Loading...
8164_SITE PLAN - JC JC REALTY TRUST - CAR WASH - MILL, POPLAR AND SPRINGFIELD STS. SC/� C deal + y Trust Cor - M Hop C( r `�� �"� a�. � ,� �... ��.�we �- a�,���� .w a �..» u , �., t, �<< x„F The Agawam Advertiser News � December 6, 2001 - 3usiness Laser Auto Wash now open.' N" ',. I cl °� kt t r� r I F f s' *4}�ik# � $: Y '�•''s.YES �1 MyWg gigs € a gat k s Rj fig AN III z- s � LASER AUTO WASH, located at 92 Poplar Street(corner of Mill and Springfield Streets), has been open for the past few weeks and is truly a state-of-the-art facility. In tarp photo: Owner' x 'bony Parrelli, Mayor Richard A. Cohen, and Agawam Planning Director Deborah Dachos F cheek out the four different menu items offered to motorists. In photo below:The Agawam High cheerleaders were out promoting Laser Auto Wash on "Grand Opening" day (Saturday, December Ist), with part of the proceeds earmarked) to benefit the cheerleaders. hack;:row - Jule Pootz, Mill Nunziato, and Stephanie Sadowski. Front raw - Cori Verteramo Taryn i Lapponese, Biro Ch ura, and Laura Keller. Advertiser stews photos by Kathy Shepard. 1 fl, 4tl L. -4 AGAWAM OFFICE OF PLANNING & COMMUNITY DEVELOPMENT SITE PLAN REVIEW REVIEWER: D. Dachos DATE: June 18, 2001 DATE RECEIVED: June 15, 2001 DISTRIBUTION DATE: June 15, 2001 PLANNING BOARD MEETING DATE: June 21, 2001 APPLICANT INFORMATION 1. Name of Business: Not named yet. Address: Address should be determined. 2. Owner: C & P Real Estate Address: 36 Ramah Circle North, Agawam, MA 01001 Telephone: 567-7681 Fax: 786-1354 3. Engineer: Joseph D. Lagrasse & Associates Inc. Address: 1 Elm Square, Andover, MA 01810 Telephone: (978)470-3675 Fax: (978) 470-3670 PLAN REVIEW Scale: 1"=20' Date: June 12, 2001 Title Block (Street Address, Applicant's Name, Address, Scale, Name of Preparer of Plan): Street address should be placed on the plan. Plan should be stamped by an Engineer. Description of Project: Proposed construction of a three bay car wash with future expansion for a gas station, convenience store and ATM machine. Site Plan Review Page 2 Description of Site: On the site there presently exists a single family dwelling. The applicant must show all structures on the plan and indicate what is to be done with them. Provision for Traffic Flow: The plan shows one curb cut on Springfield Street, one on to Poplar Street and one on to Mill Street. The Mill Street curb cut appears to be one way. The plan is difficult to read. Widths of the driveways and radii are to be shown. Parking: No parking is shown. Drainage: Must be approved by the DPW. Public Utilities: Al proposed utilities are to be shown on the plan. Landscaping/Screening and Buffers: The following landscape note must be placed on the plan: "All plantings must be maintained and that portion of the public way abutting the parcel and including the treebelt shall be maintained in a safe and attractive condition by the owner of the parcel." Sign Location: Should be noted on plan. Exterior Lighting: Must be shown on plan. Cut sheets for all lighting should be supplied. Rendering or Elevations: Colors and textures should be supplied. Dumpster Location: Dumpster must be screened and fenced. The height and type of fencing and/or screening must be shown on the plan. Other Comments or Concerns: A more legible plan should be submitted for review. TowN OF AGAWAM MEMORANDUM s 1 Zb Building Dept. CC Planning J File From: