Town of Agawam
36 Main Street Agawam, Massachusetts 01001-1837
Mpy` Tel. 413-786-0400 Fax 413-786-9927 Q
y
r
March 5, 2004
On rr
I HEREBY CERTIFY THAT THESE ARE TRUE COPIES OF THE APPROVED CHANCES
TO THE SUBDIVISION RULES AND REGULATIONS OF THE AGAWAM PLANNING
BOARD.
APPROVED MARCH 4, 2004
VOTE: 3 YES - 0 NO
ATTEST:
char M. Theroux, Town Clerk
J�4�
od-1/y.
6 �7 - '7 i�F C2
�� 9 Town of Aawam
g
40
36 Main Street Agawam, Massachusetts 01001-1837.
ATE0 Ma`1 TeI. 413-786-0400 Fax 413-786-9927
PLANNING BOARD
March 5, 2004
Recorder of Land
Old Court Housc Rm. 408
Boston, MA 02108
To Whom It May Concern:
Attached please find a copy of amendments to the Agawam PIanning Board Subdivision Rules
and Regulations which were approved on March 4, 2004.
Sincerely,
Dennis B. Hopkins, Chairman
AGAWAM PLANNING BOARD
DBH/DSD:pre
cc: Hampden County Registrar of Deeds
Town Clerk
File
Town of Agaftm i
Subdivision Regulation Amendment
This procedure shall be added to Section 159-12. E. of the Subdivision Regulations
LOT GRADING PLAN PROCEDURES
The Town of Agawam requires the following procedure to be followed for lot grading plans for
all subdivisions approved after Jan. 1, 2004.
Review Scope - This review/approval process will address drainage and runoff concerns for the
lot in question, adjacent lots, and the subdivision as a whole only. The elevation of the
foundation is reviewed for comparison to adjacent grades, and generally for comparison to
adjacent homes. This review does not address the constructability of the foundation or the
building layout proposed.
Procedure Overview
Step 1. Lot Grading Plan Approval - The owner's engineer/surveyor submits information for
review and approval to Agawam DPW Engineering. It is hoped that the owner is part of this
process in order to expedite Step 2.
Step 2. Builder/Owner Sign-Off-The owner and builder send a letter to DPW indicating that
the approved Lot Grading Plan will be complied with during construction. The owner/builder
sign-off, including all information shown in the sample letter, must be forwarded to DPW within
one week after Step 1 is complete. The white form will be forwarded-from-DPW to the
Building Dept. for the Building Permit after this step is complete.
Step 3. Construction Field Check-The builder/owner will contact DPW Engineering to
schedule a field check on the top of foundation wall to ensure compliance with the approved lot
grading plan. The builder/owner must allow a 48 hour window for DPW to perform the field
check. DPW is available Monday thru Friday 8:30 am to 4:30 pm, except holidays. The builder
will be contacted by Agawam DPW with the results of the field check. Failure by the builder to
com 1 with The a roved Lot Gradin Plan will result i DP noti in he Plan Lng Board,
The Planning Board will then request the Building Department to iskue a Stop Work Or de
for the lor until a resolution can be agreed upon.
Page 1
T D L
DPW Engineering a val is required before the white farm 1 be forwarded to the Building
Department.
The following information, at a minimum, will be required for each Lot Grading Plan
submittal.
Location(Street Address)
Owner's Name
Lot number
Scale,North arrow, and revision date
Note indicating local bench location and elevation used
Professional engineer/licensed surveyor stamp and signature
Layout and location of building foundation
Locations and spot grades (as needed) of all proposed yard drains,swales,retaining
walls,sewer cleanouts, septic systems, wetland resources, streams,easements, buffers,
tree line, existing/proposed pipes, manholes, or other structures found on lot.
Maximum lawn grades of 3:I
Water service location (5 ft min. cover)
Sanitary service location(4 ft min. cover)
Note specifying the minimum cover requirements for the services must be included,
Sanitary service must have 4 ft. cover minimum.
Water service must have 5 ft. cover minimum."
Existing and proposed 2 ft contours within the lot
Existing 2 ft contours at least 20 feet into adjacent lots within subdivision. Any
previously approved grading plans on nearby lots must be taken into consideration.
Existing 2 ft. contours at least 50 feet into adjacent lots outside of subdivision.
