Loading...
8290_SITE PLAN - ECO SPRFLD-LLC- M STREET EXT. an `own of Agawam 36 Main Street Agawam, Massachusetts 01001-1837 Ma Tel. 413-786-0400 Fax 413-786-9927 a p PLANNING BOARD . c.a 1 April 2, 2004 eco/Springfield, LLC P.O. Box 609 Agawam,MA 01001-0609 To Whom It May Concern: At its duly called meeting held on April 1, 2004, the Agawam Planning Board voted to approve the site.plan entitled "Energy Answers Corporation, 188 M Street Extension, Carbon Filter Bulding, Proposed Site Plan", prepared by Hill Engineers Architects Planners and dated 1/28/04, revised 3/19/04. If you have any questions,please contact this office at 786-0400, extension 283. Sincerely, asp Dennis B. Hopkins, Chairman AGAWAM PLANNING BOARD DBH:pre cc: Building Inspector ZBA Engineering Dept. Town Clerk File AGAWAM OFFICE OF PLANNING & COMMUNITY DEVELOPMENT SITE PLAN REVIEW REVIEWER: D. Dachos DATE: March 31, 2004 DATE RECEIVED: February 26, 2004 DISTRIBUTION DATE: March ], 2004 PLANNING BOARD MEETING DATE: April 1, 2004 APPLICANT INFORMATION 1. Name of Business: Pioneer Valley Resource Recovery Facility Address: 188 M Street Ext., Agawam, MA 2. Owner: Eco/Springfield, LLC Address: P.O. Box 609, Agawam, MA 01001 Telephone. 785-5120 Fax: 731-6481 3. Engineer: Hill Engineers, Architects, Planners Address: 50 Depot Street, Dalton, Ma 01226 Telephone: 684-0925 Fax: 684-0267 PLAN REVIEW Scale: 1"=40' Date: January 28, 2004, revised March 19, 2004 Title Block (Street Address, Applicant's Name, Address, Scale, Name of Preparer of Plan): O.K. Description of Project: Proposed construction of a 18' X 30' building to house an activated carbon injection system at the Pioneer Valley Resource Recovery Facility. Site Plan Review Page 2 Description of Site: Site is on the grounds of the resource recovery facility and is partially pave with trap rock and bituminous concrete. Building is proposed to be located on the river side of the existing building. A Notice of Intent must be submitted to the Conservation Commission. Provision for Traffic Flow: Unchanged. Parking: Unchanged. ~ Drainage: See Engineering comments. Public Utilities: Not provided. Landscaping/Screening and Buffers: Not provided. The following landscape note must be placed on the plan: "All plantings must be maintained and that portion of the public way abutting the parcel and including the treebelt shall be maintained in a safe and attractive condition by the owner of the parcel." Sign Location: Unchanged. Exterior Lighting: Not provided. Rendering or Elevations: Not provided. Dempster Location: N.A. Other Comments or Concerns: 9 0 To TAN oF A GA wAm INTEROFFICE MEMORANDUM To: Planning Board CC: Hill Engineers Architects Planners, file From: Engineering Division Date: March 29, 2004 Subject: Site Plan 436 - 188 M Street Ext. - eco/Springfield, LLC Per your request dated March 1, 2004, we have reviewed the Site Plan entitled, "Carbon Filter Building, Prepared For: Energy Answers Corp., 188 M Street Extension; Prepared By: Hill Engineers Architects Planners, Scale 1" = 40'; Proposed Site Plan, Date: 2/4/04, Rev. 3/19/04", and I have the following comments: From a site visit, it was determined that the proposed location of the Carbon Filter Building is in an area in which a major portion is paved and a portion has trap rock covering pervious or impervious material. The existing drainage system which serves this site outlets to the Connecticut River. This existing `private' drainage system is owned and maintained by the City of Springfield. Its flows do not impact the Agawam public drainage system. The construction of the proposed building within the existing impervious area should not significantly impact flows to this drainage outfall. It is recommended that sediment and erosion control measures be implemented at the site to keep soils out of the existing