Loading...
8212_SITE PLAN - TENNESSEE GAS PIPELINE CO. - 1615 SUFFIELD ST. Gas AGAWAM PLANNING BOARD Form D Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to: Agawam Planning board Office of Planning and Community Development 36Main Street Agawam, MA 01001 I. Name of Business Address .09ee4-49,,w 17,V-9' oy'po/ Telephoner` v�i� 1r1n1 7b (� 3 Fax �D-7g '�a41 2. Name of Applicant/Owner. Address Telephone Fax 3. Name of Engineer/Architect Address Telephone Fax 4. Please give a brief description of the proposed project: noPOO ry. SEA S 1 re ft,9A) �o�' 75�AJ P ^ MAY VC V 41i il� Pbi `:. . 04/18/02 08:59 FAX 1617.720411J- HOL ANA&KNIGHT BOSTON Z023/025 D.T.E. 01-57 Page 20 Department only after consulting with municipal officials,and thea only if the municipality is un ble to grant the necessary zoning approval, or if it encounters difficulties in obtaining municipal zoning approvals within a reasonable period of time. IV. MER Accordingly,after due notice, hearing and consideration, it is hereby MEMD: That Tennessee's petition for an exemption from Section 190-37 of the Agawam zoning ordinance be allowed,pursuant to G.L. c.40A, § 3; and it is FMTE1ER ORDERED: That Tennessee's petition for an exemption from Simon 1 g0- 13 of the Agawam zoning ordinance be denied,pursuant to G.L.c. 40A, § 3; and it is FURTHER ORDERED: That Tennessee's petition for a blanket exemption from the Agawam zoning ordinance be denied,pursuant t© G.L. c.40A, § 3; and it is PURTBER RDE D. That Tennessee notify the Department of any significant changes in the planned timing,design or environmental impacts of the proposed project; and it is H !J7 H > C7 70 Cr 3 M Cn S. 'K MAY 04/18/02 08:48 FAX 113177204111. - HOLLAND&KNIGHT B0.51ON tM011/025 D.T.E. 01-57 Page 8 products, certain logging activities, certain residential uses, and airports(i�d�}. The Company stated that the proposed chromatograph building would not be a permitted use in an agricultural district(id}. Based upon a review of the express language of Section 180-37 of the zoning ordinance, it cannot reasonably be argued that the Company's proposed chromatograph building is a perirsitted use in an agricultural district. The Department therefore concludes that without zoning relief;such as the issuance of an exemption pursuant to G.L. c.40A, § 3, Tennessee would be prohibited from constructing and operating its chromatograph building as proposed. Accordingly, the Department finds that exemption of the proposed chromatograph building from . Section 180-37 of the Agawam zoning ordinance is required within the meaning of n G.L. c.40A, § 3. f� b. Section 180_13: Site Plan Review o- -n Section 18043 of the zoning ordinance identifies uses or projects requiring tW- 7.1 preparation of a site plan, and sets forth procedures for the review of site plans by the Agamim Planning Bo4rd (Exh. TEN-1, exh. B at§ 180-13). Tennessee stated that its proposed chromatograph building"will conflict"with this provision of the zoning ordinance(Exh.HQ-Z- 2). The Company did not identify the nature of the conflict and did not further explajn its used for exemption from Section 180-13- Based on the evidence in the record the Department concludes that Te=essee bas not demonstrated that exemption from Section 180-13 of the Agawam zoning ordinance is necessary to allow construction or operation of the Company's cbromatograph building as proposed. Consequently, the Department finds that exemption of the proposed building y P, r`+ MAY 0 6 . PLr11� d it 1 04/18/02 08`50 FAX 16177204111, xOLLa:N'D&XA IGHT BO�ToN [�o12fa25 D.T.E. 01-57 Page 9 Section I80-13 is not requircd within the meaning of G.L. c. 40A, § 3. 