Note indicating the tie-in or direction of roof drains
Elevation of the top of the foundation wall,at all levels as needed - garage etc.
Spot elevations of proposed finished grade at the comers of the building foundation
Spot elevations throughout the lot/at all property lines (every 50 ft.), including back
proposed sidewalk elevations.
Spot elevation of gutter at the driveway centerline
If field conditions require a change from the approved plan during construction, the
engineer/surveyor shall submit a revised lot grading plan to Engineering for approval,befo e
changes are implemented.
Page 2
STEP 2. OW R a d BlUILDER
SIGN-OFF LETTER
Submit to DPW within one week of DPW approval of Lot Grading Plan
Required submission to DPW Engineering before the white form will be forwarded to the Building
Department. Once the grading plan is approved by DPW Engineering,the lot OWNER AND
BUILDER BOTH must submit a letter to DPW Engineering acknowledging the information
shown on the approved grading plan and agreeing that the lot will be graded and the elevation of
the foundation will be built according to its details. A copy of the approved Lot Grading Plan
must be attached to the Owner and Builder Sign-Off Letter.
IMPORTANT: Failure of the builder to follow the approved Lot Grading Plan may result in
alterations being required to the building, the site, and possibly including the alteration of the
foundation walls, in order to comply with the approved grading plan.
Sample er and Builder Sign-Off Le er: All pertinent information shown in this
sample letter must be included in the submittal to DPW.
To: Agawam DPW Engineering Date:
Town Hall, 36 Main St.
Agawam, MA 01001
1, the owner of Lot , # Stree� t Name and within
the Subdivision,and I, the builder of the home
at this location have reviewed the approved lot grading plan. We understand the information that is
shown on the attached plan Revision Date. We agree to comply with the information
specified within the lot grading plan. If any significant alterations are wanted, we will have the
engineer/surveyor submit a revised lot grading plan to Agawam DPW Engineering for approval. The
builder must not begin the construction of any changes until a new approval has been received from
Agawam DPW Engineering.
The Town of Agawam will not be held responsible, by the owner or builder, for any costs incurred
in order to comply with the Lot Grading Plan approval process or to reconstruct any structures in
order to comply with the approved Lot Grading Plan. (Attach a copy of the approved Lot Grading
Plan.)
Sincerely,
owner , builder
Lot , St.
Attachment: Lot Approved Grading Plan - Revision Date
Page 3
{
SIEP 3 DPW Elcyation Field Check
Scheduling a field_check_by DPW
Call 786-0400 x275 or x278 to schedule a field check of the top of wall elevation. Field checks
will be performed by DPW within 48 hours of notification, Monday thru Friday 8:30am to
4:30pm excluding weekends and holidays.
When scheduling this field check please give the following information to DPW Engineering:
Where is the location? Subdivision Lot#
When will the site be ready for the top of wall elevation check? Day Time
Who should DPW contact with the information on compliance with the lot grading plan?
Contact Name Phone Number
The top of wall elevation must come within one foot of the approved top of wall elevation as
shown on the approved Lot Grading Plan.
Compliance with approved Lot Gradi Ian
If the top of foundation wall is not within one foot of the approved top of wall elevation, DPW
will inform the Planning Board, who will request the Building Department to issue a Stop Work
Order for construction on the lot until the issue is resolved.
Page 4
The following will be given to the contractor(if on-site) at the time of the DPW field check of the
top of wall elevation.
Building Fou!jdation Elevatiog Ejeld Chec_k Contact Name
Phone Number
Scheduled Time:
Office Information
Date
Lot#- Address
Approved Grading Plan Top of Wall Elevation
by
Field Data
Bench Description Bench elevation
Foundation Elevation Measurement Location
Foundation Elevation Measurement
Field Sketch (optional)
Measurements Taken by
This field check information is for the contractor's use to assist with compliance of the approved lot
grading plan. This field check does not imply approval by Agawam DPW of the construction of the
foundation. It is the contractor's responsibility to comply with the approved lot grading plan
regardless of the presence of a DPW inspector on site or information given during the field check.
This DPW field check does not take the place of any Building Dept. requirements or inspections.
IMPORTANT: Failure of the builder to follow the approved Lot Grading Plan may
result in alterations being required to the building, the site, and possibly including the
alteration of the foundation walls, in order to comply with the approved grading plan.
