Loading...
8601_AMENDMENT TO RULES AND REGS INSPECTION FEE Am viclai-eh t -6 Tow" n of Ag' awam 36 Main Street Agawam, Massachusetts 01001-1837 Tel. 413-786-0400 Fax 413-786-9927 PLANNING BOARD May 8, 2009 Recorder of Land 226 Causeway Street Boston, MA 02114 To Whom It May Concern: Attached please find an amendment to the Agawam Subdivision Rules and Regulations which was approved by the Planning Board on May 7, 2009. Sincerely, '-Z Travis Ward, Chairman } AGAWAM PLANNING BOARD TW/DSD:prk v3 cc: HCRD Town Cleric File of Ag' awam Town 36 Main Street Agawam, Massachusetts 01001-1837 Tel. 413-786-0400 Fax 413.-786-9927 May 8, 2009 I HEREBY CERTIFY THAT THIS IS A TRUE COPY OF THE APPROVED CHANGES TO THE SUBDIVISION RULES AND REGULATIONS OF THE AGAWAM PLANNING BOARD, APPROVED May 7, 2009. VOTE: 4 YES, 0 NO, 0 ABSTENTIONS �1 r ATTEST: j JIF Richard M. T eroux Town C erk AGAWAM PLANNING BOARD Amendment To Section 159-7H(6)(h) of the Agawam Subdivision Rules and Regulations entitled "Inspection Fee". which now reads: The unit rate of inspection fee levied shall be$0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection(roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board. Shall now read as follows: The unit rate of inspection fee levied shall be $1.20 per linear foot measured on each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection (roadway,water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction, but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer, water or drain. When warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board 0 FAc TOWN OF AGAWAM Department of Public Works 1000 Suffield Street • Agawam, MA 01001 Tel (413) 8210600 * Fax (413) 8210631 Ep M� John P. Stone . Superintendent MEMORANDUM To: Planning Board CC: John Stone—DPW Supt.;File From: Michael Chase—Engineering; John Decker—Engineering Date: May 7, 2009 Subject: Subdivision Inspection Fee Increase, Additional Information As requested, we have performed the following comparison between the current and proposed Agawam subdivision inspection fees and to those of several Pioneer Valley communities. We used "Windermere Estates", off of Mill Street, as a typical subdivision to model the rates. Agawam's inspection fee is per linear foot of installed item for: water, sewer, drain, and roadway. Of the other communities in the comparison only South Hadley's rate is based on a similar structure where they impose per linear foot inspection fee for: sewer, storm, road construction, and sidewalks. The other community's fees are based on a linear footage of the roadway itself. Community Length Rate Fee Diff. Proposed Vs. Cost per LF of Roadway LF LF Agawam-Current 3079..33 $ 0.75 $2,309.50 $ 1,385.70 $ 3.24 Agawam-Proposed 3079.33 $ 1.20 $3,695.20 $ - $ 5.18 West Springfield 713.33 $ 5.00 $3,566,65 $ 128.55 $ 5.00 Amherst 713.33 ri 6.00 1 $4,279.98 $ (584.78) $ 6. 