Engineering Date: November 20, 2001 Subject: JC Car Wash - SP 381 Punch List Per your request, we have made an inspection of the subject site today and report the following: A final walk through was performed at the JC Car Wash. All items relative to Engineering have been;satisfied. If you have any questions, please do not hesitate to contact our division. Sincerely, � L y Pichard S. Seidnitzer James T. Daley, P.E. Civil Engineer I Town Engineer y `l t i" S:\SITEPLAN\Sp381-01.wpd C �. Town of Agawam may 36 MAIN STREET AGAWAM, MASSACHUSETTS 01001 Tel. 413-786-0400 September 19, 2001 Jeffrey N. LeBeau Jr.,P.E. Baystate Environmental Consultants Inc. 296 North Main Street: East Longmeadow,MA 01028 Attached are two pages that show the drain line and direction of flow between the two drain, manholes:shown on your plan sheet U-1, "Site Utility Plan"Proposed,Car Wash 92 Poplar Street Agawam, MA 01001. These pages were copied from a drainage study prepared by a consultant and from Massachusetts State Drawings for Intersection Improvements. Please revise and resubmit sheet U-I to show the drain line between the two drain manholes and also label the direction of flow on all drain lines entering and exiting the two drain manholes, Sincerely, Harold D. Piligian, E.I.T.. James T. Daley,P.E. Civil Engineer I Town Engineer cc DPW Supt. Jack Stone; Planning Board : 0 �,y S F y a if f h:lengeneerlspl3 8 1104.wpd' AMM6N rago IS ,° FLUS Ile u. r 5,4TVAE'R LTA 1 '' a jo t A � a d r 1771 R.) � r .. te . .. ► t _ ry 1 y r ET slap(AA) or FW5T T (R E-x I 3T, D F7Y V r_- e �E vez Y. "{ If r rZ / � TEMP. erg 5T* aw i �, ``� _ i#•* #�; a s* -"`"' '''�� t,,..�.irr kF ! � �'. i 'a,., 'V� • #.. #a^+q,;"R#a##�r,�,#i#.#♦ #,- ,g .. � ,�"" a '?..§r' h 8 nlit air ' aa�'a •• ■ •'■ :c".^^. 1 fit, \�t'�..� : r '' AM � �µ�'y, t,/ � •h•y•Be �■i r"' #ii *a ,'�,L" -... ,� �;. � k • 40. �� 2 �� .r"A'� r y is a a ■ 4a��#�y'� a��w�* e � f �' �"6� � r NI, t}y 3� /{ �•py� ��! .�t��4 ■ M a yy� �rt °''t+ � { '� 1 5 !. ,tpsj=,( { IK �,•# ��,,: x '' � _''+' d` °�■ r . - ,tea V t 'i ■ �n ■ i pX . ®. 'a • ■4k A f i � �q# � i i r&i 1E �� ��. F,�A,, � _ i •ems zoo 1 _"� � 14 ` ram- � � -,t ' • �?l' 1 ��'�`� �} .�y8��4f � �+ } M■ �`M �,.,.t'+.+�"°� 'a � ��� � ".ram.., ,.-•`� -. l JJP t� F +` r P0. � * .�W{■�'Mfg r �k� ``,,+.� ;�r � ..�.,.. �. � u�, "` y�_,,..�... , ■ � 1 i� yp.1-LsS' �'�671'. � 5 x. S�'P'' 4 ti' 3 - $ §'d a}'*. 3 � I �t ,t x ya. 0 0 TowN OF GAWAM MEMORANDUM To: Planning Board CC: File From: Engineering Date: August 29, 2001 Subject- JC/JC Car Wash.- Springfield, Mill, and Poplar Streets - SP381 0 Baystate Environmental Consultants and Josepb D. LaGrasse Associates, Inc. have mailed a set of the final construction drawings that address engineering comments. Provided is a set of the submitted final construction drawings. If you have any questions, please contact our division. Sincerely, I Harold Piligian, E.I.T. Civil Engineer I s-Asp4381%02.wN %AWN TowN MEMORANDUM 0 To Dominic Urbinati CC: John P. Stone, DPW Supt., Planning Board, Pile From: Engineering Date: August 2 , 2001 Subject: JC/ C Car Wash- Springfield, Mill; and Poplar Streets - SP381 We have reviewed the revised plans from Baystate Environmental Consultants dated 8/22/01 entitled "Site Utility Plan" and from Joseph D. Larasse Associates, Inc. dated 6/12/01 revised 8/20/01 entitled "Laser Car Wash, 92 Poplar Street, Agawam, A" for