2. Blank,..et Exemption In addition to its requests far exemption from Sections 1 SO-37 and 180-13 of the zoning ordinance,the Company has requested"a blanket exemption from any and all provisions"of the ordinance (Exh.TEN-1, at 3-4)s Tennessee identified a number of reasons for its request,the majority of which reflected the Company's view that a G,L_ c. 40A, § 3 proceeding before the Department is a more advantageous forum for seeking zoning relief than a proceeding before a local zoning board. The Company stated that: (1)as a public service corporation, Temessee has the statutory right to make use of G.L. c, 40A, § 3; (2) zoning appeals"are different locally than at the state level'; (3) decisions by zoning boards of appeals are automatically stayed pending appeal,while Department decisions are not automatically stayed,(4)zoning Bylaws in.diff�Tcnt municipalities may contain different standards than those applied by the Department; (5)the Company seeks uniforms treatment of its zoning petitions, which is more likely if all petitions are addressed to a single body, (6)the Department is charged with balancing regional or statewide concerns,whereas a local zoning board is charged only with balancing local concerns and joca l t+7 Cn public interest; and (7)the Company seeks"to avoid the problems encountered in D.Tl- 9-33- (Exh. HO-Z-2).6 �" m As the Company notes, the Massachusetts Supreme ludicial Couxt confirmed the Department's authority to issue comprehensive zoning exemptions in Plarsniu Be f Braintree v.,Deparmtent oflic Utilities.420 Mass, 22 (1995), which upheld the Department's final order in Braintree Elmtdcz Light,Dgpadrp=L D1'_U. 90-263(1991). 6 In D.T.E. 98-33 (December 10, 1998)Tennessee sought and received a zoning exemption in connection with an unrelated project in Agawam. The referenced "problems" apparently refer to the allegations set forth in a motion for clarification " I a, MAY o 6 32 PI ':} f Town of Agawam - 36 -Main Street Agawam, Massachusetts 01061-1.837 gyp. Tel, 413-786-0400 Fax 413-786-9927 PLANNING BOARD May 17, 2002 Tennessee Gas Pipeline Co. 1615 Suffield Street Agawam, MA 01001 Attention: Jim Hartman Dear Mr. Hartman: At its duly called meeting held on May 16, 2002,the Agawam Planning Board voted to approve the Site Plan entitled "Chromatograph Installation Plot Plan, Station No. 261, 1615 Suffield Street,Hampden County,Massachusetts" dated 5-17-01, revised 6-01. If you have any questions,please contact this office at 786-0400, extension 283. Sincerely, YT ' Dennis B. Hopkins, Acting Chairman AGAWAM PLANNING BOARD DBH/DSD:pre cc: Building Inspector - Engineering Tin Clerk File MEMO To: Planning Board From: Sergeant Donald Galle ani Subject: Site Plan, Tennessee Gas ipeline Co., Suffield Street Date: May 14, 2002 The proposal by Tennessee Gas Pipeline Co. to install an 8'x 10' building for determining gas quality will have no impact on