10 South Hadle See Table Below $fi,815.99 $ 3,120.79 $ 9.06 South Ha ley Ins action Fees Inspection Item Length RateLF LF Fee Sewer 775 $ 2.00 $1,550.00 Drainage 820 $ 2.00 $1,640.00 Road 713.33 $ 3.00 $2,139.99 Sidewalk 1 1486 $ 1.00 $ 1,486.00 Total Fee $6,815.99 Total Feel Roadway Length $ 9.56 The proposed inspection fee increase is an adjustment of the existing fee by the Consumer Price Index (CPI) to bring it up to current level. The CPI is an accepted inflation index, and as code specifies inflation a warrant for increasing the unit inspection fee.Although the change is a 60% increase, this change is appropriate because the fee has not been adjusted for about 18 years. Developers have enjoyed the benefit of paying the fee at the 1991 level, shifting an ever increasing burden to the Town. sAfilesUnspection fee increase add info 5_09.doe - tarr.r r at1...�Y r 1 Vt./7.�t L\..2tlte,l�L'r�Lis�1 r.71 t+l 1!til'I.CLi,AA 1 4-15-2009 U.S. Department Of Labor Bureau of Labor Statistics Washington, D.C. 20212 Consumer Price Index - All Urban C0n51amr9 - (CPI-U) V.S. city average All items 1982-94-100. - V Percent change Aonua Dec- Avg- Year Jan, Feb, Mar. Apr. .May June July Aug. Sep. Oct. Nov, Dec. A Dec Avg 1913 9.8 9.8 9.0 9.8 9.7 9.8 9.9 9.9 10.0 10,D 10.1 10.0 9.9 3914 10.0 9.9 9.9 9.0 9.9 9,9 10.0 10.2 10.2 10.1 10.2 10.1 10.0 2.0 1.0 1915 20.1• 10,0 9.9 10,0 20.1 10.1 10.1 10.1 10.1 10.2 10.3 10.3 10.1 2,0 1.0 1926 20.4 10.4 10.5 10.6 10.7 10.8 1018 10-9 11.1 11.3 11,5 11.9 10.9 12.6 7.9 1917 11.7 12.0 12.0 12.6 12-.8 13.0 12.8 13.0 13.3 23.5 13.5 13,7 12.8 18.1 17.4 1919 14.0 14.1 - 14.0 14.2 14.5 14.7 15.I 25.4 15.7 16.0 16.3 16.5 15.2 20.4 18.0 1919 16.5 16.2 16.4 16.7 16.9 16.9 17.4 17.7 17.0 18.2 18.5 18.9 17.3 I4.5 14.6 1920 19.3 19.5 19.7 20.3 20.6 20.9 20.0 20.3 20,0 19.9 19.9 19.4 20.0 2.6 15.6 _ 1921 19.0 '18.4 18.3 18,1 17.7 17.6 I7.7 17.7 17.5 17.5 17.4 17.3 17.9 -10.8 -10.5 1922 16.9 16.9 16.7 16.7 16.7 16.7 16.9 16.6 16.6 16.7 16,8 16.9 16.8 -2.3 -6.1 1923 16.8 16.8 16.8 16.9 16.9 17.D 17.2 17.1 17.2 17.3 17.3 17.3 17.1 2.4 1.8 1924 17.3 17.2 17.1 17.0 17.0 17.0 17.1 17.0 17.1 17.2 17.2 17.3 17.1 0.0 0.0 1925 17.3 17.2 17.3 17.2 17.3 17.5 17.7 17,7 17.7 17.7 18.0 17.9 17.5 3.5 2.3 1926 17.9 17.9 17.9 17.9 17.8 17.7 17.5 17.4 17.5 17.6 17.7 _ 2717 17.7 -1.1 1.1 -1927 17,5 17.4 17.3 17.3 17.4 27.6 17.3 11.2 17.3 17.4 17.3 17.3 17.4 -2.3 -1.7 1920 17,3 17,1 17.1 17,1 17.2 17.1 17,1 17.1 17.3 17.2 17.2 17.1 17.1 -1,2 -1.7 1929 27.1 17.1 17.0 16.9 17.0 17.1 17.3 17.3 11.3. 17.3 17.3 17,2 17.1 0.6 0.0 1930 1-1.1 17,0 16.9 17,0 16.9 16.8- 16.6 16.5 16.6 15.5 16.4 16.1 16.7 -6.4 -2.3 1931 15.9 15.7 15.6 15.5 15.3 15.1 15.1 15.1 15.0 - 14.9 14.7 14.6 15.2 -9.3 -9.0 1932 14.3 14.1 - 14.0 13.9 13.7 13.6 13.6 13.5 13.4 13.3 23,2 13.1 13.7 -10.3 -9.9 1933 12.9 12.7 12,6 12.6 12.6 12,7 13.1 13.2 13.2 13.2 13.2 13,2 13.0 0,8 -5.1 1934 13.2 13.3 13,3 13.3 13.3 13.4 13.4 13.4 13.6 13.5 23.5 13.4 13.4 1.5 3.1 1935 13.6 13,7 13.7 13.8 23.8 13.7 13.7 13.7 13.7 13.7 13.8 13.8 13.7 3.0 2.2 1936 13.0 13.8 13.7 - 13.7 13.7 13.8 13.9 14.0 14.0 14.0 14.0 14.0 13.9 1.4 1.5 1937 14.1 14.1 14.2 14.3 14.4 ' 14.4 14.5 34.5 14,6 14.6 14.5 - 14,4 14.4 2.9 3.6 1938 14.2 14.1 14.1 14.2 14.1 14.1 24.1 I4.1 14.2 14.0 24.0 14.0 14.2 -2.6 -2.1 - 1939 14-0 13.9 13.9 13.8 13.8 13.9 13.0 13.8 14.1 14.0 14.0 14.0 13.9 0,0 -1.4 1941) 13.9 14.0 14.0 14.0 14.0 14.1 14,0 14-0 14.0 14.0 14.0 14.1 14.0- 0,7 0.7 1941 14.1 I4.2 14.2 24.3 24.4 14.7 14.7 14.9 15.1 15.3 15,4 15.5 14.7 -9.9 5.0 1942 15.7 15.0 16.0 16.1 16,3 16.3 16.4 16.5 16.5 16.7 16.8 16.9 - 16.3 9.0 10.9. 