compliance with our comments per Planning Board approval letter dated June 26, 2001., All engineering comments; have been addressed. To expedite the release of the "Service Availability and'Permit Applicability" for forni for Anthony Parrelli 36 Ramah Cir, Agawam, MA we have signe4 the building permit with the understanding that the owner's engineering consultants will nail copies of the final revised plans to our office. Jeffrey N. Lebeau, Jr. o Baystate Environmental Consultants, Inc. has stamped the Drainage Calculation with his Professional Civil Engineering seat. If you have any questions, please contact our division; Sincerely, RaroId Piligian, E.l. James T. Daley, P.E. Civil Engineer I Town Engineer s.% \381\02. , 1 { x LAZER AUTO CENTER' FEEDING HILLS, MASSACHUSETTS' JULY 16, 2001' FROM: LAZER AUTO CENTER TO DIRECTOR OF PLANNING & COMMUNITY DEVELOPMENT DEAR DEBORAH,; PLEASE BE ADVISED THAT THE OFFICIAL NAME FOR AUTO WASH AT 92 POPLAR STREET, FEEDING HILLS;, MA WILL BE LAZER AUTO CENTER. ADDITIONALLY, THE BUILDING WILL BE BRICK AS PER PHOTO' SUBMITTED AT THE JUVE 21, 2001 PLANNING BOARD MEETING. IF YOU HAVE ANY FURTHER QUESTIONS'I MAY BE REACHED AT 531-5298., SINCERELY, TOARRELLI y . JUL 1 8 2001 F PLA� I Y TOWN OF AGAWAM fl MEMORANDUM `lb Planning Board CC: John P Stone, DPW Supt., Pile From. Engineering Date: June 29, 2001 Subject: JC/JC Car Wash- Springfield Mill, and Poplar Streets - SP381 Per your requestdated June 15, 2001, we have reviewed the above referenced site plan entitled "Site Improvement Plan, JC/JC Realty Trust Car Wash, Agawam, MA" by Joseph D. LaGrasse Associates, Inc. dated 6/12/01, and we have the following continents; 1. A Storm Drain Permit is required for this site. The applicant must submit drainage< calculati ns for the 2, 10, and, 100 year storms. Detention will be required to ensure than the proposed peak rates of runoff will not be greater than:the existing. Also, the plan should show the existing drainage systems in Springfield, Poplar, d Mill Streets. The= plan shows the site drainage discharging to an existing catch basin on Poplar Street, but does not slow what that catch basin is tied into. 1 The plan should show the street address 92 Poplar Street:.: 3. The plan should show the location of the proposed sidewalk (details are drown) and a detail of the handicap ramp. . The handicap parking space must be van accessible (S' wide with ail S' wide access aisle) ;. We recommend that one of the exit drives ,along Springfield Street be eliminated. .Also, if the westernmost exit drive along Springfield Street is to be used as an exit only, we;, recommend that the width be limited to approximately 12 feet. .All radii must be labeled. The driveway on Mill Street shall have "Do Not Enter" and "Exit Daly" sighs. It looks a if the applicant's intent was to have these sign, but some of the ter °ia.` t• f on the plan. Also, the applicant should show an analysis of g tl e' ill Street.exit or the exit should be re-designed to be right out only. June 29, 2001 SP-381 Page 2 7: The plan must show a benchmark. 