pedestrian or traffic safety. TOWN OF AGAWAM INTEROFFICE MEMORANDUM - o To: Planning Board CC: File, John P. Stone, Supt of D.P.W. From: Engineering Date: May 13,2002 Subject: Site Plan-Tennessee Gas Pipeline Company Per your request dated May 6 , 2002 we have reviewed the site plan entitled, "Chromatograpgh Installation Plot Plan Station No.261"Hampden County, Massachusetts prepared for Tennessee Gas Pipeline, scale V =80', date 5-17-01, revision 6-01,and we have the following comment: We recommend the applicant put the address 1615 Suffield Street,Agawam, Ma. 01001 in the title block on the plot plan. If you have any questions,please contact our division. Sincerely, Sincerely, e4AIn James T. Daley, P.E. Harold Piligian, E.I. . Town Engineer Civil Engineer I hAengineeP sp%40I 0I.wpd ' " _ ut AGAWAM PLANNING BOARD Form D Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to: Agawam Planning board Office of Planning and Community Development 36 Main Street Agawam, MA 01001 1. Naine ofBusinesses ,6/,V*6 6;5 /01P1,2,*,V9 Address I�/ ,jv L.t i� � � '0q4.%`✓11 6712•g- 42/00/ Telephone�A" � � -9oL3 Fax gam"76 oy 2. Name of Applicant/Owner � ✓ Address r Telephone Fax 3. Name of En a °' a I� ?t� c �� �j ��o✓� Address Telephone c Fax,_ 4. Please give a brierf ription of the proposed project: " 1,V6r9Z44 yr 'X �o` 13c, G � bar �rr��.✓.n�C 1�- ,4x9nJ o u)A1VN4 Corra SAY G 6 0132 f PDVL�. , - - Tennessee ep Gas Pipeline an El Paso company James D.Hartman Tenriessee Gas Pipeline Principal Property Rights tei860.763,6033 fax 860.763.6041 Specialist Iim.hartmar@elpaso.ccm 8 Anngina Drive Entield,Connecticut 06082 AGAWAM PLANNING BOARD Form D Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to: Agawam Planning board Office of Planning and Community Development 36 Main Street Agawam, MA 01001 1. Name of Business F n3'S£t 49-5 /�i��,�1�✓� , Address e�zla22l7Yl'� o�ao/ Telephone 41OW"t T � 6-70-6P33 F g4D-76 yl Z. Name of Applirantl0wner � !35 �l�o �� _ . Address Telephone Fax 3. Name of Engineer/Architect Ce~t o9j #9160 PS Address Telephone Fax { 4. Please give a brief description of the proposed project: /NSTi9Ld•9 y.�v✓ or ,x /o' 63 a�41��n�C ��Jrn nl/✓Js�[ 3 Sx s roc GT0iWz 11Ik .q ; :, t ��- f� Z , t MAY 262 Revised 9/12/00 ' '4 04/18/02 08:53 FAA 1617720411 ROLL-A"&KNIGHT BOSTON �]029/025 D.T.E. 01-57 Page 20 Department only after consulting with municipal officials, and then only if the municipality is unable to grant the necessary zoning approval, or if it encounters difficulties in obtaining municipal zoning approvals within a reasonable period of time. N. ORDER . Accordingly, after due notice, hearing and consideration, it is hereby ORDERED: That Tennessee's petition for an exemption from Section 190-37 of the Agawam zoning ordinance be allowed,pursuant to G.L. c.40A, § 3; and it is FURTHER ORDERED: That Tennessee's petition for an exemption from Section 1 g0- 13 of the Agawam zoning ordinance be denied, pursuant to G.L. c. 40A, § 3; and it is FURTBER ORDERED: That Tenncssee's petition for a blanket exemption from the Agawam zoning ordinance be denied,pursuant to G.L. c.40A, § 3; and it is FURTHER ORDERED: That Tennessee notify the Department of any significant changes in the planned tinning, design or environmental impacts of the proposed project; and