2943 16.9 36.9 17.2 17.4 17.5 17.5 17.4 17.3 17.4 17.4 17.4 17,4 17.3 _ 3.0 6.1 2944 17,4 27.4 17.4 17.5 17.5 '17.6 17.7 17.7 17.7 17.7 17,7 17.0 17.6 23 1.7 1945 17.6 17.8 17,8 17.8 17.9 18.1 18.1 18.1 16.1 I8.1 1911 18,2 18.0 2,2 2.3 1946 18.2 18.1 18.3 18.4 I8,5 18.7 19.6 20.2 20.4 20.8 2I.3 21.5 19-5 16.1 8.3 1947 21.5 21.5 21.9 21.9 21.9 22.0 22.2 22.5 23.D 23.0 23.1 23.4 22.3 8.8 14.4 1948 23.7 23.5 23.4 23.8 23.9 24.1 24.4 24.5 24.5 24.4 24.2 24.1 24.1 3.0 8.1 1949 24.0 .23.0 23.8 23.9 23.8 23.9 23.7 23_8 23.9 23.7 23,8 23.6 23.9 -2.1 -1.2 1950 23.5 23.5 23.6 23.6 23.7 23.8 24.1 24.3 24.4 24.6 24.7 25.0 2411 5.9 113 1951 25.4 25.7 25,8 25.0 25.9 25.9 25.9 25.9 26.1 26.2 26.4 26,5 26.0 6,0 7.9 1952 26.5 26.3 26.3 26.4 26.4 26.5 26.7 26.7 26.7 26.7 26.7 26.7 26.$ 0.8 1.9 1953 26.6 26,5 26.6 26.6 26,7 26.8- 26.8 26.9 26.9 27.0 26.9 26.9 26.7 0.7- 0.8 1954 26.9 26.9 26.9 26.8 26.9 2619 26.9 26.9 26.8 26.8 26.8 26.7 26.9 -0.7 0.7 1955 26.7 26.7 26.7 26.7 26.7 26.7 26.8 26.8 26.9 26,9 26,9 26.0 26.8 0.4 -0.4 1956 26.B 26.8 26,8 26.9 27.0 27,2 27.4 27.3 27.4 27.5 27,5 27.6 27.2 3.0 1.5 1957 27.6 2717 21.8 27.9 28.0 29.1 29.3 28.3 28.3 28.3 28.4 28.4 28.1 2.9 3.3 1958 28.6 28.6 2B,8 28.9 28.9 28.9 29,0 28.9 28.9 28.9 29.0 28.9 28.9 1.8 2.8 1959 29.0 28.9 28.9 29.0 29.0 29.1 29,2 29.2 29.3 29.4 29.4 29.4 29.1 1.7 0.7 1960 29.3 29.4 29.4 29.5 29.5 29.6 29.6 29.6 29.6 29.9 29.0 29.8 29.6 1.4 Z.7 1961 29.6 29.8 29.8 29.8 29.8 29.0 30.0 29.9 30-0 36.0 3D.0 30.0 29.9 0.7 1.0 1962 30.0 W.1 30.1 30.2 30.2 30.2 30.3 3D.3 30.4 30.4 30.4 30.4 30.2 1.3 1.0 1963 3014 30.4 30.5 30.5 30.5 30.6 30.7 30.7 30.7 30.8 30.8 30.9 30.6 1.6 1-3 1964 30.9 36,9 30.9 30,9 30.9 31.0 31.1 31.0 31.1 31.1 31.2 31.2 31.0 1.0 1.3 1965 31.2 31,2 31.3 31.4 31.4 31.6 31-6 31.6 31.6 31.7 31.7 31.9 31.5 1.9 1.6 1966 31.0 32.0 32.1 32.3 32.3 32.4 32.5 32.7 32.7 32.9 32.9 32.9 32.4 3.5 2.9 1967 32.9 32.9 33.0 33.1 33.2 33.3 33.9 33.5 33.6 33.7 33.8 33.9 33.4 3.0 3.1 1968 34.1 34.2 34,3 34.4 34.5 34.7 34A 35.4 35.1 35.3 35.4 35.5 34.8 4.7 4.2 1949 35.6 - 35.8 36.1 36.3 36.4 36.6 36.6 37.0 37.1 17.3 37.5 37.7 36.1 - 6.2 5.5 1970 37.8 39.0 38.2 38.5 30.6 36.8 39.0 39.D 39.2 39.4 39.6 39.8 38.8 5.6 5.7 1971 39.8 39.9 40.0 40.1 40.3 40.6 40.7 40.8 40.8 40.9 40.9 41.1 40.5 3.3 4.4 1972 41.1 41.3 41.4 41.5 41.6 41.7 41.9 42.0 42.2 42.3 42.4 42.5 41,8 3.4 3.2 1973 42.6 42.9 43.3 43.6 _ 43.9 44.2 44.3 45.1 45.2 45.6 45.9 46.2 44.4 8.7 6.2 1974 46.6 47.2 47.8 48.0 48,6 49.0 49.4 50.0- 50-,6 51.1 51,5 51.9 49.3 12.3 11.0 1975 52.1 52.5 52.7 52.9 53.2 53.6 54.2 54.3 54.6 54.9 55.3 55.5 53.8 6.9 9.1 1976 55.6 55.8 55.9 56.1 56,5 56.8 57-1 57.4 57.6 57.9 58.0 58.2 56.9 4.9 5.6 1977 58.5 59.1 59.5 60.0 60.3 60.7 61.0 61.2 61.0 61.6 61.9 62.1 60.6 6.7 6.5 - 1978 62.5 62.9 63.4 63.9 64.5 65.2 65.7 66.0 66.5 67.1 67.4 67.7 65.2 9.0 7.6 1979 68.3 69.1 69.8 70.6 71,5 72.3 73.1 73.8 74.6 75.2 75.9 76.7 72.6 13.3 I1.3 1980 77.8 78.9 80.1 81.0 81.8 82.7 82.7 83.3 64.0 84.8 05.5 86.3 82.4- 12.5 13.5 1981 87.0 8719 68_5 89.1 89.8 90.6 91.6 92.3 93.2 93.4 93.7 94.0 90.4 8.9 10.3 1992 94.3 94.6 94.5 94.9 95.8 97.0 97.5 97.7 97.9 98-2 9810 97.6 96.5 3.8 6.2 - 1983 97.8 97.9 9-1.9 98.6 99,2 99.5 99.9 100.2 100.7 101.0 101.2 10113 99.6 3.8 -1.2 1984 101.9 102.4 102.6 103.1 