ; 'r'- --'''--''--<,) X77.3 125 P X77,' X76, GO, Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services One Federal Street Building 103-3N Springfield, Massachusetts 01105 413-747-7113 A FAX 413-747-0916 N I No, Revi!lion Dote I"P."", Designed by ! Drown by 1 Checked by JJF CAO checkd 0)' Approved by Sco$c 1"-20' Dote February 13,2009 Pro' et Tit1 e Six Flags New England Proposed Shade Structure 1623 Main Street (Route 159) Agawam, Massachusetts Issued for Munidpai Review Not Approved for Construction Drawing Title Existing Conditions Plan OfQWtn'j Number SV-l Sheet of '-1 1 ~P.:\.'.07.7.5 .• 0.0\~c.od.\.ld~\~P.lo~ns~e.t\.C~on~o~py~\.Lo~y.ou~t~P~lo~n~.d~w~9 .................. __ ............ ____________________ .. ________________ ........................ __ .......... __________________________________________ ........ ____ ................ --................................ --.......................... ------.... -----,111111111111111 Six Flags • New England PERSPEt-TIVE VIEW (CANOPY 1 l' SQ. STEEL TUBING __ WRD. STEEL TUBfNG--__ . 5' , SIDE VIEW AIR SHIELD AWNINGS & SIGNS 219PBERLINROAD,SUITE2U' ~ CHERRY HILL. NJ 08034 890.227.4233 '---' 1" SQ. STEEL TUBING %" RD. STEEL TUBING TENSION BAR ... I 4 Jt.....1/ ~I L ........... 1/ , 1/ ........... I ........ ........... I~ it •• I vI(' •. ----3" 0.0. STEEL POST 1..1 --'-'---37' ---.--. 12" rl:t----!,o.o. $T~EE~LP~OS:!::T ===========~==t5~Oi" =====-----·-·~·-_-·-_-____ ~ ... i'-ll TENSION BAR I GENERAL NOTES & SPECIFICATIONS .. This set of drawings is only inlended to define Ihe woodhal comprises the awning sllUclore assemblies I", Ihe sne at · All wOO< shall comply wilh Ihe lalestadi~on or the 1000'.ing standards", codes. , §,g,!;fI, Qyrrglll r§Yi~m · American Inslfiute for steel Cons1ruc1ion: 'Spedficatloos for1he de~gn, labricatioo, and erection of slrucrural sleel forb~lding." "Code 01 standard practice for steel buildings & bridges' · Induslrial FabricsAssoo.lnfl· 'Awning Design Manual" · American Wel<ing 8000ly Structural Building Code AWS Ot.l 8.2 · All supporting framel'loilr shall be made in such a manner as to develop the full s~englh of the members. · Anchorage of frame 10 structure shall be done by 3J8' X3 'h'lag screws into wood and ~(8" X 1\\'lag bolts IlAth 518" shields Into concre1e. · The Slructure has been loaded as 100lows: live load 30 poundsisquare loot normal IN Wind load 30 pounds/square luolliormal OUT · Fabric shal be Brite-Awn polyesler coaled ~nyl. W~gh1: 16 czlsquare yard Width: 61", Single sided color coded, Flame relamanl. California fire Marshall Title 1911273.2 and 1237B. NFPA 701. NfPA Class A UCS Cia,,; 1. FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD,SUITE 2~Ol ~~ CHERRY HILL. NJ 06034 ~ "<-""'-- 800227.4233 / '-" PERSPECI'IVE VIE'V (;llNOPY 2 SIDE VIIEW 1" SQ. STEEL TUBING %" RD. STEEL TUBING • I 4 ll'--..IL / .......... , / "'" 1/ " TENSION BAR .......... 1..,.." .......... 1 .......-::- " 12" 11_ W~::L2cQ,.. r= ro.D. illlli_qlT-------.----30'-.. TENSION BAR GENERAL NOTES & SPECIFICATIONS -' This set of drawings is only intended 10 define Ihe 1'100< Ihal comprises Ihe awning s{lUcture assemblies lex the ,ne at · All work shaa complywilh the lalesl edilion of the foDowing standards cr codes. · S.O.CA Current re\1sioo · American Institute for Steel Construction: "SpecificaliO!1s forihe design, fabricatioo, and erection of structural steel for building: ·Code of standard practice for sleel buildings & bridges" · Industrial FabricsAssoc.lnfl· "Awning Design Manual" · American Welding Society Slructural Building Code AWS D1.1 8.2 · All supporting frameworlc shall be made in such a manner as 