it is ' Cr- CC) n 4. MAY 0 6 2MZ 04/18/02 08:49 FAX 161772o4iii HOLLAND&KNIGHT BOSTON WU011/025 D.T.E. 01-57 Page 8 products, certain logging activities, certain residential uses, and airports(LdJL . The Company stated that the proposed chromatograph building would not be a permitted use in an agricultural district (W. Based upon a review of the express language of Section 180-37 of the zoning ordinance, it cannot reasonably be argued that the Company's proposed chromatograph building is a permitted use in an agricultural district_ The Dcparanent therefore concludes that without zoning relief,such as the issuance of an exemption pursuant to G.L. c. 40A, § 3, Tennessee would be prohibited from constructing and operating its chromatograph building as proposed. Accordingly,the Department fords that exemption of the proposed chromatograph building from Section 180-37 of the Agawam zoning ordinance is required within the meaning of a3 G.L. c.40A, § 3. c b. Section 180-13:Site Plan Review ;, Cr Section 180-13 of the zoning ordinance identifies cases or projects requiring tha preparation of a site plan, and sets forth procedures for the review of site plans by the Agawam Planning Bo4rd(Exh. TEN-1, exh.B at§ 150-13). Tennessee stated that its proposed chromatograph building"will conflict"with this provision of the zoning ordinance(Exh_H0-Z- 2). The Company did not identify the nature of the conflict and did not further explain its need for exemption from Section 180-13. Based on the evidence in the record the Depattment concludes that Tensesseehas not demonstrated that exemption from Section 180-13 of the Agawam zoning ordinance is necessary to allow construction or operation of the Company's chTomatograph building as proposed. n� Consequently, the Depamnent finds that exemption of the proposed building MAY 0 6 2001 ' oV18f02 08:50 FAX 1617720411 HOLL#INID&KNIGHT BOSTON [it012/025 D.T.E_ 01-57 Page 9 Section 180-13 is not requi=d within the meaning of G.L. c. 40A, § 3. 2. Blanket Exemption In,addition to its requests far exemption from Sections 180-37 and 180-13 of the zoning ordinance,the Company has requested"a blanket exemption from any and all provisions"of the ordinance (Exh. TEN-1, at 3-4).s Tennessee identified a number of reasons for its request,the majority of which reflected the Company's view that a G.L. c.40A, § 3 proceeding before the Department is a more advantageous forum for seeking zoning relief than a proceeding before a local zoning hoard_ The Company stated that. (1) as a public service corporation, Tennessee has the statutory right to make use of G.L. c. 40A, § 3; (2) zoning appeals"are different locally than at the state level"; (3) decisions by zoning boards of appeals are automatically stayed pending appeal, while Department decisions are not automatically stayed; (4)zoning bylaws in.diffemt municipalities may contain different standards than those applied by the Department; (5)the Company seeks uniform treatment of its zoning petitions, which is more likely if all petitions are addressed to a single body-, (6) the Department is charged with balancing regional or statewide concerns,whereas a local zoning board is charged only with balancing local concerns andlocA, public interest; and(7)the Company seeks"to avoid the