1D3.4 163.7 104.1 104.5 105.0 105.3 105.3 105.3 103.9 3.9 4.3 1985 ID5,5 106.0 106.4 106.9 107,3 107.6 307.8 108.0 109.3 109.7 109.0 109.3 107.6 3.8 3.6 1 of 2 4/16/2009 4.08 PM ` 1LY.lI LL1J_VA 1 Vla!Jl 21�.,.1t'lA.a.l�yia,t VA.iJ 1 Jf%-1 L/Vl-lAl.1,/' 1986 109,6 109.3 108.8 108..6 108.9 109.5 109.5 109.7 120.2 110.3 110.4 110.5 109_6 1.1 1.9 1987 111.2 111.6 112.1 112.7 113.1 113.5 113.8 114.4 115.0 115.3 115.4 - 115.9 113.E 4.4 3.6 _ 1988 115.7 1I6.0 116.5 117.1 117.5 lie:0 138.5 119.0 119.8 120.2 120.3 120.5 118.3 4.4 4.1 1989 121.1 121.6 122.3 123.1 123.8 124.1 124.4 124.6 125.0 125.6 125.9 126.1 124.D 4.6 4.8 1990 127A 129.0 128.7 128.9 129.2 129.9 130A 131.6 -132.7 133.5 I33:B 133.8 130.7 6.1 5.4 1991 134.6 134,E 135.0 135.2 135,E 136,0 136.2 136.6 137.2 137.4 13'i.8- 137 3.1 4.2 1992 130.1 138.6 139.3 139.5 - 139.7 146.2 146.5 19D.9- -141.3 _ 141.8 142.4 141.9 f1= 2.9 3.0 1993 142.6 143.1 143.6 144.0 144.2 144.4 144.4 144.0 145.1 145.7 145,8 145A 144.5 2.7 3.D 1994 146.2 146.7 147.2 147.4 147.5 - 148.0 14BA 149.0 149.4 149.5 149.7 149.7 148.2 2.7 2.6- 1995 150.3 150.9 151.4 1$1.9 152.2 152.5 152.5 152.9 153.2 153.7 153.6 153.5 152.4 2.5 .2.B 1996 154.4 154.9 155.7 156.3 156.6 156.7 157.0 157.3 15718 158.3 156.6 158.6 156.9 3.3 3.D 1997 159.I 159.6 160.0 160.2 160.1 260.3 160.5 160.9 151.2 161.6 163.5 161.3 160.5 1.7 2.3 1998 161.6 161.9 162.2 162.5 162.8 - 163.0 163.2 IQ A 163.6 164.0 164.0 163.9 163.0 1.6 1.6 1999 164.3 164.5 165.0 166.2 166.2 166.2 166.7 167,1 167,9 168.2 ISSA 168.3 166.6 2.7 2.2 - 2000 168.8 169.8 171.2 171.3 171.5 172.4 172.8 172,E 173.7 174.0 174.1 174,0 172.2 3.4 3.4 2001 176.2 175.0 176.2 -176.9 177.7 178.0 177.5 177.5 170.3 - 177.7 177.4 176.7 177.1 1.6 - 2.8 2002 177.1 177.8 178.9 179.8 1.79.8 179.9 180.1 180.7 1B1.0 181.3 181.3 180.9 179.9 2.4 1.6 2003 181.7 103.1 184.2 1B3.8 183.5 183.7 183.9 184.6 185.2 185.0 184.5. 184.3 184.0 1.9 2,3 2004 185.2 1B6.2 187.4 108.D- I89.1 189.7 189.-4 169.5 169.9 190.9 I91.0 190,3 188.9 3.3 2.7 2005 190.7 191.8 193.3 194.6 194.4 . 194.5 195.4 196.4 198.8 199.2 197.6 196.8 195.3 3.4 3.4 2006 198.3 190.7 199.8 201.5 202.5 202.9 203.5 203.9 202.9 201.8 201.5 201.8 201.6 2.5 3,2 2007 202.416 203.499 205.352 206.686 207.949 208.352 208,299 M.917 208.490 208.936 210:177 210 A36 201.392 4.1 2,0 2008 211.080 211.693 213.528 214.823 216.632 218,815 219.964 219.086. 218.783 21.6.573 212.425 210.228 21155.303 0.1 3.0 2009 211.143 212.193 212.709 2 of 2 4/1612009 4:08 PA • 9-7 § 159-7 SUBDIVISION OF LAND :d so (3) Extension of time. If the time schedule is altered, notice must be given to the t the Planning Board which, at its discretion, may extend the time of completion, A to � provided that arly securities then held by the Town must be reviewed and increased has as necessary to cover any increased.cost of improvements. As part of the increased ding V� costs, the cost increment due to inflation of construction costs shall be added to the in a bond or cash security posted by the applicant. The Engineering News Record f the ` . ° Construction Cost or similar index most accurately reflecting Agawam's liability, the determined by e th City Engineer,ineer, will be used to arrive at the increased , ��� ,, as shall construction cost. [Amended 