drainage system during the construction phase. This should be addressed in the submittal described below. Upon review of the revised information and consultation with the Conservation Commission, it is recommended that the proposer submit a Notice of Intent relating to this work. This submittal is required due to the construction of the building at the edge of the 200'Riverfront Area. Construction operations will impact the 200' buffer. Once approved, please submit the construction phase best management practices from the N.O.1 to include in this site plan submission.. If you have questions, please do not hesitate to contact our division. ; Si cerely, 7 Ge ganne J oym , P.E. ` T Engineer h:1engineeASP4436 ECO spfld reivew march 04.wpd ! • Town of Agawam oil , ' 36 Main Street Agawam, Massachusetts 01001-1837 `1 Tel. 413-786-0400 Fax 413-786-9927 Q MP . MEMO TO: Engineering Department FROM: Planning Board SUBJECT: Revised Site Plan - eco/Springfield LLC - M Street DATE: March 25, 2004 Attached, for your use, is a revised plan received today from Hill Engineers. This item appears on the Board's April 1' agenda. DSD:pre • 0 � Hiii }� engineers architects planners LETTER OF TRANSMITTAL log, i Date:March 23, 2004 To: Town of Agawam 36 Main Street Job File No.: EAC-3 Agawam MA 01001 ATTN: Pam Edmonds Re: Proposed Carbon Filter Building I 1 WE ARE SENDING YOU: [X] Attached [ ] Under separate cover via the following items: [ ] Shop Drawings [X] Prints [ ] Plans [ ] Samples [ ) Specifications 1 [ ] Copy of Letter [ ] Change Order i COPIES DWG. NO. REV. DESCRIPTION - - n I 3 EAC 3 Ll B Proposed Site Plan � THESE ARE TRANSMITTED as checked below: [ ] For Approval ( ] No Exceptions Taken [ ] Resubmit Copies for Approval [X] For Your Use [ ] Make Corrections Noted [ ] Submit Copies for Distribution, [ ] As Requested { ] Amend and Resubmit [ ] Return Corrected Prints [ ] For Review & Comment [ ] Rejected [ ] [ ] FORBIDS DUE: 20_ TIME: { ] PRINTS RETURNED AFTER LOAN TO US Pam, Here are three copies of the site plan for E;NC showing a modified Riverfront Area based on the Mean Annual High Water as.observed by our field crew while.,the were surveying the area�Georgeanne requested the three copies-of the plan; If the town requires 66�!`ddditional information, pleasev, -:rrie-`a"call Ken Boudreau Hill Engineering COPY TO: �j SIGNED: if enclosures are not as noted,kindly notify us at once. 50 Depot Street • Dalton, Massachusetts 01226 . (413) 684-0925 TELEFAX (413) 684-0267 • Email: hill@hillengineers.com � I To wN OF AGA wAm 0 INTEROFFICE 'y - �pTE0 MEMOR4NDUM To: Planning Board CC: File From: Engineering Division Date: March 17,2004 Subject: Site Plan 436 - 188 M Street Ext. - eco/Springfield, LLC Per your request dated March 1, 2004, we have reviewed the Site Plan entitled, "Carbon Filter Building, Prepared For: Energy Answers Corp., 188 M Street Extension; Prepared By: Hill Engineers Architects Planners, Scale V =40; Proposed Site Plan, Date: 2/4/04",and I have the following comments: I have requested additional information from Hill Engineers concerning the Mean Annual High Water boundary of the Connecticut River and the on-site drainage system. Once I receive this additional information, I will forward my final comments to the Planning Board. If you have questions, please do not hesitate to contact our division. SkganneJ.dioym P.E. Engineer h:IengineerLV143G ECOspJld reivewmarch 04.wpd Sr I I AGAWAM FIRE DEPARTMENT FIRES 800 Main Street • Agawam , MA 01001 Telephone (413) 786-0657 Fax (413) 786-1241 Inter"Office mo To: Planning Board From: Day' Pis no Chief Regarding: o Sp in a d, L C 3/2/0 The fire department has no objections or comments for the building proposal at M Street Ext, eco/Springfield at this time. MEMO TO: Engineering Department, Police Department, Fire Department FROM: Planning