problems encountered in DIX. %33 to (Exh.HD-Z-2)6 ` _ D ' As the Company notes,the Massachusetts Supreme Judicial Court confirmed the Department's authority to issue comprehensive zoning exemptions in Nag i=BoaTd%f Braintree v. Department of Public Utilities, 420 Mass. 22 (1995),which upheld the Departtncnt's final order in Braintree Electric Light Dep ., cut_D_P_iT. 90-263(1991)- 6 In D.T.E. 98-33 (December 10, 1998) Tennessee sought and received a zoning exemption in connection with an unrelated project in Agawam. The referenced "problems" apparently refer to the allegations set forth in a motion for clarification( fih1 MAY 6 6 ZW2 Pb 7 TOWN OF AGAWAM INTEROFFICE ` MEMORANDUM To: Engineering, Police,&Fire CC: From: Planning Board Date: May 6, 2002 Subject: Site Plan, Tennessee Gas Pipeline Co., Suffield Street Please review and comment on the attached Site Plan for Tennessee Gas Pipeline Co., Suffield Street, prior to the Board's May 16, 2002 meeting. Thank you. DSD/jls Attachment FROM THE DESK OF... Fax: i $ g R. n n a C. I I I I W. I I I 5 _ 1 2 — 1 N.15+00 _ r 23 sl r I 9 is is l— SEE ENLARGED PLAN "A" 1] 12 I x tp+9q - - - - - DWG. TE C26t F3 YA 01A Z I I1: INSETT G ID ATE POINT I NORTH I WEN DESCMP7*N t0+20. HT r 61 OE I 2 10+SO.It i044 110P.CORNER N.e+00 w I 13 LT'�• - 3 1e+e1.2a I5+ ENT 23.N UN .. � PLAIR. ... . �1"j� . . � - ........ . . � ..... � : .. . . .. . ... ..� 0 te+71.11 1 +2.30 ROP. R W3IRwl111NCE I - //�� I + ti+61.91 .C =� N CNi ■T� IIQN�IIT x 0 INxe.lt 7!+ {pP.COppFR ' i101xIWE11T h _ CHINNYM.RdPN F 7 COMMIT e 12+J6.9a t1+0y ROP.COMIkA LT.+18}[,0. r1 LT.STO. -T BIIR01N0 eel'-2 N.7+W 1 •' C _ t0 I+29.7] 10+11.ea WENT 11 +E. 11+75.a u 9+W YONl1�1ENT I j 13 O+W 0+ •W P.EN7 d"'•r I �� + 0+3.d4 lOP. CORck NER �1 i+sit 2+1es5 uWENT % _ AI + 2+27.7e 1 ��� x � I% 3+e3.92 e+ee.9] Ro.C9RNFR 1 u1M NwLA j,ewol# P /� 2A 7 +OI,+ WENT �� 31I: 1 f0+6137 NT 1 1 +27./I a++ WENT i 11 t 1 ..... NT Yr ILr.STO. / r 'IA%Wv >reel i CRIB Strom Ag"DIS ANCES KA+04_. . .. ... - _- - . LT.510. O LT.SM. YON �x / 2 elCl F- N0.03 3 x 4 Neaa406 E-11/.6 ` Ni"W l 11W-.3i ar - r r .1 e -- -- -- x _ s7r41 11 es .es 7 r 7 stra2la 11 7e e P APPROVAL • 1+ AGAWAM (A�/'� p �Q,� n r e sztsoa ss.97 F _ ! l9 510'93 ae E- 130.24 1 t �C 7M 1 11 E14r s!E- ee.ae 12 �'t 'Nlaf 1'13"W 1 WEBT- 11e7.ee 13 - 14 N iM9 Nea 'sa'w 1... . .. :. n r ....Ia-.. a Norse x - a! ! 15 1 aE�! 15 Nee•II to - t is is mrm - 1pp 01 1 MLtt>.Sm` WARF1OM L� _ �x1PrUINE 1 - At to 4 �i1011tl�10 a -x 1 a 20 "r-m I -ee0 3I x . . .. N64'2!1 — 7 21 2 t 1 _ I k L . x Na os .es 1 9+00 .. .. . .. / WEST- 1147.ee'PLOD SCL,LE� 1'se0' F'Re No.:62092197 RErERENCE DRAWINGS REVISIONS Mto C OATE -I -1wr wxwwc No nRE OR$*=N0. 7RtE No. DATE RLwficS ■Et a a � CNFCXEp aW nAa N�PxOh E0 ZzjeRY Zw"FLE E' -C a-F-YF- 1 e- 1 R ROW a NO '3'0 oRIr1111G COORe, nK 9.TE -�-d PLOT PLAN r1w Tennessee DNTE 9E1c,1 wK STATION NO. 261 Tennessee Gas Pipeline C. Gas Pipeline OISCPLRIEFNX, DATE - um. WE 1615 Suffield Street an El Paso company a 9a "ae °"` 1 =e9 WAMPDEN COUNTY, frIASSACNUSETi5 TE—C261--Al-YA-01 A- A —_—__—.__,----- —..._..---__--_—__—..-----.___—__—__—._ MATERIAL LIST ! CODE QUANTITY UNITS DESCRIPTION NBR C A/R CY CONCRETE,READY MIX,MIN, 4090 PSI,COMPRESSION STRENGTM OOI ITEM INTENTIONALLY LEFT BLANK j HEAT TRACE SAMPLE LINE 002 I ENCASED 1H 4' SCH.BO PVC. (TYP.) i ) C 4 FT REINFORCING BAR,STL„NO B,bD GRADE. 