8. The plan should show the location and a detail of the proposed business sign. 9 The plan should show the location of the proposed kiosk that is shown on the detail sheet- 10. The sanitary sewer rims, inverts, slopes, size, and type of pipe must be shown. Also, the plans must show a detail of the proposed sanitary sewer manhole (with brick invert), MDC trap, and typical sewer trench section. According to John Savioli, Deputy Supt. of Water & Sewer, the sewer connection shall tie into the existing sewer manhole in the intersection of Poplar and Mill Streets, 11, The plan must show the proposed water connection location, size, and type of pipe. The existing �vater mains are,not shown correctly. The applicant should plan on connecting to the 8" water main in Mill Street at the intersection with Poplar Street Oust no of the existing drain manhole). See John Savioli if there are any questions. 12. The radius curbing at the Mill Street and Poplar Street entrances shall be vertical granite curbing. The radius curbing on Springfield Street can be bituminous curbing. Wherever curbing is shown on the plan, its type should be noted (the information provided is not clear). 13. The following notes shall be added to the plan: "Prior to any installation of any sewer, water or drainage lines, the contractor/owner shall contact the Town of Aga is Engineering Division, 786-0400 ext. 275. No piping/appurtenances will be installed or backfilled without the permission of the division." "All plafttings must be maintained and that portion of the public way abutting the parcel and including the treebelt shall be maintained in a safe and attractive condition by the owner of the parcel." If you have any questions, please do not hesitate to contact our division. As the drainage system requires substantial revisions, we may have further comments. Sincerely, Jennifer Grabowski, P.E. atnes T. Daley, P.E. Civil Engineer H Town Engineer 0s038t%OLwPd TOWN OF AGAWAM 6 MAIN STREET A AWAM, MASSACHUSETTS 01001 Tel. 41 -756-040+ PLANNING BOARD June 26, 2001 P deal Estate 6 Ramah Circle Agawam, MA 01001 To Whore It May Concern: At its duly called meeting held on June 2.1, 2001, the Agawam Planning Beard voted to approve the Site Plan entitled `Site linprovernent Plain,JC/JC Realty Tryst, Car Wash, Agawam, "� prepared by Joseph P.Lagrasse Associates,Inc. and dated Jute 12,2001 with the following editions: the applicant is to address any comments from the Engineering Department's review; the exterior of the building shall be brownstone colored block as discussed at the meeting; and the dumpster location is to he moved ftuther from the street and the applicant is consider enclosing the dumpster as discussed at the meeting with masonry on three sides with a gate. If you have any questions,please contact this office at 76-0400, extension 283. Sincerely, s Dennis B. Hopkins, Acting Chairman AGAWAM PLANNING BOARD DBH:prk cc: Building Inspector Engineering Dept. Town Clerk Pile AQ ,,roWN OF AGA A . 6 MAIN STREET ACA WAtil. MASSACHUSETTS 01001, Tel. 413-M, -0400 MEMO` TO Planning Board FROM: Engineering Department DATE: June 21,2001 SUBJECT: Site Plan Review - Car Wash-Mill,Poplar and Springfield Streets - SP 381: Please be advisedthat this office received the Site Plan for the proposed Car Wash at Springfield,Mill and poplar Streets on June 18,2001 Due to the poor quality of the print,the plan was illegible. We received a better copy of the plan this afternoon but will not have time to review it prior to tonight's meeting. We will provide our comments as soon as possible. Sincerer, t Jennifer Grabowski, P.E. Civil Engineer 11 2001 PLANNIN01 WN OF AGAWAM '_ 36 MAIN STREET AGAWA'4 , „ IASSACHLISETTS 01001 Tel. 1 - • 00 MEMO