12-5-19961. loard e the z (4) Upon request, partial release of securities shall be made upon acceptance by the Board of the work cor--'-ted. . the - (5) Building lot bond. A performance bond will be required of contractors or other parties constructing residences upon vacant lots where curbs, sidewalks, treebelts �rded and other municipal facilities have been placed at, the lot. frontage. The r requirements for this band shall conform to the applicable provisions of Subsection H(2) of these regulations. The bond amount shall be based upon the potential > . . damage of Town facilities plus administrative costs. It shall be the responsibility of f the the developer to ensure that all permitted but uncompleted residences existing in e of ` ". the subdivision at the time of subdivision bond relp-ce have proper building lot e an ': r honds. )f all t A as (6) Inspection fee. [Added 3-24-19'9111 .,_,. ��` ed to (a) There shall be a fee instituted to pay for the costs,of inspection.The fee shall or to .ty be based upon the linear footage of roadway, water lines, sewer lines and .tod . Y s drainage lines. The footage shall be as measured on the approved definitive rence `; plans. Any substantial increase in constructed footages over the plan footage shall result in a prorated increase in fee. Roadways shall be measured along the center line, from its beginning intersection with an existing street layout -x line or other beginning point to the final intersection with another street or ill be A F existing layout line, so as to encompass all proposed rights-of-way. indby Culs-de-sac shall be measured on the basis of a center line extending straight shall through the center of the cul-de-sac to the far edge of the layout. Water line „ connections and building sewers in the right-of-way will.not be included in the measurement for fee determination, except where their length exceeds 40 t11 be ( feet. such The. (b) The unit rate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories. cited above. The total inspection fee shall be Durity Y1q:. equal to the unit rate times the total footage of each line category of nable inspection (roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the cornmencement of construction, but these fees need only be paid beforehand for the particular )f the ,T[ , phase of work to be undertaken, e.g., roadway, sewer, water.or drain.1When .ation f the.:.,.w_ warranted by inflation or other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and Y approved by the Planning Board 20(i8'«u 159.15 9 07-01-2008 III i I �'4 r }A �� I APPENDIX C APPLICATION FEES Approval Not Required Plan - Form A $50+ $20/lot for plans containing more than 3 lots Preliminary Subdivision .Plan -Form B $100+ $20 I lot Definitive Subdivision Plan- Form.C $250 +$30/lot with approval of preliminary plan $500+ $50/lot without approval of preliminary plan Amended Subdivision Plan-Form CC $100/affected lot More Than One Building Plan-Form D $500+$50/building Inspection Charges $5 per lineal foot of roadway .._.