10 develop the full strength at Ihe members. · Anchorage of frame to struclure shall be done by 3.18" X3 \\"Iag screws into wood and 318" X 1\\" lag belts vAth 518" shields into concrete. · The structure has been loaded as follows: Live load 30 pounds/square foot nOll11a1IN Wind load 30 pounds/square foot nOll1lal OUT · Fabric shall be Brile-Awn polyester coated vinyl. Weight 16 ozisquare yard Width: 61'. Single sided colorcoded, Flame relardant. California Fire Marshall T~e 1911273.2 and 1237B. NFPA 701. NFPAClass AUCB Class 1. PERSPECI'IVIl VIEW (;1lNOPY 3 l' SQ, STEEL ruSING-__ "W RD. STEa TU8~ _____ SIDE view FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD. SUITE 2~' ~t, CHERRY HILL. NJ 08034 ............ IO:....A ...... 800.227.4233 v ~ 1" SQ. STEEL TUBING %" RD. STEEL TUBING TENSION BAR ... I 4 Jl'-.JL .... ~ L. .-......,., L---....: 1./ "-.... I ........ ........... 1 "..< 's 11 _____ 3_"_o·13s~E_E_L _po __ s_T ________ -i I i --===TEN=S'±ON8AR==-2211'=' =======-=-=-=---=---=-=--. -~-.~~ GENERAL NOTES & SPECIFICATIONS .. This set 01 drawings is onlyinlended to define Ihe wOO< thaI cempnses the awn;,g slructure assemblies for the site at · All wOO< shall comply with the latesl edl~on of the following slandards or codes. · IW:SA: SUITOO!r@Vi§ioo · American Inst~ute for Steel Cons1ruclion: 'SpeciflCaiions for 1he design, lab!ication, and ereclion of structural steel for btJlding." "Code of standard practice for steel bundings & bridges" · InduSinal FabricsAssoc.tnfl· "Awning Design Manual" · American Welding Socie1y SllUclural Building Code AWS 01.18.2 · All sUlOj)ooing framework shall be made in such a manner as to develop the full strength of the members. · Anchorage 01 frame 10 structure shall be done by 3IB" X3 Yo'lag screws inlo wood and 318" X 1)1' tag belts \lith 518' shields "to concrete. · The structure has beGn loaded as follows: Live load 30 poundslsquare loot nO!TTlaiIN Wind load 30 poundsJsquare fool normal OUT • Fabric shall be Brile·Awn polyester coaled 'Anyl. Weight 16 ozlsquare yard Width: 61'. Single sided calor coded. Flame retardant. California Fire Marshall T~e 1911273.2 and 1237S. NFPA 701. NFPAClassAUCB Class 1. FOOTING DETAIL 3" 0.0. STEEL POST 18" X 18" X 36" CONCRETE FOOTING AIR SHIELD AWNINGS & SIGNS 219P BERLIN ROAD, SUrrE 2~1 ~~ CHERRY HU. NJ 08034 ~ _ 800.227.4233 f'C"",,.,,-r; .. ~- Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services No. Re"j",OI'l Designed by IDrawn by CAD checked by . Dote ppvd. IChecked by Appro'Jed f;,y Scole As Noted Dote February 13, 2009 Pro)9CI Tille Six Flags New England Proposed Shade Structure 1623 Main Street Agawam, Massachusetts Issusd lor Municipai Review Not Approved for Construction Drcwing n~le Reference Drawing Plan Drowing Number S/-,eet of 3 Pro jeet Nwmbcr 10775.00 LA your PLAN.Dwe Fino I '" 24'-." rn Q , " -is ~ '" \ .c u 0 ~ ~ N ~ N N v ~ ~ '" / Cl I Drawing : I I I I I I I I I I I : I I r-------I ~~l ~~ ~rs rs rs IS" 2' 5ft 8",·)R , 5 tH: I COI1~nt p,.(j Oet(li Ii: I, Single rOll lockers pad dlm~osi/)n~-4~ hi9h ~ 23' ,dd, t Isngth oi ladu bon\:. 2, Slick 10 beck Icckors-4" I\iQh l 36~ 1I'ldc l i-cngth ~f lochr borok. I L 1/21109 I A + Vanasse Hangen Brustlin, Inc. Transportation Land Development Environmental Services .. N" Revision Designed by !f(lWt'l by CAD ehecked by Dote !"ppvd. lC'1eCked by Approved by Scale As Noted D(lte Februruy 13,2009 Six Flags New England Proposed Shade Structure 1623 Main Street Agawam, Massachusetts ISSl,.Ied for Municipai Review Not Approved for Construction (n'owinq Titlo Reference Drawing Plan Drowln9 Numher Sheet of 3 Oroject Number 10775,00 LA Your PLAN.OWG