9D3 I (SEE NOTE 7) SAMPLE STREAM BOX C 4 CA ANCHOR BOLTS. 3/4' DIA.x 25' DVERALL LENGTH INCLUDING 4 IH 004 SEE DETAIL -10% t ; 1 HOOK ONE CHI ,3 IN. THDS,OTHER END,V/1 HEX NUT. TYPE J, i DVG. TE-C2S1-F3-YA--01A-2: SI M1LD CARBON STL.,PER TT-A-13-5A N.S+OO I i B' X 10' I i C 4 CA PLATE,1/2' 1K.M 3' VD.x 4 LG.,OALV. STL. 005 iEGM/CHROMATOGRAPH BLDG. .............................-.............-..............._-_-..._....__.,...._,..,............,.......,........ ;................_.................,................,.....,..,.i C 2 FT SIINOTUBE IN' DI A, 006 I 200-2 SUCTION SWPLE TAP (MOTE 30 I C BAY STATE (SPRINGFIELD DELIVERY)SAMPLE TAP (NOTE'10) NDTE 0)SCHARGE GAS SAMPLE TAP j SUPPLIER CODES BERKSHIRE POWER SAMPLE TAP (MOTE ]0) , I E(OR RWOK) -SUPPLIED BY EL PASO ENERGY (EITHER PURCWt5ED. ( CHROMATEIGRAPH N.7+50' SUPPORT P]ERS BUILDING N,7+50' TRANSFERRED OR PRE-ORDERED) -- sE »£TAIL 1�� [ ---^ j t-CONTRACTOR SUPPLIED MI ONUMENT `E THfs DWG. MONUMENT N.7+I 6'-4 3 1 6" /\ a0I I V-VENDER SUPPLIED I THE CONTRACTOR IS CAUTIONED THAT QUANTITIES SHOWN OR THIS SHEET GpE SHOULD BE VERIFIED BY IA4TERIAI TAKE-OFf REVIEW.MATERIALS LISTED N.7+00 f, CONTROL I BUBBLES IN TIME DRAM UMOATXM"PACKAILS AGE WILLDETAIL BE ONLY. L............................,...........-..._..._.__...1.._.------__._..._...._._.._.._____..._._...__..._....__...-...n._.._.. .._.._..._....... .........._-._..._.._.._.-.....-..-_.._.._._ _......_._._..._......-_......._.._..-__......,-- -.._._.._..__.__._._-.._.-....._......._ ASSOCIATED WITH THE w� W, ON THIS DRAWING ARE FOR 3 i I ANY OTHER MATERIAL BUBBL 1 IS 7NG "' BLDG. " D" """'{ H TERKI, LIST DRAWNG TE-C201-F3-YA-DUI-1M.. L.o. , I I v STORAGE +! TANK N o+3 t 171 + 1 h3 } L.i! MONUMkNT ' W 6+55' w MONUMENT I NL• I I � I� NLv 6+48 i N.6+33'�3," I I LT. STD. AIR I N .6+20' STORAGEI _ I N.6+00 C E I I ,I I•T win TANK c�5+ s ._...-._ _ .......... ++ M III IiI ._..... _._..__......_.............. POOLS rn 7 " CNI +} +!+ +N T e . . + STORAGE M! N.5+47'-8 11 F" + w N.5+53' I ! FN-5+50' Mf N TANK W La L.D. z1LJ w N.5+37' La N,5+40' RUNDOWN TANK ; LT. COMP. r SEPTIC: COMP STD BLDGMP'C" BLDG. "D" + TANK a BLDG. "A" N. N.5+00 w IN.5+00' 5+02'-8" COMP00 . I LT. STD. + - o BLDG. I AIR 8 + STORAGE In i rn '6 I TANK w 1 Do CDNC. PACTS ! j + ''n LT. STD i ❑ LT. STD. N.4+00 L — _ — �- W N.a+Oo_-. _ l N.4+00' . _ -.-- -----_-�---- - -- --� -_0f.5+40' - 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 GENERAL MOM: + + + + + + + + 1.CONTOC70R SHALL ADO A 2 POLE,60 AMP CIRCUIT BREAKER TO THE DISTRIBUTION PANEL ly "i III 1Q 11� OR O) M THE EXISTING EOM BUILDING AND SUB-FLED THE DISTRIBUTION PANEL IN THE NEW EON ILDO. W LL1 LMJ LLJ Ld Lil LLj BULDING. CONDUIT ROUTINE SHALL BE OETEMNED BY CONDITIONS FOUNO AT THE JOGSFIE DETAIL BUMN11 ACTUAL CONSTRUCTON_pTum Irar n n rr 2.CONTRACTOR SHALL COORpMATE WITH LOCAL TELEPHONE COMPANYµ o TOP AREA e- 4" I ENLARGED PLAN A PERSONNEL TO NAVE A NEW PHONE LINE INSTALLED N THE NEW EGM BUILDING, IF It 15 4 DEEMED APPROPRIATE TO EXTEND THE EXISTING PHONE UIE FROM THE EXISTING E0M BUILDING INTO THE NEW EGM BULDING,THE CONTRACTOR SHALL MAKE PROVISIONS TO DO SCALE: 1'>•40' SO- 3.A CLASS 1 ON15OM 1 AREA CLASSIFICATION SHALL