TO: Building Inspector,Engineering Department,Police Department;Fire DepaMent FROM: Planning Board DATE: June 15, 2001 SUBJECT Site Play:-JC/JC Realty Trust- Car Wash-Intersection of Mill,Poplar and Springfield Streets Please review and comment on the attached Site Plan for JC/JC Realty Trust- Car Wash, at the intersection of Mill, Poplar and Springfield Street, prior to the Board's June 21" meeting;. Thank you. DSD/js Attachment ' " AM R E DOWTMENT DATE. A SIGN..aa.... ..:+e .rw. raatis. :tc+. ----------- 1 V� TOWN OF AGAWAN4 M 3 r AI't S7C'R T AGAWA I, NI�iSSACH�f..�SETTS 010Ji:' Tel. 41 -786 MEMO TO: Buildina'ln pectcr; Engineering Department,Police Department Fire Department FROM: Planning Board DATE: June 15, 2001 SUBJECT: Site Plan-3CIJC Realty Trust-Car W -Intersection of Mill,Poplar and Springfield Streets Please review and comment on the attached Site Plan for JCIJC Realty Trust-Car Wash, at the intersection of Mill,Poplar and Springfield Street, prior to the Board's June 21' meeting. Thank you:. DSDlj g Attachment e 4 tncm /Ve -0 P m; -n` rn d ' z,, =s A �! TOWN OF AGAWAM �e q. ;:' ,6 MAIN STREET ACAWAM, MASSACHLiSETTS 01001. Z Tel. 4143 7W0400 1 MEMO' TO: Building Inspector,Engineering Department,Police Department,:Fire Department FROM Planning Board DATE: June 15 2001 SUBJECT: Site Plan- JC/JC Realty Trust- Car Wash-Intersection of Mill,Poplar and Springfield Streets Please review and comment on the attached Site Plan for JC/JC Realty Trust- Car Wash, at the intersection of Mill, Poplar and Springfield Street, prior to the Board's June 21" meeting. Thank you. DSD/jsg Attachment ij x r i:SA i fil4'f�il �Ji I�. AGAWAM PLANNING BOARD '0 1 JUt4I '19 3 ( 8 Farm D Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to Agawam Punning board Office of Planning and Community Development 36-Main Street Agawam,MA 0100 1. Name of Business YET TO BE NAMED AUTOMOBILE CAR WASH Address INTERSECTION OF MILL, POPLAR AND SPRINGFIELD , STREET -- Telephone 567 7681 Fax 786 1354 2. Name of Applicant/Owner C & P REAL ESTATE' Address 36 RAMAH CIRCLE NORTH, AGAWAM MA 0100-1 567 7681 786 1354 Telephone Fax - -- JOSEPH D . LACRASSE & ASSOCIATES INC . 3 Name of Engineer/Architect Address EKM SQUARE, ANDOVER, MA 0181.0 Telephone 978 470 3675 Fax 978 470 3670' es 4. Please give a brief description of the proposed project. THREE BAY CAR WASH, WITH FUTURE EXPANSION FOR GAS STATION, CONVIEN,CE STORE AND ATM MACHINE. Revised 9/12100 " } B jol � �. lip' MAI 1043 "PN stab, 48 Igo o \ Idol il 5 jj 77 45,- f t e a m ��ts " O . TAIC M " ' r ;ENE. zoo( * . vo , fo 1,14 0 Tr 1 101 A4j MA. WALTER F. t �4�t1K£i JVt 1 1 D E�,1, , + h y. 22d4 i �'r 1 s q , 3 `i , I /0 54 r 56 i act,' o li � P 10 JOUD 00 ,_D� r f OSr�Ei - " 1 oz 7 1 i lot. �n1 A3 3 - 6 c4 JS f ` 403 AYb 2 � - / yin ca, 'b"X 410 c}fir,-}. • /) i o� WA �_.i 11� K�..:fi`T`- , C .LS r .. .,r�` . Al) MA 4 mow+ i Sr �-`� P W}�l.T'ER � ltf {441KEET JFt < JUN 2 1 .55 ZQ�f sy, R : i ' t r SPRINGFIELD - `REE o OR le 7E �.� . i671 "* 44 OVA /0 ja IcOP vlli • - r , lot • f45 • t jut TO 0 r JUN, t PLA lot-got RAM F. f f 22434 , g y m v a, `w Ev i RED 4ti ' 4 i L r r Page t of 5 ALlrnaXIA 41awrlma a K E: I'rt d act features I l_ o Sh€r to I FbqWm,9trjQ Data I YI Files I i e Ail l Erodprt c tetra PWi(flabflft Home KSE: Symmetra Premium Cutoff,,,guar �� �. '�' �.. .