�� $250 per detention /retention/subsurface leaching basin Public hearing notice $65 (check made payable to the West S rin field Record All checks except that for the Public Hearing Notice are to be trade payable to the Town of West Springfield. All fees must be submitted in full at the time of application in order for an application to be deemed complete. Ar, Air Section II.B. (continued) Planning Board are hereby authorized to sign said endorsement. rf the Board determines that the plan does require approval under the Subdivision Control Law, it shall, within twenty-one (21)days of submission of said plan,so inform the Clerk of its deternunation. Before the Board makes its decision, a review by the Town Engineer is required. II.C. basic Reauirernents No person shall make a subdivision within the meaning of the Subdivision Control Law or any land within the Town or proceed with the improvement or sale of lots in a subdivision,or the construction of ways,or the installation of municipal services therein,unless and until a Defensive Plan of such subdivision has been submitted to and approved by the Board as hereinafter provided, and subsequently recorded at the Hampshire County Registry of Deeds and, in the case of regi stered land, with the recorder of the Land Court. R.D. Zoning, Subdivisions shall meet the Rules and Regulations pertaining to lot size and restrictions to water courses under existing zoning laws. No subdivision rules can affect the size,shape,width, frontage or use of lots except that compliance with the requirements of the zoning bylaw will be required. H.E. E22 ineerin-& The Definitive Plan shall be prepared by a Registered Land Surveyor. Construction details shall be designed by a Registered Professional Engineer. MR Nees The following application fees shall be paid at the time of the filing of subdivision applications: 1. ANR/Fon-n A $50/two lots +$10 extra lot 2. Preliminary Subdivision flan $500 plus $75 per lot I . Definitive Subdivision Plan $500 plus $100 per lot 4. Definitive Subdivision Plan if no Preliminary Plan has been filed $1,250 plus$200 per lot 5. Amendment to a Definitive Subdivision Plan $350 plus$75/affected lot 6. Inspectipn $b/linear foot of new road rage ;! of i John Decker j dl From: Richard Harris[planningsh@a southhadley.org] Sent: Tuesday;April 21,2009 9:21 AM To: 'Yem Lip';John Decker Subject: RE:Subdivision Inspection Fees Good Morning Mr. Decker, Our subdivision inspection fee schedule is as follows: IINSPECTION TEES-- Sewer Mains&Appurtenances $ 2/lineal foot Storm Drainage&Appurtenances $ 2/lineal foot Road Construction,including curbing&paving $ 3/lineal foot Sidewalk S Mineal foot Just for future reference,all of the Planning Board fees(Special Permits, subdivisions, site plan review, .etc.)are on the Town's website—on the Planning Board page, If you have any questions, please feel free to contact me. Sincerely, Richard Harris,AICP South Hadley Town Planner From: Yem Up[maitto:yemdpw@comcast.net] Sent: Tuesday,April 21, 2009 9:00 AM To: 'John Decker'; Richard Harris Subject: RE: Subdivision Inspection Fees John, Richard HarrisEis our Town Planner. He can help you out with subdivision inspection fees. Yem From:John Decker[mailto:JDecker@agawam.ma.us] Sent: Friday,April 17, 2009 12:57 PM To: yemdpw@comcast.net Subject: Subdivision Inspection Fees Hello Mr. Lip, I was wondering what your Town subdivision inspections fees for water, sewer,drain and