S:/PW/town code changes/lot grading plan/memos/grading plan procedures three steps RV March 1 04.wpd
Page 5
Town of Ag am
Subdivision Regulation Amendment
This procedure shall added to Section 159-12. E. of the Subdivision Regulations
LOT GRADING PLAN PROCEDURES
The Town of Agawam requires the following procedure to be followed for lot grading plans for
all subdivisions approved after Jan. 1, 2004.
Review Scope - This review/approval process will address drainage and runoff concerns for the
lot in question, adjacent lots, and the subdivision as a whole only. The elevation of the
foundation is reviewed for comparison to adjacent grades, and generally for comparison to
adjacent homes. This review does not address the constructability of the foundation or the
building layout proposed.
Procedure Overview
Step 1. Lot Grading Plan Approval - The owner's engineer/surveyor submits information for
review and approval to Agawam DPW Engineering. It is hoped that the owner is part of this
process in order to expedite Step 2.
Step 2. Builder/Owner Sign-Off- The owner and builder send a letter to DPW indicating that
the approved Lot Grading Plan will be complied with during construction. The owner/builder
sign-off, including all information shown in the sample letter, must be forwarded to DPW within
one week after Step 1 is complete. The white form will be forwarded from DPW to the
Building Dept. for the Building Permit after this step is complete.
Step 3. Construction Field Check- The builder/owner will contact DPW Engineering to
schedule a field check on the top of foundation wall to ensure compliance with the approved lot
grading plan. The builder/owner must allow a 48 hour window for DPW to perform the field
check. DPW is available Monday thru Friday 8:30 am to 4:30 pm, except holidays. The builder
will be contacted by Agawam DPW with the results of the field check. Failure by the builder to
comply With h the approved Lot Grading Plan will resuh in DPW noti&i_'n_g Lhe Planning Board
The Planning Board will then request the BuildingDWartment to issue a Stop Work Order
or the lot until a resolution can be agreed upon.
Page 1
STEP )l. LOT GRANG PLAN APPROVAL •
DPW Engineering approval is required before the white form will be forwarded to the Building
Department.
The following information, at a minimum,will be required for each Lot Grading Plan
submittal.
Location(Street Address)
Owner's Name
Lot number
Scale,North arrow, and revision date
Professional engineer/licensed surveyor stamp and signature
Layout and location of building foundation
Locations and spot grades (as needed) of all proposed yard drains, swales, retaining
walls, sewer cleanouts, septic systems,wetland resources, streams, easements, buffers,
tree line, existing/proposed pipes, manholes, or other structures found on lot.
Maximum lawn grades of 3:1
Water service location (5 ft min. cover)
Sanitary service location (4 ft min. cover)
Note specifying the minimum cover requirements for the services must be included,
" Sanitary service must have 4 ft. cover minimum.
Water service must have 5 ft. cover minimum."
Existing and proposed 2 ft contours within the lot
Existing 2 ft contours at least 20 feet into adjacent lots within subdivision. Any
previously approved grading plans on nearby lots must be taken into consideration.
Existing 2 ft. contours at least 50 feet into adjacent lots outside of subdivision.
Note indicating the tie-in or direction of roof drains
Elevation of the top of the foundation wall,'at all levels as needed - garage etc.
Spot elevations of proposed finished grade at the corners of the building foundation
Spot elevations throughout the lot/at all property lines (every 50 ft.), including back of
proposed sidewalk elevations.
Spot elevation of gutter at the driveway centerline
Page 2
• •
STEP_ 2. OWNER and BUILDER
SIGN-OFF LETTER
Submit to DPW within one week of DPW approval of Lot Grading Plan
Required submission to DPW Engineering before the white form will be forwarded to the Building
Department. Once the grading plan is approved by DPW Engineering, the lot OWNER AND
BUILDER BOTH must submit a letter to DPW Engineering acknowledging the information
shown on the approved grading plan and agreeing that the lot will be graded and the elevation of
the foundation will be built according to its details. A copy of the approved Lot Grading Plan
must be attached to the Owner and Builder Sign-Off Letter.
IMPORTANT: Failure of the builder to follow the approved Lot Grading Plan may result in
alterations being required to the building, the site, and possibly including the alteration of the
foundation walls, in order to comply with the approved grading plan.
Sample Qwner and Builder Sign-Off Letter: All pertinent information shown in this
sample letter must be included in the submittal to DPW.