�L/A7 r ut fu JUN 2 1 RANN'N; Typical area of use: Outdoor � r Vow l Lithonia Product Group: Architectural Outdoor t General product category: Area Lighting View Product Sqlaotion Guide Pac e Features. Housing: Rugged, heavy-gauge, extruded aluminum housing. Square shape, seam- welded and internally sealed for weathertight integrity.. Standard finish is dare bronze polyester powder (DDB)p,electrostatically applied and oven cured. Architectural Class 1 anodize finish and other architectural colors available.. Optics: Anodized segmented panels tabbed and riveted to aluminum reflector housing. Reflectors are rotatable and interchangeable. Four cutoff distributions available: Type 11 (Roadway), Type III (Asymmetric), Type IV (Forward throw, sharp cutoff), Type IV (Wide forward throw)) and Type V (Symmetric). Door Frame: Naturally anodized, extruded aluminum door frame sealed to housing by silicone closed-cell gasket and secured with ) quarter-turn closing screws. Can b hinged from any of the four sides. Lens: .1 "-thick, impact-resistant tempered glass. Mounting: Extruded 4" aluminum arm for pole or wall mounting shipped in fixture carton. {optional mountings available. Electrical System: High power factor , constant-wattage autotransformer ballast, copper wound and 100% factory tested. Removable power tray and positive-locking disconnect http://www.lithonia.conVproducts/Catalog/family.asp?family=KSE 6l {ll l Versa-Lok- Installation Page I of 3 The following infort-nation is provided to give you a general understanding of retaining wall construction. If you are building a VERSA-LOK retaining wall yourself, please request a Design & Installation Guide available free from your supplier, through our"FREE Helpful Stuff" section, or by calling(800) 770-4525. Important; Walls which support heavy loads or exceed four feet in height require special soil reinforcement and often professionally designed plans. Please consult a qualified engineer if unsure about any construction, site or soil conditions. Also be sure to check local building codes before wall construction or design. Step 1 Leveling Pad Preparation VERSA-LOK walls should be placed on a leveling pad of well-compacted gravel, crushed stone or coarse sand approximately 6" thick and 24" wide. The first course of VERSA-LOK units should be embedded below grade approximately 1/10th of the exposed wall height. Excavate to lines and grades you've established for your wall, allowing for the leveling pad and unit embedment. Place and compact leveling pad material. It may be helpful to add a thin layer of sand to create a uniform, level pad, http://www.versa-lok.com/install.htm 6/2 OIL 1 Versa-Lok -Installation Page 2 of 3 Step 2 Install Base Course Place VERSA-LOK units on prepared leveling pad. As you proceed,level each unit front to back,side to side,and with adjacent units. Leveling is critical at g, this stage, so take your time', Align straight wall sections using a string line or by sighting down the grooves on unit tops. If your wall has a comer,begin at the comer and workout from there. Step 3 Backfill Using native soil,backfill and compact behind and in front of the base course to a level even with the grade in front of the wall. Next,place and compact 12" of drainage aggregate behind units. Step 4 Install Successive Courses Stack units one course at a time.Set units back 3/4" and insert two pins in front holes of units so they fall into the rear slots of the units beneath. Tap pins with another pin and a mallet to properly set them.Place and compact drainage aggregate behind each course as it is completed. http://www.versa-lok.com/install.htTn 6/20/01 Versa-Lok-Installation, Page 3 of Step 5 Install Caps IAfter completing the top course of your i gall,install RSA-LOK caps,either with a slight overhang(recommended), set back or flush with the wall face. 