EXIST FOR ALL AREAS WITHIN A S' RADIUS OF ANY ABOVE GROUND pROCESS PIPING WHICH MAY INCLUDE FLANGES.VALVES. ILOW-DFTS,VENTING OR EXHAUST.A CLASS 1 DIVISION 2 AREA SMALL EXTEND FROM A j IS'RADIUS PROR GROUND DN f ANY ABOVE GUND PROCESS AS DESCRIBED.A GLASS 1 ISION 1 GRADEAREA$RAUL EXIST THIR THE TERIOR OF ANY NGS OR ' PROCESS PIPING(((43 IDLSCRIBEDMABOVE))OR EQUIPMENT IS INSTALLED.VAULTS LASS 1R DIVISION 2 AREA SHALL DMND FOR A 10' ROWS BEYOND THOSE LIMITS AS DESCRIBED. B 3/4' CONTRACTOR SHALL USE ONLY MATERIALS LISTED AND RATED TOR USE IN THESE Y9T ~""•�` ems. CLASSIFIED AREAS. THIS DETAIL o BLDG. A I FOUNDATION 4.CHROMA.00RAPN SAMPLE STREAM SHALL ORIGINATE FROM THE EXISTING 1/2'VALVE 1 { �a f LOCATED BETWEEN THE BLOCK VALVE AND THE CHECK VALVE ON THE ARM GROUND INLET to . 01 s p PPIPING.1 i s.� '-Y 4 1 r 3 S.CONTRACTOR SHALL LOCATE AND MSTAL,L BUILDING PIERS FOR SUPPORT OF THE NEW EOM n T qr STA110F1_'° �" BILLING AS SHOWN ON PIER DETAILS- GRADE B0 fB 140. 3ZE>fi6 4.THIS DRAWING REPRESENTS THE BEST IHFDRMATION FGUND AT THE TIME DF DESDN- g EIMFOBAR F`AM'.: ',.' ���,.,.��1, �TY ACTUAL CONSTRUCTION WHICH MAYONTACION SHALL MAKE NOT BE THE OWN THIS POUND DPAWMG.E JOBSITE DURING (NOTE) "•A ,, " * \" of 1f of n 7.CDNOUR AMO TUBING WHICH MIRY BE SHOWN ON THIS DRAWING ARE SHOWN `� ow, SECTION 1 A-1 A SECTION 1 B-1 B DETERMINE SE"`SST ROUTL0NTRACTOR NIS BASED SHAM CO*OffIiaS FOUND ATATE WITH TTiHE`R�iTE UD RMGL TAACTUAL Is' SQIIOTUBE It B' LG. f -.•.,'y CONSTRUCTION. REMOVE AFTER INSTALLATION '••v. SCALE 3/32'-1' SCALE:3/32..1' '•'r: REF.THIS DETAIL VET-TF•S DETAIL S.COWTkW R SMALL GROUND THE SKID OF THE NEW EOM BUILDIN/G,ANY CONDUR STUB-UP OiN GREEN 0 GRAD 'SKIN NY SMALL BE GROUNDED PY 0R"ORAJNG AND TAPPING FOR AN !IDLES: APPROPRIATE SERYM POSE.CONDUIT AND RRTRUMENT STANDS SRALL USE AN APPROPRIATE 1_If DIOOMG BECOMES DIFFICULT•OR SOUR ROCK 4 ENCOUNTERED WHILE ODGING,AND PER GROUND CLAMP.THE /2 GROIINIHIM CONDUCTOR SMALL BE RUN NO LESS THAN 24" BELOW DEPTH IS AT LEAST 3'FROM NATURAL GRADE AND 1' BELOW ASSUMED FROST LINE,THE ,y ` �41 GRADE TO THE EKISTI METER STATOR GROUNDING GSD.CONTRACTOR SHALL LOCATE PIERS CAM BE LESS THAN B DEEP.IF PIER IS LESS THAN W-O'OEE►.THE/S STEEL IIv T 1�i"" EXISTING GROUND 0R10 AND EXTEND OROUHINNO CONDUCTORS AS RECURRED. GROUNDING REINFORCING BAR SHALL REST ON TNB BOTTOM OF INC HOLE, CONDUCTORS SHALL BE ATTACHED TO EXISTING GROUND GRID BY EXOTHERMIC WELDS. USING _ THE PPOPEN MOLDS AND CARTRDGEL EXOTHERMIC WELDS SHALL THEN BE WRAPPED AA2.AGGREGATE SIZE SHALL BE N0 LARGER THAN 3/4%CONTRACTOR SHALL ADD A PLASTICIZER ` PROTECTED FROM WrEMMTK)TI AS REDIRRED_ TO THE CONCRETE MIX, 1. CONTRACTOR SHALL ENSURE THAT NEAT TRICE TUBING 5 FLO FROM A On PROTECTED DETAIL "1" DA. cIRCUIT- SCALE:3/32'>< T' �L� 10 ry .FOR SAMPLE PROVE DETAILS SEE DETAILS'2', 'S'.OR 'It'.BWO.TE-C2e1-F3-VA-01A-2_ EGLI NG WND4TION fF T (4 RECURRED) File No.:03677572 _ - REFERENCE C)RGROW M. REVISIONS SG LD BY C 'I 'D' MATOG P ION T,FRRY EARLEY 9AMarMG Ilo. TREE oRAWRIc M. TITLE LID. DUE REMARK: Rom. CX9. .APP. Tennessee .UK GATT 6-6-DI ENLARGED PLAN "A" sDPERMapI RIW DINE B-5-01 43PIanGas Pipeline D� LIAR TpTIaN p g1 Tennessee Gas Pipeline Co. H DA _,_ , 1DA R&Y2bAd Street El Paso company E°o'D3"7 sP �E: 1 .40 HAMPDEN COUNTY, MASSACHUS£TTS TE—C261434A—n 2