Board SUBJECT: Site Plan - M Street Ext. - eco/Springfield, LLC DATE: March 1, 2004 Please review and comment on the attached Site Plan for eco/Springfield, LLC prior to the Board's March 18' meeting. Thank you. DSD:pre i TOWN OF AGAWA 36 MAIN STREET AGAWAM, MA 01001 BOARD OF APPEALS M MEMO DATE: February 26, 2004 TO: Planning Board FROM: Board of Appeals RE: Site Plans for: ECO Springfield LLC Attached please find 10 copies of the site plan for the above referenced property. These plans are for your review and comments, and any recommendations you may have so we can consider these recommendations and comments in our final decision. If you do not respond to this Board within thirty-five (35) days of the above referenced date, we will assume that you have no objections. 0 AGAWAM PLANNING BOARD Form D Application for Site Plan Approval Please complete the following form and return it and 10 copies of the Site Plan to: Agawam Building Department 36 Main Street Agawam, MA 01001 1. Name of Business Pioneer Valley Resource Recovery Facility Address 188 M Street Ext. , Town of Agawam Telephone (413) 785-5120 Fax (413) 731-6481 2. Name of Applicant/owner eco/Springfield, LLC Address PO Box 609, Town of Agawam, MA 01001 Telephone (413) 785-5120 Fax (413) 731-6481 3. Name of Engineer/Architect Hill,-Engineers, Architects, Planners Address 50 Depot Street, Dalton, MA 01226 Telephone (413) 684-0925 _ __Fax (413) 684-0267 4. Please give a brief description of the proposed project: See attached description-and proposed site plan. Revised 8/14103 0 Description of Proposed Project eco/Springfield, LLC ("eco Springfield") is proposing to install and operate an activated carbon injection system at the Pioneer Valley Resource Recovery Facility ("the Facility"). The activated carbon injection system is designed to further reduce the emissions of mercury from the Facility in accordance with regulations promulgated by the United States Environmental Protection Agency ("the USEPA") and the Massachusetts Department of Environmental Protection ("the MADEP"). The proposed equipment will provide conformance with the USEPA's implementation plan for air emissions from small municipal waste combustors. It should also be noted that eco/Springfield has voluntarily agreed to meet the MADEP's more stringent mercury standard for large combustors at 310 CMR 7.08, which standard would otherwise not apply to the small combustors at the Facility. The proposed activated carbon technology involves the introduction of activated carbon into the flue gas from each combustor so as to provide the means for mercury to be adsorbed from the flue gas onto the surface of the carbon particles, which would then be collected in the existing fabric filters at the Facility. A similar activated carbon injection system which we installed and are operating at our Pittsfield Resource Recovery Facility has significantly reduced the already low emissions of mercury from that facility. Associated with the proposed installation of the activated carbon system is construction of a building enclosure on the site of the Facility for housing associated equipment. The equipment to be housed includes 3 Porta-Pac units, each consisting of a replaceable 900-pound super sack of activated carbon, volumetric feeder and regenerative blower. The proposed location of the building enclosure is shown on the attached, proposed site plan, Drawing No. EAG3-LI. The proposed enclosure will be a free standing metal building and concrete slab designed to applicable Massachusetts Building Codes. The building will be approximately 18 feet high by 18 feet deep by 30 feet long. The Porta-Pac units will be placed approximately 8 feet apart in line across the 30 foot face of the building. � : i ;�._ i _ I CD 001 JOB a - LOG # c TL4 BOX # DOCUMENT# j PAGE # i i II I I fI I