'Use VERSA-LOK concrete adhesive to secure cap wits to the wall. TOP Of PAGE A� VALLCOMP ENU �1 auEituaws 401M VERSA-LOA Retaining Well System@ Revised.114159 http://www.versa-lok.con-i/install.ht 6/ 0/01- Catalog Number Type 1011101, FEATURES & SPECIFICATIONS HOUSING-hugged,heavy-gauge,Xt thick,lightweight extruded,alu- minum housing.Square shape,seam-welded and internally sealed for weather-tight integrity. Standard finish is dark bronze (011), Area Lighting polyester powder,alactrustaticaNy•applied and oven-cured,tither powder architectural colors available, DOOR FRAME-Naturally anodized,extruded,aluminum door frame is sealed to housing by a silicone,closed-cell gasket and is secured' K Sk E 1 with(3)quarter turn closing screws.Can be hinged from any of the four sides. i METAL HALIDE OPTICAL SYSTEM-Reflectors are anodized and segmented for supe- 10OW, 150W, 175W, 20OW, 250W rior uniformity and control,which allows the flexibility to mix distr 15' to 25' Mounting butions without compromising the overall fighting job. Reflectors attach with tool-less fasteners and are rotatable and interchange- able.Three cutoff distributions available:Type 11(Roadway),Type III I (Asymmetric),Type IV(Forward Throw,Sharp CutoM. LENS-tens is',125"thick impact-resistant,tempered glass. — ELECTRICAL SYSTEM-high reactance,high power factor ballast for D IODW,Constant-wattage autotransfpr er ballast for 15I1.250W.Bal- last is copper wound and 100%factory tested.Removable power tray and Positive locking disconnect,plug, SOCKET--Porcelain,horizontally-oriented,socket with copper alloy, nickel-plated screw shell and center contact.Medium-base socket Specifications used with IOOW and mogul-base used with 150-250W. UL listed EPA:1.3ftll.r2mt) Arm Square 150W-6DOV. (includes arm) All dimenattns ere inches (taattitimatarstunteaa INSTALLATION-Extruded,V aluminum arm for pole or wall mounting Square: 15.11116(3911 otherwise specified: is shipped in fixture carton.Optional mountings available. Depth:8-3/4 f22.2) comply with LISTING-.UL listed for wet locations.Listen and labeled to rN�ymEm_a.O�aC-ion ore r rataarart Aimlength:4{t0,2}, slow DA12ir 5 Canadian Standardadsee Options): Weight:2S6 lbs 112:1kg) NJ9acr,DA12ws e wwXX 7 ORDERING INFORMATION Example: KSE12SOMR3120SP045FDDB choose the boldface catalog nomenclature that boar suits your nest nestdo and Atha it on the ttrre;Order ttaaits,sopert n r- KSEI 250M Scaries l/oltag+e Mraunting8 Options XSE1 100M 120 SP04 Square pole IV arm) Shipped installed In Fixture Architectural Color lists 1W 2081 (standardlt Sf Single fuse,(120,277,347V) 1powwder finish}t KSE1 1TSM 2401 SPOS Square pole l `arm) DI'Double fuse(208,240,4840 standard Ca KSE1 RP04 Round prole I4r army Dark bronze(standard) 2T7' PER EEEt+lt twist-lock sactsptacla KSE1 2501W 347 RP09 Round pole IT arm) only OWH White 4801 WWg4 Wood pale or wall 14 QRS;Quartz restrike system 000W D� Black [7tistribution a(trllr maxi lfatrip net inctudedl Classic Colors R2 IES Type 11 roadway T82 WW09 Wood pole