To: Agawam DPW Engineering Date:
Town Hall, 36 Main St.
Agawam, MA 01001
I, the owner of Lot , # Street-Name and within
the Subdivision,and I, the builder of the home
at this location have reviewed the approved lot grading plan. We understand the information that is
shown on the attached plan Revision Date. We agree to comply with the information
specified within the lot grading plan. If any significant alterations are wanted, we will have the
engineer/surveyor submit a revised lot grading plan to Agawam DPW Engineering for approval. The
builder must not begin the construction of any changes until a new approval has been received from
Agawam DPW Engineering.
The Town of Agawam will not be held responsible, by the owner or builder, for any costs incurred
in order to comply with the Lot Grading Plan approval process or to reconstruct any structures in
order to comply with the approved Lot Grading Plan. (Attach a copy of the approved Lot Grading
Plan.)
Sincerely,
owner , builder
Lot St.
Attachment: Lot_Approved Grading Plan - Revision Date
Page 3
STEP 3. DPW Elevation Field Check
Scheduling a field check by DPW
Call 786-0400 x275 or x278 to schedule a field check of the top of wall elevation. Field checks
will be performed by DPW within 48 hours of notification, Monday thru Friday 8:30ain to
4:30pm excluding weekends and holidays.
When scheduling this field check please give the following information to DPW Engineering:
Where is the location? Subdivision Lot#
When will the site be ready for the top of wall elevation check? Day Time
Who should DPW contact with the information on compliance with the lot grading plan?
Contact Name Phone Number
The top of wall elevation must come within one,foot of the approved top of wall elevation as
shown on the approved Lot Grading Plan.
Compliance with approved Lot Grading Plan
If the top of foundation wall is not within one foot of the approved top of wall elevation, DPW
will inform the Planning Board, who will request the Building Department to issue a Stop Work
Order for construction on the lot until the issue is resolved.
Page 4
0
The following will be given to the contractor(if on-site) at the time of the DPW field check of the
top of wall elevation.
Building Foundation Elevation Field Check Contact Name
Phone Number
Scheduled Time:
Office Information
Date
Lot# Address
Approved Grading Plan Top of Wall Elevation
by
Field Data
Bench Description Bench elevation
Foundation Elevation Measurement Location
Foundation Elevation Measurement
Field Sketch(optional)
Measurements Taken by
This field check information is for the contractor's use to assist with compliance of the approved lot
grading plan. This field check does not imply approval by Agawam DPW of the construction of the
foundation. It is the contractor's responsibility to comply with the approved lot grading plan
regardless of the presence of a DPW inspector on site or information given during the field check.
This DPW field check does not take the place of any Building Dept. requirements or inspections.
IMPORTANT: Failure of the builder to follow the approved Lot Grading Plan may
result in alterations being required to the building, the site, and possibly including the
alteration of the foundation walls, in order to comply with the approved grading plan.
SJPW/town code changesAot grading planlmemos/grading plan procedures three steps RV March 104.wpd
Page 5
TOWN OF AGAWAM Ilk
o
INTEROFFICE
z
MEMORANDUM
To: Planning Board
CC: John Stone, DPW Supt. / File
From: Engineering
Date: Feb. 18, 2004
Subject: Proposed New Lot Grading Plan Procedure
The attached proposal is a revised Lot Grading Plan procedure for subdivision construction.
The purpose of these changes is to address concerns and problems with this process in the past.
During my first five months serving as the Town Engineer in Agawam, there have been problems
with the speed of lot grading plan reviews and compliance with the approved lot grading plan by
the builder or owner. The proposed changes to this procedure are aimed at ensuring that the
engineer 1 surveyor is aware of all information which the Engineering Division needs to review
a submittal. Another change is to get an owner/builder sign-off on the approved Lot Grading Plan
before DPW approval of the building permit goes to the Building Department. This is targeting
improved compliance with the approved grading plan. To further assist the owner / builder, DPW
is offering to field check foundation form elevations within a 48 hour window Monday thru
Friday.
I welcome any comments on this new draft procedure. It is my hope that the changes to this
procedure will help all involved get through the lot grading plan approval and implementation
successfully. Thank you for your consideration of this new procedure.