roadway? Thank you, -John John Decker, E.I.T. Assistant Town Engineer Town of Agawam Department of Public Works 1000 Suffield Street Agawam MA 01001 Email:}decker_aciawarn.ma.us Phone: (413)821-0628 Fax: (413)821-0631 4/21/2009 r Tnow of Ag' awam 36 Mein. Street AgAwamt Massaehusetts 01001-1837 Ted.. 413-786-0400 Fax 413-786-9927 AGAWAM PLANNING BOARD Proposed Amendment To Section 159-7H(6)(6)of the Agawam Subdivision Rules and Regulations entitled"Inspection Fee". which now reads: The unit rate of inspection fee levied shall be $0.75 per linear foot measured on each of the four categories cited above. The total inspection fee shall-be equal to the unit rate times the total footage of each line category of inspection(roadway, water, sewer and drain lines)as measured by the City Engineer.-The fees described above must be paid prior to the commencement of construction,but these fees need only be paid beforehand for the particular phase of work to be undertaken, e.g., roadway, sewer,water or drain. When warranted by inflation or-other factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works-and approved by the Planning Board.- Shall now read as follows: The unit rate of inspection fee levied shall be$1.20 per linear foot measured on-each of the four categories cited above. The total inspection fee shall be equal to the unit rate times the total footage of each line category of inspection(roadway, water, sewer and drain lines) as measured by the City Engineer. The fees described above must be paid prior to the commencement of construction,but these fees need only be paid beforehand for the particular phase of work to be undertaken,e.g.,roadway, sewer,water or drain. ,When warranted by inflation or other-factors, the unit inspection fee will be increased as proposed by the Agawam Department of Public Works and approved by the Planning Board 0 AGAWAM PLANNING BOARD The Agawam Planning Board will hold a public hearing on Thursday, April 2, 2009-at 7:00 PM at the Agawam Public Library, 750 Cooper Street, Agawam, MA. The purpose of this hearing will be to hear the petition of the Agawam Planning Board on a proposed amendment to Section 159-7H(6)(b)of the Agawam Subdivision Rules and Regulations entitled"Inspection Fee". Per order of: Travis Ward, Chairman AGAWAM PLANNING BOARD To be run 3/19 & 3/26/09. FAG TOWN OF AGAWAM Department of Public Works 1000 Suffield Street & Agawam, MA 01001 Tel (413) 8210600 • Fax (413) 8210631 ATED John P. Stone + Superintendent MEMORANDUM To: Planning Board CC: File From: John Stone—DPW Supt. Date: February 6, 2009 Subject: Subdivision Inspection Fee Increase The Department of Public Works proposes that the subdivision inspection fee outlined in Town subdivision code be increased to $1.20 per linear foot from the current$0.75. The fee does not appear to have been adjusted since its inception in 1991. $0.75 x CPI(2008) =$0.75 x 136.2 215.303 CPI(1991) =$0.75 x 1.581 =$1.19, Say$1.20. Consumer Price Index(CPI)yearly average data from:ITP:(/FI'P'.B1S,G. V lPUB ICPFCIAI_RRnIMAT'/CPIfCPIALTXT If you have any questions please do not hesitate to contact me. Sincerely, vhn P. Stone Superintendent of Public Works ]PSljgd saf'ileslinspection fee increase feb 2009.doc FEBVED n 9 2009 Pt