or wag 19' EC Emergency circuit DME, Medium bronze arm) R3 lES Type Ill asyrnrnelric CR Corrosion-resl5tarrt finish DNA Natural alummurn R IFS Type IV forward W804 Wall bracket W arm? CSA Listed and labeled to ootn 1 Sandstone DGC throw,sharp cutoff WB09 Wall bracket (9»arm)' with Canadian Standards p DTG Charcoal grey KOTts UARM When ordering KMA,, SCWA Super CWA Pulse Start Ballast TG Tennis groan 1 CoesuhtacieryforavoilabfarwinCsnada. DA1;2 1T8 only) DBR Blight rod 2 Optional mutti-tepballost 1120,208,2e0,277v1.112C, tURPSL Low Loss Reactor Pulse Start DS13 Steal blue 2r7,34r1inC t $lrtpl4 OPTIONAL T,IftHtil+lTiAifia' Ballast (277'V rrralyf 3 The Spot,RP09 or WWO9 most be used when we or SDW Dark bronze' more luminaires are oriented on a 801 drilling pattern, (shipped soparatelO White 4 May be orderedasareessotyy, DA12P Degree arm {pale( SM Black 5 Addttionslarchitecturalcoloraavailable;see DA12WB Degree arm (Wall) Thippadep�Patelyr ArchltecturalColorsbrochureformno:7at.a PE1 NEMA twist-lock photocontrol � Natural aluminum Kf4rtA Mast arts adapter Sandstone d For etm mrxuntinq,rater to technical data section lh 1120,200,2401r1 me Outdoor binder for drilling template. itTMB Twin mounting bar PE3 NEMA twist-lock phot+econtrin SDTG Tennis green 7 Sloping isavaitablieinttaa too relent li;stedonty, (347V) SM Bright red a Merbe ordered:with SCwdorLLRPSL.: PE4 NEMA twist-iock:Phtlocontiol SOMA Bark blue 9 Most be ordered with'SCWA or LLRPSL. (480V1 SDGYM Gray PE7 NEMA twist-lock'photocontrol SDVW Yellrlw Accessories,Tertranril ountiAg Slirsritter fQrderselalzrateFyi 127311) Arch tecttaral Glass 1 Anodize Number of fixtures, SC Shorting cap for PER option ADS Dark Bronze Tenon 0.0. One T too° T 'a lhroo*120' Thre *t Tour ' *t AB! Black 2.318» TZO-190 T20-2ti0 TZO-2'90 T20-320 T20.100 T20-490 KSE1N5 House soda shield(II2 f�} 2 7/8' T25-190 T25-280 T25-290 TZ -32g T25.390 T25-49te KSE11rG Vandal guard 4' T35.190 T36-280 T35-290 1733.320 TIS-300 T35-490 OUTDOOR 5r65-KSEt KSE1 Premium Cutoff Lighting Coefficient of Utilitation Initial Fooritcandles KSE1 250M R2 Test No.1195020554 KSE1 250M R3 Test No.1195020534 KSEI 250M R4SC lost No.1195021808 MUMEW I ls"ra I coufaw IN'JIM"M COEEWWOF02AM LOW` T N X a 0 2,6 2, ,26 2 �25 0250 W Metal 1 Hafi0 la 3 4 S 6 z 3 4 5 6 0 1 2 1 4 5 6 ll mp,2DOW rated 25OW Maul Halide lamp,2MOOfated 250 Metal Halide lamp.2M rated fureami.toftandlar values bidod to 3Y to faltbWEft Values baw on 35' lumarst Fo&afl(b values based on 35, mwdq hailliK OisAttiart 0,tatid mwxft h*K lAstributloo III,toW movittirl h*K Nsitritiotion IV,am. NOTES: Mounting Height Correction Facw I. Photometric data for other distributions can be ac- iMuldply the fe level by the corroction factor) cessed from the Lithonis Lighting webelte. lwww1ithonia-com) 15 k-IJ7 2. For electrical charact"fica, consult taclrmical date 18-ft.-Ilm tab. 26 ft...64 I Tested to current I&$ and NEMA standards undst stabifizoo laboratory conditions. Various operating " factors can cause differences between laboratory and Existing Mound"How" z Correction Factor actual field measurements.Dimensions and specifics- Now mourntling Haight, tiorts are based on the most current'available date and are Subject to chango, AW Ah 565-KSEI VAN1.1r"A7M1AA'r.AGAffr1JVG 01999 uthopis Ughling. Rev,WN ONE LMAZIA ARCHITECTURAL OUTDOOR LIGHTING �=Y,8�IF4 6=A 104 1 JJVD FAX 770450�3 29 565KSE1.P66 1% Er H"2V3