Sincerely,v
rgZng�iVer711
oy P.E.
wn
SAPM258 Town Code Changes/lot grading planlmemo to planning board.wpd
Town of
Ag aAm - DPW Policy 'Rffective: DRAFT
LOT GRADING PLAN PROCEDURES
The Department of Public Works, Town of Agawam requires the following procedure to be
followed for all lot grading plans for all subdivisions approved after Jan. 1, 2004.
STEP 1. LOT GRADING PLAN APPROVAL
DPW Engineering approval is required before the white form will be forwarded to the Building
Department.
The following information, at a minimum, will be required for each Lot Grading Plan
submittal.
Location (Street Address)
Owner's Name
Lot number
Scale,North arrow, and revision date
Professional engineer/licensed surveyor stamp and signature
Layout and location of building foundation
Locations and spot grades (as needed) of all proposed yard drains, swales, retaining
walls, sewer cleanouts, septic systems, wetland resources, streams, easements, buffers,
tree line, existing/proposed pipes, manholes, or other structures found on lot.
Maximum lawn grades of 3:1
Water service location (5 ft min. cover)
Sanitary service location (4 ft min. cover)
Note specifying the minimum cover requirements for the services must be included,
" Sanitary service must have 4 ft. cover minimum.
Water service must have 5 ft. cover minimum."
Existing and proposed 2 ft contours within the lot
Existing 2 ft contours at least 20 feet into adjacent lots within subdivision. Any
previously approved grading plans on nearby lots must be taken into consideration.
Existing 2 ft. contours at least 50 feet into adjacent lots outside of subdivision.
Note indicating the tie-in or direction of roof drains
Elevation of the top of the foundation wall, at all levels as needed - garage etc.
Spot elevations of proposed finished grade at the corners of the building foundation
i
0
Lot Grading Plans - Page 2
Spot elevations throughout the lot/at all property lines (every 50 ft.), including back of
walk elevations.
Spot elevation of gutter at the driveway centerline
STEP 2, OWNER and BUILDER
SIGN-OFF LETTER_
Required submission to DPW Engineering before the white form will be forwarded to the Building
Department. Once the grading plan is approved by DPW Engineering, the lot OWNER AND
BUILDER BOTH must submit a letter to DPW Engineering acknowledging the information
shown on the approved grading plan and agreeing that the lot will be graded and the home will be
built according to its details. A copy of the approved Lot Grading Plan must be attached to the
Owner and Builder Sign-Off Letter.
Sample Owner and_Builder Sign-Off Letter:
To: Agawam DPW Engineering Date:
Town Hall, 36 Main St.
Agawam, MA 01001
I, the owner of Lot , # Street Name and within
the Subdivision, and I, the builder of the home
at this location have reviewed the approved lot grading plan. We understand the information that is
shown on the attached plan Revision Date. We agree to comply with the information
specified within the lot grading plan. If any significant alterations are wanted, We will have the
engineer/surveyor submit a revised lot grading plan to Agawam DPW Engineering for approval. The
builder must not begin the construction of any changes until a new approval has been received from
Agawam DPW Engineering. I will not hold the Town of Agawam responsible for any costs incurred
in order to comply with the Lot Grading Plan approval process or to reconstruct any structures in
order to comply with the approved Lot Grading Plan. (Attach a copy of the approved Lot Grading
Plan.)
Sincerely,
owner , builder
Lot St.
Attachment: Lot_Approved Grading Plan - Revision Date
IMPORTANT: Failure of the builder to follow the approved Lot Grading Plan
may result in alterations being required to the building, the site, and possibly
including the alteration of the foundation walls, in order to comply with the
approved grading plan. DPW Engineering may be contacted at 786-0400 x 275, to field
check the elevation of the foundation forms BEFORE the concrete is poured to assist in this
process. 48 hour advanced notice is required Monday thru Friday only.
S:/subdiv/woodside/memas/grading plan procedures jan 9 04 two steps.wpd
i
AGAWAM PLANNING BOARD
The Agawam Planning Board will hold a public hearing on Thursday, February 19, 2004 at 7:15
PM at the Agawam Public Library, 750 Cooper Street, Agawam, MA. The purpose of this
hearing will be to hear the petition of the Agawam Planning Board for an amendment to the
Subdivision Rules and Regulations regarding a new grading plan procedure.
Per order of the AGAWAM PLANNING BOARD
To be run 2/5 & 2/12/04.